Item List 245356 |
Date:09/27/2024 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 245356 | Primary Project Number | BR05610042400 |
Contract Description | CR 1004 | ||
Primary County | JEFFERSON | Fed/St Number | STP BRZ 9030 (473) |
Vendor ID | 02691 | Vendor Name | HALL CONTRACTING OF KENTUCKY INC |
Bid Amount | $ 845,100.00 |
SM- Project | BR05610042400 |
Fed/State Number | STP BRZ 9030 (473) |
Project Description | CR 1004 |
*********** |
SM- Project | BR05610042400 | CATEGORY NUMBER | 0001 | CATEGORY Description | BRIDGE - 056C00091N |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0005 | DGA BASE | 00001 | 225.000 |
225.000 |
$60.000 |
TON | 1.6 |
0010 | ASPHALT SEAL AGGREGATE | 00100 | 5.000 |
5.000 |
$1,800.000 |
TON | 1.1 |
0015 | ASPHALT SEAL COAT | 00103 | 1.000 |
1.000 |
$2,900.000 |
TON | 0.3 |
0020 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 182.000 |
182.000 |
$170.000 |
TON | 3.7 |
0025 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 36.000 |
36.000 |
$420.000 |
TON | 1.8 |
0030 | ASPHALT MATERIAL FOR TACK | 00356 | 1.000 |
1.000 |
$100.000 |
TON | 0.0 |
0035 | ENTRANCE PIPE-18 IN | 00441 | 147.000 |
147.000 |
$72.000 |
LF | 1.3 |
0040 | REMOVE PIPE | 01310 | 147.000 |
147.000 |
$12.000 |
LF | 0.2 |
0045 | DELINEATOR FOR GUARDRAIL BI DIRECTIONAL WHITE | 01987 | 20.000 |
20.000 |
$15.000 |
EACH | 0.0 |
0050 | DELINEATOR FOR BARRIER WALL-B/W | 01990 | 4.000 |
4.000 |
$20.000 |
EACH | 0.0 |
0055 | GRANULAR EMBANKMENT | 02223 | 126.000 |
126.000 |
$90.000 |
CUYD | 1.3 |
0060 | STRUCTURE GRANULAR BACKFILL | 02231 | 110.000 |
110.000 |
$94.000 |
CUYD | 1.2 |
0065 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 125.000 |
125.000 |
$95.000 |
LF | 1.4 |
0070 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 1.000 |
1.000 |
$200.000 |
EACH | 0.0 |
0075 | GUARDRAIL END TREATMENT TYPE 7 | 02371 | 3.000 |
3.000 |
$2,100.000 |
EACH | 0.7 |
0080 | REMOVE GUARDRAIL | 02381 | 284.000 |
284.000 |
$22.000 |
LF | 0.7 |
0085 | EXTRA LENGTH GUARDRAIL POST | 02399 | 20.000 |
20.000 |
$200.000 |
EACH | 0.5 |
0090 | CHANNEL LINING CLASS II | 02483 | 98.000 |
98.000 |
$55.000 |
TON | 0.6 |
0095 | CLEARING AND GRUBBING APPROX LESS THAN 1 ACRE | 02545 | 1.000 |
1.000 |
$30,000.000 |
LS | 3.5 |
0100 | TEMPORARY SIGNS | 02562 | 200.000 |
200.000 |
$5.000 |
SQFT | 0.1 |
0105 | EDGE KEY | 02585 | 36.000 |
36.000 |
$15.000 |
LF | 0.1 |
0110 | FABRIC-GEOTEXTILE CLASS 1 | 02602 | 498.000 |
498.000 |
$2.800 |
SQYD | 0.2 |
0115 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$55,000.000 |
LS | 6.5 |
0120 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 2.000 |
2.000 |
$1,000.000 |
EACH | 0.2 |
0125 | STAKING | 02726 | 1.000 |
1.000 |
$10,000.000 |
LS | 1.2 |
0130 | REMOVE STRUCTURE | 02731 | 1.000 |
1.000 |
$90,000.000 |
LS | 10.6 |
0135 | ARMORED EDGE FOR CONCRETE | 03299 | 43.000 |
43.000 |
$100.000 |
LF | 0.5 |
0140 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 1,128.000 |
1,128.000 |
$1.250 |
LF | 0.2 |
0145 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$30,000.000 |
LS | 3.5 |
0150 | CYCLOPEAN STONE RIP RAP | 08019 | 400.000 |
400.000 |
$60.000 |
TON | 2.8 |
0155 | CYCLOPEAN STONE RIP RAP | 08019 | 400.000 |
400.000 |
$60.000 |
TON | 2.8 |
0160 | PRE-DRILLING FOR PILES | 08039 | 100.000 |
100.000 |
$468.000 |
LF | 5.5 |
0165 | PILES-STEEL HP12X53 | 08046 | 120.000 |
120.000 |
$185.000 |
LF | 2.6 |
0170 | PILE POINTS-12 IN | 08094 | 10.000 |
10.000 |
$159.000 |
EACH | 0.2 |
0175 | CONCRETE-CLASS A | 08100 | 39.000 |
39.000 |
$1,100.000 |
CUYD | 5.1 |
0180 | CONCRETE-CLASS AA | 08104 | 34.000 |
34.000 |
$1,400.000 |
CUYD | 5.6 |
0185 | STEEL REINFORCEMENT-EPOXY COATED | 08151 | 8,000.000 |
8,000.000 |
$2.000 |
LB | 1.9 |
0190 | PRECAST PC BOX BEAM CB33-48 | 08665 | 462.000 |
462.000 |
$350.000 |
LF | 19.1 |
0195 | EROSION CONTROL | 21415ND | 1.000 |
1.000 |
$5,000.000 |
LS | 0.6 |
0200 | SNOW FENCE | 21476ED | 1,682.000 |
1,682.000 |
$5.000 |
LF | 1.0 |
0205 | CONCRETE SEALING | 23378EC | 4,250.000 |
4,250.000 |
$1.980 |
SQFT | 1.0 |
0210 | DECK DRAIN | 23813EC | 4.000 |
4.000 |
$590.000 |
EACH | 0.3 |
0215 | RAIL SYSTEM SINGLE SLOPE - 40 IN | 25028ED | 154.000 |
154.000 |
$250.000 |
LF | 4.6 |
0220 | THRIE BEAM GUARDRAIL TRANSITION TL-3 | 25078ED | 4.000 |
4.000 |
$4,002.000 |
EACH | 1.9 |
0225 | MOBILIZATION FOR CONCRETE SURF TREATMENT | 26233EC | 1.000 |
1.000 |
$1,404.000 |
LS | 0.2 |
Category Total $832,512.40 |
SM- Project | BR05610042400 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION &/OR MOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0230 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$12,587.600 |
LS | 1.5 |
Category Total $12,587.60 |