Project Details

​​​​​​​Back

Project Name
County
  
Description

​US 51 Corridor Study (Fulton to Wickliffe)

Ballard, Carlisle, Fulton, Hickman

​This study was initiated to analyze existing conditions and anticipated traffic to identify priority investments along US 51 between the cities of Fulton and Wickliffe.

  
  
US 51 Corridor Study - Final Report.pdfUS 51 Corridor Study - Final Report
  
  
US 51 Corridor Study - Executive Summary.pdfUS 51 Corridor Study - Executive Summary
  
  
There are no items to show in this view of the "Planning Studies and Reports" document library.
  
  
There are no items to show in this view of the "Planning Studies and Reports" document library.
  
  
Appendix A - US 51 Forecast Report.pdfAppendix A - US 51 Forecast Report
Appendix C - US 51 Geotechnical Overview.pdfAppendix C - US 51 Geotechnical Overview
Appendix D - US 51 Cultural Historic Overview.pdfAppendix D - US 51 Cultural Historic Overview
Appendix E - US 51 Socioeconomic Report.pdfAppendix E - US 51 Socioeconomic Report
Appendix F - US 51 Meetings.pdfAppendix F - US 51 Meetings
Appendix G - US 51 Cost Estimates.pdfAppendix G - US 51 Cost Estimates
Appendix H - US 51 Stage 1 ICE.pdfAppendix H - US 51 Stage 1 ICE
Appendix I - US 51 Hydraulic Modeling.pdfAppendix I - US 51 Hydraulic Modeling
  
  
Appendix B - US 51 Crashes.pdfAppendix B - US 51 Crashes

 ‭(Hidden)‬ Content Editor

Follow Us