Remarks
  
  
  
Centerline Rumble Strips.PDF
  
6/29/2012 9:05 AMLightfoot, Telma S (KYTC)Traffic6/15/20122012
4
Guidance on the application on future highway projects
6/15/2012Joint Traffic Operations/Maintenance/Design Memorandum 01-12
Design and Traffic Operations Joint Memorandum 2+1 Roadway Design.pdf
  
9/23/2022 7:36 AMLightfoot, Telma S (KYTC)Traffic9/21/20222022
15
Guidance on 2 + 1 roadway design, signing and pavement markings
9/21/2022Design Memorandum No. 01-22; Traffic Operations Memorandum 03-22
FHWA Termination of Interim Approval for Use of Clearview Font.pdf
  
2/18/2016 10:01 AMLightfoot, Telma S (KYTC)Traffic2/16/20162016
8
Guidance memorandum from FHWA and a copy of the relevant section of the Federal Register are included.
2/16/2016Highway Design Memo No. 01-16, Traffic Operations Memo No. 01-16
PavementMarkerSystem.pdf
  
5/14/2020 11:35 AMLightfoot, Telma S (KYTC)Traffic8/22/20162016
9
Revised Pavement Marker System which establishes the list of roadways where raised pavement markers should be installed and maintained.
8/22/2016Pavement Marker System
Procedures for Electrical Devices and Plans.pdf
  
12/11/2012 12:33 PMLightfoot, Telma S (KYTC)Traffic10/31/20122012
5
Procedures for handling requests for electrical devices and associated plans on highway projects
10/31/2012Highway Design Memo No. 03-12, Traffic Operations Memo No. 01-12
Signing for High-Water Conditions.PDF
  
3/22/2012 10:24 AMLightfoot, Telma S (KYTC)Traffic3/20/20122012
3
Modifications for signing of high-water conditions
3/20/2012Signing for High-Water Conditions
TO Memo 01-19.pdf
  
4/17/2019 8:11 AMLightfoot, Telma S (KYTC)Traffic4/3/20192019
10
Pavement Marking policy which includes normal width, materials, construction, and the approval process for non-standard pavement marking applications not on the State Primary Road System.
4/3/2019Pavement Markings on the State Primary Road System
TO Memo 01-20 Double Fines in Work Zones.pdf
  
5/27/2020 10:00 AMLightfoot, Telma S (KYTC)Traffic1/2/20202020
12
Provides standards and guidance for staff on changes and encourage use of double fine signing would likely enhance the safety of maintenance and inspection activities.
1/2/2020Double Fines in Work Zones
TO Memo 02-19 Inlaid Pavement Markers.pdf
  
1/21/2020 9:03 AMLightfoot, Telma S (KYTC)Traffic12/13/20192019
11
Inlaid pavement markers will be used as a standard delineation option. Type V pavement markers must obtain approval.
4/24/2020Traffic Operations Memo No. 02-19
Traffic 01-11.PDF
  
11/21/2011 10:26 AMLightfoot, Telma S (KYTC)Traffic11/18/20112011
2
Revised prequalification criteria for the Electrical Engineering Traffic Signal Services and Electrical Engineering Roadway Lighting Services
11/18/2011Traffic Operations Memo 01-11
Traffic Operations and Construction Joint Memorandum to Electrical Contractors Regarding Inspections (Final).pdf
  
9/14/2022 9:37 AMLightfoot, Telma S (KYTC)Traffic9/14/20222022
14
Updated guidance on the electrical inspection process as it relates to KYTC highway projects and KYTC-owned assets.
9/14/2022Traffic Operations Memo No. 02-22, Construction Memo No. 22-06
Traffic Signal Loops in Proposal Projects - 2022 Version.pdf
  
9/14/2022 9:36 AMLightfoot, Telma S (KYTC)Traffic5/13/20222022
13
Provides guidance on the replacement of traffic signal loops that are impacted by proposal projects.
5/13/2022Maintenance Memo No. 01-22, Traffic Operations Memo No. 01-22
Work Zone Traffic Control (TO-808).PDF
  
8/9/2013 6:35 AMLightfoot, Telma S (KYTC)Traffic7/31/20132013
7
Policy addressing issues associated with work zone traffic control
7/31/2013Work Zone Traffic Control (TO-808)