U.S. 42 Improvements (from the bridge over Harrods Creek to River Road) - Project 5-972

​​​


Purp​oseThis project aims to reduce traffic congestion, improve mobility, and enhance safety along U.S. 42 from the bridge over Harrods Creek to River Road. The need for the project is generally derived from the current traffic congestion on U.S. 42, combined with the projected future traffic volumes and high crash rates.
Project Scope

Implement safety and mobility enhancements on U.S. 42 from the eastern end of the bridge over Harrods Creek to just east of River Road.

The design work is being conducted following the 2022 Planning Study completed by the City of Prospect and the early 2011 design work completed by KYTC.

Currently, the project scope includes Preliminary Engineering and Environmental Analysis to address four build alternatives. Should a build alternative be advanced, the scope will then move to the final design phase. 

Selected Alternative

Alternative 1:
Two lanes in each direction will be maintained throughout US 42 with this alternative.  The centerline of US 42 will also remain essentially unchanged.  Roundabouts are to be constructed on US 42 at the Timber Ridge, Fox Harbor, and River Road intersections.  Roundabouts will improve both safety and mobility at all of these locations.  A 2-lane configuration will be used for all roundabouts.   In addition, a raised median will be constructed on US 42 starting at the Timber Ridge intersection and continuing Eastward to the River Road intersection.  Raised medians will also improve safety and mobility through the project area.

Curbs are to be constructed on both sides of US 42 throughout the project.  Pedestrian facilities will also be added on each side of US 42.  A Shared Use Path is to be constructed on the North side of US 42 along the business frontages.  The Shared Use path will tie into the existing pedestrian facility on the East side of River Road.  A sidewalk will also be constructed along the South side of US 42, adjacent to​ the park and government center properties.  The sidewalk will also connect with the existing sidewalk/trail system in the park East of the government center.



Alternatives/Build Options

The five alternatives currently under consideration include:

Alternative 1 (Selected): 

Alternative 2:
Alternative 3:
Alternative 4:
Alternative 5:
  • No build/no changes.
These files are large and may take some time to download ​

Links 

US 42 – Prospect: Harrods Creek Bridge to River Road: Public Feedback

https://youtu.be/FFSqePWA1Ls

Traffic Simulation: US 42 Prospect Project Alternatives
https://youtu.be/AZL9Ic8K5jQ

Sign up as a consulting party for this project by clicking here and following the application instructions.

Press Release

Project Timeline

​As of Summer 2026 (SUBJECT TO CHANGE)

  • In September 2025,the Project Team (with input from the public) selected Alternative 1 for Final Design.
  • The project is currently in the design phase which is expected to continue through 2027.
  • Right-of-Way plans are being developed.  Right-of-Way plan development is in progress, and will contain easements as coordinated with the utility companies present.  Initial Right-of-Way plans are expected at the end of 2026.
  • Right-of-Way and easement acquisitions will begin in 2027.  It is anticipated that Right-of-Way and easement acquisition will be completed at the end of 2028.
  • Utility coordination and relocation will begin after all Right-of-Way and easements are obtained.

The anticipated project milestone dates above are subject to change due to changes in funding availability from KIPDA.


Public Input​A public meeting was held on July 16, 2026, at St. Francis in the Fields Episcopal Church. 
Project ManagerCarl Jenkins, PE
Email: Carl.Jenkins@ky.gov
Phone: 502-764-0493


This page is maintained by KYTC District 5 Staff, who may be contacted to make corrections or changes.

​Page Last Updated: 07-27-2026

Department of Aviation

Airport Zoning Commission

Department of Rural and Municipal Aid

Local Programs
Local Public Agencies

Department of Vehicle Regulation

Drive.ky.gov
Motor Vehicle Commission

Powered by Google TranslateTranslate