19-5037 | 302 | Breathitt | Will the Department post the plans for the project? | Yes, the plans will be posted in Project Related Information. | 1/8/2019 7:43 AM |
19-5027 | 303 | Caldwell | Will the Department provide as built plans for the existing structure? | Existing plans will be posted in Project Related Information. Each contractor submitting a bid for this work shall make a thorough inspection of the project site prior to submitting. | 1/9/2019 7:57 AM |
19-5026 | 108 | Casey | What is the intent of the Concrete – Class B bid item? | A note on page 20 of the proposal states "Mass concrete (Class B) should be placed in the excavation from the top of the footing to the bedrock surface where the footing does not extend to the bedrock surface." | 1/10/2019 8:55 AM |
19-2016 | 331 | Harlan | The crack seal note on page 20 of proposal is consistent with projects that include overband crack sealing, however there is not a bid item. Please advise. | An addendum will be posted to add the bid item. | 1/10/2019 10:02 AM |
19-2017 | 335 | Jackson | Please clarify why the leveling course area is greater than the surface course area. | There will need to be some leveling of the roadway at various locations, as directed by the engineer, prior to the first overall leveling course as a part of the double layer of Microsurface. | 1/10/2019 11:44 AM |
19-2046 | 350 | Taylor | Will the Department specify where the 7,042 square yards of Microsurfacing Leveling Course is on the project? | The leveling and wedging will be placed as directed by the engineer. | 1/10/2019 11:45 AM |
19-2021 | 346 | Pulaski | There is a special note on page 9 of the proposal requiring the use of a material transfer vehicle (MTV). Does the department want an MTV to be used on this thin lift overlay project? | | 1/10/2019 11:54 AM |
19-2024 | 347 | Pulaski | There is a special note on page 9 of the proposal requiring the use of a material transfer vehicle (MTV). Does the department want an MTV to be used on this thin lift overlay project? | | 1/10/2019 11:54 AM |
19-2047 | 328 | Franklin | Under Aggregate in the Special Note for Asphalt Chip Seal on Page 12 of the proposal the contractor is to provide an aggregate having no more than 2 percent passing the No. 200 sieve. It does not mention a nominal aggregate size. In the past they have specified either No. 8, 9M or No. 11. Which coarse aggregate is to be used? | The nominal aggregate size shall be a No. 9M. | 1/10/2019 1:36 PM |
19-5033 | 307 | Lewis | There are two bid items for Armored Edge for Concrete. Is this correct? | No. An addendum will be posted to remove the duplicate item. | 1/10/2019 4:26 PM |
19-2017 | 335 | Jackson | Will the additional Microsurfacing leveling course, as directed by the engineer, be a double layer using Type III aggregate at 18 lbs/sy or minor leveling using Type II aggregate at 14 lbs/sy? | A Type III aggregate at 18 lbs/sy will be used. | 1/11/2019 2:06 PM |
19-2015 | 351 | Todd | Will the Department allow the chipped roadway to be open to traffic during the curing period of the Chip Seal? | Once the surface has been rolled by the steel drum roller and the application has had a sufficient amount of time to lock the aggregate in, which could range from 30 minutes to 2 hours, 25 mph traffic can be permitted. The contractor will be required to sweep the roadway clean before the end of the work day. | 1/11/2019 2:08 PM |
19-2046 | 350 | Taylor | Will the Department specify whether the leveling course is a double layer or to be used as minor leveling? | The microsurface leveling course will be minor leveling as directed by the engineer. | 1/11/2019 2:10 PM |
19-2015 | 351 | Todd | Will the Department specify whether the leveling course is a double layer or to be used as minor leveling? | The microsurface leveling course will be minor leveling as directed by the engineer. | 1/11/2019 2:13 PM |
19-2060 | 334 | Hopkins | Will the Department specify whether the leveling course is a double layer or to be used as minor leveling? | The leveling course is used a double layer. | 1/11/2019 2:29 PM |
19-2020 | 341 | Marion | Will the Department specify whether the leveling course is a double layer or to be used as minor leveling? | The leveling course is used as a double layer. | 1/11/2019 2:33 PM |
19-2059 | 401 | McCracken | Will the Department please specify whether the leveling course is a double layer or to be used as minor leveling? | For the KY 1310 portion of the project, the leveling is for minor leveling as directed by the engineer. The leveling for the US 60 portion of the project is for a double layer. | 1/14/2019 9:21 AM |
19-2069 | 311 | Martin | On page 8 of the proposal, the area to be surfaced is listed at 1,408 square yards. The JPC PAVEMENT-8 IN bid item quantity is only 155 square yards. Please advise. | The bid item is correct. The note on page 8 of the proposal should be 155 square yards. | 1/14/2019 9:21 AM |
19-2042 | 312 | Pendleton | Will the Department provide a drawing that shows the limits of the project? | Yes. An addendum will be posted. | 1/14/2019 1:18 PM |
19-2042 | 312 | Pendleton | There is a bid item for Mobilization for Mill & Text, but no item for asphalt milling. Please clarify the intent of this item. | The bid item was mistakenly added. An addendum will be posted to remove the item. | 1/14/2019 1:19 PM |
19-2042 | 312 | Pendleton | Page 22 of the proposal states that the Engineer may specify days and hours when lane closures will not be allowed. Please provide the hours and days lane closures will be allowed. | There will be no restriction on lane closures as long as there are two lanes in each direction when no work is being performed. | 1/14/2019 1:25 PM |
19-1002 | 105 | Grant | The completion date on this project seems to be overly aggressive when taking into account the railroad requirements in the Special Provision. Not only are there 75 trains a day thru this corridor (which will increase the time needed for work on the railroad right-of-way exponentially), the railroad review time for all of the submittals will essentially take up over half of the time available to build the project. Did the Department take into account all of the submittal review time required by the railroad when establishing the completion date for this project? | Yes. This project is being accelerated due to the closure of this bridge. | 1/14/2019 1:29 PM |
19-1022 | 348 | Rowan | The bid items appear to not include the quantities from the loop summary on page 74 of the proposal. Please advise. | Disregard the loop summary on page 74 of the proposal it was mistakenly included in the proposal. | 1/15/2019 9:46 AM |
19-1203 | 107 | Lincoln | According to the plans, there appears to be multiple existing underground utilities beneath the proposed bridge foundations. On Sheet R2E of the Roadway Plans and in the Utilities and Rail Certification Note, it states that utility relocation will not be complete until April 30, 2019. However, it does not list any utilities to be relocated in the Utilities Certification Note. What utilities are being relocated? | Atmos Energy (Gas) has already been relocated. Water and Sewer (City of Stanford) are currently being relocated. Electric (KU) is currently relocating. Windstream (Communications) is currently relocating. Charter (Communications) is currently relocating. | 1/15/2019 10:01 AM |
19-1201 | 104 | Boone | In reference to sheet R11 - Geotechnical Notes, note 16, will the Department consider adding a pay item for draining existing pond? | The Department will not add a bid item for draining the pond. Draining of any pond on the project shall be incidental to “Embankment in Place”. In addition, according to section 206.04.01 of the Standard Specifications, the Department will measure and pay for the volume of any unsuitable foundation material that is excavated in the pond areas as “Embankment in Place”. | 1/15/2019 10:51 AM |
19-5026 | 108 | Casey | The 45 calendar days allotted for the bridge replacement seems to be a very aggressive schedule for the work that is involved. Would the Department consider a 60 day closure similar to other bridge replacement projects in this letting with comparable scopes? | The closure duration will remain at 45 calendar days. This project needs to be completed in an expedited fashion due to future bridge work planned for this area later this year. | 1/15/2019 10:54 AM |
19-1002 | 105 | Grant | In Appendix E-14 (Page 43) of the NS RR Special Provision, Item 4 details Field/Site Trailer and Furnishing requirements for the flagman’s use during the project. Will the Department add a bid item for this item of work? | No. Bid items will not be added. | 1/15/2019 11:07 AM |
19-2016 | 331 | Harlan | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:34 AM |
19-2057 | 339 | Lee | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:35 AM |
19-2020 | 341 | Marion | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:37 AM |
19-2021 | 346 | Pulaski | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:38 AM |
19-2024 | 347 | Pulaski | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:39 AM |
19-2022 | 348 | Rowan | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:40 AM |
19-2046 | 350 | Taylor | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:43 AM |
19-2015 | 351 | Todd | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:45 AM |
19-2059 | 401 | McCracken | Can the raised pavement markers be removed the same day as the Microsurfacing leveling course is applied? | Best practice is to remove raised pavement markers the day prior, however as long as the removal process is far enough ahead of the paver, the raised pavement markers can be removed the same day. | 1/15/2019 11:48 AM |
19-2015 | 351 | Todd | The contract quantity for asphalt items exceeds the threshold specified in Section 109.07 of the Standard Specifications. Will the department consider Fuel and Asphalt Adjustments for this contract? | Fuel and Asphalt Adjustments will not be bid as individual bid items on this project, however, Section 109 of the Standard Specifications for Road and Bridge Construction price adjustments will apply. | 1/15/2019 1:43 PM |
19-1001 | 200 | Boone | The appendix in the Special Note for Sound Barrier Walls on PDF page 82 of 415 of the proposal states: “Formliner shall be used on all exposed concrete on the front face (face toward the roadway) and the rear face of the precast panels.” Is it Department’s intent to use true “formliner” on each side, requiring that these precast panels be constructed standing up with forms and formliner on each side? Or can 1 side of the panel be stamped when poured in the lay down position? | Provided any dimensional and structural requirements of the wall are met and the pattern is monolithically cast into the panel; the method of applying the specified architectural treatment to each side of the wall shall be at the discretion of the contractor. | 1/15/2019 3:27 PM |
19-5033 | 307 | Lewis | Page 31 of the proposal states that Concrete Patching Repair will be measured per square feet, however, the bid item on page 82 has the unit of measurement in cubic feet. Which is correct? | The note on page 31 of the proposal is correct. An addendum will be posted to revise the bid item. | 1/15/2019 3:47 PM |
19-1001 | 200 | Boone | Are as built drawings available for the existing lighting on this project? | Plans for the existing lighting are not available. | 1/16/2019 11:06 AM |
19-5032 | 308 | Nicholas | Page 26 of the proposal states that Concrete Patching Repair will be measured per square feet, however, the bid item on page 84 has the unit of measurement in cubic feet. Which is correct? | The note on page 26 of the proposal is correct. An addendum will be posted to revise the bid item. | 1/16/2019 11:23 AM |
19-2021 | 346 | Pulaski | Page 37 of the proposal calls for two (2) Electrical Junction Box (10x8x4), however, there is not bid items for these two boxes. Please advise. | An addendum will be posed to add the bid item. | 1/16/2019 12:02 PM |
19-5037 | 302 | Breathitt | Will the Department accept a metal deck bridge kit and replacement process instead of the posted method of repair and replacement? | No. The metal grid deck structures are not currently considered approved equivalent structures by the Department at this time. | 1/16/2019 2:04 PM |
19-5038 | 306 | Harlan | Will the Department accept a metal deck bridge kit and replacement process instead of the posted method of repair and replacement? | No. The metal grid deck structures are not currently considered approved equivalent structures by the Department at this time. | 1/16/2019 2:05 PM |
19-5034 | 310 | Pike | Will the Department accept a metal deck bridge kit and replacement process instead of the posted method of repair and replacement? | No. The metal grid deck structures are not currently considered approved equivalent structures by the Department at this time. | 1/16/2019 2:05 PM |
19-2060 | 334 | Hopkins | Will the Department add a bid item for removal of pavement markers? | Yes. An addendum will be posted. | 1/17/2019 7:02 AM |
19-2020 | 341 | Marion | Will the pavement markers that are removed need to be installed after the new surface is placed? | | 1/17/2019 7:04 AM |
19-2046 | 350 | Taylor | Will the pavement markers that are removed need to be installed after the new surface is placed? | | 1/17/2019 7:05 AM |
19-2022 | 348 | Rowan | Will the pavement markers that are removed need to be installed after the new surface is placed? | | 1/17/2019 7:07 AM |
19-2021 | 346 | Pulaski | The typical section for the microsufacing alternate shows no leveling on the 1-2’ shoulders although proposed quantities would indicate otherwise. Please specify if leveling is required on the shoulders. | Yes. The Microsurfacing Leveling Course will be applied to the shoulders as well as the mainline as the quantities reflect. | 1/17/2019 7:10 AM |
19-2023 | 344 | Ohio | In regards to the chip seal, please specify the type of emulsion to be used on the mainline as opinions may differ between the Department and Contractor. | The chip seal application will utilize a CMS-1P emulsion. | 1/18/2019 10:32 AM |
19-2016 | 331 | Harlan | Will all cracks need to be routed? Will a heat lance need to be used if the cracks are dry? | The cracks will not be routed. A heat lance will be required at the discretion of the engineer. | 1/18/2019 10:47 AM |
19-2015 | 351 | Todd | In regards to the chip seal, please specify the type of emulsion to be used on the mainline as opinions may differ between the Department and Contractor. | The chip seal application will utilize a CMS-1P emulsion. | 1/18/2019 10:49 AM |
19-5032 | 308 | Nicholas | How will erosion control be paid? | Erosion control items will be incidental to the item REMOVE STRUCTURE. | 1/18/2019 10:52 AM |
19-5035 | 300 | Adair | How will erosion control be paid? | Erosion control items will be incidental to the item FOUNDATION PREPARATION. | 1/18/2019 10:55 AM |
19-5029 | 304 | Clinton | How will erosion control be paid? | Erosion control items will be incidental to the item FOUNDATION PREPARATION. | 1/18/2019 10:58 AM |
19-5026 | 108 | Casey | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:49 PM |
19-5031 | 109 | Spencer | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:49 PM |
19-5035 | 300 | Adair | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:50 PM |
19-5029 | 304 | Clinton | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:52 PM |
19-5030 | 305 | Graves | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:52 PM |
19-5038 | 306 | Harlan | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:52 PM |
19-5033 | 307 | Lewis | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:53 PM |
19-5032 | 308 | Nicholas | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:53 PM |
19-5034 | 310 | Pike | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:54 PM |
19-5035 | 300 | Adair | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:31 PM |
19-5037 | 302 | Breathitt | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:32 PM |
19-5027 | 303 | Caldwell | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:32 PM |
19-5029 | 304 | Clinton | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:33 PM |
19-5030 | 305 | Graves | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:33 PM |
19-5038 | 306 | Harlan | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:34 PM |
19-5033 | 307 | Lewis | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:34 PM |
19-5032 | 308 | Nicholas | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:35 PM |
19-5034 | 310 | Pike | Is there a color requirement for item 23378EC CONCRETE SEALING? | Yes. All requirements of the 2012 KYTC Standard Specification for Road and Bridge Construction, Section 821, shall apply to the item 23378EC CONCRETE SEALING. The target color value is GRAY L*= 74.94, a*= -1.54, b*= 3.92 | 1/18/2019 2:35 PM |
19-2950 | 408 | Clark | Will the Department provide the approximate square footage for the project? | Yes. The approximate square footage of structural steel to be cleaned and painted for each bridge will be posted under project related information. The Square Footage for the structures posted is for informational purposes only and is not intended for bidding purposes. | 1/18/2019 2:47 PM |
19-1001 | 200 | Boone | Will the water pipe in question be internally restrained or normal push on joint with Mega Lugs? | The pipe for this project is to be internally restrained using a Field Lok type gasket or equivalent, in addition all fittings and bends are to be restrained using Mega Lugs or equivalent. | 1/18/2019 3:15 PM |
19-1001 | 200 | Boone | There is a discrepancy in the quantity for item Piezoelectric Sensor. Can the Department verify the quantity? | The bid quantities are correct, an addendum will be issued to correct the special notes. | 1/18/2019 3:32 PM |
19-1001 | 200 | Boone | Will the existing ARTIMIS radars near US42 be impacted by this project? | The ARTIMIS camera on south west corner of the interchange with US 42 will not be impacted. | 1/18/2019 3:32 PM |
19-1001 | 200 | Boone | The Special Note for Sound Barrier Walls appears to end in mid-sentence (page 7 of 7 of the note) and (PDF page 82 of the entire proposal). Is the note complete or is there more? | The note is not complete. An addendum will be posted to revise the note. | 1/18/2019 3:34 PM |
19-1001 | 200 | Boone | Will the ashlar stone pattern (front face and rear face) used on sound wall projects in Jessamine County-East Nicholasville Bypass, Jefferson County-Breckinridge Lane, Jefferson County-Southern Parkway, Jefferson County- I-265 be acceptable? | District 6 has made the approval process very similar to the approval process used on those projects, but the exact same people are not involved. The Special Note for Sound Walls on this project have specific requirements for approval of these walls. | 1/18/2019 3:35 PM |
19-2023 | 344 | Ohio | The Surfacing Areas listed on page 9 of the proposal show 52,637 SY of mainline area and 4,577 SY of shoulder area to be surfaced for a total of 57,214 SY. The bid item for Microsurfacing has a total of 52,637 SY. Is this bid item quantity incorrect? | The quantity is correct. There are no significant shoulders on the project. The shoulder square yardage listed is for DGA. | 1/18/2019 3:37 PM |
19-5037 | 302 | Breathitt | The pavement design on page 13 (Normal Section) does not match the pavement design on page 38 of the proposal. Which is correct? | The pavement design on page 38 is correct. Disregard the pavement design on Page 13 for the normal section. | 1/22/2019 9:45 AM |
19-5037 | 302 | Breathitt | Will all of the DGA be paid as granular embankment or is a portion of the DGA incidental to the Bridge Overlay Approach Pavement? | DGA for construction of final pavement typical will be incidental to Bridge Overlay Approach Pavement. | 1/22/2019 9:47 AM |
19-2950 | 408 | Clark | Will a truck mounted attenuator be required for lane closures. | | 1/22/2019 10:08 AM |
19-2023 | 344 | Ohio | Will the chip seal course be a single layer treatment or double layer treatment? | The chip seal will be a single layer treatment. | 1/22/2019 10:11 AM |
19-4201 | 111 | Spencer | The special note for base failure refers to saw cutting the existing pavement prior to milling and resurfacing. Is saw cutting the limits of the base failures required? | | 1/22/2019 10:33 AM |
19-2015 | 351 | Todd | Do all the crossovers and turn lanes get resurfaced? | | 1/22/2019 11:20 AM |
19-2015 | 351 | Todd | There is a bid item for Asphalt Seal Coat but the typical section refers to a fog seal. Please clarify. | An addendum will be posted to revise the bid item. | 1/22/2019 11:23 AM |
19-2601 | 202 | Jefferson | The Latex Overlay work on I-65 is limited to weekend work. Will the Department consider using Rapid Set Latex in place of Portland Cement to increase the ability to complete the work within the scheduled time frame while obtaining the required compressive strength of the concrete cylinder breaks within the given time restrictions?
| | 1/22/2019 11:47 AM |
19-2045 | 333 | Harlan | It appears the quantities for Pave Marking Thermo Cross-hatch are based upon measurement of island area and not the actual square footage of thermo marking to be applied. Does the Department intend to measure and pay for this item in the same way or will pay quantities be reflective of marking area actually applied in the field? | Payment is based on island area and not the actual square footage of thermo marking to be applied. | 1/22/2019 11:52 AM |
19-4100 | 110 | Henderson | Will Thermoplastic Merge Arrows need to be removed prior to application of High Friction Surface Treatment?
| | 1/22/2019 11:55 AM |
19-2601 | 202 | Jefferson | Will temporary steel barrier wall be acceptable in lieu of concrete 9T barrier wall? | | 1/22/2019 11:57 AM |
19-2029 | 404 | Johnson | Note M. Asphalt Patching on Page 14 of the proposal states “Asphalt paving will not be part of the contract. If necessary, asphalt paving will be done by state forces at a later date”, however, there are asphalt bid items in the project. Please clarify. | An addendum will be posted to remove the asphalt bid items. | 1/22/2019 12:02 PM |
19-1004 | 100 | McCracken | For bid item LIGHTING CONTROL EQUIPMENT, sheet T50 shows to use a quantity of (8) 10 AMP branch breaker. There is not a 10 AMP branch breaker available, can there be a change to switch from (8) 10 AMP breakers to (8) 15 AMP breakers and then change the circuit main breaker to 200 AMP from the original 100 AMP and then the contactor to 200 AMP as well from the original 100 AMP?
| | 1/22/2019 12:08 PM |
19-1005 | 101 | McCracken | For bid item LIGHTING CONTROL EQUIPMENT, sheet T50 shows to use a quantity of (8) 10 AMP branch breaker. There is not a 10 AMP branch breaker available, can there be a change to switch from (8) 10 AMP breakers to (8) 15 AMP breakers and then change the circuit main breaker to 200 AMP from the original 100 AMP and then the contactor to 200 AMP as well from the original 100 AMP? | | 1/22/2019 12:10 PM |
19-5027 | 303 | Caldwell | The as-built plans provided reference additional details on drawings G-62, A36, A25 and M-8. Can these be provided? | All additional drawings will be posted in Project Related Information. | 1/22/2019 3:58 PM |
19-5027 | 303 | Caldwell | Can the most recent bridge condition inspection report be provided? | Bridge Inspection Reports are kept on file with the Department and must be obtained through an open records request. | 1/22/2019 3:59 PM |
19-5038 | 306 | Harlan | There are two bid items for Clearing and Grubbing and Diversions (By-Pass Detours). Will an addendum be issued to correct the bid items? | | 1/23/2019 10:13 AM |
19-5037 | 302 | Breathitt | Can information be provided as to what type of waterproofing membrane the Department would like to be used on this project? | Waterproofing membrane is required to meet the properties listed in Project Related Information for this project. Examples of this membrane include Pave Prep, Pave Prep SA, Polyguard 1100, ODOT Type 3, or any approved equal. | 1/23/2019 10:46 AM |
19-2069 | 311 | Martin | A note on page 12 and 13 of the proposal under the Culvert and Channel Lining sections calls out wingwalls and headwalls. Is the contractor required to provide appropriate headwalls or is this just a general note to ignore? | Wingwalls and Headwalls will not be required. | 1/23/2019 10:47 AM |
19-2069 | 311 | Martin | On page 11 and 26, there are notes that call out the existing culvert. Under construction methods section C on page 11, it says to completely remove existing culverts. On page 26, There is a note that says to only remove the portion of the existing culvert that is necessary. Is it expected that the entire existing culvert be removed? | No. Only remove the portion of the culvert required for installation of the new pipe. | 1/23/2019 10:48 AM |
19-2018 | 329 | Graves | Do all crossovers and turn lanes get resurfaced? | | 1/23/2019 10:48 AM |
19-1005 | 101 | McCracken | Will a Traffic Coordinator be required on the project 24/7? Or only when a lane is closed? | See “TRAFFIC COORDINATOR” note on R69 and “ALTERNATIVE TRAFFIC CONTROL NOTES AND CONSTRUCTION SEQUENCING, Note E” on R71. | 1/23/2019 10:49 AM |
19-1005 | 101 | McCracken | Shall the contractor provide access for emergency vehicles through the closed portions of Highway 60 during the 4week shut down? If so, please explain what is expected and the number of gates, guards, attendants, security personnel, Law Enforcement Participation or other means of restricted/controlled access. | Yes. Law Enforcement Officer shall be on site to provide opening through the closure area. A bid item will be added for this by addendum. A minimum of a 12’ travel way must be accessible to emergency vehicles at all times. | 1/23/2019 10:49 AM |
19-1004 | 100 | McCracken | Will a Traffic Coordinator be required on the project 24/7? Or only when a lane is closed? | See “TRAFFIC COORDINATOR” note on sheet R69. | 1/23/2019 10:50 AM |
19-1004 | 100 | McCracken | Sheet R2J, Note-Typical Commercial Entrance Full Depth Asphalt Pavement and Section A-A Asphalt Entrance – indicate a 2’ gutter extends adjacent to the driving lane from one side of the entrance to the other. This is not represented on the plan sheets nor does it appear the quantities. Extending a 2’ gutter across asphalt entrance would create access issues, cause inconvenience and delays while adding more cost to the project, above and beyond the current quantities. Will the department delete the 2’ gutter extension on all asphalt entrances? | The plan view of the “Typical Commercial Entrance Full Depth Asphalt Pavement” on Sheet R2J shows a “dash” line indicating the projection of the gutter line which corresponds to the “2’” dimension on the asphalt section below the typical. The gutter ends at the beginning of the radius to the entrance as shown on the plan sheets. It does not continue across the entrance. | 1/23/2019 10:50 AM |
19-1004 | 100 | McCracken | Will the department add Bore and Jack Conduit to the Signalization Package as many conduits must be installed beneath existing / remaining pavement? | Yes. An addendum will be posted. | 1/23/2019 10:51 AM |
19-1004 | 100 | McCracken | Bid items PAVE STRIPING-TEMP PAINT-4 IN, PAVE STRIPING-TEMP PAINT-6 IN, and PAVE MARK TEMP PAINT STOP BAR are for temporary paint and stop bars. Will all temporary paint used on the project during any and all phases be paid per these bid items? | Yes. Payment will be as noted in the plans. | 1/23/2019 10:52 AM |
19-1004 | 100 | McCracken | Water blasting is very time consuming and leaves the roadway wet therefore delaying painting operations, especially at night, when lane closures and MOT activities will take place. Will the department allow the use of Black Paint to cover existing striping as an alternate method to water blasting? | Yes, see Note 24 on Sheet R69. | 1/23/2019 10:53 AM |
19-1004 | 100 | McCracken | Bid Item 1450 PRECAST CONC BOX SECT 13’ x 3’ appears to be referring to the 3’x 3’ RCBC extension at 171+75.3. Please clarify. | Yes. It is the 3’ x 3’ RCBC @ Sta. 171+75.3. | 1/23/2019 10:53 AM |
19-1005 | 101 | McCracken | Sheet R2J, Note-Typical Commercial Entrance Full Depth Asphalt Pavement and Section A-A Asphalt Entrance – indicate a 2’ gutter extends adjacent to the driving lane from one side of the entrance to the other. This is not represented on the plan sheets nor does it appear the quantities. Extending a 2’ gutter across asphalt entrance would create access issues, cause inconvenience and delays while adding more cost to the project, above and beyond the current quantities. Will the department delete the 2’ gutter extension on all asphalt entrances? | The plan view of the “Typical Commercial Entrance Full Depth Asphalt Pavement” on Sheet R2J shows a “dash” line indicating the projection of the gutter line which corresponds to the “2’” dimension on the asphalt section below the typical. The gutter ends at the beginning of the radius to the entrance as shown on the plan sheets. It does not continue across the entrance. | 1/23/2019 10:54 AM |
19-1005 | 101 | McCracken | Will all signs, message boards, barriers and etc. used for closures of I-24 ramps and Hwy 60 through movement be paid for at the unit prices established in the contract as they will be in place for 4 to 6 weeks? | Yes, payment as noted in the plans. | 1/23/2019 10:54 AM |
19-1005 | 101 | McCracken | Will the department add Bore and Jack Conduit to the Signalization Package as many conduits must be installed beneath existing / remaining pavement? | Yes. An addendum will be posted. | 1/23/2019 10:55 AM |
19-1005 | 101 | McCracken | Bid items PAVE STRIPING-TEMP PAINT-4 IN, PAVE STRIPING-TEMP PAINT-6 IN, and PAVE MARK TEMP PAINT STOP BAR are for temporary paint and stop bars. Will all temporary paint used on the project during any and all phases be paid per these bid items? | Yes. Payment will be as noted in the plans. | 1/23/2019 10:55 AM |
19-1005 | 101 | McCracken | Water blasting is very time consuming and leaves the roadway wet therefore delaying painting operations, especially at night, when lane closures and MOT activities will take place. Will the department allow the use of Black Paint to cover existing striping as an alternate method to water blasting? | Yes, see Note 24 on Sheet R69. | 1/23/2019 10:56 AM |
19-1005 | 101 | McCracken | Bid Item 1450 PRECAST CONC BOX SECT 13’ x 3’ appears to be referring to the 3’x 3’ RCBC extension at 171+75.3. Please clarify. | Yes. It is the 3’ x 3’ RCBC @ Sta. 171+75.3. | 1/23/2019 10:56 AM |
19-2024 | 347 | Pulaski | Will Microsurfacing or Thinlay material be required on all inside shoulders (various widths), turning lanes, cross overs, ramps and approaches? | REVISED: Microsurfacing or Thinlay material will be required on all inside shoulders, turning lanes, and crossovers. | 1/22/2019 10:07 AM |
19-2021 | 346 | Pulaski | Will Microsurfacing or Thinlay material be required on all inside shoulders (various widths), turning lanes, cross overs, ramps and approaches? | REVISED: Microsurfacing or Thinlay material will be required on all inside shoulders, turning lanes, and crossovers. | 1/22/2019 10:06 AM |
19-5037 | 302 | Breathitt | The Special Note for Bridge Overlay Approach Pavement says pavement striping shall be paid according to specifications but there is no bid items. How will this be paid? | Temporary Striping, if required, for both bridge and approach work is incidental to the item MAINTAIN & CONTROL TRAFFIC. Permanent Striping, if required, for both bridge and approach work is incidental to the item BRIDGE OVERLAY APPROACH PAVEMENT. | 1/18/2019 12:51 PM |
19-2019 | 325 | Daviess | Will a bid item be added for loop testing? | Yes. An addendum will be posted to add the bid item. | 1/23/2019 11:52 AM |
19-1002 | 105 | Grant | Per general notes on page 4: USACE 401\404 permits are referenced as applicable to this project. Are there any 401\404 permits for this project? | No 401/404 permits are required for this project. | 1/23/2019 1:42 PM |
19-1002 | 105 | Grant | Maintenance of traffic notes-General Section-Section 2A: Refers to a temporary roadway, but none is shown. Is this applicable to this project? | No. A temporary roadway is not needed. | 1/23/2019 1:43 PM |
19-2069 | 311 | Martin | A note on page 20 of the proposal states that the road cannot be closed for more than 5 days, however on page 21 it is stated there is a maximum of 7 days. Which is correct? | REVISED: The road cannot be closed for more than 7 calendar days. The note on page 20 of the proposal is incorrect and should be 7 calendar days. | 1/23/2019 10:47 AM |
19-1001 | 200 | Boone | A note on page 178 of the proposal states that “Special Note for Fixed Completion Date and Disincentive Fees A+B” applies to all phases of the contract. When does “Special Note for Fixed Completion Date and Liquidated Damages” on page 244 apply? | An addendum will be posted to remove the Liquidated Damages special note on page 244 and it will be replaced by a Law Enforcement Officer special note. Page 178 refers to the Special Note for Fixed Completion Date and Disincentive Fees “A+B” beginning on page 224. The Note beginning on page 224 does apply to both portions of the overall project, Item No. 6-20002.10, and Item No. 6-14.50. An addendum is being issued to revise portions of the Special Note for Fixed Completion Date and Disincentive Fees “A+B” beginning on page 224. | 1/23/2019 1:47 PM |
19-1001 | 200 | Boone | Can a bid item be added for Law Enforcement Officers? | Yes. An addendum will be posted to add a Law Enforcement Officer bid item. | 1/23/2019 1:50 PM |
19-1001 | 200 | Boone | Please note project line number and bid code 1210-08904 – Crash Cushion Type VI Cass C (4-each) found within the proposal indicates a permanent crash cushion. However, the project plan set indicates the above item code to be utilized as a temporary crash cushion. Can you please confirm if proposal or if the plan set is correct? | The bid item for the crash cushions indicated in the maintenance of traffic plans is incorrect. The correct bid item is Crash Cushion Type VI-BT and is covered by standard drawing RBE-100-10. Any reference to a crash cushion in the maintenance of traffic plans shall be understood to be Crash Cushion Type VI-BT. An addendum will be posted to correct the bid item. | 1/23/2019 2:25 PM |
19-5027 | 303 | Caldwell | How far have the spans slipped relative to each other? Guardrail notes say to use shims in order to keep the final rail straight, however no indication has been given as to the possible thickness of shims required. | The contractor should make their own determination on shims needed to meet the requirement based of field verification and site visits. | 1/23/2019 2:27 PM |
19-2026 | 343 | Meade | Will Fuel and Asphalt Adjustments be applied to this project? | Fuel and Asphalt Adjustments will not be bid as individual bid items on this project, however, Section 109 of the of the Standard Specifications for Road and Bridge Construction price adjustments will apply if thresholds are met. | 1/23/2019 2:54 PM |
19-2023 | 344 | Ohio | Will Fuel and Asphalt Adjustments be applied to this project? | Fuel and Asphalt Adjustments will not be bid as individual bid items on this project, however, Section 109 of the of the Standard Specifications for Road and Bridge Construction price adjustments will apply if thresholds are met. | 1/23/2019 2:55 PM |
19-1001 | 200 | Boone | In the “Special Note for Sound Barrier Walls” in the first paragraph under II. Design A. General it is stated “Furnish plans for sound barrier walls and drilled shaft foundations (see attached geotechnical report). Where can the Geotechnical report referenced be located? Further on page 2 “Geotechnical Notes” are referred to. When reviewing the “Geotechnical notes” there is no mention of the sound barrier shafts. Can the Geotechnical report and the Geotechnical notes regarding the sound barrier be made available? | The Geotechnical reports will be posted in Project Related Information. | 1/23/2019 3:39 PM |
19-1203 | 107 | Lincoln | Could a powder coat finish be used on the metal handrail in lieu of the anodized finish? | The City of Stanford, Kentucky expressed a keen interest in determining certain aspects of this structure, particularly the plans and specifications concerning the “Special Notes” included within the contract drawings devoted to the decorative railing attached to the top of superstructure barriers. Any deviation from the aforesaid notes would require approval by the “Engineer” with an additional endorsement by a representative of the City of Stanford. | 1/24/2019 7:37 AM |
19-1203 | 107 | Lincoln | Can the department provide a design, including member sizes, for the railing? | Shop drawings are a required submittal. This submittal shall include plans, elevations, sections, details and attachments to other work. All elements indicated to comply with appropriate design loads shall include structural analysis signed and sealed by a qualified Kentucky licensed professional engineer responsible for their preparation. This includes sizing of indicated members, which will then be analyzed to determine their proper strength. | 1/24/2019 7:37 AM |
19-1203 | 107 | Lincoln | Are the utility relocation plans for this project available? | | 1/24/2019 7:39 AM |
19-5037 | 302 | Breathitt | The completion date is June 1, 2019, however the project has to be completed and the bridge re-opened to traffic in 45 calendar days. A Special Note for tree removal states all tree clearing and bridge removal must be completed by March 31, 2019. Based on these restrictions, does the project have to be "completed" prior to May 15, 2019 or does the bridge need to be open by this date? Please clarify. | The Contractor has 45 calendar days to close the bridge in order to complete all work necessary to reopen the bridge to traffic. The bridge will need to be re-opened 45 calendar days from the time it is closed, however other work that does not require closures can be performed until the completion date of June 1, 2019. | 1/24/2019 7:41 AM |
19-2950 | 408 | Clark | Will the Department provide an approximate square footage for the concrete coating? | Yes. The Approximate Square Footage of Concrete to be Pressure Washed and have Concrete Coatings Applied for each bridge will be posted under Project Related Information. The Square Footage for the structures posted is for informational purposes only and is not intended for bidding purposes. | 1/24/2019 8:30 AM |
19-1001 | 200 | Boone | For bid item LIGHTING CONTROL EQUIPMENT, sheet T48 shows to use a quantity of (4) 30 AMP branch breaker and then another (6) 20 amp branch breakers with a 200 amp circuit breaker and a 200 amp contactor. With the specified breakers given, the total amperage will add up to 220 (not including the spare 20 amp breaker), and the total amperage needs to be equal or less than the circuit and contactor amperage of 200 in order to function properly. Please advise. | Please bid as shown in the plans. | 1/24/2019 9:02 AM |
19-1001 | 200 | Boone | Since the new lighting control cabinets for project 6-14.5 are only replacing currently existing lighting cabinets, does the contractor have to pay the lighting electric bills for the project? | No, contrary to Section 105.12 of the Standard Specifications for Road and Bridge Construction, the Department will continue to pay all electric bills for the project limits. The contractor shall remain responsible for any and all work or coordination necessary to construct the new lighting control equipment and provide power to it. | 1/24/2019 9:33 AM |
19-1001 | 200 | Boone | Can the Department define the limits or area of “Maintain Lighting” as well as a description of what is required under this item? | Contrary to Section 105.11 of the Standard Specifications for Road and Bridge Construction, Lighting shall be maintained by the contractor. Lighting shall be maintained on the mainline interstate and all associated ramps between mile-points 177.5 and 183.3 Existing or proposed lighting must remain burning throughout the entire timeline of the project; from the date Notice to begin work is distributed until the Project Completion Notice is issued. In the event that existing or proposed lighting cannot remain burning, temporary lighting shall be provided that meets the design parameters of the currently existing lighting. In order to Maintain the lighting system, the successful bidder may need to investigate and or perform work in areas outside the work zones prescribed for both components of the overall project, Item No. 6-20002.10, and Item No. 6-14.50. Maintaining the lighting system shall require the successful bidder to perform any work necessary to ensure all lights remain burning; all necessary work not specifically outlined by the highway plans shall be performed according to section 716 of the Standard Specifications. In the event that maintaining the lighting system requires new poles, transformer bases or light arms, the cabinet will provide those; however all other materials and devices necessary to maintain the lighting shall be provided by the contractor. Maintaining the lighting system shall be considered a component of the overall traffic control plan and shall be subject to section 112.03.15 – A) of the standard specifications, except that only the prescribed dollar values in that section shall be used in lieu of the project liquidated damage rate. | 1/24/2019 9:40 AM |
19-1004 | 100 | McCracken | Addendum 1 added the bid item Install Mast Arm Pole. Does this mean the Department will be providing the contractor these poles to install? | Yes. The Department will provide the Mast Arm Poles for the contractor to install. | 1/24/2019 9:47 AM |
19-1004 | 100 | McCracken | Will the Department be supplying mast arm brackets for the 4-section signal heads? | Yes. The Department will supply all sign and signal hangers. | 1/24/2019 9:48 AM |
19-1005 | 101 | McCracken | Addendum 1 added the bid item Install Mast Arm Pole. Does this mean the Department will be providing the contractor these poles to install? | Yes. The Department will provide the Mast Arm Poles for the contractor to install. | 1/24/2019 9:48 AM |
19-1005 | 101 | McCracken | Will the Department be supplying mast arm brackets for the 4-section signal heads? | Yes. The Department will supply all sign and signal hangers. | 1/24/2019 9:48 AM |
19-1202 | 106 | McCracken | The bid quantity for Temporary Signs does not include the proposed detour signage on Sheet R10. How will the detour signs be paid? | Payment for proposed detour signage will be incidental to Maintain and Control Traffic. | 1/24/2019 12:50 PM |
19-2950 | 408 | Clark | The completion date is 11/15/2019. Is there a start date? If not, is there a specific amount of working days? | Work can begin when notice to proceed and preconstruction meeting have been completed. See Section 614 of the Standard Specifications for Road and Bridge Construction for seasonal and weather limitations for cleaning and painting. Joint seal replacement shall be completed by manufactures specifications including season limitations. | 1/24/2019 1:44 PM |
19-1001 | 200 | Boone | Being that lighting must remain burning at all times, when can wiring and pole placement for the new lighting be performed? | Work must be performed under a lane closure during the approved lane closure time periods. The work cannot be performed under a simple shoulder closure. If lighting can’t remain burning while the work is being performed, then the applicable “B” day closures permitted during phases 4 and 6 may be utilized to perform the work during daylight hours. | 1/24/2019 2:07 PM |
19-1001 | 200 | Boone | How will the existing potholes be treated? The stretch of roadway is in poor condition due to pavement deteriorating. Will a bid item be added to patch existing pavement or will this be considered incidental to the maintenance of traffic bid item? | Contrary to section 105.11, the contractor will be required to perform pothole patching. Upon receipt of the "notice to begin work", the contractor shall be responsible for routine pothole patching. The contractor shall be responsible for patching both NB and SB pavements for the entire timeline of the project. Be aware that this roadway has pavement failures that continually cause potholes to form and reoccur. Many potholes have been patched in the past. Some may need patching at the time of bid and others may occur between the time of bid and the notice to begin work. The contractor shall inspect and repair these issues as necessary and as further directed by the engineer should additional notice be necessary to maintain traffic in a safe and reasonable manner to avoid damage to the traveling public. Significant spot issues shall be repaired within 24 hours of notice, for the safety and protection of the traveling public and their property and may require temporary, quick repairs. Other, more extensive repairs, may need to be scheduled in order to provide a more permanent preventative repair that will last throughout the winter. This item of work, including all labor, materials and equipment, as well as proper traffic control, shall be incidental to the "maintain and control traffic" bid item and shall be subject to the provisions of supplemental specification 112. 03.01 regarding non-compliance. | 1/24/2019 2:28 PM |