Folder: 1-201-Special-Notes
  
8/30/2025 3:49 PMVaughn, Mike S (KYTC)
Folder: 1-3400-Guardrail-Notes
  
9/1/2025 3:44 PMVaughn, Mike S (KYTC)
Folder: 1-3800-Traffic-Control-Plan
  
9/1/2025 4:02 PMVaughn, Mike S (KYTC)
Folder: 1-725-Utility-Notes
  
9/1/2025 3:43 PMVaughn, Mike S (KYTC)
Folder: 1-943-KPDES-Storm-Water-Permit-BMP-and-eNOI
  
9/1/2025 3:44 PMVaughn, Mike S (KYTC)
Folder: 1-9625-Summary-Sheets
  
9/1/2025 4:03 PMVaughn, Mike S (KYTC)
Folder: 1-9801-Detail-Sheets
  
9/1/2025 4:04 PMVaughn, Mike S (KYTC)
1-125 National Highway System.doc
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-126 Project Traffic Coordinator (PTC).doc
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-131 Surfacing Areas.doc
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-132 Asphalt Mixture.doc
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-134 DGA Base.doc
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-157 Fuel and Asphalt Pay Adjustments Calculation Spreadsheet.xls
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-157 Fuel and Asphalt Pay Adjustments.doc
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-160 Compaction Option A.doc
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-165 Compaction Option B.doc
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-220 Completion Date and Liquidated Damages (Flexible Start Date).docx
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-220 Completion Date and Liquidated Damages.docx
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-296 Waste and Borrow Sites.pdf
  
9/1/2025 9:21 PMVaughn, Mike S (KYTC)
1-3090 Special Note for Non-Tracking Tack Coat (5-23-2022).pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3094 Electronic Delivery Management System - Aggregate (3-26-2025).pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3095 Special Note for Experimental KYCT and Hamburg Testing (10-8-2020).pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3097 Special Note for RAP Stockpile Management (6-18-2025).pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3193 Coordination of Work With Other Contracts.docx
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3215 Double Asphalt Seal Coat.docx
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3435 Removal of Guardrail to Accommodate Trenching and Shoulder Paving Operation.docx
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3725 Typical Section Dimensions.docx
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3885 Durable Pavement Edge Details.pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-3886 Special Note for Spray Thermo.pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-556 Special Note for Bridge Demolition Renovation and Asbestos Abatement.pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-557 Asbestos Report EXAMPLE.pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
1-949 Communicating All Promises (EXAMPLE).docx
  
9/1/2025 7:25 PMVaughn, Mike S (KYTC)
1-9701 Typical Sections (Multiple Situation EXAMPLES).pdf
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
2-701 Standard Drawings (3-19-2025).docx
  
9/1/2025 4:13 PMVaughn, Mike S (KYTC)
Standard Drawings Headwall Supplement (1-22-2022).docx
  
9/1/2025 4:15 PMVaughn, Mike S (KYTC)