Item List 199102 |
Date:06/20/2025 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 199102 | Primary Project Number | 0600800751901 |
Contract Description | KY 536, KY 338 AND I-75 DESIGN BUILD | ||
Primary County | BOONE | Fed/St Number | 008GR19D004 |
Vendor ID | 03830 | Vendor Name | JOHN R JURGENSEN CO J/V EATON ASPHALT J/V HAYDON BRIDGE |
Bid Amount | $ 120,626,685.53 |
SM- Project | 0600800751901 |
Fed/State Number | NHPPIM 0757(144) |
Project Description | I-75 REHAB |
*********** |
SM- Project | 0600800751901 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING - I75 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0005 | DGA BASE I-75 PAVEMENT | 00001 | 1,171.000 |
1,171.000 |
$40.530 |
TON | 0.0 |
0010 | ASPHALT SEAL AGGREGATE I-75 PAVEMENT | 00100 | 287.000 |
287.000 |
$108.170 |
TON | 0.0 |
0015 | ASPHALT SEAL COAT | 00103 | 34.000 |
34.000 |
$810.930 |
TON | 0.0 |
0020 | LEVELING & WEDGING PG76-22 I-75 PAVEMENT | 00194 | 1,000.000 |
1,000.000 |
$101.510 |
TON | 0.1 |
0025 | CL4 ASPH BASE 1.00D PG76-22 I-75 PAVEMENT | 00219 | 3,413.000 |
3,413.000 |
$95.650 |
TON | 0.3 |
0030 | CL3 ASPH SURF 0.38D PG64-22 I-75 PAVEMENT | 00339 | 8,100.000 |
8,100.000 |
$81.750 |
TON | 0.5 |
0035 | CL4 ASPH SURF 0.38A PG76-22 I-75 PAVEMENT | 00342 | 42,337.000 |
42,337.000 |
$90.520 |
TON | 3.2 |
0040 | ASPHALT PAVE MILLING & TEXTURING I-75 PAVEMENT | 02677 | 54,323.000 |
54,323.000 |
$15.730 |
TON | 0.7 |
0045 | JOINT ADHESIVE I-75 PAVEMENT | 20071EC | 527,911.000 |
527,911.000 |
$0.610 |
LF | 0.3 |
0050 | BLOW UP/RELIEF JOINT I-75 PAVEMENT | 20509ED | 2,715.000 |
2,715.000 |
$300.050 |
SQYD | 0.7 |
0055 | FIBER REINFORCEMENT FOR HMA I-75 PAVEMENT | 24785EC | 963.000 |
963.000 |
$24.760 |
TON | 0.0 |
0060 | ASPHALT MATERIAL FOR TACK NON-TRACKING I-75 PAVEMENT | 24970EC | 160.000 |
160.000 |
$1,097.290 |
TON | 0.1 |
0065 | POTHOLE PATCHING | 21549EN | 409.190 |
409.190 |
$200.000 |
SQYD | 0.1 |
8075 | SUBGRADE STABILIZATION I-75 PAVEMENT | 24790EC | 0.000 |
10.000 |
$474.250 |
SQYD | 0.0 |
8181 | LOT PAY ADJUSTMENT I-75 PAVEMENT | 10000NS | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $7,300,971.26 |
SM- Project | 0600800751901 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY - I75 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0070 | BARRIER WALL REPLACEMENT | 23696EC | 185.000 |
185.000 |
$442.160 |
LF | 0.1 |
0075 | CRUSHED AGGREGATE SIZE NO 2 I-75 ROADWAY | 00078 | 4,441.000 |
7,359.490 |
$47.120 |
TON | 0.2 |
0080 | PERFORATED PIPE EDGE DRAIN-4 IN I-75 ROADWAY | 01005 | 10,000.000 |
10,000.000 |
$12.230 |
LF | 0.1 |
0085 | NON-PERFORATED PIPE-4 IN I-75 ROADWAY | 01010 | 275.000 |
275.000 |
$48.610 |
LF | 0.0 |
0090 | INSPECT & CERTIFY EDGE DRAIN SYSTEM I-75 ROADWAY | 01015 | 1.000 |
1.000 |
$84,291.230 |
LS | 0.1 |
0095 | PERF PIPE HEADWALL TY 1-4 IN I-75 ROADWAY | 01020 | 4.000 |
4.000 |
$711.060 |
EACH | 0.0 |
0100 | PERF PIPE HEADWALL TY 2-4 IN I-75 ROADWAY | 01024 | 4.000 |
4.000 |
$729.290 |
EACH | 0.0 |
0105 | PERF PIPE HEADWALL TY 3-4 IN I-75 ROADWAY | 01028 | 4.000 |
4.000 |
$729.290 |
EACH | 0.0 |
0110 | PIPE CULVERT HEADWALL-18 IN I-75 ROADWAY | 01204 | 1.000 |
1.000 |
$2,413.390 |
EACH | 0.0 |
0115 | REMOVE PIPE I-75 ROADWAY | 01310 | 3.000 |
3.000 |
$751.960 |
LF | 0.0 |
0120 | RECONSTRUCT INLET I-75 ROADWAY | 01720 | 2.000 |
2.000 |
$4,787.990 |
EACH | 0.0 |
0125 | CORED HOLE DRAINAGE BOX CON-4 IN I-75 ROADWAY | 01740 | 4.000 |
4.000 |
$425.420 |
EACH | 0.0 |
0130 | DELINEATOR FOR GUARDRAIL MONO DIRECTIONAL WHITE I-75 ROADWAY | 01982 | 24.000 |
19.000 |
$7.000 |
EACH | 0.0 |
0135 | DELINEATOR FOR BARRIER - WHITE I-75 ROADWAY | 01984 | 60.000 |
60.000 |
$33.500 |
EACH | 0.0 |
0140 | DELINEATOR FOR BARRIER - YELLOW I-75 ROADWAY | 01985 | 65.000 |
79.000 |
$7.250 |
EACH | 0.0 |
0145 | RELOCATE TEMP CONC BARRIER I-75 ROADWAY | 02003 | 3,000.000 |
3,000.000 |
$4.940 |
LF | 0.0 |
0150 | PARTIAL DEPTH PATCHING I-75 ROADWAY | 02110 | 2,286.000 |
2,286.000 |
$94.830 |
CUFT | 0.2 |
0155 | TEMP DITCH I-75 ROADWAY | 02159 | 22,664.000 |
22,664.000 |
$0.670 |
LF | 0.0 |
0160 | CLEAN TEMP DITCH I-75 ROADWAY | 02160 | 11,332.000 |
11,332.000 |
$0.470 |
LF | 0.0 |
0165 | REMOVE PAVED DITCH I-75 ROADWAY | 02165 | 84.000 |
90.440 |
$24.230 |
SQYD | 0.0 |
0170 | ROADWAY EXCAVATION I-75 ROADWAY | 02200 | 2,644.000 |
4,802.330 |
$28.110 |
CUYD | 0.1 |
0175 | FLOWABLE FILL I-75 ROADWAY | 02220 | 25.000 |
30.000 |
$286.020 |
CUYD | 0.0 |
0180 | FENCE-WOVEN WIRE TYPE 1 I-75 ROADWAY | 02262 | 50.000 |
50.000 |
$6.000 |
LF | 0.0 |
0185 | REMOVE FENCE I-75 ROADWAY | 02265 | 50.000 |
50.000 |
$2.500 |
LF | 0.0 |
0190 | GUARDRAIL-STEEL W BEAM-S FACE I-75 ROADWAY | 02351 | 1,025.000 |
1,050.000 |
$17.000 |
LF | 0.0 |
0195 | GUARDRAIL TERMINAL SECTION NO 1 I-75 ROADWAY | 02360 | 7.000 |
8.000 |
$50.000 |
EACH | 0.0 |
0200 | GUARDRAIL END TREATMENT TYPE 1 I-75 ROADWAY | 02367 | 1.000 |
0.000 |
$2,500.000 |
EACH | 0.0 |
0205 | GUARDRAIL END TREATMENT TYPE 2A I-75 ROADWAY | 02369 | 1.000 |
1.000 |
$1,000.000 |
EACH | 0.0 |
0210 | REMOVE GUARDRAIL I-75 ROADWAY | 02381 | 1,075.000 |
1,050.000 |
$2.000 |
LF | 0.0 |
0215 | CHANNEL LINING CLASS III I-75 ROADWAY | 02484 | 604.000 |
604.000 |
$96.680 |
TON | 0.0 |
0220 | CLEARING AND GRUBBING I-75 ROADWAY | 02545 | 1.000 |
1.000 |
$97,929.500 |
LS | 0.1 |
0225 | TEMPORARY SIGNS I-75 ROADWAY | 02562 | 1,200.000 |
1,264.000 |
$13.400 |
SQFT | 0.0 |
0230 | DITCHING AND SHOULDERING I-75 ROADWAY | 02575 | 45,328.000 |
45,328.000 |
$1.200 |
LF | 0.0 |
0235 | FABRIC-GEOTEXTILE TYPE I I-75 ROADWAY | 02596 | 1,105.000 |
1,965.280 |
$5.000 |
SQYD | 0.0 |
0240 | MAINTAIN & CONTROL TRAFFIC I-75 ROADWAY | 02650 | 1.000 |
1.000 |
$549,864.330 |
LS | 0.5 |
0245 | TRUCK MOUNTED ATTENUATOR I-75 ROADWAY | 02654 | 4.000 |
4.000 |
$30,270.630 |
EACH | 0.1 |
0250 | PORTABLE CHANGEABLE MESSAGE SIGN I-75 ROADWAY | 02671 | 4.000 |
4.000 |
$2,208.670 |
EACH | 0.0 |
0255 | MOBILIZATION FOR MILL & TEXT I-75 ROADWAY | 02676 | 1.000 |
1.000 |
$2,707.380 |
LS | 0.0 |
0260 | SHOULDER RUMBLE STRIPS I-75 ROADWAY | 02696 | 190,915.000 |
190,915.000 |
$0.130 |
LF | 0.0 |
0265 | SILT TRAP TYPE A I-75 ROADWAY | 02703 | 2.000 |
2.000 |
$470.050 |
EACH | 0.0 |
0270 | SILT TRAP TYPE B I-75 ROADWAY | 02704 | 2.000 |
2.000 |
$470.050 |
EACH | 0.0 |
0275 | SILT TRAP TYPE C I-75 ROADWAY | 02705 | 2.000 |
2.000 |
$507.570 |
EACH | 0.0 |
0280 | CLEAN SILT TRAP TYPE A I-75 ROADWAY | 02706 | 2.000 |
2.000 |
$213.530 |
EACH | 0.0 |
0285 | CLEAN SILT TRAP TYPE B I-75 ROADWAY | 02707 | 2.000 |
2.000 |
$213.530 |
EACH | 0.0 |
0290 | CLEAN SILT TRAP TYPE C I-75 ROADWAY | 02708 | 2.000 |
2.000 |
$173.230 |
EACH | 0.0 |
0295 | ARROW PANEL I-75 ROADWAY | 02775 | 4.000 |
4.000 |
$1,163.010 |
EACH | 0.0 |
0300 | RELOCATE CRASH CUSHION I-75 ROADWAY | 02898 | 3.000 |
3.000 |
$3,000.000 |
EACH | 0.0 |
0305 | CONCRETE BARRIER WALL TYPE 9T I-75 ROADWAY | 03171 | 3,000.000 |
3,660.000 |
$41.760 |
LF | 0.1 |
0310 | EXCAVATION AND BACKFILL I-75 ROADWAY | 03235 | 25.000 |
25.000 |
$147.270 |
CUYD | 0.0 |
0315 | CLEAN PIPE STRUCTURE I-75 ROADWAY | 03262 | 157.000 |
157.000 |
$659.570 |
EACH | 0.1 |
0320 | ARMORED EDGE FOR CONCRETE I-75 ROADWAY | 03299 | 948.400 |
948.400 |
$215.870 |
LF | 0.2 |
0325 | CONDUIT-1 IN I-75 ROADWAY | 04792 | 20.000 |
20.000 |
$5.000 |
LF | 0.0 |
0330 | CONDUIT-1 1/4 IN I-75 ROADWAY | 04793 | 440.000 |
440.000 |
$9.000 |
LF | 0.0 |
0335 | CONDUIT-2 IN I-75 ROADWAY | 04795 | 210.000 |
210.000 |
$10.000 |
LF | 0.0 |
0340 | ELECTRICAL JUNCTION BOX TYPE B I-75 ROADWAY | 04811 | 8.000 |
8.000 |
$550.000 |
EACH | 0.0 |
0345 | TRENCHING AND BACKFILLING I-75 ROADWAY | 04820 | 640.000 |
640.000 |
$4.000 |
LF | 0.0 |
0350 | PIEZOELECTRIC SENSOR I-75 ROADWAY | 04829 | 60.000 |
60.000 |
$1,200.000 |
EACH | 0.1 |
0355 | LOOP WIRE I-75 ROADWAY | 04830 | 17,528.000 |
17,528.000 |
$0.900 |
LF | 0.0 |
0360 | CABLE-NO. 14/1 PAIR I-75 ROADWAY | 04850 | 470.000 |
470.000 |
$1.500 |
LF | 0.0 |
0365 | POLE 35 FT WOODEN I-75 ROADWAY | 04871 | 2.000 |
2.000 |
$1,200.000 |
EACH | 0.0 |
0370 | LOOP SAW SLOT AND FILL I-75 ROADWAY | 04895 | 3,800.000 |
3,800.000 |
$9.000 |
LF | 0.0 |
0375 | ELECTRICAL SERVICE I-75 ROADWAY | 04899 | 2.000 |
2.000 |
$2,250.000 |
EACH | 0.0 |
0380 | EROSION CONTROL BLANKET I-75 ROADWAY | 05950 | 18,000.000 |
18,000.000 |
$1.500 |
SQYD | 0.0 |
0385 | TEMP MULCH I-75 ROADWAY | 05952 | 6,453.000 |
6,453.000 |
$0.140 |
SQYD | 0.0 |
0390 | TEMP SEEDING AND PROTECTION I-75 ROADWAY | 05953 | 4,840.000 |
4,840.000 |
$0.160 |
SQYD | 0.0 |
0395 | INITIAL FERTILIZER I-75 ROADWAY | 05963 | 1.000 |
1.000 |
$800.000 |
TON | 0.0 |
0400 | MAINTENANCE FERTILIZER I-75 ROADWAY | 05964 | 1.000 |
1.000 |
$800.000 |
TON | 0.0 |
0405 | SPECIAL SEEDING CROWN VETCH I-75 ROADWAY | 05989 | 2,160.000 |
2,160.000 |
$0.220 |
SQYD | 0.0 |
0410 | AGRICULTURAL LIMESTONE I-75 ROADWAY | 05992 | 6.000 |
6.000 |
$65.000 |
TON | 0.0 |
0415 | FLEXIBLE DELINEATOR POST-M/W I-75 ROADWAY | 06401 | 466.000 |
466.000 |
$29.000 |
EACH | 0.0 |
0420 | FLEXIBLE DELINEATOR POST-M/Y I-75 ROADWAY | 06404 | 96.000 |
96.000 |
$29.000 |
EACH | 0.0 |
0425 | PAVE STRIPING-TEMP PAINT-6 IN I-75 ROADWAY | 06511 | 310,000.000 |
310,000.000 |
$0.240 |
LF | 0.1 |
0430 | PAVE STRIPING-THERMO-6 IN W I-75 ROADWAY | 06542 | 154,953.000 |
154,953.000 |
$0.750 |
LF | 0.1 |
0435 | PAVE STRIPING-THERMO-6 IN Y I-75 ROADWAY | 06543 | 95,458.000 |
95,458.000 |
$0.750 |
LF | 0.1 |
0440 | PAVE STRIPING-THERMO-12 IN W I-75 ROADWAY | 06546 | 9,466.000 |
9,466.000 |
$1.250 |
LF | 0.0 |
0445 | PAVE MARKING-THERMO STOP BAR-24IN I-75 ROADWAY | 06568 | 84.000 |
84.000 |
$10.000 |
LF | 0.0 |
0450 | PAVE MARKING-THERMO CURV ARROW I-75 ROADWAY | 06574 | 6.000 |
6.000 |
$75.000 |
EACH | 0.0 |
0455 | PAVE MARKING-THERMO ONLY I-75 ROADWAY | 06576 | 4.000 |
4.000 |
$300.000 |
EACH | 0.0 |
0460 | PAVEMENT MARKER TY IVA-MW TEMP I-75 ROADWAY | 06585 | 2,780.000 |
2,780.000 |
$6.000 |
EACH | 0.0 |
0465 | PAVEMENT MARKER TY IVA-MY TEMP I-75 ROADWAY | 06586 | 1,250.000 |
1,250.000 |
$6.000 |
EACH | 0.0 |
0470 | APPROACH SLAB I-75 ROADWAY | 08500 | 2,424.000 |
2,424.000 |
$342.430 |
SQYD | 0.7 |
0475 | CRASH CUSHION TY VI CLASS BT TL3 I-75 ROADWAY | 08903 | 3.000 |
7.000 |
$5,000.000 |
EACH | 0.0 |
0480 | GALVANIZED STEEL CABINET I-75 ROADWAY | 20359NN | 6.000 |
6.000 |
$450.000 |
EACH | 0.0 |
0485 | WOOD POST I-75 ROADWAY | 20360ES818 | 12.000 |
12.000 |
$200.000 |
EACH | 0.0 |
0490 | ELECTRICAL JUNCTION BOX TYPE A I-75 ROADWAY | 20391NS835 | 10.000 |
10.000 |
$550.000 |
EACH | 0.0 |
0495 | LAW ENFORCEMENT OFFICER I-75 ROADWAY | 20411ED | 1,000.000 |
1,020.000 |
$65.000 |
HOUR | 0.1 |
0500 | CLEAN CULVERT | 24662EC | 21.000 |
21.000 |
$4,270.710 |
EACH | 0.1 |
0505 | REMOVE AND RESET PERF PIPE HEADWALL I-75 ROADWAY | 20758ED | 4.000 |
4.000 |
$607.740 |
EACH | 0.0 |
0510 | WATER BLASTING EXISTING STRIPE I-75 ROADWAY | 22664EN | 93,750.000 |
93,750.000 |
$0.450 |
LF | 0.0 |
0515 | CONCRETE WEDGE CURB I-75 ROADWAY | 22883EN | 10.000 |
10.000 |
$40.000 |
LF | 0.0 |
0520 | INSTALL CONTROLLER CABINET I-75 ROADWAY | 23206EC | 2.000 |
2.000 |
$1,500.000 |
EACH | 0.0 |
0525 | PIPE LINER ACCEPTANCE TESTING I-75 ROADWAY | 23484EC | 1.000 |
1.000 |
$1,500.000 |
LS | 0.0 |
0530 | INLAID PAVEMENT MARKER I-75 ROADWAY | 24489EC | 3,498.000 |
3,498.000 |
$25.000 |
EACH | 0.1 |
0535 | PAVE MARK THERMO CHEVRON I-75 ROADWAY | 24679ED | 4,206.000 |
4,206.000 |
$3.500 |
SQFT | 0.0 |
0540 | INTELLIGENT COMPACTION FOR ASPHALT I-75 ROADWAY | 24781EC | 1.000 |
1.000 |
$32,953.660 |
TON | 0.0 |
0545 | PVC FOLD AND FORM PIPE LINER-30 IN I-75 ROADWAY | 24864EC | 317.000 |
317.000 |
$176.540 |
LF | 0.0 |
0550 | PAVE MOUNT INFRARED TEMP EQUIPMENT I-75 ROADWAY | 24891EC | 1.000 |
1.000 |
$13,125.470 |
SF | 0.0 |
0555 | PVC CONDUIT-1 1/4 IN-SCHEDULE 80 I-75 ROADWAY | 24900EC | 60.000 |
60.000 |
$3.000 |
LF | 0.0 |
0560 | LOOP TEST I-75 ROADWAY | 24963ED | 4.000 |
4.000 |
$250.000 |
EACH | 0.0 |
0565 | HMA ELECTRONIC DELIVERY MGMT SYSTEM I-75 ROADWAY | 24986EC | 1.000 |
1.000 |
$35,376.420 |
LS | 0.0 |
0570 | TEMPORARY SILT FENCE I-75 ROADWAY | 40030 | 4,840.000 |
4,840.000 |
$2.720 |
LF | 0.0 |
8016 | ASPHALT ADJUSTMENT I-75 ROADWAY | 10030NS | 0.000 |
696,427.233 |
$1.000 |
DOLL | 0.0 |
8017 | FUEL ADJUSTMENT I-75 ROADWAY | 10020NS | 0.000 |
217,622.037 |
$1.000 |
DOLL | 0.0 |
8069 | STEEL REINFORCEMENT-EPOXY COATED I-75 ROADWAY | 08151 | 0.000 |
1,239.000 |
$1.399 |
LB | 0.0 |
8125 | INCENTIVE/DISINCENTIVE I-75 ROADWAY | 02571 | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8142 | MAINTAIN & CONTROL TRAFFIC I-75 ROADWAY | 02650 | 0.000 |
0.000 |
$-16,430.000 |
LS | 0.0 |
8147 | GUARDRAIL CONNECTOR TO BRIDGE END TY A-1 I-75 ROADWAY | 02387 | 0.000 |
3.000 |
$703.333 |
EACH | 0.0 |
Category Total $4,097,028.37 |
SM- Project | 0600800751901 | CATEGORY NUMBER | 0003 | CATEGORY Description | DEMOBILIZATION &/OR MOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0575 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$563,920.000 |
LS | 0.5 |
0580 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$183,274.000 |
LS | 0.2 |
8124 | MOBILIZATION | 02568 | 0.000 |
1.000 |
$4,947.250 |
LS | 0.0 |
8144 | D/B CONTRACT PAYMENT I-75 ACCOUNTING RECONCILIATION | 25083EN | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $747,194.00 |
SM- Project | 0600803881901 |
Fed/State Number | FD52 008 0075 177-179 |
Project Description | RICHWOOD RD INTERCHANGE |
*********** |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2095 | LIME STABILIZED ROADBED RICHWOOD PAVEMENT | 00013 | 159,226.000 |
0.000 |
$7.950 |
SQYD | 1.0 |
2100 | LIME RICHWOOD PAVEMENT | 00014 | 2,895.000 |
0.000 |
$185.440 |
TON | 0.4 |
2105 | DRAINAGE BLANKET-TYPE II-ASPH RICHWOOD PAVEMENT | 00018 | 24,701.000 |
24,701.000 |
$68.760 |
TON | 1.4 |
2110 | TRAFFIC BOUND BASE RICHWOOD PAVEMENT | 00020 | 1,066.000 |
1,400.310 |
$47.620 |
TON | 0.0 |
2115 | ASPHALT SEAL AGGREGATE RICHWOOD PAVEMENT | 00100 | 135.000 |
135.000 |
$157.150 |
TON | 0.0 |
2120 | ASPHALT SEAL COAT RICHWOOD PAVEMENT | 00103 | 16.000 |
16.000 |
$961.720 |
TON | 0.0 |
2125 | CL2 ASPH BASE 1.00D PG64-22 RICHWOOD PAVEMENT | 00212 | 13,625.000 |
1,598.510 |
$68.690 |
TON | 0.8 |
2130 | CL3 ASPH BASE 1.00D PG64-22 RICHWOOD PAVEMENT | 00214 | 22,889.000 |
22,889.000 |
$66.680 |
TON | 1.3 |
2135 | CL3 ASPH BASE 1.00D PG76-22 RICHWOOD PAVEMENT | 00216 | 8,099.000 |
8,099.000 |
$75.840 |
TON | 0.5 |
2140 | CL4 ASPH BASE 1.00D PG64-22 RICHWOOD PAVEMENT | 00217 | 4,337.000 |
4,337.000 |
$70.430 |
TON | 0.3 |
2145 | CL4 ASPH BASE 1.00D PG76-22 RICHWOOD PAVEMENT | 00219 | 5,744.000 |
5,744.000 |
$70.430 |
TON | 0.3 |
2150 | CL2 ASPH BASE 0.75D PG64-22 RICHWOOD PAVEMENT | 00221 | 10,170.000 |
10,358.060 |
$70.290 |
TON | 0.6 |
2155 | CL2 ASPH SURF 0.38D PG64-22 RICHWOOD PAVEMENT | 00301 | 3,841.000 |
3,887.630 |
$98.010 |
TON | 0.3 |
2160 | CL3 ASPH SURF 0.38A PG76-22 RICHWOOD PAVEMENT | 00336 | 4,875.000 |
4,875.000 |
$96.770 |
TON | 0.4 |
2165 | ASPHALT PLACEMENT WITH MTV RICHWOOD PAVEMENT | 00338 | 6,202.000 |
6,202.000 |
$5.670 |
TON | 0.0 |
2170 | CL4 ASPH SURF 0.38A PG76-22 RICHWOOD PAVEMENT | 00342 | 2,353.000 |
2,353.000 |
$99.200 |
TON | 0.2 |
2175 | ASPHALT MATERIAL FOR TACK RICHWOOD PAVEMENT | 00356 | 164.000 |
164.950 |
$700.140 |
TON | 0.1 |
2180 | ASPHALT CURING SEAL RICHWOOD PAVEMENT | 00358 | 232.000 |
232.000 |
$873.190 |
TON | 0.2 |
2185 | CL3 ASPH SURF 0.38B PG64-22 RICHWOOD PAVEMENT | 00388 | 749.000 |
749.000 |
$84.350 |
TON | 0.1 |
2190 | JPC PAVEMENT-12 IN RICHWOOD PAVEMENT | 02070 | 42.000 |
42.000 |
$120.000 |
SQYD | 0.0 |
2195 | JPC PAVEMENT-11 IN RICHWOOD PAVEMENT | 02071 | 46,438.000 |
46,438.000 |
$115.760 |
SQYD | 4.5 |
2200 | JPC PAVEMENT-11 IN SHLD RICHWOOD PAVEMENT | 02072 | 1,237.000 |
1,239.220 |
$125.330 |
SQYD | 0.1 |
2205 | JPC PAVEMENT-9 IN RICHWOOD PAVEMENT | 02073 | 685.000 |
685.000 |
$116.870 |
SQYD | 0.1 |
2210 | JPC PAVEMENT-8 IN RICHWOOD PAVEMENT | 02084 | 1,146.000 |
1,366.470 |
$90.000 |
SQYD | 0.1 |
2215 | CEM CONC ENT PAVEMENT-8 IN RICHWOOD PAVEMENT | 02101 | 817.000 |
817.000 |
$87.070 |
SQYD | 0.1 |
2220 | ASPHALT PAVE MILLING & TEXTURING RICHWOOD PAVEMENT | 02677 | 1,775.000 |
1,784.000 |
$31.850 |
TON | 0.0 |
2225 | SAND FOR BLOTTER RICHWOOD PAVEMENT | 02702 | 398.000 |
398.000 |
$35.820 |
TON | 0.0 |
2230 | JOINT ADHESIVE RICHWOOD PAVEMENT | 20071EC | 46,500.000 |
46,500.000 |
$0.610 |
LF | 0.0 |
2235 | STAMPED CONCRETE-10 IN RICHWOOD PAVEMENT | 23188EC | 40.000 |
40.000 |
$188.840 |
SQYD | 0.0 |
2240 | FULL-DEPTH ASPH PAVEMENT (TEMPORARY) | 23764EC | 21,838.000 |
22,403.330 |
$22.130 |
SQYD | 0.4 |
2245 | INTELLIGENT COMPACTION FOR ASPHALT RICHWOOD PAVEMENT | 24781EC | 1.000 |
1.000 |
$40,854.930 |
TON | 0.0 |
2250 | PAVE MOUNT INFRARED TEMP EQUIPMENT RICHWOOD PAVEMENT | 24891EC | 1.000 |
1.000 |
$151,151.370 |
SF | 0.1 |
2255 | CRUSHED STONE BASE - MODIFIED RICHWOOD PAVEMENT | 24965EC | 52,956.000 |
42,618.530 |
$26.470 |
TON | 1.2 |
2260 | HMA ELECTRONIC DELIVERY MGMT SYSTEM RICHWOOD PAVEMENT | 24986EC | 1.000 |
1.000 |
$40,425.390 |
LS | 0.0 |
8021 | CL2 ASPH BASE 1.00D PG64-22 RICHWOOD PAVEMENT TEMPORARY | 00212 | 0.000 |
12,256.000 |
$68.690 |
TON | 0.0 |
8022 | CRUSHED STONE BASE - MODIFIED RICHWOOD PAVEMENT TEMPORARY | 24965EC | 0.000 |
11,338.000 |
$26.470 |
TON | 0.0 |
8037 | CEMENT STABILIZED ROADBED RICHWOOD PAVEMENT | 00008 | 0.000 |
158,681.560 |
$7.950 |
SQYD | 0.0 |
8038 | CEMENT RICHWOOD PAVEMENT | 02542 | 0.000 |
4,498.570 |
$118.929 |
TON | 0.0 |
8073 | SUBGRADE STABILIZATION RICHWOOD PAVEMENT | 24790EC | 0.000 |
544.440 |
$16.912 |
SQYD | 0.0 |
8077 | NON-SPEC MATERIAL DGA BASE RICHWOOD PAVEMENT | 10070NS | 0.000 |
-20,548.010 |
$1.000 |
DOLL | 0.0 |
8078 | NON-SPEC MATERIAL CRUSHED STONE BASE - MODIFIED RICHWOOD PAVEMENT | 10070NS | 0.000 |
-19,200.000 |
$1.000 |
DOLL | 0.0 |
8105 | CRUSHED STONE BASE - MODIFIED RICHWOOD PAVEMENT | 24965EC | 0.000 |
398.000 |
$31.470 |
TON | 0.0 |
8182 | LOT PAY ADJUSTMENT RICHWOOD PAVEMENT | 10000NS | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8183 | COST PLUS WORK RICHWOOD PAVEMENT | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8184 | D/B CONTRACT PAYMENT RICHWOOD PAVEMENT JPC PAVEMENT CREDIT | 25083EN | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $17,601,327.19 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2265 | CRUSHED AGGREGATE SIZE NO 57 RICHWOOD ROADWAY | 00071 | 1,268.000 |
1,268.000 |
$41.090 |
TON | 0.0 |
2270 | CRUSHED AGGREGATE SIZE NO 2 RICHWOOD ROADWAY | 00078 | 10.000 |
10.000 |
$297.130 |
TON | 0.0 |
2275 | PERFORATED PIPE-4 IN RICHWOOD ROADWAY | 01000 | 38,186.000 |
39,609.000 |
$6.320 |
LF | 0.2 |
2280 | PERFORATED PIPE-6 IN RICHWOOD ROADWAY | 01001 | 50.000 |
50.000 |
$66.380 |
LF | 0.0 |
2285 | PERFORATED PIPE-8 IN RICHWOOD ROADWAY | 01002 | 28.000 |
28.000 |
$68.490 |
LF | 0.0 |
2290 | NON-PERFORATED PIPE-4 IN RICHWOOD ROADWAY | 01010 | 538.000 |
538.000 |
$18.970 |
LF | 0.0 |
2295 | NON-PERFORATED PIPE-6 IN RICHWOOD ROADWAY | 01011 | 8.000 |
8.000 |
$70.590 |
LF | 0.0 |
2300 | NON-PERFORATED PIPE-8 IN RICHWOOD ROADWAY | 01012 | 8.000 |
8.000 |
$74.810 |
LF | 0.0 |
2305 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 1.000 |
1.000 |
$26,341.010 |
LS | 0.0 |
2310 | PERF PIPE HEADWALL TY 1-4 IN RICHWOOD ROADWAY | 01020 | 1.000 |
1.000 |
$616.380 |
EACH | 0.0 |
2315 | PERF PIPE HEADWALL TY 1-10 IN RICHWOOD ROADWAY | 01023 | 1.000 |
1.000 |
$2,067.240 |
EACH | 0.0 |
2320 | PERF PIPE HEADWALL TY 2-4 IN RICHWOOD ROADWAY | 01024 | 6.000 |
6.000 |
$632.190 |
EACH | 0.0 |
2325 | PERF PIPE HEADWALL TY 3-4 IN RICHWOOD ROADWAY | 01028 | 6.000 |
6.000 |
$632.190 |
EACH | 0.0 |
2330 | PERF PIPE HEADWALL TY 3-6 IN RICHWOOD ROADWAY | 01029 | 1.000 |
1.000 |
$1,070.500 |
EACH | 0.0 |
2335 | PERF PIPE HEADWALL TY 3-8 IN RICHWOOD ROADWAY | 01030 | 1.000 |
1.000 |
$1,091.560 |
EACH | 0.0 |
2340 | REMOVE PIPE RICHWOOD ROADWAY | 01310 | 1,492.000 |
1,660.000 |
$20.000 |
LF | 0.0 |
2345 | PLUG PIPE RICHWOOD ROADWAY | 01314 | 17.000 |
16.000 |
$405.650 |
EACH | 0.0 |
2350 | REMOVE JUNCTION BOX RICHWOOD ROADWAY | 01655 | 8.000 |
8.000 |
$543.680 |
EACH | 0.0 |
2355 | REMOVE INLET RICHWOOD ROADWAY | 01718 | 31.000 |
32.000 |
$681.710 |
EACH | 0.0 |
2360 | CORED HOLE DRAINAGE BOX CON-4 IN RICHWOOD ROADWAY | 01740 | 271.000 |
285.000 |
$289.750 |
EACH | 0.1 |
2365 | REMOVE MANHOLE RICHWOOD ROADWAY | 01787 | 8.000 |
10.000 |
$681.710 |
EACH | 0.0 |
2370 | ADJUST MANHOLE RICHWOOD ROADWAY | 01792 | 5.000 |
5.000 |
$503.640 |
EACH | 0.0 |
2375 | STANDARD CURB AND GUTTER RICHWOOD ROADWAY | 01810 | 5,112.000 |
5,109.000 |
$24.480 |
LF | 0.1 |
2380 | STANDARD CURB AND GUTTER MOD RICHWOOD ROADWAY | 01811 | 21,923.000 |
22,536.000 |
$26.860 |
LF | 0.5 |
2385 | REMOVE CURB AND GUTTER RICHWOOD ROADWAY | 01812 | 202.000 |
202.000 |
$11.590 |
LF | 0.0 |
2390 | BARRIER CURB AND GUTTER RICHWOOD ROADWAY | 01815 | 87.000 |
87.000 |
$56.650 |
LF | 0.0 |
2395 | LIP CURB AND GUTTER MOD RICHWOOD ROADWAY | 01821 | 596.000 |
596.000 |
$31.150 |
LF | 0.0 |
2400 | STANDARD INTEGRAL CURB RICHWOOD ROADWAY | 01830 | 7,583.000 |
7,522.000 |
$15.750 |
LF | 0.1 |
2405 | STANDARD HEADER CURB RICHWOOD ROADWAY | 01875 | 993.000 |
993.000 |
$58.030 |
LF | 0.0 |
2410 | ISLAND HEADER CURB TYPE 1 RICHWOOD ROADWAY | 01890 | 50.000 |
50.000 |
$56.650 |
LF | 0.0 |
2415 | STANDARD BARRIER MEDIAN TYPE 1 RICHWOOD ROADWAY | 01915 | 170.000 |
170.000 |
$138.560 |
SQYD | 0.0 |
2420 | STANDARD BARRIER MEDIAN TYPE 2 RICHWOOD ROADWAY | 01917 | 61.000 |
61.000 |
$155.360 |
SQYD | 0.0 |
2425 | CONC TERMINAL SECTION TYPE 1 RICHWOOD ROADWAY | 01956 | 2.000 |
2.000 |
$6,619.140 |
EACH | 0.0 |
2430 | DELINEATOR FOR GUARDRAIL MONO DIRECTIONAL WHITE RICHWOOD ROADWAY | 01982 | 62.000 |
86.000 |
$7.000 |
EACH | 0.0 |
2435 | DELINEATOR FOR BARRIER - WHITE RICHWOOD ROADWAY | 01984 | 207.000 |
191.000 |
$10.000 |
EACH | 0.0 |
2440 | DELINEATOR FOR BARRIER - YELLOW RICHWOOD ROADWAY | 01985 | 50.000 |
66.000 |
$10.000 |
EACH | 0.0 |
2445 | CURB TO BARRIER WALL TRANS RICHWOOD ROADWAY | 02001 | 6.000 |
10.000 |
$7,364.980 |
EACH | 0.0 |
2450 | RELOCATE TEMP CONC BARRIER RICHWOOD ROADWAY | 02003 | 35.000 |
35.000 |
$100.000 |
LF | 0.0 |
2455 | BARRICADE-TYPE III RICHWOOD ROADWAY | 02014 | 35.000 |
35.000 |
$100.000 |
EACH | 0.0 |
2460 | REMOVE PAVEMENT | 02091 | 98,884.000 |
99,028.000 |
$9.850 |
SQYD | 0.8 |
2465 | PAVED DITCH TYPE 2 RICHWOOD ROADWAY | 02158 | 65.000 |
65.000 |
$136.120 |
SQYD | 0.0 |
2470 | TEMP DITCH RICHWOOD ROADWAY | 02159 | 22,220.000 |
22,220.000 |
$1.580 |
LF | 0.0 |
2475 | CLEAN TEMP DITCH RICHWOOD ROADWAY | 02160 | 11,110.000 |
11,110.000 |
$0.530 |
LF | 0.0 |
2480 | ROADWAY EXCAVATION RICHWOOD ROADWAY | 02200 | 760,882.000 |
761,465.190 |
$9.430 |
CUYD | 5.9 |
2485 | GRANULAR EMBANKMENT RICHWOOD ROADWAY | 02223 | 15,728.000 |
15,728.000 |
$65.220 |
CUYD | 0.9 |
2490 | WATER RICHWOOD ROADWAY | 02242 | 4,207.000 |
4,207.000 |
$1.580 |
MGAL | 0.0 |
2495 | FENCE-WOVEN WIRE TYPE 1 RICHWOOD ROADWAY | 02262 | 4,962.000 |
5,940.000 |
$6.000 |
LF | 0.0 |
2500 | REMOVE FENCE RICHWOOD ROADWAY | 02265 | 529.000 |
529.000 |
$2.500 |
LF | 0.0 |
2505 | REMOVE & RESET FENCE RICHWOOD ROADWAY | 02267 | 1,803.000 |
1,803.000 |
$10.000 |
LF | 0.0 |
2510 | GUARDRAIL-STEEL W BEAM-S FACE RICHWOOD ROADWAY | 02351 | 3,462.500 |
5,296.500 |
$17.350 |
LF | 0.0 |
2515 | GUARDRAIL-STEEL W BEAM-D FACE RICHWOOD ROADWAY | 02352 | 312.500 |
337.500 |
$30.000 |
LF | 0.0 |
2520 | GUARDRAIL TERMINAL SECTION NO 1 RICHWOOD ROADWAY | 02360 | 1.000 |
5.000 |
$50.000 |
EACH | 0.0 |
2525 | GUARDRAIL CONNECTOR TO BRIDGE END TY A RICHWOOD ROADWAY | 02363 | 3.000 |
4.000 |
$2,400.000 |
EACH | 0.0 |
2530 | GUARDRAIL END TREATMENT TYPE 1 RICHWOOD ROADWAY | 02367 | 12.000 |
15.000 |
$2,500.000 |
EACH | 0.0 |
2535 | GUARDRAIL END TREATMENT TYPE 2A RICHWOOD ROADWAY | 02369 | 5.000 |
6.000 |
$1,000.000 |
EACH | 0.0 |
2540 | GUARDRAIL END TREATMENT TYPE 7 RICHWOOD ROADWAY | 02371 | 1.000 |
1.000 |
$1,200.000 |
EACH | 0.0 |
2545 | REMOVE GUARDRAIL RICHWOOD ROADWAY | 02381 | 4,824.000 |
4,824.000 |
$2.650 |
LF | 0.0 |
2550 | GUARDRAIL END TREATMENT TYPE 4A RICHWOOD ROADWAY | 02391 | 5.000 |
3.000 |
$2,000.000 |
EACH | 0.0 |
2555 | TEMP GUARDRAIL RICHWOOD ROADWAY | 02397 | 1,237.500 |
1,570.000 |
$8.000 |
LF | 0.0 |
2560 | RIGHT-OF-WAY MONUMENT TYPE 1 RICHWOOD ROADWAY | 02429 | 198.000 |
201.000 |
$100.000 |
EACH | 0.0 |
2565 | WITNESS POST RICHWOOD ROADWAY | 02432 | 39.000 |
39.000 |
$90.000 |
EACH | 0.0 |
2570 | CHANNEL LINING CLASS II RICHWOOD ROADWAY | 02483 | 2,297.000 |
2,322.000 |
$50.570 |
TON | 0.1 |
2575 | CHANNEL LINING CLASS III RICHWOOD ROADWAY | 02484 | 883.000 |
993.000 |
$48.470 |
TON | 0.0 |
2580 | CLEARING AND GRUBBING RICHWOOD ROADWAY | 02545 | 1.000 |
1.000 |
$644,372.370 |
LS | 0.5 |
2585 | CONCRETE-CLASS B RICHWOOD ROADWAY | 02555 | 527.000 |
0.000 |
$767.750 |
CUYD | 0.3 |
2590 | TEMPORARY SIGNS RICHWOOD ROADWAY | 02562 | 2,750.000 |
2,750.000 |
$7.500 |
SQFT | 0.0 |
2595 | EDGE KEY RICHWOOD ROADWAY | 02585 | 453.000 |
453.000 |
$19.630 |
LF | 0.0 |
2600 | FABRIC-GEOTEXTILE TYPE IV RICHWOOD ROADWAY | 02599 | 2,117.000 |
2,117.000 |
$7.900 |
SQYD | 0.0 |
2605 | FABRIC GEOTEXTILE TY IV FOR PIPE RICHWOOD ROADWAY | 02600 | 31,257.000 |
32,045.800 |
$4.210 |
SQYD | 0.1 |
2610 | HANDRAIL-TYPE A-3 RICHWOOD ROADWAY | 02613 | 89.000 |
89.000 |
$131.710 |
LF | 0.0 |
2615 | REMOVE HEADWALL RICHWOOD ROADWAY | 02625 | 46.000 |
47.000 |
$681.710 |
EACH | 0.0 |
2620 | MAINTAIN & CONTROL TRAFFIC RICHWOOD ROADWAY | 02650 | 1.000 |
1.000 |
$3,491,118.000 |
LS | 2.9 |
2625 | DIVERSIONS (BY-PASS DETOURS) RICHWOOD ROADWAY | 02651 | 1.000 |
1.000 |
$232,177.050 |
LS | 0.2 |
2630 | DIVERSIONS (BY-PASS DETOURS) RICHWOOD ROADWAY | 02651 | 1.000 |
1.000 |
$206,174.250 |
LS | 0.2 |
2635 | DIVERSIONS (BY-PASS DETOURS) RICHWOOD ROADWAY | 02651 | 1.000 |
1.000 |
$250,566.230 |
LS | 0.2 |
2640 | DIVERSIONS (BY-PASS DETOURS) RICHWOOD ROADWAY | 02651 | 1.000 |
1.000 |
$100,810.200 |
LS | 0.1 |
2645 | DIVERSIONS (BY-PASS DETOURS) RICHWOOD ROADWAY | 02651 | 1.000 |
1.000 |
$94,488.360 |
LS | 0.1 |
2650 | PORTABLE CHANGEABLE MESSAGE SIGN RICHWOOD ROADWAY | 02671 | 8.000 |
8.000 |
$2,208.670 |
EACH | 0.0 |
2655 | MOBILIZATION FOR MILL & TEXT RICHWOOD ROADWAY | 02676 | 1.000 |
1.000 |
$6,841.490 |
LS | 0.0 |
2660 | SAFELOADING RICHWOOD ROADWAY | 02690 | 321.500 |
370.500 |
$224.430 |
CUYD | 0.1 |
2665 | TEMP SILT FENCE RICHWOOD ROADWAY | 02701 | 22,220.000 |
22,220.000 |
$1.580 |
LF | 0.0 |
2670 | SILT TRAP TYPE A RICHWOOD ROADWAY | 02703 | 219.000 |
219.000 |
$285.180 |
EACH | 0.1 |
2675 | SILT TRAP TYPE B RICHWOOD ROADWAY | 02704 | 219.000 |
219.000 |
$258.140 |
EACH | 0.0 |
2680 | SILT TRAP TYPE C RICHWOOD ROADWAY | 02705 | 219.000 |
219.000 |
$315.040 |
EACH | 0.1 |
2685 | CLEAN SILT TRAP TYPE A RICHWOOD ROADWAY | 02706 | 657.000 |
657.000 |
$72.700 |
EACH | 0.0 |
2690 | CLEAN SILT TRAP TYPE B RICHWOOD ROADWAY | 02707 | 657.000 |
657.000 |
$72.700 |
EACH | 0.0 |
2695 | CLEAN SILT TRAP TYPE C RICHWOOD ROADWAY | 02708 | 657.000 |
657.000 |
$72.700 |
EACH | 0.0 |
2700 | SIDEWALK-4 IN CONCRETE RICHWOOD ROADWAY | 02720 | 2,731.000 |
2,758.000 |
$56.580 |
SQYD | 0.1 |
2705 | REMOVE CONCRETE SIDEWALK RICHWOOD ROADWAY | 02721 | 41.000 |
41.000 |
$17.910 |
SQYD | 0.0 |
2710 | ARROW PANEL RICHWOOD ROADWAY | 02775 | 5.000 |
5.000 |
$1,163.010 |
EACH | 0.0 |
2715 | CONCRETE BARRIER WALL TYPE 9T RICHWOOD ROADWAY | 03171 | 47,786.000 |
49,526.000 |
$21.070 |
LF | 0.8 |
2720 | CLEAN ROADWAY DRAINS RICHWOOD ROADWAY | 03260 | 7.000 |
7.000 |
$1,251.730 |
EACH | 0.0 |
2725 | BARRIER MOUNTING BRACKET RICHWOOD ROADWAY | 04904 | 1.000 |
1.000 |
$150.000 |
EACH | 0.0 |
2730 | EROSION CONTROL BLANKET RICHWOOD ROADWAY | 05950 | 19,042.000 |
19,231.000 |
$1.500 |
SQYD | 0.0 |
2735 | TEMP MULCH RICHWOOD ROADWAY | 05952 | 379,004.000 |
379,004.000 |
$0.140 |
SQYD | 0.0 |
2740 | TEMP SEEDING AND PROTECTION RICHWOOD ROADWAY | 05953 | 284,260.000 |
284,260.000 |
$0.160 |
SQYD | 0.0 |
2745 | INITIAL FERTILIZER RICHWOOD ROADWAY | 05963 | 17.700 |
17.700 |
$800.000 |
TON | 0.0 |
2750 | MAINTENANCE FERTILIZER RICHWOOD ROADWAY | 05964 | 29.500 |
29.500 |
$800.000 |
TON | 0.0 |
2755 | SEEDING AND PROTECTION RICHWOOD ROADWAY | 05985 | 533,115.000 |
533,893.000 |
$0.350 |
SQYD | 0.2 |
2760 | SPECIAL SEEDING CROWN VETCH RICHWOOD ROADWAY | 05989 | 36,003.000 |
36,003.000 |
$0.220 |
SQYD | 0.0 |
2765 | SODDING RICHWOOD ROADWAY | 05990 | 39,255.000 |
36,150.000 |
$5.250 |
SQYD | 0.2 |
2770 | AGRICULTURAL LIMESTONE RICHWOOD ROADWAY | 05992 | 352.400 |
352.400 |
$65.000 |
TON | 0.0 |
2775 | PAVE STRIPING-TEMP PAINT-6 IN RICHWOOD ROADWAY | 06511 | 449,460.000 |
449,460.000 |
$0.200 |
LF | 0.1 |
2780 | PAVE STRIPING-TEMP PAINT-12 IN RICHWOOD ROADWAY | 06513 | 3,500.000 |
3,500.000 |
$0.480 |
LF | 0.0 |
2785 | PAVE STRIPING-PERM PAINT-4 IN RICHWOOD ROADWAY | 06514 | 89,892.000 |
90,760.000 |
$0.200 |
LF | 0.0 |
2790 | PAVE STRIPING-PERM PAINT-6 IN RICHWOOD ROADWAY | 06515 | 24,386.000 |
24,386.000 |
$0.240 |
LF | 0.0 |
2795 | PAVE STRIPING-PERM PAINT-8 IN RICHWOOD ROADWAY | 06516 | 13,588.000 |
13,588.000 |
$0.300 |
LF | 0.0 |
2800 | PAVE STRIPING-PERM PAINT-12 IN RICHWOOD ROADWAY | 06517 | 8,020.000 |
8,020.000 |
$0.520 |
LF | 0.0 |
2805 | PAVE STRIPING-THERMO-12 IN W RICHWOOD ROADWAY | 06546 | 275.000 |
275.000 |
$5.000 |
LF | 0.0 |
2810 | PAVE STRIPING-THERMO-12 IN Y RICHWOOD ROADWAY | 06547 | 95.000 |
95.000 |
$5.000 |
LF | 0.0 |
2815 | PAVE MARKING-THERMO R 6 FT RICHWOOD ROADWAY | 06562 | 2.000 |
2.000 |
$150.000 |
EACH | 0.0 |
2820 | PAVE MARKING-R/R XBUCKS 16 IN RICHWOOD ROADWAY | 06563 | 42.000 |
42.000 |
$6.000 |
LF | 0.0 |
2825 | PAVE MARKING-THERMO X-WALK-6 IN RICHWOOD ROADWAY | 06565 | 1,963.000 |
1,963.000 |
$4.000 |
LF | 0.0 |
2830 | PAVE MARKING-THERMO STOP BAR-24IN RICHWOOD ROADWAY | 06568 | 1,275.000 |
1,275.000 |
$10.000 |
LF | 0.0 |
2835 | PAVE MARKING-THERMO CROSS-HATCH RICHWOOD ROADWAY | 06569 | 6,542.000 |
6,542.000 |
$3.500 |
SQFT | 0.0 |
2840 | PAVE MARKING-DOTTED LANE EXTEN RICHWOOD ROADWAY | 06572 | 1,581.000 |
1,581.000 |
$4.500 |
LF | 0.0 |
2845 | PAVE MARKING-THERMO STR ARROW RICHWOOD ROADWAY | 06573 | 25.000 |
25.000 |
$75.000 |
EACH | 0.0 |
2850 | PAVE MARKING-THERMO CURV ARROW RICHWOOD ROADWAY | 06574 | 184.000 |
184.000 |
$75.000 |
EACH | 0.0 |
2855 | PAVE MARKING-THERMO COMB ARROW RICHWOOD ROADWAY | 06575 | 40.000 |
40.000 |
$110.000 |
EACH | 0.0 |
2860 | PAVE MARKING-THERMO ONLY RICHWOOD ROADWAY | 06576 | 10.000 |
10.000 |
$300.000 |
EACH | 0.0 |
2865 | PAVEMENT MARKER TY IVA-MW TEMP RICHWOOD ROADWAY | 06585 | 1,212.000 |
1,749.000 |
$6.000 |
EACH | 0.0 |
2870 | PAVEMENT MARKER TY IVA-BY TEMP RICHWOOD ROADWAY | 06588 | 1,588.000 |
1,700.000 |
$6.000 |
EACH | 0.0 |
2875 | REMOVE PAVEMENT MARKER TYPE V RICHWOOD ROADWAY | 06600 | 123.000 |
123.000 |
$26.340 |
EACH | 0.0 |
2880 | FOUNDATION PREPARATION RICHWOOD ROADWAY | 08003 | 1.000 |
1.000 |
$568,624.810 |
LS | 0.5 |
2885 | CRASH CUSHION TY VI CLASS BT TL2 RICHWOOD ROADWAY | 08901 | 17.000 |
18.000 |
$4,200.000 |
EACH | 0.1 |
2890 | CRASH CUSHION TY VI CLASS BT TL3 RICHWOOD ROADWAY | 08903 | 3.000 |
3.000 |
$5,000.000 |
EACH | 0.0 |
2895 | GRANULAR EMBANKMENT RICHWOOD ROADWAY | 20072ES805 | 9,625.000 |
10,480.430 |
$57.950 |
TON | 0.5 |
2900 | OBJECT MARKER TY 3 | 20191ED | 9.000 |
9.000 |
$150.000 |
EACH | 0.0 |
2905 | SHOULDER RUMBLE STRIPS-SAWED RICHWOOD ROADWAY | 20362ES403 | 26,627.000 |
26,627.000 |
$0.230 |
LF | 0.0 |
2910 | LAW ENFORCEMENT OFFICER RICHWOOD ROADWAY | 20411ED | 1,512.000 |
1,733.000 |
$65.000 |
HOUR | 0.1 |
2915 | SAW CUT RICHWOOD ROADWAY | 20430ED | 17,704.000 |
17,704.000 |
$2.650 |
LF | 0.0 |
2920 | LONGITUDINAL EDGE KEY RICHWOOD ROADWAY | 21289ED | 12,171.000 |
12,171.000 |
$4.650 |
LF | 0.0 |
2925 | CONC MEDIAN BARRIER TYPE 12C(50) RICHWOOD ROADWAY | 21430ES508 | 2,005.000 |
2,005.000 |
$114.430 |
LF | 0.2 |
2930 | RAIL SYSTEM TYPE III RICHWOOD ROADWAY | 21532ED | 203.000 |
203.000 |
$152.780 |
LF | 0.0 |
2935 | EMBANKMENT | 21553EN | 23,377.000 |
23,377.000 |
$12.600 |
CUYD | 0.2 |
2940 | SOUND BARRIER WALL RICHWOOD ROADWAY | 21590EN | 45,200.000 |
45,200.000 |
$34.660 |
SQFT | 1.3 |
2945 | BARRIER INTEGRAL CURB RICHWOOD ROADWAY | 21877EN | 5,720.000 |
5,720.000 |
$13.500 |
LF | 0.1 |
2950 | PAVE MARKING-THERMO YIELD BAR-36 IN RICHWOOD ROADWAY | 22520EN | 158.000 |
158.000 |
$30.000 |
LF | 0.0 |
2955 | WATER BLASTING EXISTING STRIPE RICHWOOD ROADWAY | 22664EN | 155,744.000 |
155,744.000 |
$0.450 |
LF | 0.1 |
2960 | DETECTABLE WARNINGS RICHWOOD ROADWAY | 23158ES505 | 1,485.000 |
1,529.000 |
$45.000 |
SQFT | 0.1 |
2965 | PAVE MARK-THERMO-X-WALK-24 IN RICHWOOD ROADWAY | 23261EC | 2,731.000 |
2,731.000 |
$7.500 |
LF | 0.0 |
2970 | TURF REINFORCEMENT MAT 1 RICHWOOD ROADWAY | 23274EN11F | 1,432.000 |
1,478.000 |
$5.000 |
SQYD | 0.0 |
2975 | TURF REINFORCEMENT MAT 2 RICHWOOD ROADWAY | 23275EN11F | 347.000 |
347.000 |
$4.000 |
SQYD | 0.0 |
2980 | REMOVE RAIL EXISTING RR TRACK | 23550EC | 5,643.000 |
5,643.000 |
$33.720 |
LF | 0.2 |
2985 | PAVE MARK THERMO-LANE REDUCTION ARROW RICHWOOD ROADWAY | 23607EC | 15.000 |
15.000 |
$275.000 |
EACH | 0.0 |
2990 | MOMENT SLAB FOR BARRIER RICHWOOD ROADWAY | 23635EC | 202.000 |
631.000 |
$500.480 |
LF | 0.1 |
2995 | BARRIER CURB AND GUTTER-MOD RICHWOOD ROADWAY | 24109EC | 3,629.000 |
3,629.000 |
$30.560 |
LF | 0.1 |
3000 | INLAID PAVEMENT MARKER RICHWOOD ROADWAY | 24489EC | 2,097.000 |
2,097.000 |
$25.000 |
EACH | 0.0 |
3005 | OBJECT MARKER TYPE 1 RICHWOOD ROADWAY | 24640ED | 20.000 |
20.000 |
$100.000 |
EACH | 0.0 |
3010 | INTELLIGENT COMPACTION FOR ASPHALT RICHWOOD ROADWAY | 24781EC | 217,573.000 |
217,573.000 |
$0.060 |
TON | 0.0 |
3015 | CENTRIFUGALLY CAST CONCRETE PIPE LINER RICHWOOD ROADWAY | 24783EX | 738.000 |
738.000 |
$640.000 |
LF | 0.4 |
3020 | PIPELINE INSPECTION RICHWOOD ROADWAY | 24814EC | 18,711.000 |
18,776.000 |
$3.250 |
LF | 0.1 |
3025 | D/B DESIGN ATC DESIGN FEE | 25053EN | 1.000 |
1.000 |
$500,000.000 |
LS | 0.4 |
3030 | ROADWAY GATE 30 FT DOUBLE SWING GATE | 30005 | 1.000 |
1.000 |
$11,858.720 |
EACH | 0.0 |
8004 | RETAINING WALL SYSTEM BLOCK AND CAP RICHWOOD ROADWAY | 20752ED | 0.000 |
6,870.000 |
$58.894 |
SQFT | 0.0 |
8012 | ASPHALT ADJUSTMENT RICHWOOD ROADWAY | 10030NS | 0.000 |
143,453.250 |
$1.000 |
DOLL | 0.0 |
8013 | FUEL ADJUSTMENT RICHWOOD ROADWAY | 10020NS | 0.000 |
194,813.132 |
$1.000 |
DOLL | 0.0 |
8019 | ROADWAY GATE RICHWOOD ROADWAY | 30005 | 0.000 |
1.000 |
$3,150.000 |
EACH | 0.0 |
8020 | MAINTAIN & CONTROL TRAFFIC RICHWOOD ROADWAY I-75 SB LANE SHIFT | 02650 | 0.000 |
1.000 |
$120,155.000 |
LS | 0.0 |
8035 | CL3 ASPH SURF 0.38D PG64-22 I-75 SB Lane Shift | 00339 | 0.000 |
0.000 |
$157.000 |
TON | 0.0 |
8057 | TUBULAR MARKERS RICHWOOD ROADWAY | 03225 | 0.000 |
20.000 |
$36.000 |
EACH | 0.0 |
8071 | HIGH STRENGTH GEOTEXTILE FABRIC TY V RICHWOOD ROADWAY | 22861EN | 0.000 |
1,102.780 |
$7.900 |
SQYD | 0.0 |
8080 | NON-SPEC MATERIAL FENCE-WOVEN WIRE TYPE 1 RICHWOOD ROADWAY | 10070NS | 0.000 |
-3,220.800 |
$1.000 |
DOLL | 0.0 |
8094 | ISLAND HEADER CURB TYPE 2 RICHWOOD ROADWAY | 01891 | 0.000 |
75.000 |
$75.000 |
LF | 0.0 |
8100 | STANDARD CURB AND GUTTER RICHWOOD ROADWAY | 01810 | 0.000 |
801.000 |
$34.958 |
LF | 0.0 |
8101 | ROADWAY EXCAVATION RICHWOOD ROADWAY | 02200 | 0.000 |
6,781.070 |
$15.574 |
CUYD | 0.0 |
8102 | CHANNEL LINING CLASS II RICHWOOD ROADWAY | 02483 | 0.000 |
15.000 |
$175.639 |
TON | 0.0 |
8103 | CLEARING AND GRUBBING RICHWOOD ROADWAY | 02545 | 0.000 |
1.000 |
$8,946.680 |
LS | 0.0 |
8104 | FABRIC GEOTEXTILE TY IV FOR PIPE RICHWOOD ROADWAY | 02600 | 0.000 |
134.000 |
$4.830 |
SQYD | 0.0 |
8118 | REMOVE CONCRETE MEDIAN BARRIER END RICHWOOD ROADWAY | 24457EC | 0.000 |
0.000 |
$2,431.333 |
EACH | 0.0 |
8119 | EXCAVATION RICHWOOD ROADWAY | 21554EN | 0.000 |
0.000 |
$118.314 |
CUYD | 0.0 |
8120 | CRASH CUSHION TY VI CLASS B TL2 RICHWOOD ROADWAY | 08900 | 0.000 |
0.000 |
$23,633.999 |
EACH | 0.0 |
8122 | CONCRETE-CLASS A RICHWOOD ROADWAY | 08100 | 0.000 |
0.000 |
$623.194 |
CUYD | 0.0 |
8123 | STEEL REINFORCEMENT-EPOXY COATED RICHWOOD ROADWAY | 08151 | 0.000 |
0.000 |
$5.363 |
LB | 0.0 |
8126 | INCENTIVE/DISINCENTIVE RICHWOOD ROADWAY | 02571 | 0.000 |
450,000.001 |
$1.000 |
DOLL | 0.0 |
8139 | ADMINISTRATIVE SETTLEMENT NSRR DELAY/MITIGATION | 10104NX | 0.000 |
1,050,000.000 |
$1.000 |
DOLL | 0.0 |
8160 | D/B CONTRACT PAYMENT RICHWOOD RAMP D SLOPES & DBI | 25083EN | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8161 | COST PLUS WORK RICHWOOD ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8162 | COST PLUS WORK RICHWOOD ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8163 | COST PLUS WORK RICHWOOD ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8164 | D/B CONTRACT PAYMENT RICHWOOD DIVERSION 2 DROP OFF | 25083EN | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8166 | COST PLUS WORK RICHWOOD ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8167 | NON-SPEC MATERIAL ASPH BASE RICHWOOD PAVEMENT | 10070NS | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8168 | PAVE STRIPING-THERMO-4 IN W - Y | 06540 | 0.000 |
0.000 |
$0.000 |
LF | 0.0 |
8169 | PAVE STRIPING-THERMO-6 IN W - Y | 06542 | 0.000 |
0.000 |
$0.750 |
LF | 0.0 |
8170 | PAVE STRIPING-THERMO-8 IN W - Y | 06544 | 0.000 |
0.000 |
$0.000 |
LF | 0.0 |
8171 | PAVE STRIPING-THERMO-12 IN W - Y | 06546 | 0.000 |
0.000 |
$1.250 |
LF | 0.0 |
8172 | PAVE MARKING-THERMO X-WALK-12 IN | 06566 | 0.000 |
0.000 |
$5.000 |
LF | 0.0 |
8173 | COST PLUS WORK RICHWOOD ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8174 | COST PLUS WORK RICHWOOD ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8175 | COST PLUS WORK RICHWOOD ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8176 | COST PLUS WORK | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8179 | COST PLUS WORK RICHWOOD ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8185 | D/B CONTRACT PAYMENT RICHWOOD ROADWAY WEST DETENTION BASIN CREDIT | 25083EN | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $24,532,769.63 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
3035 | ENTRANCE PIPE-15 IN RICHWOOD DRAINAGE | 00440 | 382.000 |
382.000 |
$66.380 |
LF | 0.0 |
3040 | ENTRANCE PIPE-24 IN RICHWOOD DRAINAGE | 00443 | 96.000 |
96.000 |
$126.440 |
LF | 0.0 |
3045 | CULVERT PIPE-18 IN RICHWOOD DRAINAGE | 00462 | 250.000 |
256.000 |
$71.650 |
LF | 0.0 |
3050 | CULVERT PIPE-36 IN RICHWOOD DRAINAGE | 00468 | 88.000 |
88.000 |
$261.300 |
LF | 0.0 |
3055 | CULVERT PIPE-72 IN RICHWOOD DRAINAGE | 00474 | 63.000 |
63.000 |
$713.310 |
LF | 0.0 |
3060 | STORM SEWER PIPE-12 IN RICHWOOD DRAINAGE | 00520 | 59.000 |
74.000 |
$113.790 |
LF | 0.0 |
3065 | STORM SEWER PIPE-15 IN RICHWOOD DRAINAGE | 00521 | 6,429.000 |
6,768.000 |
$97.360 |
LF | 0.5 |
3070 | STORM SEWER PIPE-18 IN RICHWOOD DRAINAGE | 00522 | 7,612.000 |
7,714.000 |
$105.180 |
LF | 0.7 |
3075 | STORM SEWER PIPE-24 IN RICHWOOD DRAINAGE | 00524 | 3,295.000 |
3,468.000 |
$158.050 |
LF | 0.4 |
3080 | STORM SEWER PIPE-30 IN RICHWOOD DRAINAGE | 00526 | 942.000 |
942.000 |
$184.390 |
LF | 0.1 |
3085 | STORM SEWER PIPE-36 IN RICHWOOD DRAINAGE | 00528 | 401.000 |
411.000 |
$244.440 |
LF | 0.1 |
3090 | STORM SEWER PIPE-42 IN RICHWOOD DRAINAGE | 00529 | 33.000 |
53.000 |
$203.350 |
LF | 0.0 |
3095 | STORM SEWER PIPE-72 IN RICHWOOD DRAINAGE | 00534 | 556.000 |
556.000 |
$811.300 |
LF | 0.4 |
3100 | STORM SEWER PIPE-24 IN EQUIV RICHWOOD DRAINAGE | 00554 | 188.000 |
188.000 |
$89.560 |
LF | 0.0 |
3105 | PIPE CULVERT HEADWALL-15 IN RICHWOOD DRAINAGE | 01202 | 10.000 |
9.000 |
$1,033.620 |
EACH | 0.0 |
3110 | PIPE CULVERT HEADWALL-18 IN RICHWOOD DRAINAGE | 01204 | 12.000 |
12.000 |
$1,061.020 |
EACH | 0.0 |
3115 | PIPE CULVERT HEADWALL-24 IN RICHWOOD DRAINAGE | 01208 | 4.000 |
4.000 |
$1,123.180 |
EACH | 0.0 |
3120 | PIPE CULVERT HEADWALL-30 IN RICHWOOD DRAINAGE | 01210 | 1.000 |
1.000 |
$2,032.470 |
EACH | 0.0 |
3125 | PIPE CULVERT HEADWALL-36 IN RICHWOOD DRAINAGE | 01212 | 4.000 |
4.000 |
$2,067.250 |
EACH | 0.0 |
3130 | S & F BOX INLET-OUTLET-18 IN RICHWOOD DRAINAGE | 01450 | 4.000 |
4.000 |
$1,709.010 |
EACH | 0.0 |
3135 | CURB BOX INLET TYPE A RICHWOOD DRAINAGE | 01456 | 161.000 |
163.000 |
$4,538.800 |
EACH | 0.6 |
3140 | CURB BOX INLET TYPE A MOD RICHWOOD DRAINAGE | 01459 | 1.000 |
1.000 |
$5,533.720 |
EACH | 0.0 |
3145 | CURB BOX INLET TYPE B RICHWOOD DRAINAGE | 01480 | 5.000 |
5.000 |
$5,311.400 |
EACH | 0.0 |
3150 | DROP BOX INLET TYPE 1 RICHWOOD DRAINAGE | 01490 | 7.000 |
7.000 |
$3,702.490 |
EACH | 0.0 |
3155 | DROP BOX INLET TYPE 2 RICHWOOD DRAINAGE | 01493 | 1.000 |
1.000 |
$3,927.970 |
EACH | 0.0 |
3160 | DROP BOX INLET TYPE 3 RICHWOOD DRAINAGE | 01496 | 9.000 |
9.000 |
$3,575.000 |
EACH | 0.0 |
3165 | DROP BOX INLET TYPE 4 RICHWOOD DRAINAGE | 01499 | 1.000 |
1.000 |
$4,787.740 |
EACH | 0.0 |
3170 | DROP BOX INLET TYPE 5B RICHWOOD DRAINAGE | 01505 | 1.000 |
1.000 |
$4,078.650 |
EACH | 0.0 |
3175 | DROP BOX INLET TYPE 5D RICHWOOD DRAINAGE | 01511 | 2.000 |
2.000 |
$4,336.790 |
EACH | 0.0 |
3180 | DROP BOX INLET TYPE 6C RICHWOOD DRAINAGE | 01526 | 1.000 |
2.000 |
$4,815.140 |
EACH | 0.0 |
3185 | DROP BOX INLET TYPE 6D RICHWOOD DRAINAGE | 01529 | 3.000 |
3.000 |
$4,403.170 |
EACH | 0.0 |
3190 | DROP BOX INLET TYPE 7 RICHWOOD DRAINAGE | 01538 | 3.000 |
3.000 |
$4,465.330 |
EACH | 0.0 |
3195 | DROP BOX INLET TYPE 13G RICHWOOD DRAINAGE | 01559 | 12.000 |
13.000 |
$2,955.460 |
EACH | 0.0 |
3200 | DROP BOX INLET TYPE 13S RICHWOOD DRAINAGE | 01568 | 7.000 |
7.000 |
$4,059.680 |
EACH | 0.0 |
3205 | DROP BOX INLET TYPE 15 RICHWOOD DRAINAGE | 01580 | 7.000 |
10.000 |
$1,759.580 |
EACH | 0.0 |
3210 | REMOVE DROP BOX INLET RICHWOOD DRAINAGE | 01585 | 10.000 |
10.000 |
$543.680 |
EACH | 0.0 |
3215 | CAP CURB BOX INLET RICHWOOD DRAINAGE | 01634 | 2.000 |
2.000 |
$1,018.880 |
EACH | 0.0 |
3220 | JUNCTION BOX-15 IN RICHWOOD DRAINAGE | 01641 | 1.000 |
1.000 |
$1,696.370 |
EACH | 0.0 |
3225 | JUNCTION BOX-18 IN RICHWOOD DRAINAGE | 01642 | 3.000 |
3.000 |
$1,732.180 |
EACH | 0.0 |
3230 | FLUME INLET TYPE 1 RICHWOOD DRAINAGE | 01690 | 1.000 |
1.000 |
$6,540.870 |
EACH | 0.0 |
3235 | FLUME INLET TYPE 2 RICHWOOD DRAINAGE | 01691 | 2.000 |
3.000 |
$6,412.740 |
EACH | 0.0 |
3240 | MANHOLE TYPE A RICHWOOD DRAINAGE | 01756 | 13.000 |
13.000 |
$2,743.680 |
EACH | 0.0 |
3245 | MANHOLE TYPE B RICHWOOD DRAINAGE | 01761 | 7.000 |
7.000 |
$4,799.330 |
EACH | 0.0 |
3250 | MANHOLE TYPE C RICHWOOD DRAINAGE | 01767 | 8.000 |
8.000 |
$7,924.430 |
EACH | 0.1 |
3255 | MANHOLE TYPE C MOD RICHWOOD DRAINAGE | 01768 | 3.000 |
3.000 |
$17,642.160 |
EACH | 0.0 |
3260 | MANHOLE TYPE C SPECIAL RICHWOOD DRAINAGE | 01770 | 1.000 |
1.000 |
$9,360.540 |
EACH | 0.0 |
3265 | PRECAST CONC BOX SECT 8 X 4 RICHWOOD DRAINAGE | 03016 | 44.000 |
44.000 |
$1,265.420 |
LF | 0.0 |
3270 | CONCRETE-CLASS A RICHWOOD DRAINAGE | 08100 | 3.470 |
8.470 |
$1,454.020 |
CUYD | 0.0 |
3275 | DRAINAGE JUNCTION BOX TY B RICHWOOD DRAINAGE | 23952EC | 5.000 |
5.000 |
$2,111.500 |
EACH | 0.0 |
3280 | CONC MED BARR BOX INLET TY 12A1-50(MOD) RICHWOOD DRAINAGE | 23975EC | 1.000 |
1.000 |
$14,190.430 |
EACH | 0.0 |
3285 | CONC MED BARR BOX INLET TY 12B1-50(MOD) RICHWOOD DRAINAGE | 23977EC | 9.000 |
9.000 |
$13,792.150 |
EACH | 0.1 |
3290 | PIPE CULVERT HEADWALL-72 IN RICHWOOD DRAINAGE | 24025EC | 2.000 |
2.000 |
$36,622.440 |
EACH | 0.1 |
3295 | HDPE PIPE LINER RICHWOOD DRAINAGE | 24583EC | 604.000 |
0.000 |
$350.000 |
LF | 0.2 |
8005 | STORM SEWER PIPE-72 IN RICHWOOD DRAINAGE | 00534 | 0.000 |
604.000 |
$350.000 |
LF | 0.0 |
8007 | PIPE CULVERT HEADWALL-72 IN RICHWOOD DRAINAGE-CONST REV NO 1-REVISION TO PLAN HEADWALL | 24025EC | 0.000 |
1.000 |
$16,528.000 |
EACH | 0.0 |
8011 | PLUG PIPE RICHWOOD DRAINAGE | 01314 | 0.000 |
1.000 |
$1,200.000 |
EACH | 0.0 |
8034 | PIPE CULVERT HEADWALL-42 IN RICHWOOD DRAINAGE | 01214 | 0.000 |
1.000 |
$2,737.810 |
EACH | 0.0 |
8072 | CORED HOLE DRAINAGE BOX CON RICHWOOD DRAINAGE | 23610NC | 0.000 |
1.000 |
$575.000 |
EACH | 0.0 |
8095 | STORM SEWER PIPE-15 IN RICHWOOD DRAINAGE | 00521 | 0.000 |
14.000 |
$184.372 |
LF | 0.0 |
8096 | STORM SEWER PIPE-18 IN RICHWOOD DRAINAGE | 00522 | 0.000 |
50.000 |
$166.270 |
LF | 0.0 |
8097 | PIPE CULVERT HEADWALL-15 IN RICHWOOD DRAINAGE | 01202 | 0.000 |
1.000 |
$1,569.540 |
EACH | 0.0 |
8098 | PIPE CULVERT HEADWALL-18 IN RICHWOOD DRAINAGE | 01204 | 0.000 |
1.000 |
$1,569.540 |
EACH | 0.0 |
8099 | CURB BOX INLET TYPE F RICHWOOD DRAINAGE | 01487 | 0.000 |
3.000 |
$4,927.353 |
EACH | 0.0 |
8106 | DRAINAGE JUNCTION BOX TY B RICHWOOD DRAINAGE | 23952EC | 0.000 |
1.000 |
$3,309.780 |
EACH | 0.0 |
Category Total $4,541,376.29 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0004 | CATEGORY Description | BRIDGE-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
3300 | PERFORATED PIPE-8 IN RICHWOOD STRUCTURES | 01002 | 266.000 |
266.000 |
$94.830 |
LF | 0.0 |
3305 | CONCRETE BARRIER WALL MOD RICHWOOD STRUCTURES | 02000 | 750.000 |
1,154.000 |
$247.280 |
LF | 0.2 |
3310 | STRUCTURE GRANULAR BACKFILL RICHWOOD STRUCTURES | 02231 | 390.000 |
327.400 |
$67.370 |
CUYD | 0.0 |
3315 | STRUCTURE GRANULAR BACKFILL RICHWOOD STRUCTURES | 02231 | 614.000 |
614.000 |
$67.370 |
CUYD | 0.0 |
3320 | STRUCTURE GRANULAR BACKFILL RICHWOOD STRUCTURES | 02231 | 3,734.000 |
3,734.000 |
$67.370 |
CUYD | 0.2 |
3325 | REMOVE CONCRETE MASONRY RICHWOOD STRUCTURES | 02403 | 3.200 |
3.200 |
$474.140 |
CUYD | 0.0 |
3330 | REMOVE CONCRETE MASONRY RICHWOOD STRUCTURES | 02403 | 2.700 |
2.700 |
$474.140 |
CUYD | 0.0 |
3335 | QUALITY CONTROL RICHWOOD STRUCTURES | 02572 | 1.000 |
1.000 |
$100,095.840 |
LS | 0.1 |
3340 | HANDRAIL-TYPE A-1 RICHWOOD STRUCTURES | 02611 | 390.000 |
390.000 |
$131.710 |
LF | 0.0 |
3345 | MASONRY COATING RICHWOOD STRUCTURES | 02998 | 1,732.000 |
1,559.100 |
$10.010 |
SQYD | 0.0 |
3350 | MASONRY COATING RICHWOOD STRUCTURES | 02998 | 473.000 |
473.000 |
$10.010 |
SQYD | 0.0 |
3355 | MASONRY COATING RICHWOOD STRUCTURES | 02998 | 2,145.000 |
2,145.000 |
$10.010 |
SQYD | 0.0 |
3360 | MASONRY COATING RICHWOOD STRUCTURES | 02998 | 140.000 |
140.000 |
$10.010 |
SQYD | 0.0 |
3365 | ARMORED EDGE FOR CONCRETE | 03299 | 134.000 |
134.000 |
$102.770 |
LF | 0.0 |
3370 | CONDUIT-4 IN RICHWOOD STRUCTURES | 04799 | 262.000 |
262.000 |
$105.360 |
LF | 0.0 |
3375 | STRUCTURE EXCAVATION-COMMON RICHWOOD STRUCTURES | 08001 | 521.000 |
521.000 |
$12.640 |
CUYD | 0.0 |
3380 | STRUCTURE EXCAVATION-COMMON RICHWOOD STRUCTURES | 08001 | 2,744.000 |
2,744.000 |
$12.640 |
CUYD | 0.0 |
3385 | STRUCTURE EXCAV-SOLID ROCK RICHWOOD STRUCTURES | 08002 | 19.100 |
19.100 |
$26.760 |
CUYD | 0.0 |
3390 | STRUCTURE EXCAV-SOLID ROCK RICHWOOD STRUCTURES | 08002 | 2,404.000 |
2,404.000 |
$26.760 |
CUYD | 0.1 |
3395 | FOUNDATION PREPARATION RICHWOOD STRUCTURES | 08003 | 1.000 |
1.000 |
$68,486.630 |
LS | 0.1 |
3400 | FOUNDATION PREPARATION RICHWOOD STRUCTURES | 08003 | 1.000 |
1.000 |
$26,341.010 |
LS | 0.0 |
3405 | FOUNDATION PREPARATION RICHWOOD STRUCTURES | 08003 | 1.000 |
1.000 |
$205,459.890 |
LS | 0.2 |
3410 | RETAINING WALL RICHWOOD STRUCTURES | 08018 | 33,438.000 |
23,225.000 |
$74.480 |
SQFT | 2.1 |
3415 | RETAINING WALL RICHWOOD STRUCTURES | 08018 | 6,158.000 |
6,158.000 |
$74.480 |
SQFT | 0.4 |
3420 | RETAINING WALL RICHWOOD STRUCTURES | 08018 | 2,485.000 |
2,485.000 |
$74.480 |
SQFT | 0.2 |
3425 | CRUSHED AGGREGATE SLOPE PROT RICHWOOD STRUCTURES | 08020 | 42.000 |
44.000 |
$63.220 |
TON | 0.0 |
3430 | CRUSHED AGGREGATE SLOPE PROT RICHWOOD STRUCTURES | 08020 | 100.000 |
100.000 |
$63.220 |
TON | 0.0 |
3435 | CRUSHED AGGREGATE SLOPE PROT RICHWOOD STRUCTURES | 08020 | 200.000 |
200.000 |
$63.220 |
TON | 0.0 |
3440 | TEST PILES RICHWOOD STRUCTURES | 08033 | 74.000 |
64.000 |
$263.410 |
LF | 0.0 |
3445 | TEST PILES RICHWOOD STRUCTURES | 08033 | 70.000 |
70.000 |
$263.410 |
LF | 0.0 |
3450 | PRE-DRILLING FOR PILES RICHWOOD STRUCTURES | 08039 | 144.000 |
144.000 |
$302.120 |
LF | 0.0 |
3455 | PRE-DRILLING FOR PILES RICHWOOD STRUCTURES | 08039 | 793.000 |
793.000 |
$302.120 |
LF | 0.2 |
3460 | PILES-STEEL HP14X89 RICHWOOD STRUCTURES | 08051 | 476.000 |
0.000 |
$102.550 |
LF | 0.0 |
3465 | PILES-STEEL HP14X89 RICHWOOD STRUCTURES | 08051 | 820.000 |
820.000 |
$102.550 |
LF | 0.1 |
3470 | PILE POINTS-14 IN RICHWOOD STRUCTURES | 08095 | 18.000 |
0.000 |
$158.050 |
EACH | 0.0 |
3475 | CONCRETE-CLASS A RICHWOOD STRUCTURES | 08100 | 359.000 |
100.200 |
$1,016.290 |
CUYD | 0.3 |
3480 | CONCRETE-CLASS A RICHWOOD STRUCTURES | 08100 | 230.200 |
0.000 |
$1,016.290 |
CUYD | 0.2 |
3485 | CONCRETE-CLASS A RICHWOOD STRUCTURES | 08100 | 82.800 |
82.800 |
$1,016.290 |
CUYD | 0.1 |
3490 | CONCRETE-CLASS A RICHWOOD STRUCTURES | 08100 | 47.200 |
47.200 |
$1,016.290 |
CUYD | 0.0 |
3495 | CONCRETE-CLASS AA RICHWOOD STRUCTURES | 08104 | 794.000 |
538.500 |
$956.100 |
CUYD | 0.6 |
3500 | CONCRETE-CLASS AA RICHWOOD STRUCTURES | 08104 | 448.300 |
448.300 |
$956.100 |
CUYD | 0.4 |
3505 | STEEL REINFORCEMENT RICHWOOD STRUCTURES | 08150 | 121,614.000 |
27,783.000 |
$1.480 |
LB | 0.1 |
3510 | STEEL REINFORCEMENT RICHWOOD STRUCTURES | 08150 | 37,788.000 |
37,788.000 |
$1.480 |
LB | 0.0 |
3515 | STEEL REINFORCEMENT RICHWOOD STRUCTURES | 08150 | 7,759.000 |
7,759.000 |
$1.480 |
LB | 0.0 |
3520 | STEEL REINFORCEMENT RICHWOOD STRUCTURES | 08150 | 4,259.000 |
4,259.000 |
$1.480 |
LB | 0.0 |
3525 | STEEL REINFORCEMENT-EPOXY COATED RICHWOOD STRUCTURES | 08151 | 214,429.000 |
220,795.000 |
$1.530 |
LB | 0.3 |
3530 | STEEL REINFORCEMENT-EPOXY COATED RICHWOOD STRUCTURES | 08151 | 32,476.000 |
32,476.000 |
$1.530 |
LB | 0.0 |
3535 | STRUCTURAL STEEL RICHWOOD STRUCTURES | 08160 | 1.000 |
1.000 |
$3,951,151.550 |
LS | 3.3 |
3540 | SHEAR CONNECTORS RICHWOOD STRUCTURES | 08170 | 1.000 |
1.000 |
$100,095.840 |
LS | 0.1 |
3545 | BRIDGE CHAIN LINK FENCE-8 FT RICHWOOD STRUCTURES | 08712 | 422.000 |
422.000 |
$237.070 |
LF | 0.1 |
3550 | DRAIN PIPE-8 IN RICHWOOD STRUCTURES | 08821 | 656.000 |
656.000 |
$263.410 |
LF | 0.1 |
3555 | SOIL NAIL WALL RICHWOOD STRUCTURES | 20603ED | 3,465.000 |
3,465.000 |
$263.410 |
SQFT | 0.8 |
3560 | ROCK SOUNDINGS RICHWOOD STRUCTURES | 20745ED | 245.000 |
245.000 |
$75.270 |
LF | 0.0 |
3565 | ROCK SOUNDINGS RICHWOOD STRUCTURES | 20745ED | 40.000 |
92.000 |
$75.270 |
LF | 0.0 |
3570 | ROCK CORINGS RICHWOOD STRUCTURES | 20746ED | 1,746.000 |
1,746.000 |
$94.830 |
LF | 0.1 |
3575 | ROCK CORINGS RICHWOOD STRUCTURES | 20746ED | 200.000 |
112.000 |
$94.830 |
LF | 0.0 |
3580 | FORM LINER RICHWOOD STRUCTURES | 21342ED | 16,154.000 |
16,154.000 |
$15.800 |
SQFT | 0.2 |
3585 | DRILLED SHAFT-66 IN (COMMON) RICHWOOD STRUCTURES | 21420ED | 245.000 |
245.000 |
$1,580.460 |
LF | 0.3 |
3590 | DRILLED SHAFT-60 IN (SOLID ROCK) RICHWOOD STRUCTURES | 21421ED | 568.000 |
568.000 |
$1,580.460 |
LF | 0.7 |
3595 | RAIL SYSTEM TYPE III RICHWOOD STRUCTURES | 21532ED | 566.000 |
566.000 |
$135.670 |
LF | 0.1 |
3600 | HORIZONTAL DRAIN RICHWOOD STRUCTURES | 22410EN | 1,500.000 |
1,500.000 |
$36.880 |
LF | 0.0 |
3605 | DRILLED SHAFT-66 IN (ROCK) RICHWOOD STRUCTURES | 23000EX | 80.000 |
92.000 |
$1,580.460 |
LF | 0.1 |
3610 | DRILLED SHAFT-66 IN (ROCK) RICHWOOD STRUCTURES | 23000EX | 518.000 |
518.000 |
$1,580.460 |
LF | 0.7 |
3615 | BEARING PADS RICHWOOD STRUCTURES | 23380EC | 28.000 |
28.000 |
$10,536.400 |
EACH | 0.2 |
3620 | BARRIER ON MSE WALL RICHWOOD STRUCTURES | 23636EC | 1,934.400 |
0.000 |
$553.160 |
LF | 0.9 |
3625 | LIGHTWEIGHT CELLULAR CONCRETE FILL | 23930EC | 1,215.050 |
1,036.000 |
$197.660 |
CUYD | 0.2 |
3630 | PPC I-BEAM TYPE HN 42-49 | 23981EC | 1,981.000 |
1,960.000 |
$398.460 |
LF | 0.7 |
3635 | DECK WATERPROOFING RICHWOOD STRUCTURES | 24848EC | 1.000 |
1.000 |
$158,046.070 |
LS | 0.1 |
4430 | EXTRA WORK NEED SUPPLEMENTAL DESCRIPTION POST TENSION | 10090NX | 1.000 |
0.000 |
$267,756.930 |
LS | 0.2 |
8008 | DRAINAGE SYSTEM RICHWOOD STRUCTURES-CONST REV NO 1-PAINT DRAIN PIPE | 24431EC | 0.000 |
1.000 |
$46,834.000 |
EACH | 0.0 |
8009 | BACKFILL-ABUTMENT RICHWOOD STRUCTURES-CONST REV NO 1-STRUCT GRAN BACKFILL | 08035 | 0.000 |
1.000 |
$15,468.160 |
LS | 0.0 |
8010 | WATERPROOF COATING RICHWOOD STRUCTURES-CONST REV NO 1-ABUT WATERSTOP EXP | 25114EC | 0.000 |
1.000 |
$6,906.510 |
LS | 0.0 |
8026 | CONCRETE-CLASS A RICHWOOD STRUCTURES | 08100 | 0.000 |
230.200 |
$1,028.441 |
CUYD | 0.0 |
8027 | CONCRETE-CLASS A MOD RICHWOOD STRUCTURES | 08101 | 0.000 |
1,084.450 |
$12.622 |
CUYD | 0.0 |
8039 | ADMINISTRATIVE SETTLEMENT Norfolk Southern RR Delay Claim Resolution | 10104NX | 0.000 |
1,200,000.000 |
$1.000 |
DOLL | 0.0 |
8050 | EPS FOAM BLOCK RICHWOOD ROADWAY | 23931EC | 0.000 |
2,079.000 |
$17.023 |
CUFT | 0.0 |
8059 | BALLAST ROCK RICHWOOD STRUCTURES | 30072 | 0.000 |
213.360 |
$183.640 |
TON | 0.0 |
8083 | PILES-STEEL HP12X53 RICHWOOD STRUCTURES | 08046 | 0.000 |
556.000 |
$102.550 |
LF | 0.0 |
8084 | PILE POINTS-12 IN RICHWOOD STRUCTURES | 08094 | 0.000 |
18.000 |
$158.050 |
EACH | 0.0 |
8085 | CONCRETE-CLASS D RICHWOOD STRUCTURES | 08102 | 0.000 |
434.200 |
$1,350.000 |
CUYD | 0.0 |
8086 | EW~ POST-TENSIONING RICHWOOD STRUCTURES | 10090NX | 0.000 |
1.000 |
$310,980.990 |
LS | 0.0 |
8092 | FOUNDATION PREPARATION RICHWOOD STRUCURES | 08003 | 0.000 |
1.000 |
$227,652.300 |
LS | 0.0 |
8093 | CRUSHED AGGREGATE SIZE NO 57 RICHWOOD STRUCTURES | 00071 | 0.000 |
22,850.000 |
$49.980 |
TON | 0.0 |
8140 | NON-SPEC MATERIAL CONCRETE-CLASS D RICHWOOD STRUCTURES | 10070NS | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $18,220,127.13 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0005 | CATEGORY Description | UTILITY-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
3640 | CORED HOLE DRAINAGE BOX CON-4 IN RICHWOOD ELECTRIC & COMM. | 01740 | 4.000 |
4.000 |
$50.000 |
EACH | 0.0 |
3645 | CORED HOLE DRAINAGE BOX CON-6 IN RICHWOOD ELECTRIC & COMM. | 01741 | 12.000 |
12.000 |
$50.000 |
EACH | 0.0 |
3650 | CORED HOLE DRAINAGE BOX CON-6 IN RICHWOOD ELECTRIC & COMM. | 01741 | 4.000 |
4.000 |
$50.000 |
EACH | 0.0 |
3655 | REMOVE MANHOLE RICHWOOD ELECTRIC & COMM. | 01787 | 1.000 |
1.000 |
$2,400.000 |
EACH | 0.0 |
3660 | EC COMMUNICATIONS PULL BOX RICHWOOD ELECTRIC & COMM. | 17001 | 3.000 |
3.000 |
$3,850.000 |
EACH | 0.0 |
3665 | EC COMMUNICATIONS PULL BOX RICHWOOD ELECTRIC & COMM. | 17001 | 3.000 |
3.000 |
$3,850.000 |
EACH | 0.0 |
3670 | EC DUCT - 02 BANK CONCRETE ENCASED I-75 UTILITY DUCT BANK | 17004 | 1,254.000 |
1,254.000 |
$541.640 |
LF | 0.6 |
3675 | EC DUCT - 04 BANK CONCRETE ENCASED E GRAND NATIONAL DUKE | 17008 | 580.000 |
580.000 |
$136.650 |
LF | 0.1 |
3680 | EC DUCT - 04 BANK CONCRETE ENCASED E GRAND NATIONAL OWEN | 17008 | 527.000 |
527.000 |
$291.650 |
LF | 0.1 |
3685 | EC DUCT - 04 BANK CONCRETE ENCASED E LOGISTICS | 17008 | 80.000 |
80.000 |
$146.650 |
LF | 0.0 |
3690 | EC ELECTRIC MANHOLE DUKE | 17028 | 2.000 |
2.000 |
$24,850.000 |
EACH | 0.0 |
3695 | EC ELECTRIC MANHOLE OWEN | 17028 | 2.000 |
2.000 |
$17,350.000 |
EACH | 0.0 |
3700 | EC ELECTRIC MANHOLE RICHWOOD ELECTRIC & COMM. | 17028 | 2.000 |
2.000 |
$17,425.000 |
EACH | 0.0 |
3705 | EC ELECTRIC MANHOLE RICHWOOD ELECTRIC & COMM. | 17028 | 2.000 |
2.000 |
$17,425.000 |
EACH | 0.0 |
3710 | EC ELECTRIC MANHOLE RICHWOOD ELECTRIC & COMM. | 17028 | 4.000 |
4.000 |
$17,425.000 |
EACH | 0.1 |
3715 | EC ELECTRIC STRUCTURE SPECIAL | 17031 | 1.000 |
1.000 |
$10,650.000 |
EACH | 0.0 |
3720 | GAS LINE RELOCATION RICHWOOD GAS RELOCATION | 24573EN | 1.000 |
0.000 |
$985,350.000 |
LS | 0.8 |
8006 | GAS LINE RELOCATION RICHWOOD GAS RELOCATION 8 IN | 24573EN | 0.000 |
1.000 |
$1,223,835.660 |
LS | 0.0 |
8030 | GAS LINE RELOCATION RICHWOOD GAS RELOCATION 8 IN | 24573EN | 0.000 |
1.000 |
$56,553.000 |
LS | 0.0 |
8076 | NON-SPEC MATERIAL S MANHOLE RICHWOOD WATER & SEWER | 10070NS | 0.000 |
-20,000.000 |
$1.000 |
DOLL | 0.0 |
Category Total $2,170,205.11 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0006 | CATEGORY Description | SIGNING-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
3725 | OSS GALV STEEL CANTILEVER MOD RICHWOOD SIGNS & SUPPORTS | 06201 | 2.000 |
2.000 |
$28,555.000 |
EACH | 0.0 |
3730 | FLEXIBLE DELINEATOR POST-M/W RICHWOOD SIGNS & SUPPORTS | 06401 | 308.000 |
308.000 |
$29.000 |
EACH | 0.0 |
3735 | FLEXIBLE DELINEATOR POST-M/Y RICHWOOD SIGNS & SUPPORTS | 06404 | 128.000 |
128.000 |
$29.000 |
EACH | 0.0 |
3740 | SBM ALUM SHEET SIGNS .080 IN RICHWOOD SIGNS & SUPPORTS | 06406 | 3,768.000 |
3,768.000 |
$18.500 |
SQFT | 0.1 |
3745 | SBM ALUM SHEET SIGNS .125 IN RICHWOOD SIGNS & SUPPORTS | 06407 | 1,959.000 |
1,971.000 |
$14.356 |
SQFT | 0.0 |
3750 | SBM ALUM SHEET SIGNS .125 IN RICHWOOD SIGNS & SUPPORTS | 06407 | 1,086.000 |
1,086.000 |
$14.356 |
SQFT | 0.0 |
3755 | STEEL POST TYPE 1 RICHWOOD SIGNS & SUPPORTS | 06410 | 4,480.000 |
4,508.000 |
$8.000 |
LF | 0.0 |
3760 | GMSS GALV STEEL TYPE C RICHWOOD SIGNS & SUPPORTS | 06441 | 15,891.000 |
15,891.000 |
$6.550 |
LB | 0.1 |
3765 | SIGN BRIDGE ATTACHMENT BRACKET RICHWOOD SIGNS & SUPPORTS | 06448 | 8.000 |
8.000 |
$6,000.000 |
EACH | 0.0 |
3770 | REMOVE SIGN SUPPORT BEAM RICHWOOD SIGNS & SUPPORTS | 06451 | 22.000 |
22.000 |
$100.000 |
EACH | 0.0 |
3775 | OSS ALUMINUM 120 FT TRUSS RICHWOOD SIGNS & SUPPORTS | 06463 | 1.000 |
1.000 |
$126,358.000 |
EACH | 0.1 |
3780 | OSS ALUMINUM 130 FT TRUSS RICHWOOD SIGNS & SUPPORTS | 06467 | 1.000 |
1.000 |
$146,295.000 |
EACH | 0.1 |
3785 | INSTALL SPAN MOUNTED SIGN RICHWOOD SIGNS & SUPPORTS | 06472 | 14.000 |
14.000 |
$250.000 |
EACH | 0.0 |
3790 | CLASS A CONCRETE FOR SIGNS RICHWOOD SIGNS & SUPPORTS | 06490 | 283.000 |
283.000 |
$500.000 |
CUYD | 0.1 |
3795 | STEEL REINFORCEMENT FOR SIGNS RICHWOOD SIGNS & SUPPORTS | 06491 | 25,390.000 |
25,390.000 |
$2.000 |
LB | 0.0 |
3800 | REMOVE & RELOCATE SIGNS RICHWOOD SIGNS & SUPPORTS | 20418ED | 49.000 |
49.000 |
$500.000 |
EACH | 0.0 |
3805 | ROADWAY CROSS SECTION RICHWOOD SIGNS & SUPPORTS | 20419ND | 28.000 |
28.000 |
$100.000 |
EACH | 0.0 |
3810 | REMOVE SIGN RICHWOOD SIGNS & SUPPORTS | 21373ND | 79.000 |
79.000 |
$100.000 |
EACH | 0.0 |
3815 | GMSS TYPE D RICHWOOD SIGNS & SUPPORTS | 21596ND | 333.000 |
333.000 |
$480.000 |
EACH | 0.1 |
3820 | INSTALL MAST ARM MOUNTED SIGN RICHWOOD SIGNS & SUPPORTS | 24488ED | 19.000 |
19.000 |
$250.000 |
EACH | 0.0 |
3825 | BARCODE SIGN INVENTORY RICHWOOD SIGNS & SUPPORTS | 24631EC | 473.000 |
475.000 |
$5.000 |
EACH | 0.0 |
Category Total $1,043,892.04 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0007 | CATEGORY Description | SIGNALIZATION-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
3830 | CONDUIT-2 IN RICHWOOD TRAFFIC SIGNALS | 04795 | 4,697.000 |
3,667.000 |
$8.500 |
LF | 0.0 |
3835 | ELECTRICAL JUNCTION BOX TYPE B RICHWOOD TRAFFIC SIGNALS | 04811 | 34.000 |
35.000 |
$550.000 |
EACH | 0.0 |
3840 | TRENCHING AND BACKFILLING RICHWOOD TRAFFIC SIGNALS | 04820 | 3,388.000 |
3,079.000 |
$3.000 |
LF | 0.0 |
3845 | OPEN CUT ROADWAY RICHWOOD TRAFFIC SIGNALS | 04821 | 42.000 |
42.000 |
$75.000 |
LF | 0.0 |
3850 | LOOP WIRE RICHWOOD TRAFFIC SIGNALS | 04830 | 15,860.000 |
15,633.000 |
$0.950 |
LF | 0.0 |
3855 | CABLE-NO. 14/5C RICHWOOD TRAFFIC SIGNALS | 04844 | 32,630.000 |
26,099.000 |
$1.300 |
LF | 0.0 |
3860 | CABLE-NO. 14/1 PAIR RICHWOOD TRAFFIC SIGNALS | 04850 | 13,091.000 |
12,005.000 |
$1.300 |
LF | 0.0 |
3865 | POLE 45 FT WOODEN RICHWOOD TRAFFIC SIGNALS | 04873 | 10.000 |
10.000 |
$1,200.000 |
EACH | 0.0 |
3870 | ANCHOR RICHWOOD TRAFFIC SIGNALS | 04884 | 18.000 |
18.000 |
$450.000 |
EACH | 0.0 |
3875 | MESSENGER-10800 LB RICHWOOD TRAFFIC SIGNALS | 04885 | 706.000 |
706.000 |
$5.000 |
LF | 0.0 |
3880 | MESSENGER-15400 LB RICHWOOD TRAFFIC SIGNALS | 04886 | 2,485.000 |
2,485.000 |
$5.000 |
LF | 0.0 |
3885 | LOOP SAW SLOT AND FILL RICHWOOD TRAFFIC SIGNALS | 04895 | 5,984.000 |
5,979.000 |
$9.000 |
LF | 0.0 |
3890 | BLANKOUT SIGN RICHWOOD TRAFFIC SIGNALS | 04905 | 4.000 |
4.000 |
$4,000.000 |
EACH | 0.0 |
3895 | INSTALL STEEL STRAIN POLE RICHWOOD TRAFFIC SIGNALS | 04932 | 12.000 |
12.000 |
$2,000.000 |
EACH | 0.0 |
3900 | TEMP SIGNAL RICHWOOD TRAFFIC SIGNALS | 04935 | 1.000 |
1.000 |
$122,250.000 |
LS | 0.1 |
3905 | INSTALL SPAN MOUNTED SIGN RICHWOOD TRAFFIC SIGNALS | 06472 | 16.000 |
16.000 |
$346.666 |
EACH | 0.0 |
3910 | INSTALL SPAN MOUNTED SIGN RICHWOOD TRAFFIC SIGNALS | 06472 | 14.000 |
14.000 |
$346.666 |
EACH | 0.0 |
3915 | INSTALL PEDESTRIAN HEAD-LED RICHWOOD TRAFFIC SIGNALS | 20093NS835 | 32.000 |
36.000 |
$250.000 |
EACH | 0.0 |
3920 | INSTALL LED SIGNAL-3 SECTION RICHWOOD TRAFFIC SIGNALS | 20188NS835 | 126.000 |
124.000 |
$250.000 |
EACH | 0.0 |
3925 | INSTALL LED SIGNAL-5 SECTION RICHWOOD TRAFFIC SIGNALS | 20189NS835 | 1.000 |
1.000 |
$250.000 |
EACH | 0.0 |
3930 | INSTALL LED SIGNAL- 4 SECTION RICHWOOD TRAFFIC SIGNALS | 20266ES835 | 2.000 |
2.000 |
$250.000 |
EACH | 0.0 |
3935 | INSTALL COORDINATING UNIT RICHWOOD TRAFFIC SIGNALS | 20390NS835 | 4.000 |
4.000 |
$800.000 |
EACH | 0.0 |
3940 | ELECTRICAL JUNCTION BOX TYPE A RICHWOOD TRAFFIC SIGNALS | 20391NS835 | 4.000 |
4.000 |
$550.000 |
EACH | 0.0 |
3945 | ELECTRICAL JUNCTION BOX TYPE C RICHWOOD TRAFFIC SIGNALS | 20392NS835 | 12.000 |
13.000 |
$950.000 |
EACH | 0.0 |
3950 | BORE AND JACK CONDUIT RICHWOOD TRAFFIC SIGNALS | 21543EN | 607.000 |
607.000 |
$30.000 |
LF | 0.0 |
3955 | RELOCATE SIGNAL HEAD RICHWOOD TRAFFIC SIGNALS | 21659NN | 6.000 |
6.000 |
$75.000 |
EACH | 0.0 |
3960 | INSTALL PEDESTRIAN DETECTOR RICHWOOD TRAFFIC SIGNALS | 21743NN | 30.000 |
36.000 |
$75.000 |
EACH | 0.0 |
3965 | INSTALL MAST ARM POLE RICHWOOD TRAFFIC SIGNALS | 22631NN | 10.000 |
10.000 |
$3,850.000 |
EACH | 0.0 |
3970 | INSTALL LUMINAIRE POLE RICHWOOD TRAFFIC SIGNALS | 22939ND | 5.000 |
5.000 |
$1,300.000 |
EACH | 0.0 |
3975 | TRAFFIC SIGNAL POLE BASE RICHWOOD TRAFFIC SIGNALS | 23157EN | 148.000 |
148.290 |
$550.000 |
CUYD | 0.1 |
3980 | INSTALL SIGNAL PEDESTAL RICHWOOD TRAFFIC SIGNALS | 23222EC | 26.000 |
29.000 |
$750.000 |
EACH | 0.0 |
3985 | INSTALL PEDESTAL POST RICHWOOD TRAFFIC SIGNALS | 23235EC | 3.000 |
3.000 |
$275.000 |
EACH | 0.0 |
3990 | PVC CONDUIT-1 1/4 IN-SCHEDULE 80 RICHWOOD TRAFFIC SIGNALS | 24900EC | 1,084.000 |
1,006.000 |
$3.000 |
LF | 0.0 |
3995 | PVC CONDUIT-2 IN-SCHEDULE 80 RICHWOOD TRAFFIC SIGNALS | 24901EC | 2,365.000 |
2,391.000 |
$3.000 |
LF | 0.0 |
4000 | INSTALL SIGNAL CONTROLLER-TY ATC RICHWOOD TRAFFIC SIGNALS | 24908EC | 8.000 |
8.000 |
$5,000.000 |
EACH | 0.0 |
4005 | REMOVE SIGNAL EQUIPMENT RICHWOOD TRAFFIC SIGNALS | 24955ED | 2.000 |
2.000 |
$1,500.000 |
EACH | 0.0 |
8062 | FUSED CONNECTOR KIT RICHWOOD TRAFFIC SIGNALS | 04780 | 0.000 |
5.000 |
$148.050 |
EACH | 0.0 |
8063 | INSTALL PEDESTRIAN HEAD-LED RICHWOOD TRAFFIC SIGNALS | 20093NS835 | 0.000 |
2.000 |
$348.600 |
EACH | 0.0 |
8064 | INSTALL SIGNAL PEDESTAL RICHWOOD TRAFFIC SIGNALS | 23222EC | 0.000 |
1.000 |
$2,399.250 |
EACH | 0.0 |
8065 | TRENCHING AND BACKFILLING RICHWOOD TRAFFIC SIGNALS | 04820 | 0.000 |
45.000 |
$5.554 |
LF | 0.0 |
8066 | CABLE-NO. 14/5C RICHWOOD TRAFFIC SIGNALS | 04844 | 0.000 |
663.000 |
$2.142 |
LF | 0.0 |
8067 | TRAFFIC SIGNAL POLE BASE RICHWOOD TRAFFIC SIGNALS | 23157EN | 0.000 |
0.530 |
$710.850 |
CUYD | 0.0 |
8068 | PVC CONDUIT-1 1/4 IN-SCHEDULE 80 RICHWOOD TRAFFIC SIGNALS | 24900EC | 0.000 |
45.000 |
$4.725 |
LF | 0.0 |
8070 | COST PLUS WORK RICHWOOD TRAFFIC SIGNALS | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8074 | COST PLUS WORK RICHWOOD TRAFFIC SIGNALS | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8087 | CONDUIT-1 IN RICHWOOD TRAFFIC SIGNALS | 04792 | 0.000 |
45.000 |
$3.000 |
LF | 0.0 |
8088 | CONDUIT-1 1/4 IN RICHWOOD TRAFFIC SIGNALS | 04793 | 0.000 |
240.000 |
$3.000 |
LF | 0.0 |
8089 | CABLE-NO. 14/7C RICHWOOD TRAFFIC SIGNALS | 04845 | 0.000 |
4,210.000 |
$1.250 |
LF | 0.0 |
8090 | EW~ SIGNAL HEAD BRIDGE ATTACHMENT BRACKET RICHWOOD TRAFFIC | 10094NX | 0.000 |
14.000 |
$500.000 |
EACH | 0.0 |
8149 | COST PLUS WORK RICHWOOD TRAFFIC SIGNALS | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8150 | COST PLUS WORK RICHWOOD TRAFFIC SIGNALS | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8151 | COST PLUS WORK RICHWOOD TRAFFIC SIGNALS | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $687,035.80 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0008 | CATEGORY Description | LIGHTING-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
4010 | POLE 30 FT MTG HT RICHWOOD LIGHTING | 04700 | 12.000 |
12.000 |
$1,075.000 |
EACH | 0.0 |
4015 | POLE 80 FT MTG HT HIGH MAST RICHWOOD LIGHTING | 04710 | 17.000 |
17.000 |
$25,000.000 |
EACH | 0.4 |
4020 | BRACKET 6 FT RICHWOOD LIGHTING | 04721 | 6.000 |
6.000 |
$252.000 |
EACH | 0.0 |
4025 | BRACKET 10 FT RICHWOOD LIGHTING | 04723 | 5.000 |
5.000 |
$430.000 |
EACH | 0.0 |
4030 | BRACKET 12 FT RICHWOOD LIGHTING | 04724 | 1.000 |
1.000 |
$466.000 |
EACH | 0.0 |
4035 | BRACKET C RICHWOOD LIGHTING | 04730 | 25.000 |
0.000 |
$602.000 |
EACH | 0.0 |
4040 | POLE BASE RICHWOOD LIGHTING | 04740 | 12.000 |
12.000 |
$931.000 |
EACH | 0.0 |
4045 | POLE BASE-HIGH MAST RICHWOOD LIGHTING | 04742 | 17.000 |
17.000 |
$6,970.000 |
EACH | 0.1 |
4050 | TRANSFORMER BASE RICHWOOD LIGHTING | 04750 | 12.000 |
12.000 |
$757.000 |
EACH | 0.0 |
4055 | LIGHTING CONTROL EQUIPMENT RICHWOOD LIGHTING | 04761 | 5.000 |
5.000 |
$20,852.000 |
EACH | 0.1 |
4060 | FUSED CONNECTOR KIT RICHWOOD LIGHTING | 04780 | 24.000 |
24.000 |
$119.000 |
EACH | 0.0 |
4065 | CONDUIT-2 IN RICHWOOD LIGHTING | 04795 | 2,207.000 |
2,207.000 |
$14.800 |
LF | 0.0 |
4070 | CONDUIT-3 IN RICHWOOD LIGHTING | 04797 | 2,040.000 |
2,075.000 |
$24.000 |
LF | 0.0 |
4075 | MARKER RICHWOOD LIGHTING | 04800 | 33.000 |
33.000 |
$415.000 |
EACH | 0.0 |
4080 | TRENCHING AND BACKFILLING RICHWOOD LIGHTING | 04820 | 10,762.000 |
10,862.000 |
$4.000 |
LF | 0.0 |
4085 | WIRE-NO. 12 RICHWOOD LIGHTING | 04832 | 4,080.000 |
4,080.000 |
$0.550 |
LF | 0.0 |
4090 | WIRE-NO. 8 RICHWOOD LIGHTING | 04833 | 15,765.000 |
15,765.000 |
$1.000 |
LF | 0.0 |
4095 | CABLE-NO. 8/3C DUCTED RICHWOOD LIGHTING | 04860 | 13,037.000 |
13,172.000 |
$3.500 |
LF | 0.0 |
4100 | REMOVE LIGHTING RICHWOOD LIGHTING | 04940 | 1.000 |
1.000 |
$40,800.000 |
LS | 0.0 |
4105 | ELECTRICAL JUNCTION BOX TYPE A RICHWOOD LIGHTING | 20391NS835 | 27.000 |
29.000 |
$950.000 |
EACH | 0.0 |
4110 | ELECTRICAL JUNCTION BOX TYPE C RICHWOOD LIGHTING | 20392NS835 | 3.000 |
3.000 |
$1,287.000 |
EACH | 0.0 |
4115 | MAINTAIN LIGHTING RICHWOOD LIGHTING | 20410ED | 1.000 |
1.000 |
$165,000.000 |
LS | 0.1 |
4120 | TEMPORARY LIGHTING RICHWOOD LIGHTING | 20454NS835 | 1.000 |
1.000 |
$5,000.000 |
LS | 0.0 |
4125 | BORE AND JACK CONDUIT RICHWOOD LIGHTING | 21543EN | 2,109.000 |
2,109.000 |
$18.770 |
LF | 0.0 |
4130 | LED LUMINAIRE RICHWOOD LIGHTING | 24589ED | 27.000 |
27.000 |
$706.000 |
EACH | 0.0 |
4135 | HIGH MAST LED LUMINAIRE RICHWOOD LIGHTING | 24749EC | 123.000 |
123.000 |
$1,138.000 |
EACH | 0.1 |
4140 | PVC CONDUIT-1 1/4 IN-SCHEDULE 80 RICHWOOD LIGHTING | 24900EC | 2,329.000 |
2,329.000 |
$4.000 |
LF | 0.0 |
4145 | PVC CONDUIT-2 IN-SCHEDULE 80 RICHWOOD LIGHTING | 24901EC | 252.000 |
252.000 |
$6.000 |
LF | 0.0 |
8056 | REPAIR LIGHTING | 24522EC | 0.000 |
1.000 |
$3,943.550 |
LS | 0.0 |
8061 | BORE AND JACK CONDUIT RICHWOOD LIGHTING | 21543EN | 0.000 |
35.000 |
$24.060 |
LF | 0.0 |
8081 | ELECTRICAL JUNCTION BOX TYPE A RICHWOOD LIGHTING | 20391NS835 | 0.000 |
3.000 |
$1,522.500 |
EACH | 0.0 |
8082 | ELECTRICAL JUNCTION BOX TYPE C RICHWOOD LIGHTING | 20392NS835 | 0.000 |
5.000 |
$2,100.000 |
EACH | 0.0 |
8091 | CONDUIT-1 IN RICHWOOD LIGHTING | 04792 | 0.000 |
5.000 |
$3.000 |
LF | 0.0 |
8128 | ELECTRICAL JUNCTION BOX TYPE A RICHWOOD LIGHTING | 20391NS835 | 0.000 |
2.000 |
$1,732.500 |
EACH | 0.0 |
8129 | CABLE-NO. 2/3C DUCTED RICHWOOD LIGHTING | 04863 | 0.000 |
2,100.000 |
$19.950 |
LF | 0.0 |
8130 | TRENCHING AND BACKFILLING RICHWOOD LIGHTING | 04820 | 0.000 |
800.000 |
$9.450 |
LF | 0.0 |
8131 | FUSED CONNECTOR KIT RICHWOOD LIGHTING | 04780 | 0.000 |
6.000 |
$157.500 |
EACH | 0.0 |
8132 | CONDUIT-3 IN RICHWOOD LIGHTING | 04797 | 0.000 |
537.000 |
$51.033 |
LF | 0.0 |
8133 | BORE AND JACK CONDUIT RICHWOOD LIGHTING | 21543EN | 0.000 |
525.000 |
$29.400 |
LF | 0.0 |
8134 | MARKER RICHWOOD LIGHTING | 04800 | 0.000 |
2.000 |
$525.000 |
EACH | 0.0 |
8135 | ELECTRICAL JUNCTION BOX RICHWOOD LIGHTING | 04810 | 0.000 |
2.000 |
$1,548.750 |
EACH | 0.0 |
8136 | CONCRETE MEDIAN BARRIER TY 14B(50) RICHWOOD LIGHTING | 23045ES508 | 0.000 |
20.000 |
$486.380 |
LF | 0.0 |
8137 | MAINTAIN & CONTROL TRAFFIC RICHWOOD LIGHTING | 02650 | 0.000 |
1.000 |
$14,378.090 |
LS | 0.0 |
8138 | ELECTRICAL SERVICE 20 AMP BREAKER RICHWOOD LIGHTING | 04899 | 0.000 |
2.000 |
$493.500 |
EACH | 0.0 |
8148 | BRACKET C RICHWOOD LIGHTING | 04730 | 0.000 |
25.000 |
$1,049.853 |
EACH | 0.0 |
8188 | COST PLUS WORK RICHWOOD LIGHTING | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $1,354,706.03 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0009 | CATEGORY Description | WATERLINE-388 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
4150 | PLUG PIPE RICHWOOD WATER & SEWER | 01314 | 12.000 |
13.000 |
$997.800 |
EACH | 0.0 |
4155 | DROP BOX INLET TYPE 4 MOD RICHWOOD WATER & SEWER | 01500 | 13.000 |
0.000 |
$6,809.670 |
EACH | 0.1 |
4160 | SAFELOADING RICHWOOD WATER & SEWER | 02690 | 89.000 |
89.000 |
$212.840 |
CUYD | 0.0 |
4165 | W ENCASEMENT CONCRETE RICHWOOD WATER & SEWER | 14005 | 30.000 |
30.000 |
$131.710 |
LF | 0.0 |
4170 | W ENCASEMENT STEEL BORED RANGE 6 RICHWOOD WATER & SEWER | 14011 | 54.000 |
54.000 |
$1,244.350 |
LF | 0.1 |
4175 | W ENCASEMENT STEEL OPEN CUT RANGE 6 RICHWOOD WATER & SEWER | 14017 | 69.000 |
69.000 |
$337.160 |
LF | 0.0 |
4180 | W FIRE HYDRANT ADJUST RICHWOOD WATER & SEWER | 14018 | 4.000 |
4.000 |
$2,634.100 |
EACH | 0.0 |
4185 | W FIRE HYDRANT ASSEMBLY RICHWOOD WATER & SEWER | 14019 | 12.000 |
12.000 |
$4,846.750 |
EACH | 0.0 |
4190 | W FIRE HYDRANT RELOCATE RICHWOOD WATER & SEWER | 14020 | 21.000 |
21.000 |
$3,582.380 |
EACH | 0.1 |
4195 | W FIRE HYDRANT REMOVE RICHWOOD WATER & SEWER | 14021 | 4.000 |
4.000 |
$1,264.370 |
EACH | 0.0 |
4200 | W METER ADJUST RICHWOOD WATER & SEWER | 14029 | 5.000 |
5.000 |
$790.230 |
EACH | 0.0 |
4205 | W METER RELOCATE RICHWOOD WATER & SEWER | 14030 | 21.000 |
24.000 |
$1,159.000 |
EACH | 0.0 |
4210 | W METER VAULT RICHWOOD WATER & SEWER | 14031 | 1.000 |
1.000 |
$42,145.615 |
EACH | 0.0 |
4215 | W METER VAULT RICHWOOD WATER & SEWER | 14031 | 1.000 |
0.000 |
$42,145.615 |
EACH | 0.0 |
4220 | W PIPE DUCTILE IRON 06 INCH RICHWOOD WATER & SEWER | 14036 | 20.000 |
20.000 |
$115.900 |
LF | 0.0 |
4225 | W PIPE DUCTILE IRON 08 INCH RICHWOOD WATER & SEWER | 14037 | 1,342.000 |
1,308.000 |
$134.870 |
LF | 0.2 |
4230 | W PIPE DUCTILE IRON 12 INCH RICHWOOD WATER & SEWER | 14039 | 8,980.000 |
9,020.000 |
$131.600 |
LF | 1.0 |
4235 | W PIPE DUCTILE IRON 16 INCH RICHWOOD WATER & SEWER | 14040 | 1,115.000 |
1,115.000 |
$155.830 |
LF | 0.1 |
4240 | W PIPE DCTL IRON RSTRND JOINT 08 IN RICHWOOD WATER & SEWER | 14048 | 51.000 |
51.000 |
$126.440 |
LF | 0.0 |
4245 | W PIPE DCTL IRON RSTRND JOINT 12 IN RICHWOOD WATER & SEWER | 14050 | 1,039.000 |
1,039.000 |
$153.200 |
LF | 0.1 |
4250 | W PIPE DCTL IRON RSTRND JOINT 12 IN RICHWOOD WATER & SEWER | 14050 | 787.000 |
787.000 |
$153.200 |
LF | 0.1 |
4255 | W PIPE DCTL IRON RSTRND JOINT 16 IN RICHWOOD WATER & SEWER | 14051 | 270.000 |
270.000 |
$189.660 |
LF | 0.0 |
4260 | W REMOVE TRANSITE (AC) PIPE RICHWOOD WATER & SEWER | 14076 | 1,400.000 |
1,400.000 |
$57.950 |
LF | 0.1 |
4265 | W STRUCTURE REMOVAL RICHWOOD WATER & SEWER | 14088 | 1.000 |
1.000 |
$3,160.920 |
EACH | 0.0 |
4270 | W TAPPING SLEEVE AND VALVE SIZE 2 RICHWOOD WATER & SEWER | 14090 | 1.000 |
0.000 |
$12,643.680 |
EACH | 0.0 |
4275 | W TIE-IN 06 INCH RICHWOOD WATER & SEWER | 14094 | 2.000 |
2.000 |
$2,950.200 |
EACH | 0.0 |
4280 | W TIE-IN 08 INCH RICHWOOD WATER & SEWER | 14095 | 7.000 |
5.000 |
$3,160.920 |
EACH | 0.0 |
4285 | W TIE-IN 12 INCH RICHWOOD WATER & SEWER | 14097 | 5.000 |
5.000 |
$4,741.380 |
EACH | 0.0 |
4290 | W TIE-IN 16 INCH RICHWOOD WATER & SEWER | 14098 | 1.000 |
1.000 |
$5,268.210 |
EACH | 0.0 |
4295 | W VALVE 06 INCH RICHWOOD WATER & SEWER | 14105 | 2.000 |
2.000 |
$1,264.370 |
EACH | 0.0 |
4300 | W VALVE 08 INCH RICHWOOD WATER & SEWER | 14106 | 9.000 |
8.000 |
$1,791.190 |
EACH | 0.0 |
4305 | W VALVE 12 INCH RICHWOOD WATER & SEWER | 14108 | 24.000 |
26.000 |
$3,371.650 |
EACH | 0.1 |
4310 | W VALVE 16 INCH RICHWOOD WATER & SEWER | 14109 | 6.000 |
6.000 |
$6,743.300 |
EACH | 0.0 |
4315 | W VALVE BOX ADJUST RICHWOOD WATER & SEWER | 14113 | 13.000 |
13.000 |
$474.140 |
EACH | 0.0 |
4320 | W VALVE CUT-IN 08 INCH RICHWOOD WATER & SEWER | 14118 | 2.000 |
1.000 |
$4,741.380 |
EACH | 0.0 |
4325 | W SERV COPPER LONG SIDE 1 IN RICHWOOD WATER & SEWER | 14145 | 4.000 |
3.000 |
$4,425.290 |
EACH | 0.0 |
4330 | W SERV COPPER SHORT SIDE 1 IN RICHWOOD WATER & SEWER | 14149 | 6.000 |
7.000 |
$1,264.370 |
EACH | 0.0 |
4335 | W SERV COPPER SHORT SIDE 2 IN RICHWOOD WATER & SEWER | 14151 | 5.000 |
6.000 |
$3,371.650 |
EACH | 0.0 |
4340 | W SERV COPPER SHORT SIDE 3/4 IN RICHWOOD WATER & SEWER | 14152 | 7.000 |
8.000 |
$1,159.000 |
EACH | 0.0 |
4345 | S CONCRETE PIPE ANCHOR RICHWOOD WATER & SEWER | 15010 | 3.000 |
3.000 |
$1,675.290 |
EACH | 0.0 |
4350 | S ENCASEMENT CONCRETE RICHWOOD WATER & SEWER | 15012 | 170.000 |
170.000 |
$127.490 |
LF | 0.0 |
4355 | S ENCASEMENT STEEL OPEN CUT RANGE 4 RICHWOOD WATER & SEWER | 15023 | 120.000 |
120.000 |
$452.010 |
LF | 0.0 |
4360 | S LATERAL CLEANOUT RICHWOOD WATER & SEWER | 15086 | 1.000 |
3.000 |
$2,899.620 |
EACH | 0.0 |
4365 | S LATERAL SHORT SIDE 06 INCH RICHWOOD WATER & SEWER | 15090 | 6.000 |
6.000 |
$3,238.890 |
EACH | 0.0 |
4370 | S LATERAL SPECIAL RICHWOOD WATER & SEWER | 15091 | 1.000 |
1.000 |
$11,684.870 |
EACH | 0.0 |
4375 | S MANHOLE RICHWOOD WATER & SEWER | 15092 | 19.000 |
19.000 |
$11,991.480 |
EACH | 0.2 |
4380 | S MANHOLE ABANDON/REMOVE RICHWOOD WATER & SEWER | 15093 | 24.000 |
24.000 |
$3,932.190 |
EACH | 0.1 |
4385 | S MANHOLE ADJUST TO GRADE RICHWOOD WATER & SEWER | 15094 | 1.000 |
1.000 |
$616.380 |
EACH | 0.0 |
4390 | S MANHOLE CASTING STANDARD RICHWOOD WATER & SEWER | 15095 | 22.000 |
22.000 |
$650.100 |
EACH | 0.0 |
4395 | S MANHOLE CASTING WATERTIGHT RICHWOOD WATER & SEWER | 15096 | 10.000 |
10.000 |
$738.600 |
EACH | 0.0 |
4400 | S MANHOLE SPECIAL RICHWOOD WATER & SEWER | 15098 | 1.000 |
1.000 |
$11,842.910 |
EACH | 0.0 |
4405 | S MANHOLE WITH DROP RICHWOOD WATER & SEWER | 15101 | 12.000 |
13.000 |
$11,851.350 |
EACH | 0.1 |
4410 | S PIPE DUCTILE IRON 08 INCH RICHWOOD WATER & SEWER | 15104 | 2,341.000 |
2,341.000 |
$360.440 |
LF | 0.7 |
4415 | S PIPE PVC 08 INCH RICHWOOD WATER & SEWER | 15112 | 1,577.000 |
1,577.000 |
$244.390 |
LF | 0.3 |
8001 | W SERV COPPER LONG SIDE 2 IN RICHWOOD WATER & SEWER | 14147 | 0.000 |
1.000 |
$3,895.420 |
EACH | 0.0 |
8029 | S BYPASS PUMPING RICHWOOD WATER & SEWER | 15000 | 0.000 |
15.000 |
$6,809.670 |
EACH | 0.0 |
8031 | W METER/FIRE SERVICE COMBO VAULT RICHWOOD WATER & SEWER | 14032 | 0.000 |
1.000 |
$47,673.730 |
EACH | 0.0 |
8051 | S LATERAL LONG SIDE 06 INCH RICHWOOD WATER & SEWER | 15088 | 0.000 |
1.000 |
$27,404.900 |
EACH | 0.0 |
8052 | W SERVICE SPECIAL RICHWOOD WATER & SEWER | 14086 | 0.000 |
1.000 |
$4,364.830 |
EACH | 0.0 |
Category Total $4,554,246.63 |
SM- Project | 0600803881901 | CATEGORY NUMBER | 0010 | CATEGORY Description | DEMOBILIZATION &/OR MOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
4420 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$3,695,440.000 |
LS | 3.1 |
4425 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$1,201,018.000 |
LS | 1.0 |
8145 | D/B CONTRACT PAYMENT RICHWOOD ACCOUNTING RECONCILIATION | 25083EN | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $4,896,458.00 |
SM- Project | 0600805361901 |
Fed/State Number | FD52 008 0075 177-179 |
Project Description | MT ZION RD |
*********** |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0005 | CATEGORY Description | SIGNING-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1485 | SBM ALUMINUM PANEL SIGNS MT. ZION SIGNS & SUPPORTS | 06405 | 1,723.500 |
1,723.500 |
$18.500 |
SQFT | 0.0 |
1490 | SBM ALUM SHEET SIGNS .080 IN MT. ZION SIGNS & SUPPORTS | 06406 | 1,106.000 |
1,131.000 |
$14.000 |
SQFT | 0.0 |
1495 | SBM ALUM SHEET SIGNS .125 IN MT. ZION SIGNS & SUPPORTS | 06407 | 517.000 |
517.000 |
$15.000 |
SQFT | 0.0 |
1500 | STEEL POST TYPE 1 MT. ZION SIGNS & SUPPORTS | 06410 | 2,790.000 |
2,790.000 |
$8.000 |
LF | 0.0 |
1505 | STEEL POST MILE MARKERS MT. ZION SIGNS & SUPPORTS | 06412 | 1.000 |
1.000 |
$150.000 |
EACH | 0.0 |
1510 | SIGN BRIDGE ATTACHMENT BRACKET MT. ZION SIGNS & SUPPORTS | 06448 | 14.000 |
14.000 |
$6,000.000 |
EACH | 0.1 |
1515 | REM OVERHEAD STRUC CONC BASE MT. ZION SIGNS & SUPPORTS | 06450 | 15.000 |
15.000 |
$3,000.000 |
EACH | 0.0 |
1520 | REMOVE SIGN SUPPORT BEAM MT. ZION SIGNS & SUPPORTS | 06451 | 36.000 |
36.000 |
$100.000 |
EACH | 0.0 |
1525 | OSS ALUMINUM 130 FT TRUSS MT. ZION SIGNS & SUPPORTS | 06467 | 1.000 |
1.000 |
$111,000.000 |
EACH | 0.1 |
1530 | OSS ALUMINUM 140 FT TRUSS MT. ZION SIGNS & SUPPORTS | 06471 | 1.000 |
1.000 |
$115,000.000 |
EACH | 0.1 |
1535 | CLASS A CONCRETE FOR SIGNS MT. ZION SIGNS & SUPPORTS | 06490 | 55.000 |
55.000 |
$500.000 |
CUYD | 0.0 |
1540 | STEEL REINFORCEMENT FOR SIGNS MT. ZION SIGNS & SUPPORTS | 06491 | 5,524.000 |
5,524.000 |
$2.000 |
LB | 0.0 |
1545 | ROADWAY CROSS SECTION MT. ZION SIGNS & SUPPORTS | 20419ND | 2.000 |
2.000 |
$100.000 |
EACH | 0.0 |
1550 | REMOVE SIGN MT. ZION SIGNS & SUPPORTS | 21373ND | 85.000 |
85.000 |
$100.000 |
EACH | 0.0 |
1555 | GMSS TYPE D MT. ZION SIGNS & SUPPORTS | 21596ND | 204.000 |
204.000 |
$480.000 |
EACH | 0.1 |
8035 | GMSS GALV STEEL TYPE A MT. ZION NOISE WALL | 06400 | 0.000 |
355.500 |
$6.825 |
LB | 0.0 |
8036 | ROADWAY CROSS SECTION MT. ZION NOISE WALL | 20419ND | 0.000 |
1.000 |
$315.000 |
EACH | 0.0 |
8043 | SBM ALUMINUM PANEL SIGNS MT. ZION NOISE WALL | 06405 | 0.000 |
50.000 |
$19.425 |
SQFT | 0.0 |
8044 | REMOVE SIGN SUPPORT BEAM MT. ZION NOISE WALL | 06451 | 0.000 |
2.000 |
$105.000 |
EACH | 0.0 |
8045 | CLASS A CONCRETE FOR SIGNS MT. ZION NOISE WALL | 06490 | 0.000 |
1.160 |
$525.000 |
CUYD | 0.0 |
8046 | STEEL REINFORCEMENT FOR SIGNS MT. ZION NOISE WALL | 06491 | 0.000 |
114.000 |
$2.100 |
LB | 0.0 |
8047 | REMOVE SIGN MT. ZION NOISE WALL | 21373ND | 0.000 |
1.000 |
$105.000 |
EACH | 0.0 |
8143 | TEMPORARY SIGNS MT. ZION ROADWAY DETOUR | 02562 | 0.000 |
532.690 |
$4.927 |
SQFT | 0.0 |
Category Total $581,361.75 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0006 | CATEGORY Description | SIGNALIZATION-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1560 | POLE BASE MT. ZION TRAFFIC SIGNALS | 04740 | 7.000 |
7.000 |
$900.000 |
EACH | 0.0 |
1565 | FUSED CONNECTOR KIT MT. ZION TRAFFIC SIGNALS | 04780 | 49.000 |
49.000 |
$75.000 |
EACH | 0.0 |
1570 | CONDUIT-1 IN MT. ZION TRAFFIC SIGNALS | 04792 | 145.000 |
145.000 |
$8.000 |
LF | 0.0 |
1575 | CONDUIT-2 IN MT. ZION TRAFFIC SIGNALS | 04795 | 680.000 |
680.000 |
$8.500 |
LF | 0.0 |
1580 | ELECTRICAL JUNCTION BOX TYPE B MT. ZION TRAFFIC SIGNALS | 04811 | 17.000 |
17.000 |
$550.000 |
EACH | 0.0 |
1585 | TRENCHING AND BACKFILLING MT. ZION TRAFFIC SIGNALS | 04820 | 2,037.000 |
2,037.000 |
$3.000 |
LF | 0.0 |
1590 | LOOP WIRE MT. ZION TRAFFIC SIGNALS | 04830 | 15,862.000 |
15,862.000 |
$0.900 |
LF | 0.0 |
1595 | CABLE-NO. 14/5C MT. ZION TRAFFIC SIGNALS | 04844 | 17,854.000 |
17,854.000 |
$1.250 |
LF | 0.0 |
1600 | CABLE-NO. 14/7C MT. ZION TRAFFIC SIGNALS | 04845 | 141.000 |
141.000 |
$1.250 |
LF | 0.0 |
1605 | CABLE-NO. 14/1 PAIR MT. ZION TRAFFIC SIGNALS | 04850 | 14,849.000 |
14,849.000 |
$1.250 |
LF | 0.0 |
1610 | MESSENGER-10800 LB MT. ZION TRAFFIC SIGNALS | 04885 | 1,430.000 |
1,430.000 |
$5.000 |
LF | 0.0 |
1615 | MESSENGER-15400 LB MT. ZION TRAFFIC SIGNALS | 04886 | 562.000 |
562.000 |
$5.000 |
LF | 0.0 |
1620 | LOOP SAW SLOT AND FILL MT. ZION TRAFFIC SIGNALS | 04895 | 5,950.000 |
5,950.000 |
$9.000 |
LF | 0.0 |
1625 | INSTALL STEEL STRAIN POLE MT. ZION TRAFFIC SIGNALS | 04932 | 16.000 |
16.000 |
$2,000.000 |
EACH | 0.0 |
1630 | TEMP SIGNAL MULTI PHASE MT. ZION TRAFFIC SIGNALS | 04934 | 2.000 |
2.000 |
$122,250.000 |
EACH | 0.2 |
1635 | INSTALL SPAN MOUNTED SIGN MT. ZION TRAFFIC SIGNALS | 06472 | 3.000 |
3.000 |
$225.000 |
EACH | 0.0 |
1640 | INSTALL PEDESTRIAN HEAD-LED MT. ZION TRAFFIC SIGNALS | 20093NS835 | 24.000 |
24.000 |
$250.000 |
EACH | 0.0 |
1645 | TEMP RELOCATION OF SIGNAL HEAD MT. ZION TRAFFIC SIGNALS | 20094ES835 | 26.000 |
26.000 |
$75.000 |
EACH | 0.0 |
1650 | INSTALL LED SIGNAL-3 SECTION MT. ZION TRAFFIC SIGNALS | 20188NS835 | 80.000 |
80.000 |
$250.000 |
EACH | 0.0 |
1655 | INSTALL LED SIGNAL-5 SECTION MT. ZION TRAFFIC SIGNALS | 20189NS835 | 1.000 |
1.000 |
$250.000 |
EACH | 0.0 |
1660 | INSTALL LED SIGNAL- 4 SECTION MT. ZION TRAFFIC SIGNALS | 20266ES835 | 2.000 |
2.000 |
$250.000 |
EACH | 0.0 |
1665 | ELECTRICAL JUNCTION BOX TYPE A MT. ZION TRAFFIC SIGNALS | 20391NS835 | 5.000 |
5.000 |
$633.333 |
EACH | 0.0 |
1670 | ELECTRICAL JUNCTION BOX TYPE A MT. ZION TRAFFIC SIGNALS | 20391NS835 | 10.000 |
10.000 |
$633.333 |
EACH | 0.0 |
1675 | ELECTRICAL JUNCTION BOX TYPE C MT. ZION TRAFFIC SIGNALS | 20392NS835 | 9.000 |
9.000 |
$950.000 |
EACH | 0.0 |
1680 | INSTALL LED BEACON-12 IN MT. ZION TRAFFIC SIGNALS | 20408ES835 | 3.000 |
3.000 |
$225.000 |
EACH | 0.0 |
1685 | BORE AND JACK CONDUIT MT. ZION TRAFFIC SIGNALS | 21543EN | 421.000 |
421.000 |
$28.000 |
LF | 0.0 |
1690 | INSTALL PEDESTRIAN DETECTOR | 21743NN | 24.000 |
24.000 |
$75.000 |
EACH | 0.0 |
1695 | INSTALL MAST ARM POLE MT. ZION TRAFFIC SIGNALS | 22631NN | 8.000 |
8.000 |
$4,850.000 |
EACH | 0.0 |
1700 | INSTALL LUMINAIRE POLE MT. ZION TRAFFIC SIGNALS | 22939ND | 2.000 |
2.000 |
$750.000 |
EACH | 0.0 |
1705 | TRAFFIC SIGNAL POLE BASE MT. ZION TRAFFIC SIGNALS | 23157EN | 126.000 |
126.000 |
$550.000 |
CUYD | 0.1 |
1710 | INSTALL SIGNAL PEDESTAL MT. ZION TRAFFIC SIGNALS | 23222EC | 15.000 |
15.000 |
$750.000 |
EACH | 0.0 |
1715 | INSTALL MAST ARM MOUNTED SIGN MT. ZION TRAFFIC SIGNALS | 24488ED | 28.000 |
28.000 |
$250.000 |
EACH | 0.0 |
1720 | PVC CONDUIT-1 1/4 IN-SCHEDULE 80 MT. ZION TRAFFIC SIGNALS | 24900EC | 934.000 |
934.000 |
$3.000 |
LF | 0.0 |
1725 | PVC CONDUIT-2 IN-SCHEDULE 80 | 24901EC | 2,679.000 |
2,679.000 |
$4.000 |
LF | 0.0 |
1730 | INSTALL SIGNAL CONTROLLER-TY ATC MT. ZION TRAFFIC SIGNALS | 24908EC | 5.000 |
5.000 |
$5,000.000 |
EACH | 0.0 |
1735 | REMOVE SIGNAL EQUIPMENT MT. ZION TRAFFIC SIGNALS | 24955ED | 5.000 |
5.000 |
$1,500.000 |
EACH | 0.0 |
8152 | COST PLUS WORK MT. ZION TRAFFIC SIGNALS | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $663,272.79 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0007 | CATEGORY Description | WATERLINE-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1740 | W ENCASEMENT STEEL BORED RANGE 4 MT. ZION WM | 14009 | 307.000 |
307.000 |
$557.380 |
LF | 0.1 |
1745 | W ENCASEMENT STEEL BORED RANGE 5 MT. ZION WM | 14010 | 397.000 |
283.000 |
$639.570 |
LF | 0.2 |
1750 | W ENCASEMENT STEEL OPEN CUT RANGE 4 MT. ZION WM | 14015 | 250.000 |
250.000 |
$189.660 |
LF | 0.0 |
1755 | W ENCASEMENT STEEL OPEN CUT RANGE 5 MT. ZION WM | 14016 | 215.000 |
75.000 |
$221.260 |
LF | 0.0 |
1760 | W FIRE HYDRANT ASSEMBLY MT. ZION WM | 14019 | 6.000 |
6.000 |
$4,846.750 |
EACH | 0.0 |
1765 | W FIRE HYDRANT RELOCATE MT. ZION WM | 14020 | 12.000 |
13.000 |
$3,582.380 |
EACH | 0.0 |
1770 | W METER ADJUST MT. ZION WM | 14029 | 5.000 |
5.000 |
$790.230 |
EACH | 0.0 |
1775 | W METER RELOCATE MT. ZION WM | 14030 | 21.000 |
21.000 |
$1,159.000 |
EACH | 0.0 |
1780 | W METER VAULT MT. ZION WM | 14031 | 1.000 |
1.000 |
$90,613.080 |
EACH | 0.1 |
1785 | W PIPE DUCTILE IRON 08 INCH MT. ZION WM | 14037 | 1,158.000 |
1,158.000 |
$87.450 |
LF | 0.1 |
1790 | W PIPE DUCTILE IRON 12 INCH MT. ZION WM | 14039 | 3,103.000 |
2,823.000 |
$144.350 |
LF | 0.4 |
1795 | W PIPE DUCTILE IRON 16 INCH MT. ZION WM | 14040 | 1,459.000 |
1,459.000 |
$103.260 |
LF | 0.1 |
1800 | W PIPE DCTL IRON RSTRND JOINT 12 IN MT. ZION WM | 14050 | 2,600.000 |
2,880.000 |
$163.310 |
LF | 0.4 |
1805 | W REMOVE TRANSITE (AC) PIPE MT. ZION WM | 14076 | 410.000 |
410.000 |
$57.950 |
LF | 0.0 |
1810 | W STRUCTURE REMOVAL MT. ZION WM | 14088 | 1.000 |
1.000 |
$3,160.920 |
EACH | 0.0 |
1815 | W TIE-IN 02 INCH MT. ZION WM | 14091 | 1.000 |
1.000 |
$2,107.280 |
EACH | 0.0 |
1820 | W TIE-IN 06 INCH MT. ZION WM | 14094 | 4.000 |
4.000 |
$3,598.585 |
EACH | 0.0 |
1825 | W TIE-IN 06 INCH MT. ZION WM | 14094 | 6.000 |
6.000 |
$3,598.585 |
EACH | 0.0 |
1830 | W TIE-IN 06 INCH MT. ZION WM | 14094 | 3.000 |
3.000 |
$3,598.585 |
EACH | 0.0 |
1835 | W VALVE 06 INCH MT. ZION WM | 14105 | 1.000 |
1.000 |
$1,264.370 |
EACH | 0.0 |
1840 | W VALVE 08 INCH MT. ZION WM | 14106 | 13.000 |
13.000 |
$1,791.190 |
EACH | 0.0 |
1845 | W VALVE 12 INCH MT. ZION WM | 14108 | 24.000 |
24.000 |
$3,371.650 |
EACH | 0.1 |
1850 | W VALVE BOX ADJUST MT. ZION WM | 14113 | 6.000 |
6.000 |
$474.140 |
EACH | 0.0 |
1855 | W VALVE CUT-IN 02 INCH MT. ZION WM | 14114 | 1.000 |
1.000 |
$2,950.200 |
EACH | 0.0 |
1860 | W VALVE CUT-IN 06 INCH MT. ZION WM | 14117 | 1.000 |
1.000 |
$4,003.840 |
EACH | 0.0 |
1865 | W VALVE CUT-IN 08 INCH MT. ZION WM | 14118 | 4.000 |
4.000 |
$4,741.380 |
EACH | 0.0 |
1870 | W SERV COPPER LONG SIDE 1 IN MT. ZION WM | 14145 | 4.000 |
4.000 |
$4,425.290 |
EACH | 0.0 |
1875 | W SERV COPPER LONG SIDE 2 IN MT. ZION WM | 14147 | 1.000 |
1.000 |
$4,741.380 |
EACH | 0.0 |
1880 | W SERV COPPER LONG SIDE 3/4 IN MT. ZION WM | 14148 | 1.000 |
1.000 |
$2,844.840 |
EACH | 0.0 |
1885 | W SERV COPPER SHORT SIDE 1 IN MT. ZION WM | 14149 | 15.000 |
15.000 |
$1,264.370 |
EACH | 0.0 |
1890 | W SERV COPPER SHORT SIDE 1-1/2 IN MT. ZION WM | 14150 | 1.000 |
1.000 |
$2,634.100 |
EACH | 0.0 |
1895 | W SERV COPPER SHORT SIDE 2 IN MT. ZION WM | 14151 | 2.000 |
1.000 |
$3,371.650 |
EACH | 0.0 |
1900 | W SERV COPPER SHORT SIDE 3/4 IN MT. ZION WM | 14152 | 4.000 |
4.000 |
$1,159.000 |
EACH | 0.0 |
8002 | OPEN CUT ROADWAY MT. ZION WM I-75 RAMPS | 04821 | 0.000 |
254.000 |
$478.330 |
LF | 0.0 |
8028 | CRUSHED AGGREGATE SIZE NO 8 MT. ZION WM | 00083 | 0.000 |
84.000 |
$14.253 |
TON | 0.0 |
8049 | W SERV COPPER LONG SIDE 3/4 IN MT. ZION WM WALL P | 14148 | 0.000 |
1.000 |
$7,350.000 |
EACH | 0.0 |
Category Total $2,103,740.10 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0008 | CATEGORY Description | LIGHTING-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1905 | POLE 30 FT MTG HT MT. ZION LIGHTING | 04700 | 46.000 |
46.000 |
$1,075.000 |
EACH | 0.0 |
1910 | POLE 40 FT MTG HT MT. ZION LIGHTING | 04701 | 4.000 |
4.000 |
$1,243.000 |
EACH | 0.0 |
1915 | POLE 80 FT MTG HT HIGH MAST MT. ZION LIGHTING | 04710 | 5.000 |
5.000 |
$22,000.000 |
EACH | 0.1 |
1920 | BRACKET 8 FT MT. ZION LIGHTING | 04722 | 4.000 |
4.000 |
$314.000 |
EACH | 0.0 |
1925 | BRACKET 10 FT MT. ZION LIGHTING | 04723 | 25.000 |
25.000 |
$430.000 |
EACH | 0.0 |
1930 | BRACKET 12 FT MT. ZION LIGHTING | 04724 | 17.000 |
17.000 |
$466.000 |
EACH | 0.0 |
1935 | BRACKET 15 FT MT. ZION LIGHTING | 04725 | 4.000 |
4.000 |
$515.000 |
EACH | 0.0 |
1940 | POLE BASE MT. ZION LIGHTING | 04740 | 50.000 |
50.000 |
$931.000 |
EACH | 0.0 |
1945 | TRANSFORMER BASE MT. ZION LIGHTING | 04750 | 50.000 |
50.000 |
$757.000 |
EACH | 0.0 |
1950 | LIGHTING CONTROL EQUIPMENT MT. ZION LIGHTING | 04761 | 2.000 |
2.000 |
$18,852.000 |
EACH | 0.0 |
1955 | FUSED CONNECTOR KIT MT. ZION LIGHTING | 04780 | 100.000 |
100.000 |
$119.000 |
EACH | 0.0 |
1960 | CONDUIT-3/4 IN MT. ZION LIGHTING | 04791 | 30.000 |
30.000 |
$7.650 |
LF | 0.0 |
1965 | CONDUIT-1 1/4 IN MT. ZION LIGHTING | 04793 | 565.000 |
565.000 |
$15.200 |
LF | 0.0 |
1970 | CONDUIT-2 IN MT. ZION LIGHTING | 04795 | 1,881.000 |
1,881.000 |
$14.800 |
LF | 0.0 |
1975 | MARKER MT. ZION LIGHTING | 04800 | 10.000 |
10.000 |
$315.000 |
EACH | 0.0 |
1980 | TRENCHING AND BACKFILLING MT. ZION LIGHTING | 04820 | 10,711.000 |
10,711.000 |
$4.000 |
LF | 0.0 |
1985 | WIRE-NO. 12 MT. ZION LIGHTING | 04832 | 10,000.000 |
10,000.000 |
$0.550 |
LF | 0.0 |
1990 | REMOVE LIGHTING MT. ZION LIGHTING | 04940 | 1.000 |
1.000 |
$27,200.000 |
LS | 0.0 |
1995 | ELECTRICAL JUNCTION BOX TYPE A MT. ZION LIGHTING | 20391NS835 | 10.000 |
10.000 |
$950.000 |
EACH | 0.0 |
2000 | MAINTAIN LIGHTING MT. ZION LIGHTING | 20410ED | 1.000 |
1.000 |
$65,000.000 |
LS | 0.1 |
2005 | BORE AND JACK CONDUIT MT. ZION LIGHTING | 21543EN | 1,760.000 |
1,760.000 |
$18.000 |
LF | 0.0 |
2010 | SPLICE BOX MT. ZION LIGHTING | 21563NN | 17.000 |
17.000 |
$355.000 |
EACH | 0.0 |
2015 | FLEX CONDUIT-1 1/4 IN MT. ZION LIGHTING | 21579EN | 14.000 |
14.000 |
$10.000 |
LF | 0.0 |
2020 | POLE BASE-HIGH MAST | 23161EN | 45.900 |
45.900 |
$300.000 |
CUYD | 0.0 |
2025 | LED LUMINAIRE MT. ZION LIGHTING | 24589ED | 65.000 |
65.000 |
$574.000 |
EACH | 0.0 |
2030 | HIGH MAST LED LUMINAIRE MT. ZION LIGHTING | 24749EC | 22.000 |
22.000 |
$1,138.000 |
EACH | 0.0 |
2035 | CABLE-NO. 10/3C DUCTED MT. ZION LIGHTING | 24851EC | 15,700.000 |
15,700.000 |
$3.000 |
LF | 0.0 |
Category Total $671,335.30 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0009 | CATEGORY Description | MISCELLANEOUS - NOISE BARRIER WALL-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2040 | DGA BASE MT. ZION NOISE WALL | 00001 | 289.000 |
289.000 |
$36.880 |
TON | 0.0 |
2045 | ISLAND HEADER CURB TYPE 1 MT. ZION NOISE WALL | 01890 | 25.000 |
25.000 |
$20.000 |
LF | 0.0 |
2050 | GUARDRAIL-STEEL W BEAM-S FACE MT. ZION NOISE WALL | 02351 | 25.000 |
25.000 |
$17.000 |
LF | 0.0 |
2055 | GUARDRAIL CONNECTOR TO BRIDGE END TY A MT. ZION NOISE WALL | 02363 | 1.000 |
1.000 |
$2,400.000 |
EACH | 0.0 |
2060 | REMOVE GUARDRAIL MT. ZION NOISE WALL | 02381 | 775.000 |
775.000 |
$2.000 |
LF | 0.0 |
2065 | FOUNDATION PREPARATION MT. ZION NOISE WALL | 08003 | 1.000 |
1.000 |
$568,446.410 |
LS | 0.5 |
2070 | CONCRETE MEDIAN BARRIER TYPE 12C2-50 IN MT. ZION NOISE WALL | 21288ND | 942.000 |
942.000 |
$114.430 |
LF | 0.1 |
2075 | SOUND BARRIER WALL MT. ZION NOISE WALL | 21590EN | 47,350.000 |
47,350.000 |
$32.660 |
SQFT | 1.3 |
2080 | BACKFILL MT. ZION NOISE WALL | 24545EC | 679.000 |
679.000 |
$52.680 |
TON | 0.0 |
8048 | GUARDRAIL CONNECTOR TO BRIDGE END TY A MT. ZION NOISE WALL | 02363 | 0.000 |
1.000 |
$2,520.000 |
EACH | 0.0 |
8055 | SOUND BARRIER WALL MT. ZION NOISE WALL | 21590EN | 0.000 |
120.000 |
$28.445 |
SQFT | 0.0 |
8058 | FOUNDATION PREPARATION MT. ZION NOISE WALL | 08003 | 0.000 |
1.000 |
$13,859.250 |
LS | 0.0 |
Category Total $2,273,993.51 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0010 | CATEGORY Description | DEMOBILIZATION &/OR MOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2085 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$1,340,640.000 |
LS | 1.1 |
2090 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$435,708.000 |
LS | 0.4 |
8146 | D/B CONTRACT PAYMENT MT. ZION ACCOUNTING RECONCILIATION | 25083EN | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $1,776,348.00 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0585 | DGA BASE MT. ZION PAVEMENT | 00001 | 39,376.000 |
36,711.220 |
$28.160 |
TON | 0.9 |
0590 | DRAINAGE BLANKET-TYPE II-ASPH MT. ZION PAVEMENT | 00018 | 8,905.000 |
8,905.000 |
$66.770 |
TON | 0.5 |
0595 | TRAFFIC BOUND BASE MT. ZION PAVEMENT | 00020 | 690.000 |
690.000 |
$49.210 |
TON | 0.0 |
0600 | CRUSHED AGGREGATE SIZE NO 2 MT. ZION PAVEMENT | 00078 | 32,943.000 |
32,943.000 |
$30.230 |
TON | 0.8 |
0605 | ASPHALT SEAL AGGREGATE MT. ZION PAVEMENT | 00100 | 64.000 |
64.000 |
$211.160 |
TON | 0.0 |
0610 | ASPHALT SEAL COAT MT. ZION PAVEMENT | 00103 | 8.000 |
8.000 |
$800.690 |
TON | 0.0 |
0615 | LEVELING & WEDGING PG64-22 MT. ZION PAVEMENT | 00190 | 3,332.000 |
3,332.000 |
$90.240 |
TON | 0.2 |
0620 | ASPHALT SCRATCH COURSE PG64-22 MT. ZION PAVEMENT | 00191 | 1,576.000 |
1,576.000 |
$94.480 |
TON | 0.1 |
0625 | CL2 ASPH BASE 1.00D PG64-22 MT. ZION PAVEMENT | 00212 | 5,545.000 |
4,588.660 |
$75.720 |
TON | 0.3 |
0630 | CL3 ASPH BASE 1.00D PG64-22 MT. ZION PAVEMENT | 00214 | 14,995.000 |
14,995.000 |
$68.960 |
TON | 0.9 |
0635 | CL4 ASPH BASE 1.00D PG64-22 MT. ZION PAVEMENT | 00217 | 4,830.000 |
4,830.000 |
$71.840 |
TON | 0.3 |
0640 | CL2 ASPH BASE 0.75D PG64-22 MT. ZION PAVEMENT | 00221 | 888.000 |
888.000 |
$82.290 |
TON | 0.1 |
0645 | CL3 ASPH BIND 0.50D PG64-22 MT. ZION PAVEMENT | 00274 | 526.000 |
526.000 |
$94.710 |
TON | 0.0 |
0650 | CL4 ASPH BIND 0.50D PG76-22 MT. ZION PAVEMENT | 00279 | 1,337.000 |
1,337.000 |
$97.880 |
TON | 0.1 |
0655 | CL2 ASPH SURF 0.38D PG64-22 MT. ZION PAVEMENT | 00301 | 2,873.000 |
2,472.890 |
$90.610 |
TON | 0.2 |
0660 | ASPHALT PLACEMENT WITH MTV MT. ZION PAVEMENT | 00338 | 8,845.000 |
8,845.000 |
$3.720 |
TON | 0.0 |
0665 | CL3 ASPH SURF 0.38D PG64-22 MT. ZION PAVEMENT | 00339 | 316.000 |
316.000 |
$105.000 |
TON | 0.0 |
0670 | CL4 ASPH SURF 0.38A PG76-22 MT. ZION PAVEMENT | 00342 | 1,204.000 |
1,204.000 |
$95.250 |
TON | 0.1 |
0675 | ASPHALT MATERIAL FOR TACK MT. ZION PAVEMENT | 00356 | 119.000 |
119.000 |
$1,125.370 |
TON | 0.1 |
0680 | PCC BASE-10 IN MT. ZION PAVEMENT | 02065 | 238.700 |
238.700 |
$92.050 |
SQYD | 0.0 |
0685 | CEM CONC ENT PAVEMENT-8 IN MT. ZION PAVEMENT | 02101 | 1,264.000 |
1,289.000 |
$87.070 |
SQYD | 0.1 |
0690 | MOBILIZATION FOR MILL & TEXT MT. ZION PAVEMENT | 02676 | 1.000 |
1.000 |
$2,776.680 |
LS | 0.0 |
0695 | ASPHALT PAVE MILLING & TEXTURING MT. ZION PAVEMENT | 02677 | 3,332.000 |
3,332.000 |
$20.660 |
TON | 0.1 |
0700 | CL3 ASPH SURF 0.38A PG64-22 MT. ZION PAVEMENT | 22906ES403 | 4,728.000 |
4,778.000 |
$86.890 |
TON | 0.3 |
0705 | INTELLIGENT COMPACTION FOR ASPHALT MT. ZION PAVEMENT | 24781EC | 1.000 |
1.000 |
$33,660.240 |
TON | 0.0 |
0710 | PAVE MOUNT INFRARED TEMP EQUIPMENT MT. ZION PAVEMENT | 24891EC | 1.000 |
1.000 |
$13,334.390 |
SF | 0.0 |
0715 | FULL-DEPTH ASPH PAVEMENT TEMPORARY PAVEMENT | 23764EC | 5,440.000 |
5,440.000 |
$30.560 |
SQYD | 0.1 |
0720 | HMA ELECTRONIC DELIVERY MGMT SYSTEM MT. ZION PAVEMENT | 24986EC | 1.000 |
1.000 |
$40,003.150 |
LS | 0.0 |
8023 | DGA BASE MT. ZION PAVEMENT TEMPORARY | 00001 | 0.000 |
2,714.000 |
$28.160 |
TON | 0.0 |
8024 | CL2 ASPH BASE 1.00D PG64-22 MT. ZION PAVEMENT TEMPORARY | 00212 | 0.000 |
974.000 |
$75.720 |
TON | 0.0 |
8025 | CL2 ASPH SURF 0.38D PG64-22 MT. ZION PAVEMENT TEMPORARY | 00301 | 0.000 |
406.000 |
$90.610 |
TON | 0.0 |
8079 | NON-SPEC MATERIAL NON-SPEC MATERIAL DGA BASE MT. ZION PAVEMENT | 10070NS | 0.000 |
-9,807.200 |
$1.000 |
DOLL | 0.0 |
8180 | LOT PAY ADJUSTMENT MT. ZION PAVEMENT | 10000NS | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $6,700,113.73 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0725 | ENTRANCE PIPE-15 IN MT. ZION ROADWAY | 00440 | 38.000 |
54.000 |
$97.990 |
LF | 0.0 |
0730 | PERFORATED PIPE-4 IN MT. ZION ROADWAY | 01000 | 13,282.000 |
13,294.000 |
$6.320 |
LF | 0.1 |
0735 | PERFORATED PIPE-6 IN MT. ZION ROADWAY | 01001 | 26.000 |
26.000 |
$99.040 |
LF | 0.0 |
0740 | PERFORATED PIPE-8 IN MT. ZION ROADWAY | 01002 | 25.000 |
25.000 |
$105.360 |
LF | 0.0 |
0745 | NON-PERFORATED PIPE-4 IN MT. ZION ROADWAY | 01010 | 2,005.000 |
2,005.000 |
$18.970 |
LF | 0.0 |
0750 | INSPECT & CERTIFY EDGE DRAIN SYSTEM MT. ZION ROADWAY | 01015 | 1.000 |
1.000 |
$6,321.850 |
LS | 0.0 |
0755 | PERF PIPE HEADWALL TY 2-4 IN MT. ZION ROADWAY | 01024 | 1.000 |
1.000 |
$632.180 |
EACH | 0.0 |
0760 | PERF PIPE HEADWALL TY 3-4 IN MT. ZION ROADWAY | 01028 | 7.000 |
7.000 |
$632.180 |
EACH | 0.0 |
0765 | REMOVE PIPE MT. ZION ROADWAY | 01310 | 694.000 |
694.000 |
$72.700 |
LF | 0.0 |
0770 | CORED HOLE DRAINAGE BOX CON-4 IN MT. ZION ROADWAY | 01740 | 8.000 |
9.000 |
$316.090 |
EACH | 0.0 |
0775 | ADJUST MANHOLE FRAME TO GRADE MT. ZION ROADWAY | 01791 | 8.000 |
8.000 |
$612.170 |
EACH | 0.0 |
0780 | ADJUST MANHOLE FRAME TO GRADE MT. ZION ROADWAY | 01791 | 8.000 |
8.000 |
$612.170 |
EACH | 0.0 |
0785 | STANDARD CURB AND GUTTER MT. ZION ROADWAY | 01810 | 22,441.000 |
21,668.000 |
$23.490 |
LF | 0.4 |
0790 | BARRIER CURB AND GUTTER MT. ZION ROADWAY | 01815 | 7,089.000 |
7,089.000 |
$29.010 |
LF | 0.2 |
0795 | LIP INTEGRAL CURB MT. ZION ROADWAY | 01840 | 95.000 |
95.000 |
$52.230 |
LF | 0.0 |
0800 | STANDARD HEADER CURB MT. ZION ROADWAY | 01875 | 3,056.000 |
2,940.000 |
$28.150 |
LF | 0.1 |
0805 | STANDARD BARRIER MEDIAN TYPE 2 MT. ZION ROADWAY | 01917 | 20.400 |
20.400 |
$155.360 |
SQYD | 0.0 |
0810 | STANDARD BARRIER MEDIAN TYPE 4 MT. ZION ROADWAY | 01921 | 441.700 |
441.700 |
$96.540 |
SQYD | 0.0 |
0815 | DELINEATOR FOR GUARDRAIL MONO DIRECTIONAL WHITE MT. ZION ROADWAY | 01982 | 14.000 |
14.000 |
$7.000 |
EACH | 0.0 |
0820 | CURB TO BARRIER WALL TRANS MT. ZION ROADWAY | 02001 | 8.000 |
8.000 |
$7,364.980 |
EACH | 0.0 |
0825 | BARRICADE-TYPE III MT. ZION ROADWAY | 02014 | 20.000 |
20.000 |
$100.000 |
EACH | 0.0 |
0830 | REMOVE PAVEMENT MT. ZION ROADWAY | 02091 | 34,950.000 |
34,950.000 |
$8.850 |
SQYD | 0.3 |
0835 | TEMP DITCH MT. ZION ROADWAY | 02159 | 6,500.000 |
6,500.000 |
$0.120 |
LF | 0.0 |
0840 | ROADWAY EXCAVATION MT. ZION ROADWAY | 02200 | 191,328.000 |
191,328.000 |
$10.150 |
CUYD | 1.6 |
0845 | STRUCTURE GRANULAR BACKFILL MT. ZION ROADWAY | 02231 | 1,600.000 |
1,600.000 |
$68.490 |
CUYD | 0.1 |
0850 | WATER MT. ZION ROADWAY | 02242 | 1,000.000 |
1,000.000 |
$1.580 |
MGAL | 0.0 |
0855 | GUARDRAIL-STEEL W BEAM-S FACE MT. ZION ROADWAY | 02351 | 525.000 |
560.000 |
$17.000 |
LF | 0.0 |
0860 | GUARDRAIL END TREATMENT TYPE 1 MT. ZION ROADWAY | 02367 | 3.000 |
1.000 |
$2,500.000 |
EACH | 0.0 |
0865 | GUARDRAIL END TREATMENT TYPE 2A MT. ZION ROADWAY | 02369 | 3.000 |
0.000 |
$1,000.000 |
EACH | 0.0 |
0870 | REMOVE GUARDRAIL MT. ZION ROADWAY | 02381 | 2,325.000 |
2,325.000 |
$2.000 |
LF | 0.0 |
0875 | RIGHT-OF-WAY MONUMENT TYPE 1 MT. ZION ROADWAY | 02429 | 145.000 |
145.000 |
$100.000 |
EACH | 0.0 |
0880 | RIGHT-OF-WAY MONUMENT TYPE 1A MT. ZION ROADWAY | 02430 | 3.000 |
3.000 |
$100.000 |
EACH | 0.0 |
0885 | WITNESS POST MT. ZION ROADWAY | 02432 | 10.000 |
10.000 |
$90.000 |
EACH | 0.0 |
0890 | CHANNEL LINING CLASS II MT. ZION ROADWAY | 02483 | 220.000 |
220.000 |
$59.000 |
TON | 0.0 |
0895 | CLEARING AND GRUBBING MT. ZION ROADWAY | 02545 | 1.000 |
1.000 |
$554,939.810 |
LS | 0.5 |
0900 | CONCRETE-CLASS B MT. ZION ROADWAY | 02555 | 1,127.000 |
0.000 |
$700.670 |
CUYD | 0.7 |
0905 | TEMPORARY SIGNS MT. ZION ROADWAY | 02562 | 1,000.000 |
1,000.000 |
$7.500 |
SQFT | 0.0 |
0910 | EDGE KEY MT. ZION ROADWAY | 02585 | 702.000 |
702.000 |
$28.020 |
LF | 0.0 |
0915 | FABRIC-GEOTEXTILE TYPE IV MT. ZION ROADWAY | 02599 | 62,000.000 |
62,000.000 |
$2.630 |
SQYD | 0.1 |
0920 | FABRIC GEOTEXTILE TY IV FOR PIPE MT. ZION ROADWAY | 02600 | 34,454.000 |
34,938.600 |
$4.210 |
SQYD | 0.1 |
0925 | HANDRAIL-TYPE A-2 MT. ZION ROADWAY | 02612 | 1,624.000 |
1,950.000 |
$126.340 |
LF | 0.2 |
0930 | HANDRAIL-TYPE A-3 MT. ZION ROADWAY | 02613 | 20.000 |
20.000 |
$131.710 |
LF | 0.0 |
0935 | REMOVE HEADWALL MT. ZION ROADWAY | 02625 | 25.000 |
25.000 |
$674.330 |
EACH | 0.0 |
0940 | MAINTAIN & CONTROL TRAFFIC MT. ZION ROADWAY | 02650 | 1.000 |
1.000 |
$1,925,161.730 |
LS | 1.6 |
0945 | PORTABLE CHANGEABLE MESSAGE SIGN MT. ZION ROADWAY | 02671 | 10.000 |
10.000 |
$2,208.670 |
EACH | 0.0 |
0950 | SAFELOADING MT. ZION ROADWAY | 02690 | 181.000 |
191.000 |
$263.410 |
CUYD | 0.0 |
0955 | SHOULDER RUMBLE STRIPS MT. ZION ROADWAY | 02696 | 6,868.000 |
6,868.000 |
$0.800 |
LF | 0.0 |
0960 | TEMP SILT FENCE MT. ZION ROADWAY | 02701 | 6,500.000 |
6,500.000 |
$2.580 |
LF | 0.0 |
0965 | SILT TRAP TYPE A MT. ZION ROADWAY | 02703 | 58.000 |
58.000 |
$258.140 |
EACH | 0.0 |
0970 | SILT TRAP TYPE B MT. ZION ROADWAY | 02704 | 58.000 |
58.000 |
$258.140 |
EACH | 0.0 |
0975 | SILT TRAP TYPE C MT. ZION ROADWAY | 02705 | 58.000 |
58.000 |
$315.040 |
EACH | 0.0 |
0980 | CLEAN SILT TRAP TYPE A MT. ZION ROADWAY | 02706 | 58.000 |
58.000 |
$72.700 |
EACH | 0.0 |
0985 | CLEAN SILT TRAP TYPE B MT. ZION ROADWAY | 02707 | 58.000 |
58.000 |
$72.700 |
EACH | 0.0 |
0990 | CLEAN SILT TRAP TYPE C MT. ZION ROADWAY | 02708 | 58.000 |
58.000 |
$72.700 |
EACH | 0.0 |
0995 | SIDEWALK-4 IN CONCRETE MT. ZION ROADWAY | 02720 | 2,817.000 |
2,812.000 |
$56.580 |
SQYD | 0.1 |
1000 | ARROW PANEL MT. ZION ROADWAY | 02775 | 6.000 |
6.000 |
$1,163.010 |
EACH | 0.0 |
1005 | MASONRY COATING MT. ZION ROADWAY | 02998 | 1,120.000 |
1,120.000 |
$10.010 |
SQYD | 0.0 |
1010 | CONCRETE BARRIER WALL TYPE 9T MT. ZION ROADWAY | 03171 | 300.000 |
1,412.000 |
$49.520 |
LF | 0.0 |
1015 | EROSION CONTROL BLANKET MT. ZION ROADWAY | 05950 | 23,325.000 |
23,325.000 |
$1.500 |
SQYD | 0.0 |
1020 | TEMP MULCH MT. ZION ROADWAY | 05952 | 187,150.000 |
187,150.000 |
$0.140 |
SQYD | 0.0 |
1025 | TEMP SEEDING AND PROTECTION MT. ZION ROADWAY | 05953 | 140,300.000 |
140,300.000 |
$0.160 |
SQYD | 0.0 |
1030 | INITIAL FERTILIZER MT. ZION ROADWAY | 05963 | 8.700 |
8.700 |
$800.000 |
TON | 0.0 |
1035 | MAINTENANCE FERTILIZER MT. ZION ROADWAY | 05964 | 8.700 |
8.700 |
$800.000 |
TON | 0.0 |
1040 | SEEDING AND PROTECTION MT. ZION ROADWAY | 05985 | 168,000.000 |
168,000.000 |
$0.350 |
SQYD | 0.0 |
1045 | SODDING MT. ZION ROADWAY | 05990 | 18,622.000 |
18,622.000 |
$5.350 |
SQYD | 0.1 |
1050 | AGRICULTURAL LIMESTONE MT. ZION ROADWAY | 05992 | 103.000 |
103.000 |
$65.000 |
TON | 0.0 |
1055 | FLEXIBLE DELINEATOR POST-M/W MT. ZION ROADWAY | 06401 | 93.000 |
93.000 |
$29.000 |
EACH | 0.0 |
1060 | FLEXIBLE DELINEATOR POST-M/Y MT. ZION ROADWAY | 06404 | 95.000 |
95.000 |
$29.000 |
EACH | 0.0 |
1065 | PAVE STRIPING-TEMP PAINT-4 IN MT. ZION ROADWAY | 06510 | 203,385.000 |
203,385.000 |
$0.200 |
LF | 0.0 |
1070 | PAVE STRIPING-PERM PAINT-4 IN MT. ZION ROADWAY | 06514 | 6,382.000 |
6,382.000 |
$0.200 |
LF | 0.0 |
1075 | PAVE STRIPING-PERM PAINT-12 IN MT. ZION ROADWAY | 06517 | 228.000 |
228.000 |
$0.520 |
LF | 0.0 |
1080 | PAVE STRIPING-THERMO-6 IN W MT. ZION ROADWAY | 06542 | 62,580.000 |
62,580.000 |
$0.750 |
LF | 0.0 |
1085 | PAVE STRIPING-THERMO-12 IN W MT. ZION ROADWAY | 06546 | 1,926.000 |
1,926.000 |
$1.250 |
LF | 0.0 |
1090 | PAVE MARKING-THERMO X-WALK-12 IN MT. ZION ROADWAY | 06566 | 1,336.000 |
1,336.000 |
$5.000 |
LF | 0.0 |
1095 | PAVE MARKING-THERMO STOP BAR-24IN MT. ZION ROADWAY | 06568 | 1,151.000 |
1,151.000 |
$10.000 |
LF | 0.0 |
1100 | PAVE MARKING-PAINT CROSS-HATCH MT. ZION ROADWAY | 06570 | 296.000 |
296.000 |
$3.500 |
SQFT | 0.0 |
1105 | PAVE MARKING-THERMO STR ARROW MT. ZION ROADWAY | 06573 | 30.000 |
30.000 |
$75.000 |
EACH | 0.0 |
1110 | PAVE MARKING-THERMO CURV ARROW MT. ZION ROADWAY | 06574 | 173.000 |
173.000 |
$75.000 |
EACH | 0.0 |
1115 | PAVE MARKING-THERMO COMB ARROW MT. ZION ROADWAY | 06575 | 13.000 |
13.000 |
$110.000 |
EACH | 0.0 |
1120 | PAVE MARKING-THERMO MERGE ARROW MT. ZION ROADWAY | 06578 | 4.000 |
3.000 |
$275.000 |
EACH | 0.0 |
1125 | STRUCTURE EXCAVATION-COMMON MT. ZION ROADWAY | 08001 | 1,983.000 |
1,983.000 |
$33.720 |
CUYD | 0.1 |
1130 | RETAINING WALL MT. ZION ROADWAY | 08018 | 358.000 |
358.000 |
$189.660 |
SQFT | 0.1 |
1135 | PRE-DRILLING FOR PILES MT. ZION ROADWAY | 08039 | 195.000 |
195.000 |
$205.460 |
LF | 0.0 |
1140 | CONCRETE-CLASS A MT. ZION ROADWAY | 08100 | 1,951.000 |
1,951.000 |
$666.950 |
CUYD | 1.1 |
1145 | STEEL REINFORCEMENT-EPOXY COATED MT. ZION ROADWAY | 08151 | 815.000 |
815.000 |
$7.380 |
LB | 0.0 |
1150 | CRASH CUSHION TY VI CLASS B TL2 MT. ZION ROADWAY | 08900 | 3.000 |
3.000 |
$4,200.000 |
EACH | 0.0 |
1155 | JOINT ADHESIVE MT. ZION ROADWAY | 20071EC | 57,600.000 |
57,600.000 |
$0.620 |
LF | 0.0 |
1160 | SAWCUT PAVEMENT MT. ZION ROADWAY | 20550ND | 23,218.000 |
23,218.000 |
$2.650 |
LF | 0.1 |
1165 | FORM LINER MT. ZION ROADWAY | 21342ED | 10,302.000 |
10,302.000 |
$15.800 |
SQFT | 0.1 |
1170 | PAVE MARKING-THERMO YIELD BAR-36 IN MT. ZION ROADWAY | 22520EN | 40.000 |
40.000 |
$30.000 |
LF | 0.0 |
1175 | WATER BLASTING EXISTING STRIPE MT. ZION ROADWAY | 22664EN | 108,000.000 |
108,000.000 |
$0.460 |
LF | 0.0 |
1180 | HIGH STRENGTH GEOTEXTILE FABRIC TY V MT. ZION ROADWAY | 22861EN | 62,000.000 |
62,000.000 |
$3.160 |
SQYD | 0.2 |
1185 | DETECTABLE WARNINGS MT. ZION ROADWAY | 23158ES505 | 1,528.000 |
1,528.000 |
$45.000 |
SQFT | 0.1 |
1190 | REMOVE GRAVEL ENTRANCE MT. ZION ROADWAY | 23250ED | 16.000 |
16.000 |
$1,219.060 |
SQYD | 0.0 |
1195 | TURF REINFORCEMENT MAT 1 MT. ZION ROADWAY | 23274EN11F | 310.000 |
310.000 |
$5.000 |
SQYD | 0.0 |
1200 | PERM PAINT-BARRIER CURB MT. ZION ROADWAY | 24110EC | 6,038.000 |
6,038.000 |
$1.000 |
LF | 0.0 |
1205 | PERM PAINT-BARRIER CURB MT. ZION ROADWAY | 24110EC | 2,467.000 |
2,467.000 |
$1.000 |
LF | 0.0 |
1210 | PERM PAINT-BARRIER CURB MT. ZION ROADWAY | 24110EC | 3,571.000 |
3,571.000 |
$1.000 |
LF | 0.0 |
1215 | INLAID PAVEMENT MARKER MT. ZION ROADWAY | 24489EC | 650.000 |
650.000 |
$25.000 |
EACH | 0.0 |
1220 | INLAID PAVEMENT MARKER MT. ZION ROADWAY | 24489EC | 509.000 |
509.000 |
$25.000 |
EACH | 0.0 |
1225 | INLAID PAVEMENT MARKER MT. ZION ROADWAY | 24489EC | 1,217.000 |
1,217.000 |
$25.000 |
EACH | 0.0 |
1230 | OBJECT MARKER TYPE 1 | 24640ED | 3.000 |
3.000 |
$100.000 |
EACH | 0.0 |
1235 | BARCODE SIGN INVENTORY MT. ZION ROADWAY | 24631EC | 269.000 |
269.000 |
$5.000 |
EACH | 0.0 |
1240 | INTELLIGENT COMPACTION FOR AGGREGATE MT. ZION ROADWAY | 24780EC | 60,890.000 |
60,890.000 |
$0.220 |
TON | 0.0 |
1245 | PIPELINE INSPECTION MT. ZION ROADWAY | 24814EC | 9,919.000 |
9,919.000 |
$3.250 |
LF | 0.0 |
8003 | RETAINING WALL SYSTEM BLOCK AND CAP MT. ZION ROADWAY | 20752ED | 0.000 |
15,243.000 |
$51.804 |
SQFT | 0.0 |
8014 | ASPHALT ADJUSTMENT MT. ZION ROADWAY | 10030NS | 0.000 |
164,203.238 |
$1.000 |
DOLL | 0.0 |
8015 | FUEL ADJUSTMENT MT. ZION ROADWAY | 10020NS | 0.000 |
140,907.008 |
$1.000 |
DOLL | 0.0 |
8032 | CRASH CUSHION TY VI CLASS BT TL3 MT. ZION ROADWAY I-75 SB LANE SHIFT | 08903 | 0.000 |
1.000 |
$4,200.000 |
EACH | 0.0 |
8033 | MAINTAIN & CONTROL TRAFFIC MT. ZION ROADWAY I-75 SB LANE SHIFT | 02650 | 0.000 |
1.000 |
$82,201.470 |
LS | 0.0 |
8040 | GUARDRAIL-STEEL W BEAM-S FACE MT. ZION NOISE WALL | 02351 | 0.000 |
212.500 |
$17.850 |
LF | 0.0 |
8041 | GUARDRAIL END TREATMENT TYPE 2A MT. ZION NOISE WALL | 02369 | 0.000 |
1.000 |
$1,050.000 |
EACH | 0.0 |
8042 | BARCODE SIGN INVENTORY MT. ZION NOISE WALL | 24631EC | 0.000 |
1.000 |
$5.250 |
EACH | 0.0 |
8060 | CONCRETE-CLASS A HANDRAIL MT. ZION ROADWAY | 08100 | 0.000 |
12.000 |
$1,168.701 |
CUYD | 0.0 |
8107 | GUARDRAIL TERMINAL SECTION NO 1 MT. ZION ROADWAY | 02360 | 0.000 |
6.000 |
$50.000 |
EACH | 0.0 |
8108 | ISLAND CURB AND GUTTER MT. ZION ROADWAY | 01825 | 0.000 |
517.000 |
$36.750 |
LF | 0.0 |
8109 | ISLAND HEADER CURB TYPE 1 MT. ZION ROADWAY | 01890 | 0.000 |
177.000 |
$52.500 |
LF | 0.0 |
8112 | GUARDRAIL END TREATMENT TYPE 1 MT. ZION ROADWAY | 02367 | 0.000 |
2.000 |
$3,237.822 |
EACH | 0.0 |
8113 | OBJECT MARKER TY 3 MT. ZION ROADWAY | 20191ED | 0.000 |
2.000 |
$157.500 |
EACH | 0.0 |
8114 | GUARDRAIL END TREATMENT TYPE 2A MT. ZION ROADWAY | 02369 | 0.000 |
2.000 |
$1,355.350 |
EACH | 0.0 |
8115 | GUARDRAIL-STEEL W BEAM-S FACE MT. ZION ROADWAY | 02351 | 0.000 |
446.000 |
$30.974 |
LF | 0.0 |
8116 | ISLAND CURB AND GUTTER MT. ZION ROADWAY | 01825 | 0.000 |
161.000 |
$47.150 |
LF | 0.0 |
8121 | CRASH CUSHION TY VI CLASS B TL2 MT. ZION ROADWAY | 08900 | 0.000 |
0.000 |
$21,802.753 |
EACH | 0.0 |
8127 | INCENTIVE/DISINCENTIVE MT. ZION ROADWAY | 02571 | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8141 | ROADWAY EXCAVATION MT. ZION ROADWAY | 02200 | 0.000 |
1,500.001 |
$9.718 |
CUYD | 0.0 |
8153 | PAVE MARKING-THERMO ONLY MT. ZION ROADWAY | 06576 | 0.000 |
0.000 |
$300.000 |
EACH | 0.0 |
8154 | GUARDRAIL END TREATMENT TYPE 1 MT. ZION ROADWAY | 02367 | 0.000 |
0.000 |
$2,625.000 |
EACH | 0.0 |
8155 | GUARDRAIL-STEEL W BEAM-S FACE MT. ZION ROADWAY | 02351 | 0.000 |
0.000 |
$17.850 |
LF | 0.0 |
8156 | GUARDRAIL CONNECTOR TO BRIDGE END TY A MT. ZION ROADWAY | 02363 | 0.000 |
0.000 |
$2,520.000 |
EACH | 0.0 |
8157 | ISLAND CURB AND GUTTER MT. ZION ROADWAY | 01825 | 0.000 |
0.000 |
$42.000 |
LF | 0.0 |
8158 | REMOVE CURB AND GUTTER MT. ZION ROADWAY | 01812 | 0.000 |
0.000 |
$13.953 |
LF | 0.0 |
8159 | PAVE STRIPING-PERM PAINT-8 IN MT. ZION ROADWAY | 06516 | 0.000 |
0.000 |
$0.300 |
LF | 0.0 |
8177 | COST PLUS WORK MT. ZION ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8178 | COST PLUS WORK MT. ZION ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
8187 | COST PLUS WORK MT. ZION ROADWAY | 10080NSD | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $10,333,262.88 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1250 | OVERFLOW STRUCTURE | 24842EC | 2.000 |
2.000 |
$23,106.340 |
EACH | 0.0 |
1255 | STORM SEWER PIPE-12 IN MT. ZION DRAINAGE | 00520 | 185.000 |
185.000 |
$89.560 |
LF | 0.0 |
1260 | STORM SEWER PIPE-15 IN MT. ZION DRAINAGE | 00521 | 3,405.000 |
3,405.000 |
$109.580 |
LF | 0.3 |
1265 | STORM SEWER PIPE-18 IN MT. ZION DRAINAGE | 00522 | 5,536.000 |
5,617.000 |
$95.180 |
LF | 0.4 |
1270 | STORM SEWER PIPE-24 IN MT. ZION DRAINAGE | 00524 | 1,566.000 |
1,566.000 |
$110.760 |
LF | 0.1 |
1275 | STORM SEWER PIPE-30 IN MT. ZION DRAINAGE | 00526 | 366.000 |
366.000 |
$120.940 |
LF | 0.0 |
1280 | PIPE CULVERT HEADWALL-12 IN MT. ZION DRAINAGE | 01200 | 2.000 |
2.000 |
$1,027.300 |
EACH | 0.0 |
1285 | PIPE CULVERT HEADWALL-15 IN MT. ZION DRAINAGE | 01202 | 1.000 |
1.000 |
$1,283.330 |
EACH | 0.0 |
1290 | PIPE CULVERT HEADWALL-18 IN MT. ZION DRAINAGE | 01204 | 9.000 |
9.000 |
$1,121.070 |
EACH | 0.0 |
1295 | PIPE CULVERT HEADWALL-30 IN MT. ZION DRAINAGE | 01210 | 3.000 |
3.000 |
$2,032.470 |
EACH | 0.0 |
1300 | SLOPED BOX OUTLET TYPE 1-15 IN MT. ZION DRAINAGE | 01432 | 4.000 |
4.000 |
$1,692.150 |
EACH | 0.0 |
1305 | SLOPED BOX OUTLET TYPE 1-18 IN MT. ZION DRAINAGE | 01433 | 3.000 |
4.000 |
$1,719.540 |
EACH | 0.0 |
1310 | SLOPED BOX OUTLET TYPE 1-24 IN MT. ZION DRAINAGE | 01434 | 1.000 |
1.000 |
$2,032.470 |
EACH | 0.0 |
1315 | CURB BOX INLET TYPE A MT. ZION DRAINAGE | 01456 | 101.000 |
103.000 |
$4,638.870 |
EACH | 0.4 |
1320 | CURB BOX INLET TYPE B MT. ZION DRAINAGE | 01480 | 3.000 |
3.000 |
$6,154.310 |
EACH | 0.0 |
1325 | DROP BOX INLET TYPE 1 MT. ZION DRAINAGE | 01490 | 7.000 |
7.000 |
$3,927.970 |
EACH | 0.0 |
1330 | DROP BOX INLET TYPE 11 MT. ZION DRAINAGE | 01544 | 7.000 |
7.000 |
$2,511.880 |
EACH | 0.0 |
1335 | CAP DROP BOX INLET MT. ZION DRAINAGE | 01584 | 3.000 |
3.000 |
$1,017.810 |
EACH | 0.0 |
1340 | REMOVE DROP BOX INLET MT. ZION DRAINAGE | 01585 | 3.000 |
3.000 |
$543.680 |
EACH | 0.0 |
1345 | DROP BOX INLET TYPE 13G | 01559 | 20.000 |
20.000 |
$3,010.250 |
EACH | 0.0 |
1350 | CONC MED BARR BOX INLET TY 14B1 MT. ZION DRAINAGE | 01616 | 1.000 |
1.000 |
$14,121.950 |
EACH | 0.0 |
1355 | CAP CURB BOX INLET MT. ZION DRAINAGE | 01634 | 2.000 |
2.000 |
$1,181.130 |
EACH | 0.0 |
1360 | JUNCTION BOX-15 IN MT. ZION DRAINAGE | 01641 | 1.000 |
1.000 |
$1,696.370 |
EACH | 0.0 |
1365 | JUNCTION BOX-18 IN MT. ZION DRAINAGE | 01642 | 2.000 |
2.000 |
$1,732.190 |
EACH | 0.0 |
1370 | JUNCTION BOX-24 IN MT. ZION DRAINAGE | 01643 | 1.000 |
1.000 |
$2,067.240 |
EACH | 0.0 |
1375 | REMOVE JUNCTION BOX MT. ZION DRAINAGE | 01655 | 2.000 |
2.000 |
$543.680 |
EACH | 0.0 |
1380 | REMOVE INLET MT. ZION DRAINAGE | 01718 | 6.000 |
6.000 |
$543.680 |
EACH | 0.0 |
1385 | MANHOLE TYPE A MT. ZION DRAINAGE | 01756 | 14.000 |
14.000 |
$2,771.070 |
EACH | 0.0 |
1390 | MANHOLE TYPE C MT. ZION DRAINAGE | 01767 | 1.000 |
1.000 |
$7,204.790 |
EACH | 0.0 |
1395 | REMOVE MANHOLE MT. ZION DRAINAGE | 01787 | 2.000 |
2.000 |
$543.680 |
EACH | 0.0 |
1400 | CHANNEL LINING CLASS II MT. ZION DRAINAGE | 02483 | 10.000 |
10.000 |
$142.240 |
TON | 0.0 |
8053 | DECK DRAIN EXTENSION MT. ZION DRAINAGE | 20600NC | 0.000 |
3.000 |
$7,288.230 |
EACH | 0.0 |
8054 | PVC PIPE-12 IN MT. ZION DRAINAGE | 03391 | 0.000 |
74.000 |
$155.378 |
LF | 0.0 |
8110 | CURB BOX INLET TYPE A MT. ZION DRAINAGE (TOP PHASE ONLY) | 01456 | 0.000 |
1.000 |
$2,099.516 |
EACH | 0.0 |
8111 | CURB BOX INLET TYPE B MT. ZION DRAINAGE (TOP PHASE ONLY) | 01480 | 0.000 |
1.000 |
$846.016 |
EACH | 0.0 |
8117 | CURB BOX INLET TYPE B MT. ZION DRAINAGE (TOP PHASE ONLY) | 01480 | 0.000 |
1.000 |
$846.016 |
EACH | 0.0 |
8165 | MANHOLE TYPE B MT. ZION DRAINAGE | 01761 | 0.000 |
0.000 |
$4,180.560 |
EACH | 0.0 |
Category Total $1,887,544.91 |
SM- Project | 0600805361901 | CATEGORY NUMBER | 0004 | CATEGORY Description | UTILITY-536 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1405 | REMOVE AND REPLACE SIDEWALK MT. ZION ELECTRIC & COMM. | 04960 | 92.000 |
92.000 |
$90.000 |
SQYD | 0.0 |
1410 | EC COMMUNICATIONS MANHOLE MT. ZION ELECTRIC & COMM. | 17000 | 5.000 |
5.000 |
$6,850.000 |
EACH | 0.0 |
1415 | EC COMMUNICATIONS PULL BOX MT. ZION ELECTRIC & COMM. | 17001 | 16.000 |
16.000 |
$3,800.000 |
EACH | 0.1 |
1420 | EC DUCT - 02 BANK CONCRETE ENCASED MT. ZION ELECTRIC & COMM. | 17004 | 1,152.000 |
1,152.000 |
$75.000 |
LF | 0.1 |
1425 | EC DUCT - 04 BANK CONCRETE ENCASED MT. ZION ELECTRIC & COMM. | 17008 | 675.000 |
675.000 |
$125.000 |
LF | 0.1 |
1430 | EC DUCT - 06 BANK CONCRETE ENCASED MT. ZION ELECTRIC & COMM. | 17012 | 258.000 |
258.000 |
$315.000 |
LF | 0.1 |
1435 | EC DUCT - 08 BANK CONCRETE ENCASED MT. ZION ELECTRIC & COMM. | 17016 | 315.000 |
315.000 |
$315.000 |
LF | 0.1 |
1440 | EC DUCT - 10 BANK CONCRETE ENCASED MT. ZION ELECTRIC & COMM. | 17020 | 646.000 |
646.000 |
$360.000 |
LF | 0.2 |
1445 | EC DUCT - SINGLE MT. ZION ELECTRIC & COMM. | 17025 | 120.000 |
120.000 |
$95.000 |
LF | 0.0 |
1450 | EC DUCT - SINGLE CONCRETE ENCASED MT. ZION ELECTRIC & COMM. | 17026 | 606.000 |
606.000 |
$115.000 |
LF | 0.1 |
1455 | EC ELECTRIC MANHOLE MT. ZION ELECTRIC & COMM. | 17028 | 5.000 |
5.000 |
$18,500.000 |
EACH | 0.1 |
1460 | EC ELECTRIC PIT MT. ZION ELECTRIC & COMM. | 17029 | 1.000 |
1.000 |
$7,125.000 |
EACH | 0.0 |
1465 | EC ELECTRIC STRUCTURE SPECIAL MT. ZION ELECTRIC & COMM. | 17031 | 4.000 |
4.000 |
$4,100.000 |
EACH | 0.0 |
1470 | EC DIRECTIONAL BORE MT. ZION ELECTRIC & COMM. | 17034 | 115.000 |
115.000 |
$1,006.825 |
EACH | 0.1 |
1475 | EC DIRECTIONAL BORE MT. ZION ELECTRIC & COMM. | 17034 | 200.000 |
0.000 |
$1,006.825 |
EACH | 0.2 |
1480 | GAS LINE RELOCATION MT. ZION GAS RELOCATION | 24573EN | 1.000 |
1.000 |
$686,950.000 |
LS | 0.6 |
8018 | OPEN CUT ROADWAY MT. ZION ELECTRIC & COMM. I-75 RAMPS | 04821 | 0.000 |
200.000 |
$1,006.825 |
LF | 0.0 |
8186 | D/B CONTRACT PAYMENT | 25083EN | 0.000 |
0.000 |
$1.000 |
DOLL | 0.0 |
Category Total $1,888,375.00 |