Skip Ribbon Commands
Skip to main content
SharePoint
Edit
Use SHIFT+ENTER to open the menu (new window).
  
  
  
Description
  
  
  
  
  
  
 HenryDistrict 5
KY 3175 (Bedford Road): Lane closures possible at the bridge over White Sulphur Fork for bridge coating and guardrail work. Drivers should heed signage through the area.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6229/4/2020 11:04 AM
 FranklinDistrict 5
I-64 East: Closure of the left lane for rail mowing on Tuesday, September 8. Work will take place between mile marker 48 and mile marker 51 between 6 p.m. and 11 p.m. Drivers should use caution while traveling through the work zone.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6219/4/2020 11:04 AM
 JeffersonDistrict 5
I-264 East (Watterson Expressway): Left lane closures on Thursday, September 10 at mile marker 18.3 (just past Breckinridge Lane interchange) for sign work. Crews will work in the left three lanes from 9 p.m. to 5 a.m. Signs in the area will notify drivers.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6209/4/2020 11:03 AM
 JeffersonDistrict 5
I-264 East (Watterson Expressway): Right lane closures on Wednesday, September 9 at mile marker 18.3 (just past Breckinridge Lane interchange) for sign work. Crews will work in the right three lanes from 9 p.m. to 5 a.m. Signs in the area will notify drivers.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6199/4/2020 11:03 AM
 JeffersonDistrict 5
I-264 East (Watterson Expressway): Intermittent lane closures on Tuesday, September 8 at mile marker 17.5 (Breckinridge Lane) for sign work. Crews will work from 9 p.m. to 5 a.m. The ramp to Breckinridge Lane will remain open during the work. Signs in the area will notify drivers.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6189/4/2020 11:02 AM
 JeffersonDistrict 5
Bluegrass Parkway: Lane closures possible for signal work at the intersection of Bluegrass Parkway and Hurstbourne Parkway (KY 1747/mile marker 11.64). Lane closures are possible daily between 9 a.m. and 3 p.m.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6178/28/2020 12:36 PM
 JeffersonDistrict 5
I-64 West: Ramp to I-64 West from 9th Street will be closed as contractors address issues with a barrier wall. Motorists can detour the area by taking 9th Street to West Jefferson Street to North 21st Street to I-64 West.
9/11/2020/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6138/28/2020 12:35 PM
 JeffersonDistrict 5
I-64 East: Ramp to I-64 East from 9th Street and Market Street will be fully closed beginning at 12 p.m. on Saturday, August 29. Work on this ramp is scheduled to be completed by the end of September. Drivers can detour the area by taking 9th Street to the on-ramp at the intersection of 9th Street and Main Street. Signs in the area will notify drivers.
10/1/2020/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6128/28/2020 12:34 PM
 SpencerDistrict 5
KY 1060 (Plum Creek Road): Lane closures possible along portions of the roadway for ditching work. Drivers will be directed via flagging operations.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6118/21/2020 1:15 PM
 BullittDistrict 5
KY 61 (Preston Highway): Road will be reduced to one lane at mile marker 8 (near Shuffitt Lane) for ditching work.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6108/21/2020 1:15 PM
 FranklinDistrict 5
U.S. 60 (East Main Street): The city of Frankfort will be performing catch basin work between mile marker 8.6 (intersection with East Broadway) and mile marker 9.3 (intersection with Martin Luther King Jr Blvd). Lane closures are possible.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?6038/7/2020 3:40 PM
 JeffersonDistrict 5
U.S. 150 (East Broadway): Replacement of the bridge over South Fork of Beargrass Creek. The bridge will be closed beginning Monday, June 15. Work is scheduled to be complete by late October. Motorists should follow the signed detour.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?5686/12/2020 10:46 AM
 ShelbyDistrict 5
KY 1779 (Benson Pike): Pavement rehabilitation project beginning the week of Monday, June 15. Lane closures and flagging operations will be used to maintain traffic during asphalt and shoulder construction.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?5666/11/2020 11:38 AM
 JeffersonDistrict 5
All Jefferson County (Various Locations):  Motorists should watch for crews performing striping work on various roadways. Lane closures are possible during the work. Drivers should heed signage while moving through the work zone.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?5636/9/2020 2:16 PM
 JeffersonDistrict 5
KY 22 (Brownsboro Road): Lane closures and delays possible at mile marker 2.7 (Goose Creek Road) for road widening work. Drivers should heed signage in the area.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?5626/9/2020 2:16 PM
 BullittDistrict 5
I-65: Left and right shoulders closed in both directions between mile marker 116 and 112 due to construction of a new interchange. Both north and south lanes will be shifted toward the inside shoulder as ramp construction begins. The speed limit is reduced to 55 MPH. Motorists should heed signage while moving through the work zone.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?5616/9/2020 2:14 PM
 JeffersonDistrict 5
I-265 West (Gene Snyder Freeway): Ramp from KY 61 North (Preston Highway) to I-265 West closed for repair. Detour signs in the area will direct drivers.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?5405/8/2020 4:26 PM
 BullittDistrict 5
All Bullitt County (Various Locations): Motorists should watch for crews performing striping work on various roadways. Lane closures are possible during the work. Drivers should heed signage while moving through the work zone.
/DistrictFive/Pages/District-5-Traffic-Advisory.aspx?&FilterField1=ID&FilterValue1=?5124/3/2020 4:08 PM