| | 001 | 10/28/2004 | 12/17/2004 | Delineators at NarrowShoulder Bridges | Updated Spec. reference; See Design Memo No. 13A-88 |
| | 002 | 12/1/1999 | 8/21/2000 | Delineators for Guardrail | See Design Memo No. 11-91 |
| | 003 | 12/1/1999 | 8/21/2000 | Treatment of Open Sinkholes | See Design Memo No. 07-92; Design Change |
| | 004 | 4/15/2008 | 7/25/2008 | Concrete Barrier Wall Type 9T | To allow alternate positive connection See note no. 8 |
| | 005 | 4/15/2008 | 7/25/2008 | Type D Breakaway Sign Support | Revised note no. 4 to "Allow concrete to cure at least 5 days before erecting sign." |
| | 006 | 4/15/2008 | 7/25/2008 | Woven Wire Fence Type 1 | Revised note no. 1 "...shall comply with ASTM A 702..." |
| | 007 | 4/15/2008 | 7/25/2008 | Treatment of Embankments at Bridge End-Bents | Corrected formula in Note no. 8 "...H/2 or 50' Min..." |
| | 008 | 4/15/2008 | 7/25/2008 | Box Beam Stiffening of Temporary Concrete Barrier | New Drawing, for use with 9T barrier walls within 3 feet of bridge deck edge etc. See note no.1 |
| | 009 | 4/25/2008 | 7/25/2008 | Culvert, Entrance, & Storm Sewer Pipe Types & Cover Heights | Removed old note no. 11 Allows PVC and HDPE to be used on National Highway System and for Storm Sewers |
| | 010 | 4/25/2008 | 7/25/2008 | Culvert, Entrance, & Storm Sewer Pipe Types & Cover Heights | Removed old note no. 10 Allows PVC and HDPE to be used on National Highway System and for Storm Sewers |
| | 011 | 4/25/2008 | 7/25/2008 | Culvert & Storm Sewer Pipe Types & Cover Heights | Removed old note no. 9 Allows PVC and HDPE to be used on National Highway System and for Storm Sewers |
| | 012 | 3/13/2009 | 4/24/2009 | Concrete Entrance Pavement and Sidewalk | Added "with traffic control devices" to Note 11. |
| | 013 | 3/13/2009 | 4/24/2009 | Concrete Entrance Pavement and Sidewalk | Added "with traffic control devices" to Note 10. |
| | 014 | 12/15/2008 | 2/13/2009 | Sidewalk Ramps | Added "Retrofit" Grades on Note 1. Changed Detectable Warnings from incidental to a separate bid item. |
| | 015 | 3/13/2009 | 4/24/2009 | Truncated Domes | Added "with traffic control devices" to Note 3. |
| | 016 | 3/13/2009 | 4/24/2009 | Approach Slab | Changed notes in Typical Section @ Bridge End to correspond with RGX-105 |
| | 017 | 3/13/2009 | 4/24/2009 | Centerline Rumble Strips Placement | New Drawing to show placement of centerline rumble strips on 2 lane highways and 4 lane undivided highways. |
| | 018 | 3/13/2009 | 4/24/2009 | Centerline Rumble Strips 4 Inch Striping | New Drawing to show placement of 4 inch striping with centerline rumble strips on 2 lane highways and 4 lane undivided highways. |
| | 019 | 3/13/2009 | 4/24/2009 | Centerline Rumble Strips 6 Inch Striping | New Drawing to show placement of 6 inch striping with centerline rumble strips on 2 lane highways and 4 lane undivided highways. |
| | 021 | 5/20/2009 | 8/21/2009 | Turf Mat Slope Installation | New Drawing to enhance the performance of vegetative linings or covers. |
| | 022 | 5/20/2009 | 8/21/2009 | Turf Mat Channel Installation | New Drawing to enhance the performance of vegetative linings or covers |
| | | 12/10/2024 | 1/23/2025 | SEPIA 095 STEEL THRIE BEAM BULLNOSE TERMINAL COVER PAGE | NEW |
| | | 12/10/2024 | 1/23/2025 | SHEET 001 SYMMETRICAL BULLNOSE | |
| | | 12/10/2024 | 1/23/2025 | SHEET 002 ASYMMETRICAL BULLNOSE | NEW |
| | | 12/10/2024 | 1/23/2025 | SHEET 004 GRADING AT BULLNOSE | NEW |
| | | 12/10/2024 | 1/23/2025 | SHEET 005 NOSE AND ANCHOR DETAILS | NEW |
| | | 12/10/2024 | 1/23/2025 | SHEET 003 BULLNOSE TERMINAL INSTALLATION LAYOUT | NEW |
| | | 12/10/2024 | 1/23/2025 | SHEET 006 POST DETAILS | NEW |
| | | 12/10/2024 | 1/23/2025 | SHEET 007 POST BLOCK AND HARDWARE DETAILS | NEW |
| | | 12/10/2024 | 1/23/2025 | SHEET 008 SLOTTED THRIE BEAM RAIL | NEW |