Interstate 65 in Louisville will close between the Watterson Expressway (I-264) and downtown Louisville (Jefferson Street) from June 1- July 31 to speed progress on replacing 3 aging bridges.
The closure will save at least a year of construction restrictions, and a signed detour will be in place. Local street closures and ramp closures will also be needed.
Learn more at I65CentralCorridor.com.

Reconnecting Central Portland to the Riverfront - Project 05-587.10

​​​​​​​​ 


KYTC_ReconnectCentralPortland_MapofConcepts_02_20260416 2.png


Purpose
This project intends to reconnect the community to the waterfront across I-64 and better integrate the highway right-of-way with the surrounding land-use chara​cter and context. The benefits include improved connectivity to essential services and local assets for vehicles, pedestrians, and cyclists, as well as enhanced safety for all users.
Project Scope

The overall project is comprised of five components, or “sub-projects:​

​1.  22nd Street / I-64 Interchange Improvements
A.. 22nd St. between Portland Ave. and Northwestern Pkwy.
B. 22nd St. between Bank St. and Portland Ave.
2.  Access Improvements to Lannan Park and McAlpine Locks
3.  Highway Edge Treatments along I-64 Right-of-Way
A. Nelligan Ave. Edge Treatment
4.  Pedestrian Bridges
A. 23rd St. and Lannan Park
​B. 19th St. 

Type of ProjectRoadway Improvements / Pedestrian Bridges
Public InputAt this time, those interested are encouraged to share their input on further developed concepts and help decide which they prefer for each “sub-project” listed above. Feedback gathered from the public will inform the selection of the preferred concepts to advance into the final design phase. Information concerning Section 106 of the National Historic Preservation Act will be available for anyone interested in signing up for this process. An online survey will be available and remain active for 30 days after the public meeting.

 ​​PUBLIC MEETING 
Thursday, June 25, 2026
5-7 p.m. 
Good Shepherd Catholic Church
3525 Rudd Avenue​
Louisville, KY 40212

*The survey is available through July 25, 2026*


​A public meeting was also held on May 7, at the Molly Leonard Portland Community Center, with a survey available online for 30 days after.

Project TimelineAs of Spring 2026 (SUBJECT TO CHANGE*):
  • Preliminary design and environmental clearance phase for 2026
  • Final design phase in 2027
  • Construction starting in 2028

**The above project milestone dates are subject to change based on Federal Grant funding availability.
Links *Some files are large and may take a few minutes to load.
Project Manager

Larry Chaney, P.E.
Email: larry.chaney@ky.gov
Phone: 502.764.0857

Kyle Danhauer
Email: kyle.danhauer@ky.gov
Phone: 502.764.0528




This page is maintained by KYTC District 5 Staff, who may be contacted to make corrections or changes.

Page Last Updated: 07-08​-2026

Department of Aviation

Airport Zoning Commission

Department of Rural and Municipal Aid

Local Programs
Local Public Agencies

Department of Vehicle Regulation

Drive.ky.gov
Motor Vehicle Commission

Powered by Google TranslateTranslate