KY 245 (Clermont Road) Widening Project - Item No. 5-8509.00

​​​​​​​​​​​​KY 245 Clermont Road Project Map.jpg​​​​​​​​

Purpose

To provide the traveling public with a safe facility that meets current design standards.  The goals for this project are:

  • To improve safety and reduce crashes.
  • To improve the capacity and the level of service of the roadway.
  • To accommodate the forecasted increase in automotive and commercial truck traffic on KY 245.
Project Scope

Widen KY 245 to 4 lanes with left turn lanes beginning at the easternmost I-65 ramp terminals to a point 1120 feet east of Happy Hollow Road (Jim Beam entrance).

Build a 10-foot wide asphalt paved multi-use path connecting the Bernheim walking trail on the south side of KY 245 to the Bernheim Bike Hike Trail on the north side of KY 245 with a new pedestrian underpass.

Selected Alternative 
(from 2008 Public Input)

The selected alternative, Alternate 2, widens the road to the south side of the existing highway. It provides 4 lanes of travel with a mix of:

  • 20-foot grass-raised median with left-turn bays and
  • Two-way left-turn median.​​


Project Timeline

As of Spring 2025

  • The environmental document (NEPA) has been approved.
  • Right-of-way has been cleared.
  • Utility relocations (water and gas) are in progress.
  • The project is in the Letting Schedule for November 2025.
  • Construction will begin in early 2026.
Public Input

A public meeting was held on July 26, 2011, to present the alignment alternatives and gather public input. 

Documents presented at the 2011 public meeting: 

Project Manager

Charles S. Berger, P.E.
Email: chuck.berger@ky.gov
Phone: 502.764.0488

 