Purpose
Widening KY 1931 (St. Andrews Church Road) from two lanes to three lanes by the addition of a center left turn lane and an urban curb and gutter section.
Improve pedestrian and cyclist operations by constructing a sidewalk on the north side of the roadway and a ten-foot wide shared-use path on the south.
Most of the proposed widening will occur on the south side of the existing road. The intent is to hold the north (left) edge of the pavement where it is as much as possible. This reduces the overall property and environmental impacts.  
​Project Scope
KY 1931 (St. Andrews Church Road) widening between Dixie Highway to Doss High School
​Type of Project
​Road Widening - Construction 
​Links

Project Meeting Information - November 2016

*Some files are large and may take a few minutes to load.
​Project Timeline

As of Winter 2023/2024 (SUBJECT TO CHANGE*):

  • Project 05-536 is in KIPDA’s Transportation Improvement Program for funding in 2025: https://www.kipda.org/transportation/core-products/transportation-improvement-program/
  • KYTC does not have railroad right-of-way clearance to proceed
  • KYTC anticipates approximately 2.5 to 3 years for utility relocations
  • Many utility (non-K​YTC) companies must complete their work before beginning roadway construction. Utility companies set their own schedule for the completion of their utility movement. Based on recent discussions with the impacted utility companies, due to supply chain and construction crew capacity issues, KYTC doesn’t expect utility relocations to begin until late 2024.  
  • Therefore, it will likely be no earlier than 2027 before KYTC anticipates would be able to let this project to construction. 

*All tentative utility relocation and letting dates will be re-evaluated to correspond with available funding (provided in the current enacted Highway Plan).

Typical Section
An adjacent section of proposed improvements for St. Andrews Church Road from Doss High School to Palatka Road (Item No. 5-8810) is currently under design.
Both of these sections propose the same 3-lane typical and have been developed alongside each other through public involvement and preliminary line & grade. 



​Public Input
​A public meeting was held on November 15, 2016, to present all alternatives and additional information to area residents and motorists. Public comments regarding this project were accepted up to 15 days after the meeting.
Additional Project on KY 1931
Project 05-8810:  proposed improvements and widening of St. Andrews Church Road from Doss High School to Palatka Road. 
The project is in the d
esign phase.  
​Project Manager
Pat Matheny
Email: patrick.matheny@ky.gov
Phone: 502.764.0835 

  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
8310 Westport RoadLouisvilleKY40242KY8:00 a.m.-4:30 p.m. EST, M-F(502) 210-5400KYTC.District5Info@ky.govhttp://maps.google.com/maps?f=q&source=s_q&hl=en&geocode=&q=8310+Westport+Road+Louisville+KY.+40242&aq=&sll=37.704755,-85.871522&sspn=0.006986,0.016512&ie=UTF8&hq=&hnear=8310+Westport+Rd,+Louisville,+Jefferson,+Kentucky+40242&t=h&z=17https://www.facebook.com/KYTCDistrict5/https://twitter.com/KYTCDistrict5

This page is maintained by KYTC District 5 Staff, who may be contacted to make corrections or changes.

​Page Last Updated:  01-05-2024


Follow Us