US 421 Milton-Madison Bridge Approach

The Kentucky Transportation Cabinet (KYTC) is in the design phase of a project to improve safety, geometry and traffic flow along US 421 from the Milton-Madison Bridge to the US 421 hill just south of Milton in Trimble County.  The project will consist of a rural roadway design coming off the hill, consisting of two lanes, twelve feet in width each and eight foot paved shoulders.  The portion of US 421 through the business segment of Milton will consist of an urban roadway design consisting of curb and gutter with five foot sidewalks and access management.A public meeting was held on January 15, 2015 to present three alternatives for improvements to the US 421 approach to the bridge.  A fourth alternative, the "do nothing" option was also provided in the handout.  Approximately 45 people attended this meeting at Milton Elementary School, 9245 US 421 in Milton, KY .
 
The public meeting displays, handout and questionnaire provided are to the right under Supporting Documents.  The public meeting questionnaire can be downloaded and mailed to the Kentucky Transportation Cabinet District 5 Office, 8310 Westport Road, Louisville KY 40242.  Comments will be accepted until January 29, 2015.
 
Please contact the project manager Beth Niemann (502-210-5521 or elizabeth.niemann@ky.gov) if you have any questions.  Thanks in advance for your help.
​This page is maintained by Andrea.Clifford@ky.gov, who may be contacted to make corrections or changes.

Follow Us