Report_Id:   122000   Est NO  0014

Date:12/15/2015

COMMONWEALTH OF KENTUCKY

TRANSPORTATION CABINET


Contract ID 122000 Estimate Number 0014 Estimate Type PROGRESS
District Office COVINGTON (06340)  Mitchell, Laura T.

Contractor EATON ASPHALT PAVING CO INC AND SUBSIDIARY ADDR SN 1 VC Code VC0000019236
AND SUBSIDIARY
136 EAST FROGTOWN ROAD
WALTON , KY , 41094
Pay Period 07/31/2015  TO  11/19/2015
Date Approved 11/30/2015
Primary Proj Number MP00800751201
Project No. IM 0757 (138)
Primary County BOONE
Name of Road COVINGTON-LEXINGTON ROAD (I-75)
Description 0.608 MILES N OF KY 338 OVERPASS EXTENDING N (NB ONLY) TO CHANGE IN PVMT. 0.602 MILES S OF KY 236 OVERPASS (INC.RAMPS)
     
     
Date Let 01/27/2012 Formal Acceptance 04/11/2013
Date Awarded 02/08/2012 Date Work Began 04/18/2012
Date Contract Executed 04/17/2012 Open To Traffic 08/06/2012
Date NTP Issued 04/17/2012 Actual Completion Date 08/06/2012

Current Contract Amount

$3,008,920.00

Total to Date

Prev to Date

This Estimate

Original Amount

$3,008,953.00

Total Earnings

$2,371,300.52

$2,368,550.52

$2,750.00

Percent Complete

78.81

Stockpiled Materials

$0.00

$0.00

$0.00

Funds Available

$637,619.48

Gross Earnings

$2,371,300.52

$2,368,550.52

$2,750.00

Total Change Orders

$-33.00

Other Adjustments

$0.00

$0.00

$0.00

TOTAL

$2,371,300.52

$2,368,550.52

$2,750.00

Contract Id 122000

Change Order Summary

County BOONE
Estimate Nbr 0014 Project Number IM 0757 (138)
Contractor EATON ASPHALT PAVING CO INC AND SUBSIDIARY Period 07/31/2015  TO  11/19/2015
 
 
CHANGE ORDERS HISTORY  
CHANGE ORDER NBR DESCRIPTION STATUS APPROVAL DATE TOTAL CO AMOUNT CONTRACT TIME ADJUSTED
001 Pavement Repairs Approved 03/15/2013 $-33.00 0.0
002 Lot Pay Adjustment Override Approved 07/21/2015 $0.00 0.0
 
 
 
 

CONTRACT ADJUSTMENTS HISTORY

Contract Adjustments

 

 

Adjustment Description

Est No

Adjustment Amount

Line Item Adjustments History
PROJECT ITEM NBR DESCRPITION TYPE EST NO

ADJ QUANTITY

UNIT PRICE

ADJUSTED AMOUNT

Contract Id 122000

COMMONWEALTH OF KENTUCKY

County BOONE
Contract Type ASRS   ASPHALT RESURFACING

TRANSPORTATION CABINET

Primary Project Number MP00800751201
Estimate Nbr 0014 Period 07/31/2015  TO  11/19/2015
Contractor EATON ASPHALT PAVING CO INC AND SUBSIDIARY
 
Project MP00800751201 Fed/State Project Number IM 0757 (138) Category 0001 ROADWAY
LINE ITEM NUMBER ITEM DESCRIPTION ITEM NO. UNIT PLAN QTY CURRENT QUANTITY QUANTITY PAID THIS EST QUANTITY PAID PREV. EST QUANTITY PAID TO DATE UNIT PRICE AMOUNT PAID THIS EST AMOUNT PAID TO DATE
0010 LEVELING & WEDGING PG64-22 00190 TON 1,450.00 1,450.000 46.590 46.590 42.00 1,956.78
0020 CL4 ASPH BASE 1.00D PG76-22 JOINT REPAIR;(REVISED: 1-24-12) 00219 TON 1,240.00 1,240.000 1,391.720 1,391.720 100.00 139,172.00
0030 CL4 ASPH SURF 0.38A PG76-22 00342 TON 29,012.00 28,586.000 23,515.760 23,515.760 70.50 1,657,861.08
0040 GUARDRAIL-STEEL W BEAM-S FACE 02351 LF 575.00 575.000 400.000 400.000 20.00 8,000.00
0050 GUARDRAIL END TREATMENT TYPE 1 02367 EACH 3.00 3.000 4.000 4.000 2,300.00 9,200.00
0060 GUARDRAIL END TREATMENT TYPE 3 02373 EACH 1.00 1.000 0.000 0.000 800.00 0.00
0070 REMOVE GUARDRAIL 02381 LF 750.00 750.000 693.750 693.750 2.00 1,387.50
0080 GUARDRAIL END TREATMENT TYPE 4A 02391 EACH 2.00 2.000 1.000 1.000 2,100.00 2,100.00
0090 SIGNS 02562 SQFT 1,200.00 1,200.000 901.000 901.000 7.00 6,307.00
0100 MAINTAIN & CONTROL TRAFFIC 02650 LS 1.00 1.000 0.050 0.950 1.000 55,000.00 2,750.00 55,000.00
0110 TRUCK MOUNTED ATTENUATOR 02654 EACH 2.00 2.000 2.000 2.000 4,500.00 9,000.00
0120 PORTABLE CHANGEABLE MESSAGE SIGN 02671 EACH 2.00 2.000 2.000 2.000 4,200.00 8,400.00
0130 MOBILIZATION FOR MILL & TEXT 02676 LS 1.00 1.000 1.000 1.000 500.00 500.00
0140 ASPHALT PAVE MILLING & TEXTURING JOINT REPAIR;(REVISED: 1-24-12) 02677 TON 1,240.00 1,240.000 1,394.600 1,394.600 48.00 66,940.80
0150 ASPHALT PAVE MILLING & TEXTURING 02677 TON 29,012.00 29,012.000 24,144.860 24,144.860 4.00 96,579.44
0160 SHOULDER RUMBLE STRIPS-SAWED 02696 LF 75,000.00 75,000.000 63,367.000 63,367.000 0.14 8,871.38
0170 ARROW PANEL 02775 EACH 4.00 4.000 4.000 4.000 1,100.00 4,400.00
0180 CONDUIT-2 IN PLANNING LOOPS 04795 LF 50.00 50.000 50.000 50.000 5.50 275.00
0190 CONDUIT-2 IN TRAFFIC LOOPS 04795 LF 70.00 70.000 0.000 0.000 5.50 0.00
0200 JUNCTION BOX TYPE B TRAFFIC LOOPS 04811 EACH 1.00 1.000 1.000 1.000 570.00 570.00
0210 TRENCHING AND BACKFILLING PLANNING LOOPS 04820 LF 40.00 40.000 30.000 30.000 6.00 180.00
0220 TRENCHING AND BACKFILLING TRAFFIC LOOPS 04820 LF 60.00 60.000 0.000 0.000 6.00 0.00
0230 PIEZOELECTRIC SENSOR PLANNING LOOPS 04829 EACH 13.00 13.000 13.000 13.000 2,300.00 29,900.00
0240 LOOP WIRE PLANNING LOOPS 04830 LF 6,000.00 6,000.000 4,186.000 4,186.000 0.27 1,130.22
0250 LOOP WIRE TRAFFIC LOOPS 04830 LF 1,436.00 1,436.000 1,294.000 1,294.000 0.27 349.38
0260 LOOP SAW SLOT AND FILL PLANNING LOOPS 04895 LF 1,448.00 1,448.000 1,276.000 1,276.000 13.00 16,588.00
0270 LOOP SAW SLOT AND FILL TRAFFIC LOOPS 04895 LF 508.00 508.000 486.000 486.000 11.00 5,346.00
0280 PAVE STRIPING-TEMP PAINT-6 IN 06511 LF 165,000.00 165,000.000 31,578.000 31,578.000 0.22 6,947.16
0290 PAVE MARKING-THERMO X-WALK-6 IN 06565 LF 130.00 130.000 138.000 138.000 3.25 448.50
0300 PAVE MARKING-THERMO STOP BAR-24IN 06568 LF 123.00 123.000 89.000 89.000 9.00 801.00
0310 PAVE MARKING-THERMO CURV ARROW 06574 EACH 10.00 10.000 10.000 10.000 125.00 1,250.00
0320 PAVE MARKING-THERMO COMB ARROW 06575 EACH 2.00 2.000 2.000 2.000 150.00 300.00
0330 PAVE MARKING-THERMO ONLY 06576 EACH 3.00 3.000 0.000 0.000 150.00 0.00
0340 PAVE MARKING-THERMO MERGE ARROW 06578 EACH 2.00 2.000 0.000 0.000 250.00 0.00
0350 PAVEMENT MARKER TYPE V-B W/R 06592 EACH 2,575.00 2,575.000 1,935.000 1,935.000 24.00 46,440.00
0360 PAVEMENT MARKER TYPE V-B Y/R 06593 EACH 719.00 719.000 393.000 393.000 24.00 9,432.00
0370 REMOVE PAVEMENT MARKER TYPE V 06600 EACH 3,294.00 3,294.000 1,212.000 1,212.000 5.00 6,060.00
0380 FUEL ADJUSTMENT 10020NS DOLL 42,877.00 42,877.000 -3,079.110 -3,079.110 1.00 -3,079.11
0390 ASPHALT ADJUSTMENT 10030NS DOLL 75,558.00 75,558.000 40,700.450 40,700.450 1.00 40,700.45
0400 JOINT ADHESIVE 20071EC LF 132,132.00 132,132.000 116,617.000 116,617.000 0.58 67,637.86
0410 GALVANIZED STEEL CABINET PLANNING LOOPS 20359NN EACH 1.00 1.000 1.000 1.000 1,000.00 1,000.00
0420 WOOD POST PLANNING LOOPS 20360ES818 EACH 2.00 2.000 2.000 2.000 200.00 400.00
0430 JUNCTION BOX TYPE A PLANNING LOOPS 20391NS835 EACH 1.00 1.000 1.000 1.000 1,000.00 1,000.00
0440 PAVE STRIPE PERM-12 IN HD21-WHITE 22856EN LF 6,050.00 6,050.000 6,395.000 6,395.000 0.44 2,813.80
0450 DURABLE WATERBORNE MARKING-6 IN W (REVISED: 1-11-12) 24189ER LF 96,500.00 96,500.000 90,236.000 90,236.000 0.26 23,461.36
0460 DURABLE WATERBORNE MARKING-6 IN Y (REVISED: 1-11-12) 24190ER LF 68,500.00 68,500.000 52,814.500 52,814.500 0.26 13,731.77
8000 LOT PAY ADJUSTMENT 10000NS DOLL 0.00 0.001 -2,062.500 -2,062.500 1.00 -2,062.50
8001 COST PLUS WORK PAVEMENT REPAIRS- 10080NSD DOLL 0.00 30,000.000 12,753.580 12,753.580 1.00 12,753.58
Project MP00800751201 Fed/State Project Number IM 0757 (138) Category 0002 DEMOBILIZATION
0470 DEMOBILIZATION 02569 LS 1.00 1.000 0.250 0.250 45,000.22 11,250.05

SUBTOT

$2,750.00

$2,371,300.50

LNNBR STOCKPILE ADJUSTMENTS

UNIT

ADJ. QUANTITY

EST NBR

UNIT PRICE

ADJUSTED AMOUNT

SUBTOT

$0.00