Kentucky Riverport Improvement (KRI) Program

​​​​​​​​​​​​​​​​​​​​


Official Guidance:
 
Administration Links:
·        Public Riverport Authority KRS 65.510 to KRS 65.650
·        Obtaining Quotes or Bids (Link)
·        KYTC List of Work Items (Link)
·        KYTC List of Prequalified Contractors (Link)
·        KYTC List of Approved Materials (Link)
·        KYTC LPA Project Administration (Link)
 
Construction Standards:
·        KYTC Highway Design Manual (Link)
·        KYTC Standard Drawings (Link)
·        KYTC Drainage Manual (Link)
·        KYTC Structural Design Manual (Link)
·        KYTC Standard Specifications for Road and Bridge Construction, edition 2008 as revised (Link)
·        American Railway Engineering and Maintenance of Way Association (AREMA) Manual for Railway Engineering (MRE) (Link)
·        American Association of State Highway Transportation Officials’ (AASHTO) Policy on Geometric Design of Highways and Streets (Link)
·        Institute of Transportation Engineers Manual on Uniform Traffic Control Devices (MUTCD) (Link)
  
Contacts:
Jeremy Edgeworth
KYTC Division of Planning
Phone: (502) 782-5095
 
 
Documents:
Affidavits
             Closeout Checklist
             KY Riverport Planning Tool
 
Past Projects:
Below is a list of projects with funding contributions from the KRI program.  For more information about a project, please email Jeremy.Edgeworth@ky.gov or contact the appropriate riverport as listed.
 
Year
Applicant
Project Title
Awarded
FY 13
Eddyville
Dock Repairs
$32,500.00
FY 14
Eddyville
Grain Elevator Ramp Improvements #1
$22,750.00
FY 14
Eddyville
Security Gate Addition
$7,500.00
FY 14
Eddyville
Grain Elevator Ramp Improvements #2
$13,750.00
FY 15
Eddyville
Port Road Widening
$18,000.00
FY 15
Eddyville
Asphalt Overlay
$16,500.00
FY 16
Eddyville
Agri Port Road Widening
$39,250.00
FY 17
Eddyville
Truck Queuing and Grain Pit
Improvements
$75,000.00
FY 20​Eddyville​Realignment of Agri-Chem Access Road​$49,780.00
​FY 20​Eddyville​Roll-Up Garage Doors for Truck Pit$10,000.00​
FY 21EddyvilleSheet Pile Shoring Walls Near Boat Repair Bay Project$109,890.00
FY 21EddyvilleGuardrail Installation Along Pit #2$48,415.00​
FY 22​Eddyville​Dock Tieback Repairs$126,500.00​
FY 23
​Eddyville
​Barge Positioning Winch System
$105,058.00​
​FY 23
​Eddyville
​Laydown Yard
$110,229.00​
​​FY 24
​Eddyville
​CAT 330 Hydraulic Excavator
$184,061.00
​FY 26
​Eddyville
​​Port Authority Road Paving
$91,928.00
 
 
 Total
$1,061,111.00
FY 15
Greenup-Boyd
Asphalt Loading Facility
$93,122.50
FY 16
Greenup-Boyd
Crossings & Crosstie Repair
$64,215.00
 
 
 Total
$157,337.50
FY 13
Henderson
Dock Pavement Repairs-Replacement
$41,130.00
FY 14
Henderson
Railroad Bed Improvement
$61,760.00
FY 14
Henderson
Barge Access Catwalk
$37,000.00
FY 15
Henderson
Road Paving Project
$25,000.00
FY 17
Henderson
Crane Restoration
$250,000.00
​FY 20​Henderson​Forklift Replacement/Truck Hopper​$137,500.00
FY 21HendersonMooring Dolphin Replacement$108,000.00
​FY 24
​Henderson
​​Automated Truck Scale
$122,000.00
​FY 25
​Henderson
​15,500 lb Forklift
​​$95,360.00
​FY 25
​Henderson
​​12,000 lb Forklift
$27,413.00
​FY 26
​Henderson
​​Dock Staging Pad
$76,472.00
 
 
 Total
$981,635.00
FY 13
Hickman
Barge Access Catwalk
$45,996.00
FY 14
Hickman
Scale Access Improvement
$36,087.50
FY 14
Hickman
Dock Dredging
$27,500.00
FY 15
Hickman
Port Road Access
$15,000.00
FY 15
Hickman
Cargill Access Road Paving
$87,346.50
FY 16
Hickman
Dock Dredging #2
$25,075.00
FY 16
Hickman
Crane Replacement
$200,000.00
FY 16
Hickman
Grain Conveyor Access Improvement
$5,425.00
FY 17
Hickman
Dock Dredging #3
$25,200.00
FY 17
Hickman
Crane Bridge Resurface/Warehouse Repairs
$60,000.00
FY 18​Hickman​Conveyor Upgrade$135,000.00
​FY 19Hickman​Dock Dredging #4$32,400.00
FY 19HickmanDock Forklift$29,025.00
​FY 22​HickmanFront End Loader$136,265.00​
​FY 23
​Hickman
​Mooring Dock Cell Repair
​$50,000.00
​FY 23
​Hickman
​Dock Dredging #5
​$31,800.00
​FY 25
​Hickman
​​Dock Dredging #6
$65,376.00
​FY 25
​Hickman
​Spreader Bar & Coil Hooks
​​$19,600.00
 
 
 Total
$1,027,096.00
FY 13
Louisville
Riverport Railroad Rehab #1
$62,055.00
FY 14
Louisville
Riverport Railroad Rehab #2
$50,000.00
FY 14
Louisville
Bulk Terminal Access Road Paving
$37,500.00
FY 15
Louisville
Riverport Railroad Rehab #3
$55,555.00
​FY 18​Louisville​Railroad Rehab #4​$96,750.00
FY 19LouisvilleRiverport Rail Tie Replacement #5$106,025.00
FY 20​Louisville​Riverport Rail Tie Replacement #6​$150,000.00
FY 21LouisvilleRiverport Rail Tie Replacement #7$95,792.00
​FY 25
​Louisville
​​Caterpillar 255 Skid Steer
$65,207.000
​FY 26
​Louisville
​Barge Cover Handling System
​​$91,662.00
 
 
 Total
$810,546.00
FY 13
Owensboro
Railroad Maintenance
$26,384.25
FY 13
Owensboro
Harbor Road Entrance Replacement/Resurface
$91,932.00
FY 14
Owensboro
Primary Access Road Paving
$115,000.00
FY 14
Owensboro
Access Drive Spur
$50,000.00
FY 15
Owensboro
Scale Access Improvement
$105,826.00
FY 15
Owensboro
Grain Access Improvement
$83,650.00
FY 16
Owensboro
Railroad Maintenance & Repair
$88,257.50
FY 16
Owensboro
Solvay Milling Facility Paving
$77,777.50
FY 17
Owensboro
Inner Loop Road
$33,704.50
FY 18​Owensboro​Truck/Trailer Staging Area​$180,000.00
FY 19​Owensboro​Improve Gravel Access Roads​$96,330.00
​FY 19​Owensboro​Off Road 4x2 Semi Tractors$116,220.00
​FY 20​Owensboro​Railroad Maintenance and Repair$100,101.00​
​FY 20​Owensboro​Compact Track Loader (Skid Steer)$34,480.00​
​FY 20Owensboro​Erosion Control (Riprap)$28,139.00​
FY 21OwensboroFront End Loader Replacement$120,082.00
​FY 22​OwensboroCompact Track Loader$34,807.00​
​FY 23
​Owensboro
​Bucket for Liebherr LH 120
​$57,490.00
​FY 23
​Owensboro
​Caterpillar 903D Wheel Loader
​$36,790.00
​FY 23
​Owensboro
​Grapple for Sennebogen 875
$35,912.00
​FY 24
​Owensboro
​​25,000 lb Forklift
$115,859.60
​FY 24
​Owensboro
​Compact Track Loader
$31,399.83
​FY 24
​Owensboro
​10,000 lb Forklift
​$16,169.57
​FY 25
​Owensboro
​Low Road Loadout
​​$152,749.00
​FY 26
​​Owensboro
​Two CAT 255 Compact Track Loaders
$143,938.00
 
 
 Total
$1,972,998.75
FY 13
Paducah
Dock Improvement
$100,000.00
FY 13
Paducah
Conveyor Rehab/Maintenance
$50,000.00
FY 17
Paducah
Dock Dredging #1
$39,730.00
FY 17
Paducah
Truck Scale Replacement
$45,541.00
​FY 18​Paducah​Conveyor Refurbish  $88,200.00
​FY 19​Paducah​Container on Barge​$72,734.00
FY 21PaducahRiver Belt Discharge Chute Refurbishment$16,236.00
​FY 22​Paducah​Clamshell Bucket Replacement$23,625.00​
​FY 23
​Paducah
​Bulk Commodity Receiving Hopper
​$72,721.00
​​FY 24
​Paducah
​4th Street Concrete Aprons
$30,510.00
​FY 25​
​Paducah
​Bobcat S650 Skid Steer Loader
$46,055.00
​FY 25
​Paducah
​48-Foot Flatbad
​​$28,240.00
​FY 26
​Paducah
​Mobile Crane
​​$96,000.00
 
 
 Total
$709,592.00

​This page is maintained by Jacob.Rice@ky.gov, who may be contacted to make corrections or changes.​​​

Department of Aviation

Department of Aviation
Airport Zoning Commission

Department of Rural and Municipal Aid

Local Programs
Local Public Agencies

Department of Vehicle Regulation

Drive.ky.gov
Motor Vehicle Commission

Powered by Google TranslateTranslate