US 641 (Lyon/Caldwell)

Untitled design (4).jpg

Notice of Public Information Meeting       

Eddyville to Fredonia

The U.S. 641 project, from Eddyville to Fredonia, aims to better connect the region and improve safety and mobility. The proposed expansion would connect with a recently completed US 641 improvement project between Fredonia and Marion and extend the corridor improvements to Eddyville, near the Interstate 69/US 62 interchange.

The Kentucky Transportation Cabinet is currently studying potential routes for the road with a goal of selecting a preferred alternative that will be shared with the public when its engineering studies are completed.

Among the key factors being considered by KYTC are:

  • Safety
  • Impacts to farms, homes, businesses, private and public properties
  • Current and long-term transportation needs
  • Wetland impacts
  • Cost to complete


The Cabinet has reviewed more than a dozen potential routes in the area shown below but HAS NOT yet selected a preferred route or set a timetable for the start of construction on the project.

641-2-2 (1).jpg 


Latest News:

Check Back Soon for Updates

Resources:

US 641 Corridor Study (July 2005)

US 641 VE Study (2008)

December 2018 US 641 Press Release

 

 

For Questions or comments contact Chris Kuntz, P.E.

 

  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
5501 Kentucky Dam RoadPaducahKY42003KY7:00 a.m.-3:30 p.m. CST, M-F(270) 898-2431(270) 898-7457mailto:KYTC.District1Info@ky.govhttps://www.google.com/maps/place/5501+Kentucky+Dam+Rd,+Paducah,+KY+42003/@37.0167252,-88.5290865,17z/data=!3m1!4b1!4m5!3m4!1s0x887a14658fd80d33:0xf619b92c1a7ad180!8m2!3d37.0167209!4d-88.5268978https://www.facebook.com/KYTCDistrict1
District Map
Click a District number to view more information. 
 

Follow Us