Implement safety and mobility enhancements on U.S. 42 from the eastern end of the bridge over Harrods Creek to just east of River Road. The design work is being conducted following the 2022 Planning Study completed by the City of Prospect and the early 2011 design work completed by KYTC.
Currently, the project scope includes Preliminary Engineering and Environmental Analysis to address four build alternatives. Should a build alternative be advanced, the scope will then move to the final design phase.
The five alternatives currently under consideration include:
Alternative 1 (Selected):
https://youtu.be/FFSqePWA1Ls
Traffic Simulation: US 42 Prospect Project Alternatives https://youtu.be/AZL9Ic8K5jQ
As of Summer 2026 (SUBJECT TO CHANGE)
The anticipated project milestone dates above are subject to change due to changes in funding availability from KIPDA.
This page is maintained by KYTC District 5 Staff, who may be contacted to make corrections or changes.