Item List 215205 |
Date:04/21/2023 |
|
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 215205 | Primary Project Number | BR10606362100 |
| Contract Description | KY 636 (BACK CREEK ROAD) | ||
| Primary County | SHELBY | Fed/St Number | STP BRZ 9030 (304) |
| Vendor ID | 00890 | Vendor Name | SCOTT AND MURPHY INC |
| Bid Amount | $ 894,492.14 | ||
| SM- Project | BR10606362100 |
| Fed/State Number | STP BRZ 9030 (304) |
| Project Description | KY 636 (BACK CREEK ROAD) |
| *********** |
| SM- Project | BR10606362100 | CATEGORY NUMBER | 0001 | CATEGORY Description | BRIDGE - 106B00043N |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0005 | DGA BASE | 00001 | 724.000 |
724.000 |
$62.500 |
TON | 5.1 |
| 0010 | ASPHALT SEAL AGGREGATE | 00100 | 8.000 |
8.000 |
$595.000 |
TON | 0.5 |
| 0015 | ASPHALT SEAL COAT | 00103 | 1.000 |
1.000 |
$1,950.000 |
TON | 0.2 |
| 0020 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 330.000 |
330.000 |
$148.500 |
TON | 5.5 |
| 0025 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 49.000 |
49.000 |
$279.000 |
TON | 1.5 |
| 0030 | FLUME INLET TYPE 2 | 01691 | 2.000 |
2.000 |
$6,500.000 |
EACH | 1.5 |
| 0035 | ISLAND HEADER CURB TYPE 2 | 01891 | 32.000 |
32.000 |
$70.000 |
LF | 0.3 |
| 0040 | DELINEATOR FOR GUARDRAIL BI DIRECTIONAL WHITE | 01987 | 10.000 |
10.000 |
$10.040 |
EACH | 0.0 |
| 0045 | GRANULAR EMBANKMENT | 02223 | 480.000 |
480.000 |
$50.000 |
CUYD | 2.7 |
| 0050 | REMOVE & RESET FENCE | 02267 | 129.000 |
129.000 |
$15.000 |
LF | 0.2 |
| 0055 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 237.500 |
237.500 |
$33.000 |
LF | 0.9 |
| 0060 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 2.000 |
2.000 |
$66.880 |
EACH | 0.0 |
| 0065 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 2.000 |
2.000 |
$3,488.690 |
EACH | 0.8 |
| 0070 | EXTRA LENGTH GUARDRAIL POST | 02399 | 16.000 |
16.000 |
$32.410 |
EACH | 0.1 |
| 0075 | CHANNEL LINING CLASS II | 02483 | 23.000 |
23.000 |
$50.000 |
TON | 0.1 |
| 0080 | CLEARING AND GRUBBING Less than 1 acre | 02545 | 1.000 |
1.000 |
$2,000.000 |
LS | 0.2 |
| 0085 | EDGE KEY | 02585 | 41.000 |
41.000 |
$55.000 |
LF | 0.3 |
| 0090 | FABRIC-GEOTEXTILE CLASS 1 | 02602 | 38.000 |
38.000 |
$2.750 |
SQYD | 0.0 |
| 0095 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$7,000.000 |
LS | 0.8 |
| 0100 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 2.000 |
2.000 |
$1,400.000 |
EACH | 0.3 |
| 0105 | STAKING | 02726 | 1.000 |
1.000 |
$1,950.000 |
LS | 0.2 |
| 0110 | REMOVE STRUCTURE | 02731 | 1.000 |
1.000 |
$60,000.000 |
LS | 6.7 |
| 0115 | ARMORED EDGE FOR CONCRETE | 03299 | 56.000 |
56.000 |
$65.000 |
LF | 0.4 |
| 0120 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$15,000.000 |
LS | 1.7 |
| 0125 | CYCLOPEAN STONE RIP RAP | 08019 | 1,050.000 |
1,050.000 |
$50.000 |
TON | 5.9 |
| 0130 | TEST PILES | 08033 | 70.000 |
70.000 |
$60.000 |
LF | 0.5 |
| 0135 | PILES-STEEL HP12X53 | 08046 | 230.000 |
230.000 |
$60.000 |
LF | 1.5 |
| 0140 | PILE POINTS-12 IN | 08094 | 16.000 |
16.000 |
$120.000 |
EACH | 0.2 |
| 0145 | CONCRETE-CLASS A | 08100 | 78.000 |
78.000 |
$682.000 |
CUYD | 5.9 |
| 0150 | CONCRETE-CLASS AA | 08104 | 184.000 |
184.000 |
$682.000 |
CUYD | 14.0 |
| 0155 | STEEL REINFORCEMENT | 08150 | 8,600.000 |
8,600.000 |
$1.300 |
LB | 1.2 |
| 0160 | STEEL REINFORCEMENT-EPOXY COATED | 08151 | 31,300.000 |
31,300.000 |
$1.400 |
LB | 4.9 |
| 0165 | EROSION CONTROL | 21415ND | 1.000 |
1.000 |
$1,450.000 |
LS | 0.2 |
| 0170 | SNOW FENCE | 21476ED | 1,450.000 |
1,450.000 |
$3.250 |
LF | 0.5 |
| 0175 | CONCRETE SEALING | 23378EC | 9,150.000 |
9,150.000 |
$1.900 |
SQFT | 1.9 |
| 0180 | DECK DRAIN | 23813EC | 6.000 |
6.000 |
$650.000 |
EACH | 0.4 |
| 0185 | PPC I-BEAM HN 54 49 | 24463ED | 353.000 |
353.000 |
$625.000 |
LF | 24.7 |
| 0190 | RAIL SYSTEM SINGLE SLOPE - 40 IN | 25028ED | 242.000 |
242.000 |
$200.000 |
LF | 5.4 |
| 0195 | THRIE BEAM GUARDRAIL TRANSITION TL-3 | 25078ED | 4.000 |
3.000 |
$2,805.040 |
EACH | 1.3 |
| 8000 | LIQUIDATED DAMAGES Contract Overtime | 10111NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
| 8001 | ROADWAY EXCAVATION | 02200 | 0.000 |
330.760 |
$18.700 |
CUYD | 0.0 |
| 8002 | MASS CONCRETE | 10040ES | 0.000 |
5.000 |
$303.160 |
CUYD | 0.0 |
| 8003 | THRIE BEAM GUARDRAIL TRANSITION TL-2 | 25079ED | 0.000 |
1.000 |
$2,100.000 |
EACH | 0.0 |
Category Total $881,074.76 |
| SM- Project | BR10606362100 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION &/OR MOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0200 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$13,417.380 |
LS | 1.5 |
Category Total $13,417.38 |