The existing two-lane roadway, with portions of three-lane sections between Dixie Highway and Greenbelt Highway, has created safety concerns along the corridor. The roadway experiences high traffic volumes and left-turn movements, which can lead to vehicle conflicts and create challenging conditions for motorists.
Improving the roadway's design by providing a center left-turn lane increases the corridor's current operational capacity by moving left-turning traffic out of the through lanes. The addition of the multi-use path along the north side of the roadway and the sidewalk along the south side will help eliminate conflicts between cyclists & pedestrians, thus improving operational capacity.
*Some files are large and may take a few minutes to load.
Future Project Phases and completed work as of Fall 2026, and Subject to Change):
The above project milestone dates are subject to change depending on the Cabinet's funding constraints and various other factors.
The initial public meeting held on 4/3/2001 presented the preferred alternative: a five–lane section. Due to right-of-way impacts that necessitated residential and business relocations and numerous utility relocations, it was determined that context-sensitive design solutions needed to be considered.
On 3/29/2007, a second public meeting was held. This meeting presented the five-lane design, plus two three-lane options, including bike lanes. A three-lane context-sensitive design solution was ultimately selected in 2012 during the most recent preliminary design for the project.
Design: Carl Jankins III, P.E.