Item List 232334 |
Date:03/14/2025 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 232334 | Primary Project Number | MP0500882301 |
Contract Description | CUB RUN HIGHWAY (KY 88) | ||
Primary County | HART | Fed/St Number | FD04 050 0088 012-018 |
Vendor ID | 02519 | Vendor Name | SCOTTY'S CONTRACTING & STONE LLC |
Bid Amount | $ 3,448,842.89 |
SM- Project | MP0500882301 |
Fed/State Number | FD04 050 0088 012-018 |
Project Description | CUB RUN HIGHWAY (KY 88) |
*********** |
SM- Project | MP0500882301 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0285 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$160,497.920 |
LS | 4.7 |
0290 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$48,149.380 |
LS | 1.4 |
Category Total $208,647.30 |
SM- Project | MP0500882301 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0005 | DGA BASE | 00001 | 220.000 |
220.000 |
$54.580 |
TON | 0.3 |
0010 | LEVELING & WEDGING PG64-22 | 00190 | 282.000 |
282.000 |
$125.980 |
TON | 1.0 |
0015 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 45.000 |
45.000 |
$343.900 |
TON | 0.4 |
0020 | ASPHALT MIX FOR PAVEMENT WEDGE | 00263 | 468.000 |
468.000 |
$105.750 |
TON | 1.4 |
0025 | CL2 ASPH BIND 0.50D PG64-22 | 00272 | 9,200.000 |
9,200.000 |
$98.280 |
TON | 26.2 |
0030 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 4,632.000 |
4,632.000 |
$102.200 |
TON | 13.7 |
0035 | ENTRANCE PIPE-15 IN | 00440 | 28.000 |
28.000 |
$141.000 |
LF | 0.1 |
0040 | CULVERT PIPE-18 IN | 00462 | 496.000 |
496.000 |
$256.930 |
LF | 3.7 |
0045 | CULVERT PIPE-24 IN | 00464 | 229.000 |
229.000 |
$276.240 |
LF | 1.8 |
0050 | REMOVE PIPE | 01310 | 511.000 |
511.000 |
$44.350 |
LF | 0.7 |
0055 | DROP BOX INLET TYPE 1 | 01490 | 1.000 |
1.000 |
$6,200.000 |
EACH | 0.2 |
0060 | SAFETY BOX INLET-18 IN SDB-1 | 01726 | 5.000 |
5.000 |
$6,000.000 |
EACH | 0.9 |
0065 | SAFETY BOX INLET-24 IN SDB-1 | 01727 | 2.000 |
2.000 |
$6,900.000 |
EACH | 0.4 |
0070 | SAFETY BOX INLET-24 IN DBL SDB-5 | 01729 | 2.000 |
2.000 |
$8,000.000 |
EACH | 0.5 |
0075 | BARRICADE-TYPE III | 02014 | 10.000 |
10.000 |
$250.810 |
EACH | 0.1 |
0080 | JPC PAVEMENT-11 IN (REVISED 8/21/2023) | 02071 | 577.000 |
577.000 |
$163.800 |
SQYD | 2.7 |
0085 | REMOVE PAVEMENT | 02091 | 577.000 |
577.000 |
$28.990 |
SQYD | 0.5 |
0090 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 500.000 |
500.000 |
$36.950 |
LF | 0.5 |
0095 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 1.000 |
1.000 |
$4,140.410 |
EACH | 0.1 |
0100 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 1.000 |
1.000 |
$1,297.490 |
EACH | 0.0 |
0105 | REMOVE GUARDRAIL | 02381 | 550.000 |
550.000 |
$3.710 |
LF | 0.1 |
0110 | REMOVE TREES OR STUMPS | 02460 | 1.000 |
1.000 |
$5,637.670 |
EACH | 0.2 |
0115 | CHANNEL LINING CLASS II | 02483 | 145.000 |
145.000 |
$60.040 |
TON | 0.3 |
0120 | TEMPORARY SIGNS | 02562 | 450.000 |
450.000 |
$8.380 |
SQFT | 0.1 |
0125 | DITCHING AND SHOULDERING | 02575 | 59,432.000 |
59,432.000 |
$9.920 |
LF | 17.1 |
0130 | FABRIC-GEOTEXTILE CLASS 1 | 02602 | 650.000 |
650.000 |
$4.490 |
SQYD | 0.1 |
0135 | REMOVE HEADWALL | 02625 | 26.000 |
26.000 |
$331.400 |
EACH | 0.2 |
0140 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$270,805.140 |
LS | 7.9 |
0145 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 3.000 |
3.000 |
$2,506.900 |
EACH | 0.2 |
0150 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$4,255.440 |
LS | 0.1 |
0155 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 235.000 |
235.000 |
$61.280 |
TON | 0.4 |
0160 | BASE FAILURE REPAIR | 03240 | 2,805.000 |
6,280.670 |
$53.200 |
SQYD | 4.3 |
0165 | TEMP SIGNAL MULTI PHASE | 04934 | 1.000 |
1.000 |
$10,052.590 |
EACH | 0.3 |
0170 | REMOVE POLE | 04939 | 1.000 |
1.000 |
$3,613.550 |
EACH | 0.1 |
0175 | REMOVE AND REPLACE SIDEWALK | 04960 | 25.000 |
25.000 |
$346.690 |
SQYD | 0.3 |
0180 | EROSION CONTROL BLANKET | 05950 | 14,723.000 |
14,723.000 |
$1.650 |
SQYD | 0.7 |
0185 | SEEDING AND PROTECTION | 05985 | 2,072.000 |
2,072.000 |
$0.450 |
SQYD | 0.0 |
0190 | SPECIAL SEEDING CROWN VETCH | 05989 | 2,072.000 |
2,072.000 |
$0.450 |
SQYD | 0.0 |
0195 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 60,000.000 |
60,000.000 |
$0.320 |
LF | 0.6 |
0200 | PAVE STRIPING-PERM PAINT-6 IN | 06515 | 120,000.000 |
120,000.000 |
$0.340 |
LF | 1.2 |
0205 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 300.000 |
300.000 |
$4.000 |
LF | 0.0 |
0210 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 800.000 |
800.000 |
$4.000 |
LF | 0.1 |
0215 | PAVE MARKING-THERMO R 6 FT | 06562 | 4.000 |
4.000 |
$175.000 |
EACH | 0.0 |
0220 | PAVE MARKING-R/R XBUCKS 16 IN | 06563 | 88.000 |
88.000 |
$12.000 |
LF | 0.0 |
0225 | PAVE MARKING-THERMO X-WALK-6 IN | 06565 | 242.000 |
242.000 |
$5.000 |
LF | 0.0 |
0230 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 72.000 |
72.000 |
$15.000 |
LF | 0.0 |
0235 | PAVE MARKING-THERMO CROSS-HATCH | 06569 | 450.000 |
450.000 |
$8.000 |
SQFT | 0.1 |
0240 | PAVE MARKING-THERMO CURV ARROW | 06574 | 1.000 |
1.000 |
$500.000 |
EACH | 0.0 |
0245 | FUEL ADJUSTMENT | 10020NS | 8,610.000 |
8,610.000 |
$1.000 |
DOLL | 0.2 |
0250 | ASPHALT ADJUSTMENT | 10030NS | 21,627.000 |
21,627.000 |
$1.000 |
DOLL | 0.6 |
0255 | SAWCUT PAVEMENT | 20550ND | 1,043.000 |
1,043.000 |
$4.770 |
LF | 0.1 |
0260 | EROSION CONTROL | 21415ND | 1.000 |
1.000 |
$34,606.660 |
LS | 1.0 |
0265 | DETECTABLE WARNINGS (RETROFIT) | 23158ES505 | 98.000 |
98.000 |
$43.270 |
SQFT | 0.1 |
0270 | ASPHALT MATERIAL FOR TACK NON-TRACKING | 24970EC | 105.000 |
105.000 |
$0.010 |
TON | 0.0 |
0275 | SLOPED AND MITERED HEADWALL-18 IN | 26131ED | 15.000 |
15.000 |
$3,800.000 |
EACH | 1.7 |
0280 | SLOPED AND MITERED HEADWALL-24 IN | 26132ED | 2.000 |
2.000 |
$4,800.000 |
EACH | 0.3 |
8000 | FABRIC-GEOTEXTILE CLASS 2 FOR PIPE | 02607 | 0.000 |
1,093.970 |
$2.000 |
SQYD | 0.0 |
8001 | MAINTAIN & CONTROL TRAFFIC Additional Base Failure Repairs | 02650 | 0.000 |
1.000 |
$5,005.480 |
LS | 0.0 |
8002 | LOT PAY ADJUSTMENT | 10000NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $3,240,195.59 |