Kentucky Riverport Improvement Grant Program

​​​​​​​​​​​​​


Official Guidance:
 
Administration Links:
·        Public Riverport Authority KRS 65.510 to KRS 65.650
·        Obtaining Quotes or Bids (Link)
·        KYTC List of Work Items (Link)
·        KYTC List of Prequalified Contractors (Link)
·        KYTC List of Approved Materials (Link)
·        KYTC LPA Project Administration (Link)
 
Construction Standards:
·        KYTC Highway Design Manual (Link)
·        KYTC Standard Drawings (Link)
·        KYTC Drainage Manual (Link)
·        KYTC Structural Design Manual (Link)
·        KYTC Standard Specifications for Road and Bridge Construction, edition 2008 as revised (Link)
·        American Railway Engineering and Maintenance of Way Association (AREMA) Manual for Railway Engineering (MRE) (Link)
·        American Association of State Highway Transportation Officials’ (AASHTO) Policy on Geometric Design of Highways and Streets (Link)
·        Institute of Transportation Engineers Manual on Uniform Traffic Control Devices (MUTCD) (Link)
  
Contacts:
Jeremy Edgeworth
KYTC Division of Planning
P: (502) 782-5095
 
 
Documents:
Affidavits
             Closeout Checklist
             KY Riverport Planning Tool
 
Past Projects:
Below is a list of projects with funding contributions from the KRI program.  For more information about a project, please email Jeremy.Edgeworth@ky.gov or contact the appropriate riverport as listed.
 
Year
Applicant
Project Title
Awarded
FY 13
Eddyville
Dock Repairs
$32,500.00
FY 14
Eddyville
Grain Elevator Ramp Improvements #1
$22,750.00
FY 14
Eddyville
Security Gate Addition
$7,500.00
FY 14
Eddyville
Grain Elevator Ramp Improvements #2
$13,750.00
FY 15
Eddyville
Port Road Widening
$18,000.00
FY 15
Eddyville
Asphalt Overlay
$16,500.00
FY 16
Eddyville
Agri Port Road Widening
$39,250.00
FY 17
Eddyville
Truck Queuing and Grain Pit
Improvements
$75,000.00
FY 20​Eddyville​Realignment of Agri-Chem Access Road​$49,780.00
​FY 20​Eddyville​Roll-Up Garage Doors for Truck Pit$10,000.00​
FY 21EddyvilleSheet Pile Shoring Walls Near Boat Repair Bay Project$109,890.00
FY 21EddyvilleGuardrail Installation Along Pit #2$48,415.00​
FY 22​Eddyville​Dock Tieback Repairs$126,500.00​
FY 23
​Eddyville
​Barge Positioning Winch System
$105,058.00​
​FY 23
​Eddyville
​Laydown Yard
$110,229.00​
​​FY 24
​Eddyville
​CAT 330 Hydraulic Excavator
$184,061.00
 
 
 Total
$969,183.00
FY 15
Greenup-Boyd
Asphalt Loading Facility
$93,122.50
FY 16
Greenup-Boyd
Crossings & Crosstie Repair
$64,215.00
 
 
 Total
$157,337.50
FY 13
Henderson
Dock Pavement Repairs-Replacement
$41,130.00
FY 14
Henderson
Railroad Bed Improvement
$61,760.00
FY 14
Henderson
Barge Access Catwalk
$37,000.00
FY 15
Henderson
Road Paving Project
$25,000.00
FY 17
Henderson
Crane Restoration
$250,000.00
​FY 20​Henderson​Forklift Replacement/Truck Hopper​$137,500.00
FY 21HendersonMooring Dolphin Replacement$108,000.00
​FY 24

​Henderson
​​Automated Truck Scale
$122,000.00
 
 
 Total
$782,390.00
FY 13
Hickman
Barge Access Catwalk
$45,996.00
FY 14
Hickman
Scale Access Improvement
$36,087.50
FY 14
Hickman
Dock Dredging
$27,500.00
FY 15
Hickman
Port Road Access
$15,000.00
FY 15
Hickman
Cargill Access Road Paving
$87,346.50
FY 16
Hickman
Dock Dredging #2
$25,075.00
FY 16
Hickman
Crane Replacement
$200,000.00
FY 16
Hickman
Grain Conveyor Access Improvement
$5,425.00
FY 17
Hickman
Dock Dredging #3
$25,200.00
FY 17
Hickman
Crane Bridge Resurface/Warehouse Repairs
$60,000.00
FY 18​Hickman​Conveyor Upgrade$135,000.00
​FY 19Hickman​Dock Dredging$32,400.00
FY 19HickmanDock Forklift$29,025.00
​FY 22​HickmanFront End Loader$136,265.00​
​FY 23
​Hickman
​Mooring Dock Cell Repair
​$50,000.00
​FY 23
​Hickman
​Dock Dredging
​$31,800.00
 
 
 Total
$942,120.00
FY 13
Louisville
Riverport Railroad Rehab #1
$62,055.00
FY 14
Louisville
Riverport Railroad Rehab #2
$50,000.00
FY 14
Louisville
Bulk Terminal Access Road Paving
$37,500.00
FY 15
Louisville
Riverport Railroad Rehab #3
$55,555.00
​FY 18​Louisville​Railroad Rehab #4​$96,750.00
FY 19LouisvilleRiverport Rail Tie Replacement #5$106,025.00
FY 20​Louisville​Riverport Rail Tie Replacement #6​$150,000.00
FY 21LouisvilleRiverport Rail Tie Replacement #7$95,792.00
 
 
 Total
$653,677.00
FY 13
Owensboro
Railroad Maintenance
$26,384.25
FY 13
Owensboro
Harbor Road Entrance Replacement/Resurface
$91,932.00
FY 14
Owensboro
Primary Access Road Paving
$115,000.00
FY 14
Owensboro
Access Drive Spur
$50,000.00
FY 15
Owensboro
Scale Access Improvement
$105,826.00
FY 15
Owensboro
Grain Access Improvement
$83,650.00
FY 16
Owensboro
Railroad Maintenance & Repair
$88,257.50
FY 16
Owensboro
Solvay Milling Facility Paving
$77,777.50
FY 17
Owensboro
Inner Loop Road
$33,704.50
FY 18​Owensboro​Truck/Trailer Staging Area​$180,000.00
FY 19​Owensboro​Improve Gravel Access Roads​$96,330.00
​FY 19​Owensboro​Off Road 4x2 Semi Tractors$116,220.00
​FY 20​Owensboro​Railroad Maintenance and Repair$100,101.00​
​FY 20​Owensboro​Compact Track Loader (Skid Steer)$34,480.00​
​FY 20Owensboro​Erosion Control (Riprap)$28,139.00​
FY 21OwensboroFront End Loader Replacement$120,082.00
​FY 22​OwensboroCompact Track Loader$34,807.00​
​FY 23
​Owensboro
​Bucket for Liebherr LH 120
​$57,490.00
​FY 23
​Owensboro
​Caterpillar 903D Wheel Loader
​$36,790.00
​FY 23
​Owensboro
​Grapple for Sennebogen 875
$35,912.00
​FY 24
​Owensboro
​​25,000 lb Forklift
$115,859.60
​FY 24
​Owensboro
​Compact Track Loader
$31,399.83
​FY 24
​Owensboro
​10,000 lb Forklift
​$16,169.57
 
 
 Total
$1,676,311.75
FY 13
Paducah
Dock Improvement
$100,000.00
FY 13
Paducah
Conveyor Rehab/Maintenance
$50,000.00
FY 17
Paducah
Dock Dredging #1
$39,730.00
FY 17
Paducah
Truck Scale Replacement
$45,541.00
​FY 18​Paducah​Conveyor Refurbish  $88,200.00
​FY 19​Paducah​Container on Barge​$72,734.00
FY 21PaducahRiver Belt Discharge Chute Refurbishment$16,236.00
​FY 22​Paducah​Clamshell Bucket Replacement$23,625.00​
​FY 23
​Paducah
​Bulk Commodity Receiving Hopper
​$72,721.00
​​FY 24
​Paducah
​4th Street Concrete Aprons
$30,510.00
 
 
 Total
$539,297.00