To provide the traveling public with a safe facility that meets current design standards. The goals for this project are:
Widen KY 245 to 4 lanes with left turn lanes beginning at the easternmost I-65 ramp terminals to a point 1120 feet east of Happy Hollow Road (Jim Beam entrance).
Build a 10-foot wide asphalt paved multi-use path connecting the Bernheim walking trail on the south side of KY 245 to the Bernheim Bike Hike Trail on the north side of KY 245 with a new pedestrian underpass.
The selected alternative, Alternate 2, widens the road to the south side of the existing highway. It provides 4 lanes of travel with a mix of:
As of Spring 2025
A public meeting was held on July 26, 2011, to present the alignment alternatives and gather public input. Documents presented at the 2011 public meeting:
Charles S. Berger, P.E.Email: chuck.berger@ky.govPhone: 502.764.0488