Project Development

The Project Development team is responsible for projects in the developmental phase, that is, before construction. This includes planning studies, bridge and highway design, environmental components, consultant prequalification and selection, right of way acquisition and utility relocation. Within the office, crew members are assigned a number of duties in four major areas.

Joe Gossage, P.E.-- Branch Manager

 
 
Planning   
 
The mission of planning is to provide a transportation vision and plan that will strategize ways to improve sustainability and promote livability for the citizens using our transportation system in the central Kentucky area.  We work together with the of local governments, economic development, area development districts, and the Lexington Metropolitan Planning Organization so we can be better informed of the areas in our region that will experience growth, education, and healthcare.  We collect traffic volumes and percentage of trucks on our roadways in our transportation system, which bases the federal transportation funding allocation to the Commonwealth of Kentucky.
 
Jeff Dick, P.E. -- Section Supervisor 
 

Environmental   
 
The Environmental Coordinator (EC) is responsible for providing environmental guidance to District personnel, contractors, and the public concerning KYTC projects and activities. This includes the preparation and review of environmental documents required by state and federal environmental laws. The EC works closely with planning, design, construction, and maintenance staff to ensure potential impacts to  the social, economic, or physical environment are identified, evaluated, and minimized based on environmental policies.

Jami West -- Environmental Coordinator
 

Design   
 
​The Division of Highway Design is responsible for the required design activities for the Cabinet's Six-Year Highway Plan projects.  This responsibility includes conducting the studies, computations, and analyses necessary to support the preparation, assembly, and reproduction of the construction plans for a project's award.
 
Brian Dunbar, P.E.-- Section Supervisor

 
Right of Way   
 
​As a concerned property owner, you will want to know the answers to: Why here? Why my property? The right of way crew is there to give you answers and work with you on acquiring land needed for projects.  Click on the image to the right for more information about right of way acquisition.
 
Jeff Ray-- Section Supervisor 

 
Utilities   
 
The Division of Utilites is responsible for coordinating efforts between KYTC and the utility companies.  They will help to determine if any utilties might be impacted by roadway projects and make sure they are moved before our Project Development & Preservation Branch takes over.

Steve McClendon-- Section Supervisor

  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
1660 South US 27 SomersetKY42502P.O. Box 780SomersetKY425028:00 a.m.-4:30 p.m. EST, M-F(606) 677-4017(606) 677-4013KYTC.District8Info@ky.govhttp://maps.google.com/maps?q=37.07071,+-84.61883+&hl=en&ll=37.070742,-84.618824&spn=0.001721,0.007923&sll=37.069924,-84.618813&sspn=0.003831,0.007923&vpsrc=6&t=h&z=18&layer=c&cbll=37.070734,-84.618823&panoid=N34tAiHxAKzRITvIF_Y6DA&cbp=11,156.41,,0,0https://www.facebook.com/KYTCDistrict8/https://www.twitter.com/KYTCDistrict8
​This page is maintained by Amber.Hale@ky.gov, who may be contacted to make corrections or changes.

Follow Us