I-64 Bridge Replacement over Tucker Station Road Project 05-10057.00

​​​​​​5-10057_I-64 over Tucker Station Road_Project Location Exhibit.jpg​​​​​​​​​​​​​​​



Purpose​​​​
  • This project involves the replacement of the I-64 bridges (eastbound and westbound) over Tucker Station Road. The existing structures, in service for over 60 years, will undergo a full replacement of all major structural elements. This project aims to improve safety and operational efficiency on the I-64 bridge over Tucker Station Road. The bridge replacement project will be completed while maintaining traffic on I-64. No residential properties will be impacted, but traffic impacts are possible on I-64 during construction.
Project Scope
  • Replacement of the entire bridge structure, including abutments and piers. 
  • No residential properties will be impacted, and traffic will be maintained on I-64.
  • The new bridge will provide adequate width for the fourth westbound lane and full-width shoulders.
  • The existing and proposed typical sections for the I-64 bridge over Tucker Station Road are depicted below:I-64 Bridge over Tucker Station Typical Section.png
Project Timeline​​Design: 2023-2026
Construction Begin: 2026
Construction End: 2028
*The above project milestone dates are subject to change due to changes in funding availability within the next Enacted Highway Plan.
Public Input

Please visit the story map to take the public survey. ​Link: https://arcg.is/frTLj0 ​

The survey will be available from May 1 through May 29th. 

All written comments will become part of the official meeting record.
 
Story Map with Traffic Impactshttps://arcg.is/frTLj0
Project Manager​Charles Berger, P.E.
Email: chuck.berger@ky.gov
Phone: 502.764.0488 

 