Planning Studies & Reports

​​​​​​

​Below you will find electronic links to all reports for planning studies conducted by the KYTC Division of Planning from 2004 to present (and a few from 2000 through 2003).  These studies resulted from Highway Plan projects, the Statewide Transportation Planning process, or by special federal or state initiatives.  Several key elements have been included within the study process.  These include preliminary purpose and need, public input, project alternatives, socioeconomic and environmental impacts, cost-effectiveness, and scheduling.  You can search for documents by district and by project name. Please phone or e-mail using the contact information on this page if you need to access studies conducted by the KYTC Division of Planning prior to 2004.

Interstate 66

Linking Kentucky (Statewide Corridor Plan)

Search by District

Click on the map below to filter the list of projects, below, to those in your area.

  
County
  
  
  
  
District 3WarrenSmiths Grove Traffic Operations Study2024
District 3MonroeTurkey Neck Bend Bridge Feasibility Study20243-80200.00
District 3SimpsonFranklin SUA Study2024
District 3WarrenUS 231-68-68X Intersection Improvement Study2022
District 3, District 8Adair, Barren, Metcalfe, Pulaski, RussellCumberland Expressway Upgrade Study2022
District 3WarrenI-65 New Interchange Feasibility Study20213-402.00
District 3WarrenKentucky and Adams Streets Improvement Study2020
District 3Warren​Russellville Road (US 68X and US 231X) Planning Study2019
District 3WarrenUS 31W KY 446 Scoping Study2016
District 3BarrenGlasgow Small Urban Area Study2016
District 3BarrenKY 90 Scoping Study20163-8819.00
District 3WarrenUS 231 Scottsville Road Scoping and Traffic Operations Study20153-8702.00
District 3, District 4Green, MetcalfeUS 68 Scoping Study20153-203.00
District 2, District 3Butler, Daviess, Henderson, Ohio, WarrenI-69, I-66/I-65 Spurs and US 60 Connection Strategic Planning Corridor Study20142-85.00
District 3ToddGuthrie "Knot" Alternatives Planning Study20113-8630.00
District 3WarrenUS 31W Scoping Study20103-131.00
District 3WarrenElrod Road/Natcher Parkway Interchange Study20093-130.00
District 3MonroeKY 163 South Alternates Planning Study20083-8310.00
District 3Allen, SimpsonKY 100 Alternatives Study20083-8303.00
District 3MetcalfeKY 163 Alternatives Study20073-129.00
District 3WarrenUS 231/I 65 Interchange Study2007
District 3, District 8Cumberland, MetcalfeKY 90 Pre-Design Scoping Study20078-136.00
District 3SimpsonKY 1008 Pre-Design Scoping Study20043-106.00
District 3WarrenBowling Green SUA2000
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
200 Mero StreetFrankfortKY40601KY8:00am-4:30pm EST, M-F(502) 564-7183http://maps.google.com/maps?hl=en&q=200+mero+street+frankfort+ky&ie=UTF8&hq=&hnear=200+Mero+St,+Frankfort,+Franklin,+Kentucky+40601&gl=us&sqi=2&z=16&iwloc=A

This page is maintained by steven.drake@ky.gov, who may be contacted to make corrections or changes.

Follow Us