Interstate 65 in Louisville will close between the Watterson Expressway (I-264) and downtown Louisville (Jefferson Street) from June 1- July 31 to speed progress on replacing 3 aging bridges.
The closure will save at least a year of construction restrictions, and a signed detour will be in place. Local street closures and ramp closures will also be needed.
Learn more at I65CentralCorridor.com.

Erosion Control

Downloads

For KYTC held Permits:
Erosion Control Inspection Report
    (TC63-61 Excel Form, Modified 10/15)
 
For Contractor held Permits:
Erosion Control Inspection Report
    (TC63-61A Excel Form, Modified 10/15)

Inspector Requirements

​After July 1, 2008 the Department will require the erosion and sediment control inspector to have successfully completed the KEPSC Inspector Qualification Training and Testing Course.

Find out training dates, fees, and more at the Kentucky Transportation Center's website.

Need a temporary Low Water Crossing?

Click the Low Water Crossing picture for more details on how they should be constructed per Army Corps of Engineers.

Need Help?

Contact us if you have any questions or need guidance on Erosion Control Issues.

Construction Home

​This page is maintained by: Angela.Anglin@ky.gov, who may be contacted to make corrections or changes

Department of Aviation

Airport Zoning Commission

Department of Rural and Municipal Aid

Local Programs
Local Public Agencies

Department of Vehicle Regulation

Drive.ky.gov
Motor Vehicle Commission

Powered by Google TranslateTranslate