Interstate 65 in Louisville will close between the Watterson Expressway (I-264) and downtown Louisville (Jefferson Street) from June 1- July 31 to speed progress on replacing 3 aging bridges.
The closure will save at least a year of construction restrictions, and a signed detour will be in place. Local street closures and ramp closures will also be needed.
Learn more at I65CentralCorridor.com.

District 7 Permits

  • Electronic Submittal of Completed and Signed Encroachment Permit Application (Form TC 99-1A)
  • Note:  Proposed entrance location is to be marked in the field by the applicant.
     
For Commercial Permits & Utility Permits:
  • Electronic Submittal (PDF) of Completed and Signed Encroachment Permit Application (Form TC 99-1A)
  • Electronic Submittal (PDF) of all Supplemental Documents (Detailed Plans, Drawings, Traffic Control Plan, etc.)
  • Send all Documents  to RobertA​.Baker@ky.gov.
  • For Locates​ near state owned lighting and signals, please fill out the  Locates Request Form.  The District requires 3-5 business days to complete locate requests. 
 
When an Indemnity is required, an Encroachment Permit Bond form (TC 99-7) or a Cashier’s Check (payable to the Kentucky State Treasurer) must be remitted.  Indemnity amounts vary and are related to the amount of impact on Right of Way.  A notarized Power of Attorney Document shall accompany the bond.
 
Permits application will not be logged into the Kentucky Encroachment Permit Tracking (KEPT) system for internal review until all documents are received.

​This page is maintained by Ricky.Sizemore@ky.gov, who may be contacted to make corrections or changes.

Department of Aviation

Airport Zoning Commission

Department of Rural and Municipal Aid

Local Programs
Local Public Agencies

Department of Vehicle Regulation

Drive.ky.gov
Motor Vehicle Commission

Powered by Google TranslateTranslate