Interstate 65 in Louisville will close between the Watterson Expressway (I-264) and downtown Louisville (Jefferson Street) from June 1- July 31 to speed progress on replacing 3 aging bridges.
The closure will save at least a year of construction restrictions, and a signed detour will be in place. Local street closures and ramp closures will also be needed.
Learn more at I65CentralCorridor.com.

Concrete

​​​​

Spreadsheet for Maturity Meter Curves

  • Version 1.1, 40 kb, Excel 7.0 format, updated 11/15/2002.

Precast/Prestressed Concrete Manual

  • 3.10 Mb, 56 pages, updated 02/08/2008.

Concrete Plant Application

  • 11 kb, 4 pages, updated 10/19/2004.

Reinforced Concrete Pipe Pre-Installation Inspection & Repair Manual

  • 8.04 Mb, 66 pages, updated 01/14/2014.

Scale Report for Concrete Plants TC64-316

  • 137 kb, 2 pages, updated 07/14/2014.

Precast Box Culvert Kentucky Table 1

  • 734 kb, 16 pages, updated 09/23/2014.

Concrete Mobile Calibration Data Sheet

  • 19 kb, 1 page, updated 06/13/2016.

Running Average Spreadsheet - KM 64-314

  • Excel 2016 format, 40 kb, updated 06/13/2018.

Concrete Equipment Checklist

  • 99 kb, 3 pages, updated 06/19/2019.
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
1227 Wilkinson BoulevardFrankfortKY40601KY8:00am-4:30pm EST, M-F(502) 564-3160(502) 564-7034https://www.google.com/maps/place/Division+of+Materials/@38.2176751,-84.8612573,15z/data=!4m5!3m4!1s0x0:0x4b63114ae8d477bb!8m2!3d38.2176751!4d-84.8612573

​This page is maintained by Jason.Dickison@ky.gov, who may be contacted to make corrections or changes.

Department of Aviation

Airport Zoning Commission

Department of Rural and Municipal Aid

Local Programs
Local Public Agencies

Department of Vehicle Regulation

Drive.ky.gov
Motor Vehicle Commission

Powered by Google TranslateTranslate