Report_Id:   221302   Est NO  0068

Date:02/17/2025

COMMONWEALTH OF KENTUCKY

TRANSPORTATION CABINET


Contract ID 221302 Estimate Number 0068 Estimate Type PROGRESS
District Office ELIZABETHTOWN (04360)  Filiatreau, Chad J.

Contractor SCOTTY'S CONTRACTING & STONE LLC ADDR SN 0 VC Code KY0033047
AND STONE LLC
PO BOX 4500
BOWLING GREEN , KY , 42102-4500
Pay Period 01/11/2025  TO  01/24/2025
Date Approved 02/03/2025
Primary Proj Number DE04700652154
Project No. NHPPIM 0654 (041), NHPPIM 0654 (041)
Primary County HARDIN
Name of Road I-65 AT KY 222
Description IMPROVE SAFETY AND INCREASE CAPACITY AT I-65/KY-222 INTERCHA NGE.
     
     
Date Let 01/27/2022 Formal Acceptance
Date Awarded 02/08/2022 Date Work Began 04/01/2022
Date Contract Executed 03/01/2022 Open To Traffic
Date NTP Issued 02/23/2022 Actual Completion Date

Current Contract Amount

$41,226,695.51

Total to Date

Prev to Date

This Estimate

Original Amount

$37,935,589.87

Total Earnings

$38,552,944.23

$38,212,505.71

$340,438.52

Percent Complete

93.51

Stockpiled Materials

$-0.03

$-0.03

$0.00

Funds Available

$2,673,751.31

Gross Earnings

$38,552,944.20

$38,212,505.68

$340,438.52

Total Change Orders

$3,291,105.64

Other Adjustments

$0.00

$0.00

$0.00

TOTAL

$38,552,944.20

$38,212,505.68

$340,438.52

Contract Id 221302

Change Order Summary

County HARDIN
Estimate Nbr 0068 Project Number NHPPIM 0654 (041), NHPPIM 0654 (041)
Contractor SCOTTY'S CONTRACTING & STONE LLC Period 01/11/2025  TO  01/24/2025
 
 
CHANGE ORDERS HISTORY  
CHANGE ORDER NBR DESCRIPTION STATUS APPROVAL DATE TOTAL CO AMOUNT CONTRACT TIME ADJUSTED
001 High Strength Fabric/Culvert Extension Approved 12/12/2022 $57,603.59 1.0
002 Time & Material Work 30" rcbc extension Approved 04/17/2023 $18,202.52 0.0
003 Time and Materials work for Temp 72" pipe Approved 04/30/2024 $281,617.46 25.0
004 Correction to MSE wall quantity Approved 03/09/2023 $73,998.40 0.0
005 CBI Type B and DBI ty 15 Pending 0 $-2,343.33 0.0
006 Lot Pay Adjustment Override Approved 08/14/2023 $0.00 1.0
007 High mast/redi rock Approved 03/07/2024 $245,328.58 0.0
008 Additional for increase anti-skid aggregate Approved 04/11/2024 $13,899.48 0.0
009 Const. Revision 2 Northside ramps upgraded. Approved 06/25/2024 $2,084,072.15 0.0
010 Concrete median barrier Approved 08/12/2024 $168,678.20 0.0
011 Overhead Sign truss Approved 12/12/2024 $331,455.26 30.0
012 waterblasting stripe Approved 01/07/2025 $16,250.00 1.0
 
 
 
 

CONTRACT ADJUSTMENTS HISTORY

Contract Adjustments

 

 

Adjustment Description

Est No

Adjustment Amount

Line Item Adjustments History
PROJECT ITEM NBR DESCRPITION TYPE EST NO

ADJ QUANTITY

UNIT PRICE

ADJUSTED AMOUNT

Contract Id 221302

COMMONWEALTH OF KENTUCKY

County HARDIN
Contract Type GDSB   GRADE, DRAIN & SURFACE WITH BRIDGE

TRANSPORTATION CABINET

Primary Project Number DE04700652154
Estimate Nbr 0068 Period 01/11/2025  TO  01/24/2025
Contractor SCOTTY'S CONTRACTING & STONE LLC
 
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category
LINE ITEM NUMBER ITEM DESCRIPTION ITEM NO. UNIT PLAN QTY CURRENT QUANTITY QUANTITY PAID THIS EST QUANTITY PAID PREV. EST QUANTITY PAID TO DATE UNIT PRICE AMOUNT PAID THIS EST AMOUNT PAID TO DATE
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0001 PAVING
0005 DGA BASE 00001 TON 4,251.00 21,414.000 9,069.690 9,069.690 26.09 236,628.21
0010 CRUSHED STONE BASE (REVISED 1-18-2022) 00003 TON 81,635.00 82,233.000 84,103.110 84,103.110 25.93 2,180,793.64
0015 CRUSHED STONE BASE FOR STAMPED CONCRETE MEDIAN 00003 TON 1,170.00 1,170.000 0.000 0.000 28.83 0.00
0020 CEMENT STABILIZED ROADBED 00008 SQYD 11,292.00 11,292.000 130,408.990 130,408.990 5.95 775,933.49
0025 LIME STABILIZED ROADBED (REVISED 1-18-2022) 00013 SQYD 130,421.00 130,421.000 9,399.000 9,399.000 5.95 55,924.05
0030 LIME (REVISED 1-18-2022) 00014 TON 2,257.00 2,257.000 185.510 185.510 208.00 38,586.08
0035 DRAINAGE BLANKET-TYPE II-ASPH 00018 TON 6,557.00 12,258.000 8,399.450 8,399.450 58.67 492,795.73
0040 ASPHALT SEAL AGGREGATE 00100 TON 318.00 385.000 404.240 404.240 131.90 53,319.25
0045 ASPHALT SEAL COAT 00103 TON 56.00 64.000 64.290 64.290 735.92 47,312.29
0050 CL2 ASPH BASE 1.00D PG64-22 (REVISED 1-18-2022) 00212 TON 4,577.00 4,577.000 4,209.960 4,209.960 72.16 303,790.71
0055 CL3 ASPH BASE 1.00D PG64-22 00214 TON 1,553.00 6,855.000 796.530 796.530 75.47 60,114.11
0060 CL4 ASPH BASE 1.00D PG64-22 (REVISED 1-18-2022) 00217 TON 41,715.00 45,363.000 53,995.910 53,995.910 68.36 3,691,160.40
0065 CL4 ASPH BASE 1.00D PG76-22 (REVISED 1-18-2022) 00219 TON 20,408.00 21,489.000 27,718.060 27,718.060 75.47 2,091,881.98
0070 CL2 ASPH SURF 0.38D PG64-22 (REVISED 1-18-2022) 00301 TON 1,278.00 1,278.000 1,425.320 1,425.320 90.54 129,048.47
0075 CL3 ASPH SURF 0.38D PG64-22 (REVISED 1-18-2022) 00339 TON 1,559.00 2,125.000 2,434.880 2,434.880 103.42 251,815.28
0080 CL4 ASPH SURF 0.38A PG76-22 (REVISED 1-18-2022) 00342 TON 9,274.00 1,432.500 1,432.500 1,432.500 103.42 148,149.15
0085 ASPHALT CURING SEAL (REVISED 1-18-2022) 00358 TON 213.00 235.000 145.660 145.660 654.37 95,315.53
0090 CEM CONC ENT PAVEMENT-8 IN 02101 SQYD 637.00 637.000 127.780 127.780 76.32 9,752.16
0095 CEMENT 02542 TON 220.00 220.000 2,624.510 2,624.510 197.00 517,028.47
0100 SAND FOR BLOTTER (REVISED 1-18-2022) 02702 TON 326.00 326.000 0.000 0.000 19.05 0.00
0105 JOINT ADHESIVE (REVISED 1-18-2022) 20071EC LF 43,686.00 43,686.000 48,047.000 48,047.000 0.43 20,660.21
0110 ASPHALT MATERIAL FOR TACK NON-TRACKING (REVISED 1-18-2022) 24970EC TON 157.00 157.000 131.170 131.170 569.75 74,734.10
8024 CL4 ASPH SURF 0.38A PG76-22 00342 TON 0.00 8,273.500 9,594.860 9,594.860 105.10 1,008,419.78
8036 WATER BLASTING EXISTING STRIPE 22664EN LF 0.00 25,000.000 19,690.000 19,690.000 0.65 12,798.50
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0002 ROADWAY
0115 CRUSHED AGGREGATE SIZE NO 2 00078 TON 38,360.00 38,374.000 20,450.540 20,450.540 21.05 430,483.86
0120 PERFORATED PIPE-4 IN 01000 LF 7,580.00 11,389.000 8,323.000 8,323.000 9.15 76,155.45
0125 NON-PERFORATED PIPE-4 IN 01010 LF 360.00 512.000 624.000 624.000 20.00 12,480.00
0130 INSPECT & CERTIFY EDGE DRAIN SYSTEM 01015 LS 1.00 1.000 0.660 0.660 5,000.00 3,300.00
0135 PERF PIPE HEADWALL TY 2-4 IN 01024 EACH 3.00 7.000 14.000 14.000 500.00 7,000.00
0140 PERF PIPE HEADWALL TY 3-4 IN 01028 EACH 30.00 30.000 3.000 3.000 585.00 1,755.00
0145 PERF PIPE HEADWALL TY 4-4 IN 01032 EACH 5.00 15.000 15.000 15.000 585.00 8,775.00
0150 REMOVE PIPE 01310 LF 72.00 458.000 444.000 444.000 9.68 4,297.92
0155 MANHOLE TYPE B MOD 01762 EACH 1.00 1.000 1.000 1.000 6,000.00 6,000.00
0160 STANDARD CURB AND GUTTER 01810 LF 2,937.00 2,937.000 90.000 90.000 22.82 2,053.80
0165 STANDARD HEADER CURB 01875 LF 182.00 232.000 138.000 138.000 44.37 6,123.06
0170 DELINEATOR FOR GUARDRAIL MONO DIRECTIONAL WHITE 01982 EACH 94.00 108.000 80.000 80.000 8.34 667.20
0175 DELINEATOR FOR GUARDRAIL MONO DIRECTIONAL YELLOW 01983 EACH 4.00 4.000 31.000 31.000 8.34 258.54
0180 DELINEATOR FOR BARRIER - WHITE 01984 EACH 40.00 40.000 0.000 0.000 8.17 0.00
0185 DELINEATOR FOR BARRIER - YELLOW 01985 EACH 8.00 8.000 0.000 0.000 8.17 0.00
0190 DELINEATOR FOR BARRIER WALL-B/Y 01986 EACH 4.00 4.000 0.000 0.000 8.74 0.00
0195 REMOVE TEMP CONC BARRIER WALL 02002 LF 18,140.00 18,140.000 8,540.000 8,540.000 13.16 112,386.40
0200 RELOCATE TEMP CONC BARRIER 02003 LF 2,350.00 2,350.000 5,360.000 5,360.000 8.91 47,757.60
0205 JPC PAVEMENT-8 IN SHLD 02081 SQYD 88.00 88.000 0.000 0.000 120.48 0.00
0210 REMOVE PAVEMENT 02091 SQYD 49,098.00 49,098.000 20,577.550 20,577.550 7.71 158,652.91
0215 TEMP DITCH 02159 LF 29,211.00 29,211.000 1,450.000 1,450.000 0.01 14.50
0220 CLEAN TEMP DITCH 02160 LF 26,048.00 26,048.000 300.000 300.000 0.01 3.00
0225 FLOWABLE FILL 02220 CUYD 102.00 102.000 0.000 0.000 159.84 0.00
0230 GRANULAR EMBANKMENT 02223 CUYD 3,567.00 6,005.000 3,184.070 3,184.070 35.79 113,957.86
0235 EMBANKMENT IN PLACE (REVISED 1-18-2022) 02230 CUYD 391,552.00 403,332.780 18,968.640 384,364.140 403,332.780 15.37 291,547.99 6,199,224.82
0240 DITCHING 02237 LF 1,000.00 1,000.000 0.000 0.000 2.00 0.00
0245 WATER 02242 MGAL 479.00 479.000 0.000 0.000 0.01 0.00
0250 FENCE-WOVEN WIRE TYPE 1 02262 LF 15,090.00 15,090.000 14,127.000 14,127.000 6.64 93,803.28
0255 REMOVE FENCE 02265 LF 6,353.00 6,353.000 6,717.900 6,717.900 1.73 11,621.96
0260 GUARDRAIL END TREATMENT TYPE 1 02367 EACH 5.00 6.000 1.000 11.000 12.000 3,369.71 3,369.71 40,436.52
0265 GUARDRAIL END TREATMENT TYPE 2A 02369 EACH 11.00 12.000 2.000 11.000 13.000 982.26 1,964.52 12,769.38
0270 GUARDRAIL END TREATMENT TYPE 3 02373 EACH 1.00 1.000 0.000 0.000 641.41 0.00
0275 REMOVE GUARDRAIL 02381 LF 6,409.00 7,748.000 887.500 6,437.500 7,325.000 1.52 1,349.00 11,134.00
0280 GUARDRAIL END TREATMENT TYPE 4A 02391 EACH 7.00 7.000 6.000 6.000 3,440.20 20,641.20
0285 TEMP GUARDRAIL 02397 LF 3,200.00 3,200.000 37.500 3,950.000 3,987.500 10.84 406.50 43,224.50
0290 RIGHT-OF-WAY MONUMENT TYPE 1 02429 EACH 67.00 67.000 0.000 0.000 132.87 0.00
0295 WITNESS POST 02432 EACH 9.00 9.000 0.000 0.000 122.12 0.00
0300 CHANNEL LINING CLASS II 02483 TON 4,263.00 4,263.000 3,981.760 3,981.760 31.66 126,062.52
0305 CHANNEL LINING CLASS III 02484 TON 266.00 375.000 0.000 0.000 39.20 0.00
0310 CLEARING AND GRUBBING (80 ACRES) 02545 LS 1.00 1.000 1.000 1.000 146,116.80 146,116.80
0315 CONCRETE-CLASS B 02555 CUYD 15.00 15.000 15.000 15.000 892.49 13,387.35
0320 TEMPORARY SIGNS 02562 SQFT 1,494.00 1,494.000 826.000 826.000 8.35 6,897.10
0325 PROJECT CPM SCHEDULE 02570 LS 1.00 1.000 0.750 0.750 12,132.00 9,099.00
0330 EDGE KEY (REVISED 1-18-2022) 02585 LF 864.00 864.000 100.000 100.000 33.64 3,364.00
0335 FABRIC-GEOTEXTILE CLASS 1 02602 SQYD 2,638.00 2,638.000 0.000 0.000 2.19 0.00
0340 FABRIC-GEOTEXTILE CLASS 2 02603 SQYD 127,000.00 127,776.000 13,805.212 13,805.212 1.87 25,815.74
0345 FABRIC-GEOTEXTILE CLASS 2 FOR PIPE 02607 SQYD 10,150.00 10,314.000 6,244.749 6,244.749 2.00 12,489.49
0350 MAINTAIN & CONTROL TRAFFIC 02650 LS 1.00 1.000 1.000 1.000 1,179,872.29 1,179,872.29
0355 DIVERSIONS (BY-PASS DETOURS) M.O.T. TEMP RAMP 5 DIVERSION 02651 LS 1.00 1.000 1.000 1.000 602,602.52 602,602.52
0360 DIVERSIONS (BY-PASS DETOURS) M.O.T. TEMP RAMP 7 DIVERSION 02651 LS 1.00 1.000 1.000 1.000 103,505.79 103,505.79
0365 DIVERSIONS (BY-PASS DETOURS) M.O.T. TEMP RAMP 7A DIVERSION 02651 LS 1.00 1.000 0.000 0.000 43,967.43 0.00
0370 LANE CLOSURE 02653 EACH 4.00 4.000 2.000 2.000 0.01 0.02
0375 PORTABLE CHANGEABLE MESSAGE SIGN 02671 EACH 4.00 4.000 11.000 11.000 9,116.00 100,276.00
0380 SAFELOADING 02690 CUYD 86.00 86.000 47.000 47.000 375.00 17,625.00
0385 SETTLEMENT PLATFORM 02692 EACH 2.00 2.000 2.000 2.000 5,900.00 11,800.00
0390 SHOULDER RUMBLE STRIPS 02696 LF 34,494.00 38,523.000 24,161.000 24,161.000 0.20 4,832.20
0395 TEMP SILT FENCE (REVISED 1-18-2022) 02701 LF 30,961.00 30,961.000 6,311.500 6,311.500 2.68 16,914.82
0400 SILT TRAP TYPE A 02703 EACH 120.00 120.000 6.000 6.000 138.25 829.50
0405 SILT TRAP TYPE B 02704 EACH 120.00 120.000 141.000 141.000 164.48 23,191.68
0410 SILT TRAP TYPE C 02705 EACH 69.00 69.000 3.000 3.000 149.00 447.00
0415 CLEAN SILT TRAP TYPE A 02706 EACH 465.00 465.000 3.000 3.000 0.01 0.03
0420 CLEAN SILT TRAP TYPE B 02707 EACH 465.00 465.000 241.000 241.000 0.01 2.41
0425 CLEAN SILT TRAP TYPE C 02708 EACH 159.00 159.000 0.000 0.000 0.01 0.00
0430 STAKING 02726 LS 1.00 1.000 0.840 0.840 177,375.00 148,995.00
0435 REMOVE STRUCTURE EX. 6' X 5' RCBC @ I-65 STA. 664+84, 142 02731 LS 1.00 1.000 1.000 1.000 27,547.19 27,547.19
0440 REMOVE STRUCTURE EX. 6' X 6' RCBC @ I-65 STA. 665+07, 122 02731 LS 1.00 1.000 1.000 1.000 9,856.89 9,856.89
0445 REMOVE STRUCTURE EX. 8' X 5' RCBC @ I-65 STA. 665+07, 148 02731 LS 1.00 1.000 1.000 1.000 4,355.56 4,355.56
0450 REMOVE STRUCTURE EX. KY 222 BRIDGE @ I-65 (STA. 664+60) 02731 LS 1.00 1.000 1.000 1.000 147,600.00 147,600.00
0455 ARROW PANEL 02775 EACH 2.00 2.000 2.000 2.000 2,848.75 5,697.50
0460 RELOCATE CRASH CUSHION 02898 EACH 2.00 2.000 3.000 3.000 1,950.70 5,852.10
0475 CONCRETE BARRIER WALL TYPE 9T 03171 LF 18,140.00 18,140.000 9,680.000 9,680.000 13.16 127,388.80
0480 EROSION CONTROL BLANKET (REVISED 1-18-2022) 05950 SQYD 23,828.00 23,828.000 124,058.150 124,058.150 1.65 204,695.94
0485 TEMP MULCH 05952 SQYD 494,339.00 494,339.000 457,186.000 457,186.000 0.20 91,437.20
0490 TEMP SEEDING AND PROTECTION 05953 SQYD 381,976.00 381,976.000 144,958.000 144,958.000 0.25 36,239.50
0495 INITIAL FERTILIZER (REVISED 1-18-2022) 05963 TON 27.00 27.000 18.569 18.569 950.00 17,640.55
0500 MAINTENANCE FERTILIZER 05964 TON 15.90 15.900 0.000 0.000 950.00 0.00
0505 SEEDING AND PROTECTION (REVISED 1-18-2022) 05985 SQYD 469,321.00 469,321.000 216,357.900 216,357.900 0.39 84,379.58
0510 SPECIAL SEEDING CROWN VETCH 05989 SQYD 35,266.00 35,266.000 64,776.890 64,776.890 0.39 25,262.98
0515 AGRICULTURAL LIMESTONE (REVISED 1-18-2022) 05992 TON 169.00 169.000 0.000 0.000 75.00 0.00
0520 FLEXIBLE DELINEATOR POST-M/W 06401 EACH 80.00 80.000 0.000 0.000 42.25 0.00
0525 FLEXIBLE DELINEATOR POST-M/Y 06404 EACH 40.00 40.000 0.000 0.000 42.25 0.00
0530 STEEL POST MILE MARKERS 06412 EACH 4.00 4.000 0.000 0.000 375.36 0.00
0535 PAVE STRIPING-TEMP PAINT-6 IN 06511 LF 8,000.00 8,000.000 193,717.160 193,717.160 0.34 65,863.83
0540 PAVE STRIPING-PERM PAINT-4 IN (REVISED 1-18-2022) 06514 LF 7,796.00 7,796.000 7,059.000 7,059.000 0.29 2,047.11
0545 PAVE STRIPING-THERMO-4 IN Y 06541 LF 5,688.00 5,688.000 0.000 0.000 1.25 0.00
0550 PAVE STRIPING-THERMO-6 IN W 06542 LF 39,065.00 39,065.000 7,979.370 7,979.370 1.35 10,772.14
0555 PAVE STRIPING-THERMO-6 IN Y (REVISED 1-18-2022) 06543 LF 31,591.00 31,591.000 0.000 0.000 1.35 0.00
0560 PAVE STRIPING-THERMO-12 IN W 06546 LF 5,216.00 5,216.000 0.000 0.000 3.00 0.00
0565 PAVE MARKING-THERMO STOP BAR-24IN 06568 LF 463.00 463.000 976.000 976.000 15.00 14,640.00
0570 PAVE MARKING-DOTTED LANE EXTEN (REVISED 1-18-2022) 06572 LF 4,053.00 4,053.000 0.000 0.000 1.35 0.00
0575 PAVE MARKING-THERMO STR ARROW 06573 EACH 7.00 7.000 16.000 16.000 130.00 2,080.00
0580 PAVE MARKING-THERMO CURV ARROW (REVISED 1-18-2022) 06574 EACH 80.00 80.000 192.000 192.000 130.00 24,960.00
0585 PAVE MARKING-THERMO COMB ARROW 06575 EACH 10.00 10.000 19.000 19.000 275.00 5,225.00
0590 PAVEMENT MARKER TY IVA-MW TEMP 06585 EACH 251.00 251.000 0.000 0.000 4.00 0.00
0595 PAVEMENT MARKER TY IVA-MY TEMP 06586 EACH 1,004.00 1,004.000 0.000 0.000 4.00 0.00
0600 PAVEMENT MARKER TY IVA-BY TEMP 06588 EACH 110.00 110.000 0.000 0.000 4.00 0.00
0605 INLAID PAVEMENT MARKER-MW 06610 EACH 256.00 256.000 0.000 0.000 22.00 0.00
0610 INLAID PAVEMENT MARKER-BY 06612 EACH 76.00 76.000 0.000 0.000 22.00 0.00
0615 INLAID PAVEMENT MARKER-B W/R 06613 EACH 229.00 229.000 0.000 0.000 22.00 0.00
0620 INLAID PAVEMENT MARKER-B Y/R 06614 EACH 116.00 116.000 0.000 0.000 22.00 0.00
0625 FUEL ADJUSTMENT 10020NS DOLL 250,479.00 250,479.000 181,139.470 181,139.470 1.00 181,139.47
0630 ASPHALT ADJUSTMENT 10030NS DOLL 297,478.00 297,478.000 495,474.080 495,474.080 1.00 495,474.08
0635 GRANULAR EMBANKMENT FOR POND STABILIZATION 20072ES805 TON 135.00 135.000 0.000 0.000 19.37 0.00
0640 PAVE MARK TEMP PAINT STOP BAR 20099ES842 LF 30.00 30.000 190.000 190.000 25.00 4,750.00
0645 OBJECT MARKER TY 3 20191ED EACH 11.00 11.000 6.000 13.000 19.000 31.61 189.66 600.59
0650 LONGITUDINAL EDGE KEY (REVISED 1-18-2022) 21289ED LF 5,960.00 5,960.000 10,805.000 10,805.000 4.09 44,192.45
0655 LONGITUDINAL SAW CUT- 6 IN 21370ED LF 7,665.00 7,665.000 3,388.000 3,388.000 0.90 3,049.20
0660 CONC MEDIAN BARRIER TYPE 12C(50) 21430ES508 LF 145.00 145.000 230.000 230.000 225.04 51,759.20
0665 REMOVE PERF PIPE HEADWALL 21597EN EACH 19.00 40.000 29.000 29.000 53.75 1,558.75
0670 G/R STEEL W BEAM-S FACE (7 FT POST) 21802EN LF 5,675.00 7,035.000 1,387.500 6,617.250 8,004.750 29.99 41,611.12 240,062.45
0675 REMOVE CONC MEDIAN BARRIER 21935EN LF 321.00 321.000 496.500 496.500 127.00 63,055.50
0680 PAVEMENT MARKING-THERMO LETTERS FOR CAR 22692NS714 EACH 19.00 19.000 0.000 0.000 100.00 0.00
0685 PAVEMENT MARKING-THERMO LETTERS FOR TRUCK 22692NS714 EACH 15.00 15.000 0.000 0.000 100.00 0.00
0690 TURF REINFORCEMENT MAT 1 23274EN11F SQYD 26,977.00 26,977.000 7,500.000 7,500.000 6.00 45,000.00
0695 TURF REINFORCEMENT MAT 3 23276EN11F SQYD 59.00 59.000 0.000 0.000 8.00 0.00
0700 STAMPED CONCRETE RED 23379EC SQYD 2,543.00 2,543.000 0.000 0.000 87.29 0.00
0705 DRAIN POND 23649EC LS 1.00 1.000 1.000 1.000 3,348.20 3,348.20
0710 PAVE MARK THERMO CHEVRON 24679ED SQFT 7,902.00 7,902.000 176.000 176.000 4.00 704.00
0715 PIPELINE INSPECTION 24814EC LF 5,817.00 5,817.000 1,242.900 1,242.900 2.05 2,547.94
0720 THRIE BEAM GUARDRAIL TRANSITION TL-3 25078ED EACH 4.00 4.000 4.000 4.000 2,993.22 11,972.88
0725 BORE AND JACK PIPE-54 IN 25116EC LF 175.00 175.000 169.000 169.000 1,397.00 236,093.00
0730 PORTABLE QUEUE WARNING ALERT SYSTEM 26136EC MONT 27.00 27.000 23.000 23.000 5,352.35 123,104.05
0735 QUEUE WARNING PCMS 26137EC MONT 108.00 108.000 92.000 92.000 0.01 0.92
0740 QUEUE WARNING PORTABLE RADAR SENSORS 26138EC MONT 108.00 108.000 92.000 92.000 0.01 0.92
1385 KPDES PERMIT AND TEMP EROSION CONTROL (ADDED 1-18-2022) 23143ED LS 1.00 1.000 0.520 0.520 34,799.90 18,095.94
1390 PAVE MARKING-THERMO ONLY (ADDED 1-18-2022) 06576 EACH 4.00 4.000 0.000 0.000 400.00 0.00
1400 CRASH CUSHION TY VI CLASS BT TL3 (ADDED 1-21-2022) 08903 EACH 7.00 7.000 4.000 4.000 5,771.82 23,087.28
8001 HIGH STRENGTH GEOTEXTILE FABRIC TY V used in saturated areas under rock embankment 22861EN SQYD 0.00 4,000.000 6,346.680 6,346.680 4.31 27,354.19
8006 EW~ EW for temp 72" pipe August 2022 10090NX LS 0.00 1.000 1.000 1.000 85,793.35 85,793.35
8007 EW~ T&M for temp 72" install July 2022 10090NX LS 0.00 1.000 1.000 1.000 160,072.01 160,072.01
8008 EW~ T&M 72" pipe June 2022 10090NX LS 0.00 1.000 1.000 1.000 22,009.53 22,009.53
8015 LOT PAY ADJUSTMENT 10000NS DOLL 0.00 0.001 64,771.070 64,771.070 1.00 64,771.07
8026 CONC MEDIAN BARRIER TYPE 12C2-50 IN constant 6' width along bridge pier 21288ND LF 0.00 180.000 180.000 180.000 301.34 54,241.20
8027 REMOVE CONCRETE MEDIAN wide concrete median barrier @ old bridge 02006 LF 0.00 269.000 0.000 0.000 199.50 0.00
8028 CONC MEDIAN BARRIER TYPE 12C MOD Transition from 12" wide to 6' wide 03147 LF 0.00 250.000 300.000 300.000 301.34 90,402.00
8029 REMOVE CONC MEDIAN BARRIER variable width wall @ old interchange bridge I65 21935EN LF 0.00 196.000 196.000 196.000 199.50 39,102.00
8030 OSS GALV STEEL 80 FT TRUSS Overhead sign truss 06479 EACH 0.00 1.000 0.000 0.000 209,716.58 0.00
8031 STAKING Staking for overhead truss sign 02726 LS 0.00 1.000 1.000 1.000 1,575.00 1,575.00
8032 MAINTAIN & CONTROL TRAFFIC Price per day 21741NC EACH 0.00 42.000 50.000 50.000 2,131.92 106,596.00
8033 LANE CLOSURE I 65 lane closures 02653 EACH 0.00 6.000 4.000 4.000 3,553.20 14,212.80
8034 MAINTAIN & CONTROL TRAFFIC Rolling roadblock for setting the overhead sign truss across 21741NC EACH 0.00 1.000 0.000 0.000 4,263.84 0.00
8035 MOBILIZATION Setting and picking up temp barrier wall. 02568 LS 0.00 1.000 1.000 1.000 5,040.00 5,040.00
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0003 DRAINAGE
0745 ENTRANCE PIPE-15 IN (REVISED 1-18-2022) 00440 LF 1,098.00 1,098.000 752.000 752.000 57.67 43,367.84
0750 ENTRANCE PIPE-18 IN (REVISED 1-18-2022) 00441 LF 163.00 163.000 200.000 200.000 73.90 14,780.00
0755 CULVERT PIPE-12 IN 00460 LF 56.00 56.000 38.000 38.000 59.58 2,264.04
0760 CULVERT PIPE-15 IN 00461 LF 50.00 50.000 50.000 50.000 57.53 2,876.50
0765 CULVERT PIPE-18 IN 00462 LF 1,099.00 1,202.000 1,180.000 1,180.000 54.64 64,475.20
0770 CULVERT PIPE-24 IN 00464 LF 349.00 371.000 375.000 375.000 99.39 37,271.25
0775 CULVERT PIPE-30 IN 00466 LF 150.00 150.000 150.000 150.000 108.70 16,305.00
0780 CULVERT PIPE-36 IN 00468 LF 105.00 128.000 123.000 123.000 132.07 16,244.61
0785 CULVERT PIPE-42 IN 00469 LF 135.00 135.000 135.000 135.000 184.96 24,969.60
0790 CULVERT PIPE-48 IN 00470 LF 248.00 248.000 225.000 225.000 202.67 45,600.75
0795 CULVERT PIPE-54 IN 00471 LF 550.00 550.000 595.000 595.000 260.38 154,926.10
0800 CULVERT PIPE-72 IN 00474 LF 319.00 319.000 319.000 319.000 407.57 130,014.83
0805 STORM SEWER PIPE-15 IN 00521 LF 229.00 229.000 225.000 225.000 42.93 9,659.25
0810 STORM SEWER PIPE-18 IN (REVISED 1-25-2022) 00522 LF 1,394.00 1,394.000 889.830 889.830 53.38 47,499.12
0815 STORM SEWER PIPE-36 IN 00528 LF 134.00 134.000 214.500 214.500 176.85 37,934.32
0820 STORM SEWER PIPE-54 IN 00531 LF 269.00 269.000 100.000 100.000 186.62 18,662.00
0830 PIPE CULVERT HEADWALL-18 IN 01204 EACH 2.00 2.000 0.000 0.000 1,800.00 0.00
0835 PIPE CULVERT HEADWALL-30 IN 01210 EACH 1.00 2.000 3.000 3.000 4,000.00 12,000.00
0840 PIPE CULVERT HEADWALL-42 IN 01214 EACH 1.00 1.000 1.000 1.000 4,000.00 4,000.00
0845 PIPE CULVERT HEADWALL-48 IN 01216 EACH 2.00 2.000 2.000 2.000 5,000.00 10,000.00
0850 PIPE CULVERT HEADWALL-60 IN 01220 EACH 1.00 1.000 0.000 0.000 6,500.00 0.00
0855 METAL END SECTION TY 3-15 IN 01390 EACH 24.00 24.000 24.000 24.000 1,000.00 24,000.00
0860 METAL END SECTION TY 3-18 IN 01391 EACH 7.00 7.000 6.000 6.000 1,200.00 7,200.00
0865 SLOPED BOX OUTLET TYPE 1-18 IN 01433 EACH 4.00 8.000 2.000 2.000 2,500.00 5,000.00
0870 S & F BOX INLET-OUTLET-18 IN SLOPED & FLARED HEADWALL -18" 01450 EACH 8.00 8.000 13.000 13.000 3,600.00 46,800.00
0875 S & F BOX INLET-OUTLET-24 IN SLOPED & FLARED HEADWALL - 24" 01451 EACH 8.00 8.000 9.000 9.000 5,500.00 49,500.00
0880 CURB BOX INLET TYPE B 01480 EACH 6.00 6.000 0.000 0.000 4,700.00 0.00
0885 CURB BOX INLET TYPE F 01487 EACH 1.00 1.000 1.000 1.000 4,700.00 4,700.00
0890 DROP BOX INLET TYPE 1 01490 EACH 3.00 3.000 4.000 4.000 5,000.00 20,000.00
0895 DROP BOX INLET TYPE 2 01493 EACH 1.00 1.000 1.000 1.000 5,200.00 5,200.00
0900 DROP BOX INLET TYPE 3 01496 EACH 3.00 3.000 3.000 3.000 5,200.00 15,600.00
0905 DROP BOX INLET TYPE 5F 01517 EACH 4.00 4.000 4.000 4.000 5,500.00 22,000.00
0910 DROP BOX INLET TYPE 7 01538 EACH 2.00 2.000 2.000 2.000 8,000.00 16,000.00
0915 JUNCTION BOX-24 IN 01643 EACH 1.00 2.000 1.000 1.000 2,700.00 2,700.00
0920 JUNCTION BOX-30 IN 01644 EACH 1.00 1.000 1.000 1.000 3,800.00 3,800.00
0925 JUNCTION BOX-36 IN 01645 EACH 2.00 2.000 2.000 2.000 3,800.00 7,600.00
0930 JUNCTION BOX-54 IN 01648 EACH 1.00 1.000 1.000 1.000 5,000.00 5,000.00
0935 FABRIC-GEOTEXTILE CLASS 2 FOR PIPE 02607 SQYD 4,673.00 4,673.000 2,759.040 2,759.040 2.00 5,518.08
0940 REMOVE HEADWALL 02625 EACH 8.00 14.000 10.000 10.000 365.50 3,655.00
0945 SAFELOADING 02690 CUYD 5.00 5.000 28.000 28.000 375.00 10,500.00
0950 BORE & JACK PIPE (REVISED 1-25-2022) 20211ES706 LF 175.00 175.000 70.000 70.000 496.00 34,720.00
0955 PIPE CULVERT HEADWALL-54 IN (REVISED 1-25-2022) 24026EC EACH 1.00 1.000 2.000 2.000 6,000.00 12,000.00
1395 JUNCTION BOX-18 IN (ADDED 1-18-2022) 01642 EACH 1.00 1.000 1.000 1.000 2,100.00 2,100.00
1405 PIPE CULVERT HEADWALL-72 IN (ADDED 1-25-2022) 24025EC EACH 2.00 2.000 2.000 2.000 13,500.00 27,000.00
1410 METAL END SECTION TY 3-36 IN (ADDED 1-25-2022) 01395 EACH 2.00 2.000 1.000 1.000 5,500.00 5,500.00
8005 EW~ Force Account for 30" RCBC extension 10090NX LS 0.00 1.000 1.000 1.000 18,202.52 18,202.52
8020 DROP BOX INLET TYPE 15 KY 222 Rt. Station 117+50 01580 EACH 0.00 0.000 0.000 0.000 2,940.00 0.00
8022 JUNCTION BOX 72" junction box added due to slope instabiility 01650 EACH 0.00 0.000 0.000 0.000 12,085.59 0.00
8025 FLUME INLET TYPE 2 01691 EACH 0.00 2.000 2.000 2.000 6,615.00 13,230.00
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0004 BRIDGE - #26569
0960 GRANULAR EMBANKMENT 02223 CUYD 12,770.00 13,282.000 13,282.000 13,282.000 48.00 637,536.00
0965 STRUCTURE GRANULAR BACKFILL 02231 CUYD 827.00 827.000 827.000 827.000 55.00 45,485.00
0970 ARMORED EDGE FOR CONCRETE 03299 LF 367.60 367.600 373.200 373.200 85.00 31,722.00
0975 FOUNDATION PREPARATION BRIDGE OVER I-65 08003 LS 1.00 1.000 1.000 1.000 53,500.00 53,500.00
0980 RETAINING WALL 08018 SQFT 16,223.00 17,005.000 17,005.000 17,005.000 63.20 1,074,716.00
0985 TEST PILES 08033 LF 207.00 207.000 207.000 207.000 120.00 24,840.00
0990 PRE-DRILLING FOR PILES 08039 LF 9,796.00 9,796.000 6,631.090 6,631.090 80.00 530,487.20
0995 PILES-STEEL HP12X53 08046 LF 3,908.00 3,908.000 4,719.675 4,719.675 71.00 335,096.92
1000 PILES-STEEL HP14X89 08051 LF 5,682.00 5,682.000 6,223.357 6,223.357 125.00 777,919.62
1005 PILE POINTS-12 IN 08094 EACH 90.00 90.000 90.000 90.000 142.00 12,780.00
1010 PILE POINTS-14 IN 08095 EACH 80.00 80.000 80.000 80.000 168.00 13,440.00
1015 CONCRETE-CLASS A 08100 CUYD 921.50 921.500 829.000 829.000 697.00 577,813.00
1020 CONCRETE-CLASS AA 08104 CUYD 1,244.50 1,244.500 1,244.500 1,244.500 792.00 985,644.00
1025 STEEL REINFORCEMENT 08150 LB 103,424.00 103,424.000 97,765.000 97,765.000 1.31 128,072.15
1030 STEEL REINFORCEMENT-EPOXY COATED 08151 LB 426,291.00 426,291.000 426,291.000 426,291.000 1.44 613,859.04
1035 PRECAST PC I BEAM TYPE 4 08634 LF 3,826.00 3,826.000 3,826.000 3,826.000 464.00 1,775,264.00
1040 CONCRETE SEALING 23378EC SQFT 56,479.00 0.000 36,243.000 36,243.000 1.39 50,377.77
1045 RAIL SYSTEM SINGLE SLOPE - 40 IN 25028ED LF 388.00 388.000 438.000 438.000 101.00 44,238.00
1050 INTERMEDIATE FOUNDATION IMPROVEMENTS 26160EC LS 1.00 1.000 1.000 1.000 1,182,100.00 1,182,100.00
1055 INT FDN IMPROVEMENT VERIFICATION TESTING 26161EC LS 1.00 1.000 1.000 1.000 8,100.00 8,100.00
8010 MASONRY COATING 02998 SQYD 0.00 6,275.400 6,275.400 6,275.400 14.70 92,248.38
8023 EW~ redi-rock retaining wall to protect signal poles on bridge 10093EX LF 0.00 214.000 214.000 214.000 159.59 34,152.26
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0005 BRIDGE - CULVERT #27218
1060 REMOVE CONCRETE MASONRY 02403 CUYD 5.20 5.200 0.330 0.330 220.00 72.60
1065 FOUNDATION PREPARATION (27218) 08003 LS 1.00 1.000 1.000 1.000 2,945.00 2,945.00
1070 CONCRETE-CLASS A 08100 CUYD 46.60 46.600 44.940 44.940 1,270.00 57,073.80
1075 STEEL REINFORCEMENT 08150 LB 3,076.00 3,076.000 2,927.520 2,927.520 1.32 3,864.32
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0006 BRIDGE - CULVERT #27219
1080 FOUNDATION PREPARATION (27219) 08003 LS 1.00 1.000 1.000 1.000 7,610.00 7,610.00
1085 CONCRETE-CLASS A 08100 CUYD 89.60 89.600 89.600 89.600 875.00 78,400.00
1090 STEEL REINFORCEMENT 08150 LB 7,485.00 7,485.000 7,485.000 7,485.000 1.32 9,880.20
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0007 BRIDGE - CULVERT #27220
1095 FOUNDATION PREPARATION (27220) 08003 LS 1.00 1.000 1.000 1.000 8,940.00 8,940.00
1100 CONCRETE-CLASS A 08100 CUYD 82.30 87.830 87.830 87.830 930.00 81,681.90
1105 STEEL REINFORCEMENT 08150 LB 7,412.00 7,910.000 7,910.000 7,910.000 1.32 10,441.20
8000 FOUNDATION PREPARATION 9' additon to culvert as needed for road widening 08003 LS 0.00 1.000 1.000 1.000 645.12 645.12
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0008 BRIDGE - CULVERT #27221
1110 FOUNDATION PREPARATION (27221) 08003 LS 1.00 1.000 1.000 1.000 11,000.00 11,000.00
1115 CONCRETE-CLASS A 08100 CUYD 163.10 163.100 163.100 163.100 840.00 137,004.00
1120 STEEL REINFORCEMENT 08150 LB 13,881.00 13,881.000 13,881.000 13,881.000 1.32 18,322.92
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0009 BRIDGE - CULVERT #27222
1125 REMOVE CONCRETE MASONRY 02403 CUYD 3.10 3.100 0.110 0.110 185.00 20.35
1130 FOUNDATION PREPARATION (27223) 08003 LS 1.00 1.000 1.000 1.000 2,750.00 2,750.00
1135 CONCRETE-CLASS A 08100 CUYD 58.60 58.600 58.600 58.600 1,100.00 64,460.00
1140 STEEL REINFORCEMENT 08150 LB 4,305.00 4,305.000 4,305.000 4,305.000 1.32 5,682.60
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0010 BRIDGE - CULVERT #27223
1145 FOUNDATION PREPARATION (27223) 08003 LS 1.00 1.000 1.000 1.000 9,300.00 9,300.00
1150 CONCRETE-CLASS A 08100 CUYD 134.20 134.200 134.200 134.200 900.00 120,780.00
1155 STEEL REINFORCEMENT 08150 LB 9,514.00 9,514.000 9,514.000 9,514.000 1.32 12,558.48
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0011 SIGNING
1160 REFERENCE MARKER 04903 EACH 4.00 4.000 0.000 0.000 297.65 0.00
1165 SBM ALUMINUM PANEL SIGNS 06405 SQFT 180.00 180.000 0.000 0.000 34.90 0.00
1170 SBM ALUM SHEET SIGNS .080 IN 06406 SQFT 686.00 686.000 615.360 615.360 25.90 15,937.82
1175 SBM ALUM SHEET SIGNS .125 IN 06407 SQFT 412.00 412.000 184.000 184.000 40.43 7,439.12
1180 STEEL POST TYPE 1 06410 LF 1,632.00 1,632.000 1,189.600 1,189.600 25.36 30,168.25
1185 GMSS GALV STEEL TYPE C 06441 LB 3,820.00 3,820.000 0.000 0.000 4.44 0.00
1190 REMOVE SIGN SUPPORT BEAM 06451 EACH 14.00 14.000 0.000 0.000 235.63 0.00
1195 CLASS A CONCRETE FOR SIGNS 06490 CUYD 12.00 12.000 6.960 6.960 2,100.00 14,616.00
1200 STEEL REINFORCEMENT FOR SIGNS 06491 LB 904.00 904.000 604.600 604.600 1.50 906.90
1205 REMOVE & RELOCATE SIGNS 20418ED EACH 6.00 6.000 0.000 0.000 750.65 0.00
1210 ROADWAY CROSS SECTION 20419ND EACH 7.00 7.000 0.000 0.000 25.36 0.00
1215 REMOVE SIGN 21373ND EACH 1.00 1.000 0.000 0.000 250.00 0.00
1220 GMSS TYPE D 21596ND EACH 4.00 4.000 0.000 0.000 1,920.96 0.00
1225 BARCODE SIGN INVENTORY 24631EC EACH 198.00 198.000 0.000 0.000 5.23 0.00
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0012 SIGNALIZATION
1230 TRENCHING AND BACKFILLING 04820 LF 240.00 240.000 0.000 0.000 5.86 0.00
1235 CABLE-NO. 14/7C 04845 LF 7,700.00 7,700.000 8,541.000 8,541.000 4.04 34,505.64
1240 MESSENGER-15400 LB 04886 LF 1,910.00 1,910.000 1,698.000 1,698.000 9.07 15,400.86
1245 INSTALL STEEL STRAIN POLE 04932 EACH 12.00 12.000 12.000 12.000 1,784.37 21,412.44
1250 INSTALL SPAN MOUNTED SIGN 06472 EACH 3.00 3.000 3.000 3.000 371.70 1,115.10
1255 INSTALL LED SIGNAL-3 SECTION 20188NS835 EACH 37.00 37.000 38.000 38.000 255.82 9,721.16
1260 INSTALL LED SIGNAL-5 SECTION 20189NS835 EACH 3.00 3.000 3.000 3.000 306.98 920.94
1265 INSTALL COORDINATING UNIT 20390NS835 EACH 3.00 3.000 3.000 3.000 2,426.36 7,279.08
1270 TRAFFIC SIGNAL POLE BASE 23157EN CUYD 48.00 48.000 50.390 50.390 1,964.72 99,002.24
1275 PVC CONDUIT-2 IN-SCHEDULE 80 24901EC LF 240.00 240.000 0.000 0.000 14.17 0.00
1280 INSTALL SIGNAL CONTROLLER-TY ATC 24908EC EACH 3.00 3.000 3.000 3.000 7,259.80 21,779.40
1285 INSTALL RADAR PRESENCE DETECTOR TYPE A 26119EC EACH 12.00 12.000 0.000 0.000 1,621.64 0.00
1290 INSTALL RADAR ADVANCE DETECTOR TYPE B 26120EC EACH 2.00 2.000 0.000 0.000 1,621.64 0.00
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0013 LIGHTING
1295 POLE 120 FT MTG HT HIGH MAST 04714 EACH 10.00 12.000 12.000 12.000 46,871.33 562,455.96
1300 LIGHTING CONTROL EQUIPMENT 04761 EACH 2.00 2.000 2.000 2.000 26,096.29 52,192.58
1305 CONDUIT-3 IN 04797 LF 1,100.00 1,100.000 1,626.000 1,626.000 44.21 71,885.46
1310 MARKER 04800 EACH 18.00 22.000 22.000 22.000 361.86 7,960.92
1315 TRENCHING AND BACKFILLING 04820 LF 5,600.00 6,400.000 6,121.000 6,121.000 5.86 35,869.06
1320 CABLE-NO. 8/3C DUCTED 04860 LF 3,900.00 9,500.000 9,953.000 9,953.000 9.18 91,368.54
1325 POLE 45 FT WOODEN 04873 EACH 2.00 2.000 0.000 0.000 812.42 0.00
1330 REMOVE LIGHTING 04940 LS 1.00 1.000 0.800 0.800 21,947.07 17,557.65
1335 ELECTRICAL JUNCTION BOX TYPE A 20391NS835 EACH 2.00 2.000 2.000 2.000 1,250.49 2,500.98
1340 ELECTRICAL JUNCTION BOX TYPE C 20392NS835 EACH 2.00 2.000 2.000 2.000 2,572.80 5,145.60
1345 MAINTAIN LIGHTING 20410ED LS 1.00 1.000 0.750 0.750 11,277.98 8,458.48
1350 BORE AND JACK CONDUIT 21543EN LF 1,100.00 1,100.000 607.000 607.000 25.73 15,618.11
1355 POLE BASE-HIGH MAST 23161EN CUYD 100.00 120.000 120.000 120.000 1,560.07 187,208.40
1360 HIGH MAST LED LUMINAIRE 24749EC EACH 46.00 54.000 54.000 54.000 1,655.04 89,372.16
1365 CABLE-NO. 10/3C DUCTED 24851EC LF 6,000.00 6,000.000 6,525.000 6,525.000 8.20 53,505.00
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0014 DEMOBILIZATION &/OR MOBILIZATION
1370 MOBILIZATION 02568 LS 1.00 1.000 1.000 1.000 927,554.71 927,554.71
1375 DEMOBILIZATION 02569 LS 1.00 1.000 0.000 0.000 539,112.50 0.00
Project DE04700652154 Fed/State Project Number NHPPIM 0654 (041) Category 0015 TRAINEES
1380 TRAINEE PAYMENT REIMBURSEMENT 1-GROUP 2, 3 OR 4 OPERATOR 02742 HOUR 1,400.00 1,400.000 1,400.000 1,400.000 1.08 1,512.00

SUBTOT

$340,438.51

$38,552,944.07

LNNBR STOCKPILE ADJUSTMENTS

UNIT

ADJ. QUANTITY

EST NBR

UNIT PRICE

ADJUSTED AMOUNT

1245-1-0I

TRAFFIC INCIDENTAL

EACH

9.00 0006 $856.509000 $7,708.58

1295-1-0I

TRAFFIC INCIDENTAL

EACH

10.00 0006 $24741.419000 $247,414.19

1300-1-0I

TRAFFIC INCIDENTAL

EACH

1.00 0006 $7592.780000 $7,592.78

1355-1-0I

STEEL REINUN 615GR40

EACH

10.00 0006 $1863.170000 $18,631.70

0995-1-0I

PILES

LF

3,908.00 0008 $40.028250 $156,430.40

1000-1-0I

PILES

LF

5,682.00 0008 $65.877940 $374,318.45

1005-1-0I

PILE POINTS

EACH

90.00 0008 $112.683300 $10,141.49

1010-1-0I

PILE POINTS

EACH

80.00 0008 $133.628900 $10,690.31

1035-1-0I

I BEAM, TYPE 4

LF

3,825.60 0009 $314.727780 $1,204,022.59

0980-1-0I

REINFORCING TIE STR

SF

16,126.57 0010 $4.007860 $64,633.03

1360-1-0I

WIRE, ELECTRICAL

EACH

46.00 0011 $1064.950000 $48,987.70

1295-2-0I

TRAFFIC INCIDENTAL

EACH

10.00 0012 $6021.236000 $60,212.35

0995-1-0A

PILES

LF

1,529.46 0013 $40.028250 $-61,221.81

1005-1-0A

PILE POINTS

EACH

28.00 0013 $112.683300 $-3,155.13

0995-1-0A

PILES

LF

2,238.16 0014 $40.028250 $-89,589.63

1005-1-0A

PILE POINTS

EACH

44.00 0014 $112.683300 $-4,958.06

0995-1-0A

PILES

LF

140.37 0015 $40.028250 $-5,618.96

1005-1-0A

PILE POINTS

EACH

18.00 0015 $112.683300 $-2,028.30

1000-1-0A

PILES

LF

1,855.71 0021 $65.877940 $-122,250.35

1010-1-0A

PILE POINTS

EACH

40.00 0021 $133.628900 $-5,345.15

1000-1-0A

PILES

LF

1,161.62 0022 $65.877940 $-76,525.13

0980-1-0A

REINFORCING TIE STR

SF

1,233.75 0023 $4.007860 $-4,944.70

0980-1-0A

REINFORCING TIE STR

SF

3,082.90 0024 $4.007860 $-12,355.83

0980-1-0A

REINFORCING TIE STR

SF

1,990.00 0025 $4.007860 $-7,975.64

0980-1-0A

REINFORCING TIE STR

SF

1,337.26 0026 $4.007860 $-5,359.55

1000-1-0A

PILES

LF

604.33 0026 $65.877940 $-39,812.01

1010-1-0A

PILE POINTS

EACH

12.00 0026 $133.628900 $-1,603.55

1000-1-0A

PILES

LF

1,442.57 0027 $65.877940 $-95,034.00

1010-1-0A

PILE POINTS

EACH

4.00 0027 $133.628900 $-534.52

0980-1-0A

REINFORCING TIE STR

SF

510.80 0028 $4.007860 $-2,047.21

1035-1-0A

I BEAM, TYPE 4

LF

1,912.70 0028 $314.727780 $-601,979.82

0980-1-0A

REINFORCING TIE STR

SF

2,463.94 0029 $4.007860 $-9,875.13

1000-1-0A

PILES

LF

617.76 0029 $65.877940 $-40,696.96

1010-1-0A

PILE POINTS

EACH

24.00 0029 $133.628900 $-3,207.09

0980-1-0A

REINFORCING TIE STR

SF

4,399.80 0030 $4.007860 $-17,633.78

0980-1-0A

REINFORCING TIE STR

SF

1,108.12 0031 $4.007860 $-4,441.19

1035-1-0A

I BEAM, TYPE 4

LF

1,912.90 0032 $314.727780 $-602,042.77

1245-1-0A

TRAFFIC INCIDENTAL

EACH

4.00 0032 $856.509000 $-3,426.04

1245-1-0A

TRAFFIC INCIDENTAL

EACH

3.00 0033 $856.509000 $-2,569.53

1355-1-0A

STEEL REINUN 615GR40

EACH

10.00 0033 $1863.170000 $-18,631.70

1245-1-0A

TRAFFIC INCIDENTAL

EACH

1.00 0034 $856.509000 $-856.51

1245-1-0A

TRAFFIC INCIDENTAL

EACH

1.00 0040 $856.509000 $-856.50

1300-1-0A

TRAFFIC INCIDENTAL

EACH

1.00 0043 $7592.780000 $-7,592.78

1295-2-0A

TRAFFIC INCIDENTAL

EACH

4.00 0044 $6021.236000 $-24,084.94

1295-1-0A

TRAFFIC INCIDENTAL

EACH

4.00 0044 $24741.419000 $-98,965.68

1360-1-0A

WIRE, ELECTRICAL

EACH

9.54 0044 $1064.950000 $-10,159.62

1360-1-0A

WIRE, ELECTRICAL

EACH

4.24 0049 $1064.950000 $-4,515.39

1360-1-0A

WIRE, ELECTRICAL

EACH

5.30 0050 $1064.950000 $-5,644.23

1295-2-0A

TRAFFIC INCIDENTAL

EACH

5.00 0053 $6021.236000 $-30,106.18

1295-1-0A

TRAFFIC INCIDENTAL

EACH

5.00 0053 $24741.419000 $-123,707.10

1360-1-0A

WIRE, ELECTRICAL

EACH

25.44 0053 $1064.950000 $-27,092.33

1295-2-0A

TRAFFIC INCIDENTAL

EACH

1.00 0054 $6021.236000 $-6,021.23

1295-1-0A

TRAFFIC INCIDENTAL

EACH

1.00 0054 $24741.419000 $-24,741.41

1360-1-0A

WIRE, ELECTRICAL

EACH

1.48 0054 $1064.950000 $-1,576.13
SUBTOT

$0.00

 

 

 

Project DE04700652155 Fed/State Project Number NHPPIM 0654 (041) Category 0016 FEDERAL NON-PARTICIPATING
LINE ITEM NUMBER ITEM DESCRIPTION ITEM NO. UNIT PLAN QTY CURRENT QUANTITY QUANTITY PAID THIS EST QUANTITY PAID PREV. EST QUANTITY PAID TO DATE UNIT PRICE AMOUNT PAID THIS EST AMOUNT PAID TO DATE
8021 CURB BOX INLET TYPE B 01480 EACH 0.00 0.000 0.000 0.000 1,805.18 0.00

SUBTOT

$0.00

$38,552,944.07

LNNBR STOCKPILE ADJUSTMENTS

UNIT

ADJ. QUANTITY

EST NBR

UNIT PRICE

ADJUSTED AMOUNT

SUBTOT

$0.00