Erosion Control

Downloads

For KYTC held Permits:
Erosion Control Inspection Report
    (TC63-61 Excel Form, Modified 10/15)
 
For Contractor held Permits:
Erosion Control Inspection Report
    (TC63-61A Excel Form, Modified 10/15)

Inspector Requirements

​After July 1, 2008 the Department will require the erosion and sediment control inspector to have successfully completed the KEPSC Inspector Qualification Training and Testing Course.

Find out training dates, fees, and more at the Kentucky Transportation Center's website.

Need a temporary Low Water Crossing?

Click the Low Water Crossing picture for more details on how they should be constructed per Army Corps of Engineers.

Need Help?

Contact us if you have any questions or need guidance on Erosion Control Issues.