Widen Greenwood Road (KY 1931) from Greenbelt Highway (KY 1964) to Dixie Highway (US 31W) Project - 05-323.01

​​​​​​​​05-323.01.png​​​​​​​

Purpose

The existing two-lane roadway, with portions of three-lane sections between Dixie Highway and Greenbelt Highway, has created safety concerns along the corridor. The roadway experiences high traffic volumes and left-turn movements, which can lead to vehicle conflicts and create challenging conditions for motorists.

Improving the roadway's design by providing a center left-turn lane increases the corridor's current operational capacity by moving left-turning traffic out of the through lanes.  The addition of the multi-use path along the north side of the roadway and the sidewalk along the south side will help eliminate conflicts between cyclists & pedestrians, thus improving operational capacity.

Project Scope

Widen Greenwood Rd. to three lanes between Greenbelt Highway & Dixie Highway, including a sidewalk on the south side of the road and a multi-use path along the north side. 
Type of Project
Minor Corridor Widening
Links

​​5-323.01 Typical Section.png

*Some files are large and may take a few minutes to load.

Project Timeline

Future Project Phases and completed work as of Fall 2026​, and Subject to Change): 

  • Spring 2023 – Right-of-way acquisition completed for the preferred widening alternate.
  • Winter 2024/2025 – Initial utility relocation coordination underway.
  • Summer 2026 – Electric began relocating with relocations expected through 2027 and into 2028.
  • Roadway construction to begin after utility relocations. Anticipate construction in 2029, depending on utility relocation progress and funding in the 2028 Highway Plan.*

 

The above project milestone dates are subject to change depending on the Cabinet's funding constraints and various other factors.

Public Input and Stakeholder 
Input/Meetings

The initial public meeting held on 4/3/2001 presented the preferred alternative: a five–lane section. Due to right-of-way impacts that necessitated residential and business relocations and numerous utility relocations, it was determined that context-sensitive design solutions needed to be considered.

 

On 3/29/2007, a second public meeting was held. This meeting presented the five-lane design, plus two three-lane options, including bike lanes.   A three-lane context-sensitive design solution was ultimately selected in 2012 during the most recent preliminary design for the project.

Project Manager

Design: Carl Jankins III, P.E.

Email: Carl.Jenkins@ky.gov

Phone: (502) 210-5400​​


This page is maintained by KYTC District 5 Staff, who may be contacted to make corrections or changes.

Page Last Updated: 09-03​-2026​​

Department of Aviation

Department of Aviation
Airport Zoning Commission

Department of Rural and Municipal Aid

Local Programs
Local Public Agencies

Department of Vehicle Regulation

Drive.ky.gov
Motor Vehicle Commission

Powered by Google TranslateTranslate