U.S. 42 Improvements (from the bridge over Harrods Creek to River Road) - 5-972

​​​


Purp​oseThis project aims to reduce traffic congestion, improve mobility, and enhance safety along U.S. 42 from the bridge over Harrods Creek to River Road. The need for the project is generally derived from the current traffic congestion on U.S. 42, combined with the projected future traffic volumes and high crash rates.
Project Scope

Implement safety and mobility enhancements on U.S. 42 from the eastern end of the bridge over Harrods Creek to just east of River Road.

The design work is being conducted following the 2022 Planning Study completed by the City of Prospect and the early 2011 design work completed by KYTC.

Currently, the project scope includes Preliminary Engineering and Environmental Analysis to address four build alternatives. Should a build alternative be advanced, the scope will then move to the final design phase.

Alternatives/Build Options

The five alternatives currently under consideration include:

Alternative 1: 

Alternative 2:
Alternative 3:
Alternative 4:
Alternative 5:
  • No build/no changes.
These files are large and may take some time to download ​

Links 

US 42 – Prospect: Harrods Creek Bridge to River Road: Public Feedback

https://youtu.be/FFSqePWA1Ls

Traffic Simulation: US 42 Prospect Project Alternatives
https://youtu.be/AZL9Ic8K5jQ

Sign up as a consulting party for this project by clicking here and following the application instructions.

Press Release

Project Timeline
  • Summer/Fall 2025 — Identify a preferred alternative. If a Build Alternative is selected, the general schedule is as follows:
  • Winter 2025/2026 – Final Design*
  • Spring 2026 – Begin Right-of-Way Acquisition
  • 2027-2028 – Utility Relocation
  • 2028-2029 – Construction

*The above project milestone dates are subject to change due to changes in funding availability within the next Enacted Highway Plan.*

Public Input​A public meeting was held on July 16, 2026, at St. Francis in the Fields Episcopal Church. 
Project ManagerCarl Jenkins, PE
Email: Carl.Jenkins@ky.gov
Phone: 502-764-0493


This page is maintained by KYTC District 5 Staff, who may be contacted to make corrections or changes.

​Page Last Updated: 04-20-2026


Department of Aviation

Airport Zoning Commission

Department of Rural and Municipal Aid

Local Programs
Local Public Agencies

Department of Vehicle Regulation

Drive.ky.gov
Motor Vehicle Commission

Powered by Google TranslateTranslate