| | | t001 Signing quantity FAA and KAZC 2017 instructions | 1/29/2018 | 11/2/2019 |
| | | Project install
permit install
Estimate sheet | 4/28/2017 | 12/13/2018 |
| | | | 3/23/2017 | 1/20/2018 |
| | | NEW LIGHTING AND SIGNALS STANDARDS
REQUIREMENTS:
We will start doing the following in projects:
Conventional Lighting: duct or Schedule 80 PVC for all
underground except for under the roadway/above ground (this will still be rigid
steel)
High mast: still duct (rigid steel under roadway)
Signals: duct or schedule 80 PVC for all underground except
for under the roadway/above ground (except for grounds)/service conduit/conduit
from loop saw and slot (this will still be rigid steel)
Conventional lighting: add lockable doors on all transformer
bases
Signals: disconnect/meter will be aluminum
All pvc will have end bell bushing installed.
Opencut will be schedule 80 PVC
Pedestal and conventional bases will stay with rigid steel
conduit for the conductors. | 3/20/2017 | 12/1/2020 |
| | | T002 Signing General Notes 10-13-2016 .dgn and .pdf | 10/13/2016 | 3/3/2018 |
| | | Signal Plan Preparation Tutorial 2016.docx
| 8/30/2016 | 1/12/2018 |
| | | | 8/18/2016 | 2/9/2018 |
| | | Signs Standard Detail Sheets | 6/17/2016 | 4/14/2018 |
| | | 05 10-hm pole
current standards.doc
07 09 12- service (se)
all lighting standards
all signal standards
02- quantity sheet(su)
04-loops (lp)
03-cabinet base (ca)
07- poles (po)
06-ped signal countdown (po)
06-tformer base (cl)
04 09-hm base (hm)
08 10 13-service base (se)
02-quantity sheet (su) ligthing
08-mast arm mono (ma) | 4/26/2016 | 10/6/2017 |
| | | 02-Quantity Sheet (SU) revised
All signal standards | 2/2/2016 | 2/3/2017 |
| | | Quantity sheet- lighting/signal
cabinet base detail
cobrafuse detail
junction box detail - lighting/signal
service- pole/base
poles- signal
mast arm mono
Signal and Lighting estimate
All lighting Standards
All Signal Standards
kytc traffic cell library
| 1/8/2016 | 5/5/2017 |
| | | | 8/13/2015 | 6/3/2016 |
| | | Please note that the weblink for SALSA has chnaged.
It is now salsatraffic.com.
the old link will redirect you to the new link for about a month.
Please make sure that you fix your favorite for this in your browser.
I also want to mention that salsa has a suggestion box on the right after you log-in. if you see any items that need fix or better ideas for new features please log them in the suggestion box.
thanks Ted | 7/7/2015 | 8/13/2016 |
| | | 02-Quantity Sheet (SU)
02 Quantity Sheet (SU) lighting
03-Cobrafuse (CL)
04-Shepcrookfuse (CL)
06-Ped Signal Countdown (PO)
ALL LIGHTING STANDARDS
ALL SIGNAL STANDARDS | 6/23/2014 | 2/20/2015 |
| | | 03-Cabinet Base (CA).dgn/.pdf
Current Standards.doc
ALL SIGNAL STANDARDS.dgn
Add Attachment heights.xlsx | 3/14/2014 | 3/13/2015 |
| | | updated
07 09 12-Service (SE).dgn and .pdf
08 10 13-Service Base (SE).dgn and .pdf
Current Standards.doc | 2/7/2014 | 2/13/2015 |
| | | Estimates
cells
add tutorial for signals and lighting design | 1/29/2014 | 12/11/2014 |
| | | both service sheet fixed | 9/27/2013 | 3/21/2014 |
| | | signal and lighting quantities/bid note sheet
service base
service pole
All lighting standards
all signal standards
current standards
| 9/12/2013 | 5/10/2014 |
| | | New Webapp for SALSA is now available: All users will need to request login/password. Please email Ted Swansegar for access. After prequalification for Electrcial design is verify a login/password will be send to the user. | 5/17/2013 | 12/13/2013 |
| | | see current standard word document for new standard update | 5/2/2013 | 11/2/2013 |
| | | New Webapp for SALSA coming in May: All users will need to request login/password. Please email Ted Swansegar for access. | 4/22/2013 | 5/30/2013 |
| | | T010 SHEETING SIGN DETAIL SHEET 2 OF 2 .DGN/.PDF | 2/28/2013 | 4/26/2014 |
| | | Project install list
permit install list
02-Quantity sheet (SU).dgn
02-Quantity sheet (SU).pdf
07-Poles (PO).dgn
07-Poles (PO).pdf
all signal standards.dgn
current standards.doc
added: all signal standards.pdf
| 2/18/2013 | 10/26/2013 |
| | | SALSA
Correction of a bug in Drop Diagonal | 12/7/2012 | 5/18/2013 |
| | | Updated 34 foot pole
will need to request password from ted.swansegar@ky.gov | 10/3/2012 | 1/19/2013 |
| | | Updated standards:
02-Quantity (SU).DGN/PDF
02-Quantity (SU) lighting.dgn/pdf
06 07 11- Junction Box (JB).dgn/pdf
09-Juntion (JB).dgn/pdf
2011 signal and lightinf estimate.xls
ALL SIGNAL STANDARDS.DGN
ALL LIGHTING STANDARDS.DGN
Current Standards.doc | 9/20/2012 | 12/22/2012 |
| | | updated:
SALSA
Project install list
permit install list
all signal standards | 8/10/2012 | 2/9/2013 |
| | | Added All PDF Documents
Added Bid Items Notes for Lighting and Signals (.doc)
Changed:
- 06-Tformer Base (CL)
- 07 08- Barrier Wall (BW)
- 07 09 12-Service (SE)
- 08 10 13- Service Base (SE)
- ALL LIGHTING STANDARDS
- Current Standards.doc
Note: All new signal standards will be coming out soon to update for the 2012 Spec book revisions!!!! | 6/4/2012 | 12/15/2012 |
| | | Updated the following:
- Project Install Items
- Permit Install Items
| 2/21/2012 | 12/6/2012 |