Jefferson County | |
I-64 East and West | Traffic Impacts: Lane closures and traffic shifts are possible. Date/Time: Daily and nightly. Project Limits: I-64 East and West at mile point 11.799, near Exit 10 (Cannons Lane) on I-64 West, and near Exit 12 to I-264 (Watterson Expressway) on I-64 East. Type of Work: Bridge replacement project. Other Details: *Westbound traffic is currently shifted to the outer shoulders. The eastbound traffic shift is now scheduled for Sunday, April 27, after being delayed by recent inclement weather. Construction will begin in the median once the eastbound shift is in place. Two 11-foot lanes will remain open in each direction for the duration of the project.
|
I-65 South (John F. Kennedy Memorial Bridge) | Date/Time: Once expansion joints have been fabricated as part of the expansion joint replacement project, additional details regarding the project's timing will be shared. Project Limits: I-65 South (John F. Kennedy Memorial Bridge). Other Details: The project is expected to be completed by April 2026, and intermittent lane closures are to be anticipated throughout the duration of construction. |
KY 155 (Taylorsville Road) | Traffic Impacts: Shoulder closures are possible. Date/Time: Daily from 7 a.m. to 5 p.m. beginning Monday, April 28. Project Limits: KY 155 (Taylorsville Road) from Old Taylorsville Road to Hatmaker Trail. Type of Work: Punch list items. |
KY 841 North and South (Gene Snyder Freeway) | Traffic Impacts: Single lane closures are possible. Date/Time: Beginning Monday, April 28, through Saturday, May 3. Daily – 9 a.m. to 3 p.m. | Nightly – 7 p.m. to 5 a.m. Project Limits: KY 841 North and South (Gene Snyder Freeway), between mile points 35.0 and 37.7, near and through the East End Tunnel. Type of Work: Routine maintenance of the roadway and East End Tunnel. Other Details: Motorists should heed signage, use caution, and adjust commutes to accommodate the lane closures. |
KY 864 (Logan Street/Shelby Street) | Traffic Impacts: Sidewalk and lane closures are possible. Date/Time: Daily and nightly. Project Limits: Between Goss Avenue and East Gray Street. Type of Work: One-way to two-way conversion of the roadway. Other Details: Work is underway ahead of asphalt resurfacing and the two-way conversion of the roadway. *Work was temporarily paused on this project as KYTC engineers coordinated with contractors and utility providers to reduce utility conflicts along the corridor. Major work is expected to resume this Spring, with full completion expected by the Spring of 2026. |
KY 1819 (Billtown Road) | Traffic Impacts: Lane closures and delays are possible. Date/Time: Daily – 9 a.m. to 4 p.m. Project Limits: Three sections of KY 1819 (Billtown Road): - Easum Road through Mary Dell Lane
- Michael Edward Drive through Fairground Road
- Shady Acres Lane through Colonnades Place
Type of Work: Reconstruction of KY 1819 (Billtown Road) from north of Colonnades Place to south of Easum Road with new traffic signals, signal optimization, turn lanes, storage lanes, etc. (varying by intersection based on existing conditions and future traffic projections). Other Details: The reconstruction project is expected to be completed by the Summer of 2025. *Project webpage
|
Clark Station Road | Traffic Impacts: Road/bridge closure. Project Limits: Clark Station Road Bridge over Long Run Creek. Type of Work: Bridge replacement project. Other Details: Construction will require the full closure of the existing bridge through August 1, 2025. |
South Pope Lick Road | Traffic Impacts: Traffic reduced to one lane. Motorists will be directed to the work zone via flagging measures and temporary signals. Date/Time: Beginning Monday, April 28, through Monday, June 2. Project Limits: The South Pope Lick Road bridge over I-265 (Gene Snyder Freeway), between Poplar Lane and Tucker Station Road. Type of Work: Bridge deck restoration and latex overlay. Other Details: Motorists should heed signage and use caution when traveling through the work zone. |
*Various Locations | Traffic Impacts: Lane closures and delays are possible as part of a mobile operation. Date/Time: Overnight hours from 7 p.m. to 6 a.m. Type of Work: Pavement marker (reflector) replacement and installation. Other Details: Motorists should be observant of all road work signage and provide plenty of space for slow moving vehicles while traveling through the work zone. |
I-64 *Various Exit Ramps | Traffic Impacts: Ramp narrowing and shoulder closures. Project Limits: Various interchange Exit ramps on I-64. Type of Work: Installation and upgrade of wrong-way pavement markings and signs. Other Details: The Highway Safety Improvement Project will install and enhance wrong-way signs and pavement markings on interstate Exit ramps to discourage wrong-way driving. Motorists should reduce speeds and obey traffic control while workers are present. This project is expected to be completed by the Fall of 2025. |
| |
Bullitt County | |
I-65/KY 480 (Cedar Grove Road) | Traffic Impacts: Changing traffic patterns, lane shifts, and lane closures are possible as construction progresses. Date/Time: Daily and nightly. Project Limits: KY 480 (Cedar Grove Road) between I-65 between mile points 0.6 and 1.4. Other Details: The interchange reconstruction project is expected to be completed by the Fall of 2025. |
*Various Locations | Traffic Impacts: Lane closures and delays are possible as part of a mobile operation. Date/Time: Overnight hours from 7 p.m. to 6 a.m. Type of Work: Pavement marker (reflector) replacement and installation. Other Details: Motorists should be observant of all road work signage and provide plenty of space for slow moving vehicles while traveling through the work zone. |
I-65 *Various Exit Ramps | Traffic Impacts: Intermittent lane and ramp closures. Date/Time: Nightly – 8 p.m. to 6 a.m. | Daily – 9 a.m. to 3 p.m. Project Limits: Various interchange Exit ramps on I-65. Type of Work: Upgrade and install wrong way pavement markings and signs. Other Details: The Highway Safety Improvement Project will install and enhance wrong way signs and pavement markings on various interstate exit ramps to discourage wrong way driving. Motorists should reduce speeds and obey traffic control while workers are present. This project is set to be completed by the fall of 2025. |
| |
Franklin County | |
I-64/U.S. 127 Interchange | Traffic Impacts: Lane closures and traffic shifts are possible. Date/Time: Nightly. Project Limits: The I-64/U.S. 127 interchange. Type of Work: The realigning of the I-64 West off-ramp to U.S. 127 North and the I-64 West on-ramp from U.S. 127. Other improvements include the installation of a new signalized intersection on U.S. 127 to provide access to development entrances, which will be activated following project completion. Additionally, the intersection of Westridge Drive and Leonardwood Drive will be reconstructed to accommodate dual left turns onto Westridge Drive from U.S. 127. Other Details: Traffic is now in its final configuration. The interchange reconstruction project is expected to be completed by the Summer of 2025. *Press release |
*Various Locations | Traffic Impacts: Lane closures and delays are possible as a part of a mobile operation. Date/Time: Overnight hours from 7 p.m. to 6 a.m. Type of Work: Pavement marker (reflector) replacement and installation. Other Details: Motorists should be observant of all road work signage and provide plenty of space for slow moving vehicles while traveling through the work zone. |
I-64 *Various Exit Ramps | Traffic Impacts: Intermittent lane and ramp closures. Date/Time: Nightly – 8 p.m. to 6 a.m. | Daily – 9 a.m. to 3 p.m. Project Limits: Various interchange Exit ramps on I-64. Type of Work: Upgrade and install wrong way pavement markings and signs. Other Details: The Highway Safety Improvement Project will install and enhance wrong way signs and pavement markings on various interstate exit ramps to discourage wrong way driving. Motorists should reduce speeds and obey traffic control while workers are present. This project is set to be completed by the fall of 2025. |
| |
Oldham County | |
KY 22 (Ballardsville Road) | Traffic Impacts: Road closure. Date/Time: Beginning Tuesday, April 29, at 9 a.m. A timeline for reopening is not currently available, as the full extent of the damage cannot be assessed until work begins. Updates will be provided as more information becomes available. Project Limits: KY 22 (Ballardsville Road) from mile point 11.5 (at the KY 22/KY 53 intersection) to mile point 0.35 (near Radcliff Road in Henry County). Type of Work: Slide repairs following recent flooding. Detour: Drivers should continue on KY 22 (Ballardsville Road) to KY 53, then follow KY 322 (Lucas Road/McCoun Road) in Shelby and Henry Counties to reconnect with KY 22 beyond the closure. Motorists traveling from Henry County to La Grange should take KY 1861 (Smithfield Road) to Radcliff Road, then continue on KY 712 (Jericho Road) to reach La Grange. Local traffic should navigate around the closure via Ballard Vista Drive on the west side of the work zone or Ballard Glenn Parkway on the east side. |
I-71 *Various Exit Ramps | Traffic Impacts: Intermittent lane and ramp closures. Date/Time: Nightly – 8 p.m. to 6 a.m. | Daily – 9 a.m. to 3 p.m. Project Limits: Various interchange Exit ramps on I-71. Type of Work: Upgrade and install wrong way pavement markings and signs. Other Details: The Highway Safety Improvement Project will install and enhance wrong way signs and pavement markings on various interstate exit ramps to discourage wrong way driving. Motorists should reduce speeds and obey traffic control while workers are present. This project is set to be completed by the fall of 2025. |
| |
Spencer County | |
KY 1392 (Grays Run Road) | Traffic Impacts: Daily and nightly road closures. Date/Time: Daily from 9 a.m. to 2 p.m. | Nightly from 6 p.m. to 12 a.m. beginning Tuesday, April 8, through Wednesday, April 30. Project Limits: KY 1392 (Grays Run Road) from mile point 2.0 to mile point 4.5. *Crews will work in sections.* Type of Work: Cross drain replacements ahead of an upcoming resurfacing project. Other Details: Following the replacement of the cross drains, crews will place a layer of dense-grade rock over it until asphalt can be laid. Drivers should exercise caution when driving over the newly replaced cross drains. |
*Various Locations | Traffic Impacts: Lane closures and delays possible as part of a mobile operation. Date/Time: Daily – 7 a.m. to 9 p.m. Type of Work: Pavement striping. Other Details: Motorists should provide plenty of space to crews displaying "WET PAINT" signage and be observant of slowed vehicles while traveling through the work zone. |
| |
Shelby County | |
I-64 Widening and Improvement Project |
|
KY 53 (Mt. Eden Road) | Traffic Impacts: Road closure. Date/Time: Beginning Monday, April 14, at 7:30 a.m. through Friday, May 2. Project Limits: KY 53 (Mt. Eden Road) from mile point 1.62 at Lisby Lane to mile point 2.4. Type of Work: Routine maintenance of the roadway, including base failure repairs, slope protection measures, and cross drain replacements. |
*Various Locations | Traffic Impacts: Lane closures and delays are possible as a part of a mobile operation. Date/Time: Overnight hours from 7 p.m. to 6 a.m. Type of Work: Pavement marker (reflector) replacement and installation. Other Details: Motorists should be observant of all road work signage and provide plenty of space for slow moving vehicles while traveling through the work zone. |
I-64 *Various Exit Ramps | Traffic Impacts: Intermittent lane and ramp closures. Date/Time: Nightly – 8 p.m. to 6 a.m. | Daily – 9 a.m. to 3 p.m. Project Limits: Various interchange Exit ramps on I-64. Type of Work: Upgrade and install wrong way pavement markings and signs. Other Details: The Highway Safety Improvement Project will install and enhance wrong way signs and pavement markings on various interstate exit ramps to discourage wrong way driving. Motorists should reduce speeds and obey traffic control while workers are present. This project is set to be completed by the fall of 2025. |
| |
| |
Henry County | |
*Various Locations | Traffic Impacts: Lane closures and delays possible as part of a mobile operation. Date/Time: Daily – 7 a.m. to 9 p.m. Type of Work: Pavement striping. Other Details: Motorists should provide plenty of space to crews displaying "WET PAINT" signage and be observant of slowed vehicles while traveling through the work zone. |
I-71 *Various Exit Ramps | Traffic Impacts: Intermittent lane and ramp closures. Date/Time: Nightly – 8 p.m. to 6 a.m. | Daily – 9 a.m. to 3 p.m. Project Limits: Various interchange Exit ramps on I-71. Type of Work: Upgrade and install wrong way pavement markings and signs. Other Details: The Highway Safety Improvement Project will install and enhance wrong way signs and pavement markings on various interstate exit ramps to discourage wrong way driving. Motorists should reduce speeds and obey traffic control while workers are present. This project is set to be completed by the fall of 2025. |
| |
Trimble County | *Routine maintenance |