Item List 195140 |
Date:06/20/2025 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 195140 | Primary Project Number | BR06714331901 |
Contract Description | VARIOUS ROUTES IN DISTRICTS 10 & 12 | ||
Primary County | LETCHER | Fed/St Number | 121GR19D140 - STP BRZ |
Vendor ID | 03832 | Vendor Name | WALKER CONSTRUCTION & MATERIALS LLC |
Bid Amount | $ 1,827,615.21 |
SM- Project | BR06710721900 |
Fed/State Number | STP BRZ 9030 (203) |
Project Description | CAUDILL TOWN ROAD (CS 1072) |
*********** |
SM- Project | BR06710721900 | CATEGORY NUMBER | 0001 | CATEGORY Description | BRIDGE - 067C00031N |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0325 | GRANULAR EMBANKMENT | 02223 | 140.000 |
140.000 |
$94.500 |
CUYD | 0.7 |
0330 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 4.000 |
4.000 |
$50.000 |
EACH | 0.0 |
0335 | CLEARING AND GRUBBING Less than 1 acre | 02545 | 1.000 |
1.000 |
$8,925.000 |
LS | 0.5 |
0340 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$43,050.000 |
LS | 2.4 |
0345 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 2.000 |
0.000 |
$2,520.000 |
EACH | 0.3 |
0350 | STAKING | 02726 | 1.000 |
1.000 |
$7,140.000 |
LS | 0.4 |
0355 | REMOVE STRUCTURE | 02731 | 1.000 |
1.000 |
$22,050.000 |
LS | 1.2 |
0360 | BRIDGE OVERLAY APPROACH PAVEMENT | 03304 | 97.000 |
97.000 |
$157.500 |
SQYD | 0.8 |
0365 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$9,030.000 |
LS | 0.5 |
0370 | CYCLOPEAN STONE RIP RAP | 08019 | 13.000 |
13.000 |
$315.000 |
TON | 0.2 |
0375 | CONCRETE-CLASS A | 08100 | 14.500 |
14.500 |
$1,312.500 |
CUYD | 1.0 |
0380 | CONCRETE-CLASS AA | 08104 | 34.000 |
34.000 |
$1,470.000 |
CUYD | 2.7 |
0385 | STEEL REINFORCEMENT-EPOXY COATED | 08151 | 4,904.000 |
4,254.000 |
$3.620 |
LB | 1.0 |
0390 | STRUCTURAL STEEL Approx. 9663 lbs | 08160 | 1.000 |
1.000 |
$47,250.000 |
LS | 2.6 |
0395 | GUARDRAIL-STEEL W BEAM-S FACE BR | 08801 | 57.000 |
0.000 |
$200.000 |
LF | 0.6 |
0400 | EROSION CONTROL | 21415ND | 1.000 |
1.000 |
$6,825.000 |
LS | 0.4 |
0405 | CONCRETE SEALING | 23378EC | 1,560.000 |
1,560.000 |
$6.830 |
SQFT | 0.6 |
0410 | STEEL GRID DECK | 24992ED | 424.000 |
424.000 |
$162.750 |
SQFT | 3.8 |
8030 | S ENCASEMENT SPECIAL 4 Inch Split Steel Encasement Pipe | 15013 | 0.000 |
35.000 |
$155.730 |
LF | 0.0 |
8040 | RAIL SYSTEM TYPE T631 | 24896ED | 0.000 |
50.000 |
$136.130 |
LF | 0.0 |
Category Total $359,937.03 |
SM- Project | BR06710721900 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION &/OR MOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0415 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$20,750.000 |
LS | 1.1 |
0420 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$7,500.000 |
LS | 0.4 |
Category Total $28,250.00 |
SM- Project | BR06714331901 |
Fed/State Number | STP BRZ 9030 (076) |
Project Description | CR 1433 |
*********** |
SM- Project | BR06714331901 | CATEGORY NUMBER | 0001 | CATEGORY Description | BRIDGE - 067C00004N |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0005 | GRANULAR EMBANKMENT | 02223 | 28.000 |
28.000 |
$189.000 |
CUYD | 0.3 |
0010 | GUARDRAIL-STEEL W BEAM-S FACE A | 02355 | 100.000 |
100.000 |
$40.000 |
LF | 0.2 |
0015 | GUARDRAIL END TREATMENT TYPE 7 | 02371 | 2.000 |
2.000 |
$1,300.000 |
EACH | 0.1 |
0020 | EXTRA LENGTH GUARDRAIL POST | 02399 | 32.000 |
32.000 |
$50.000 |
EACH | 0.1 |
0025 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$40,950.000 |
LS | 2.2 |
0030 | ARMORED EDGE FOR CONCRETE | 03299 | 24.000 |
24.000 |
$110.250 |
LF | 0.1 |
0035 | BRIDGE OVERLAY APPROACH PAVEMENT | 03304 | 70.000 |
70.000 |
$189.000 |
SQYD | 0.7 |
0040 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$8,925.000 |
LS | 0.5 |
0045 | CYCLOPEAN STONE RIP RAP | 08019 | 29.000 |
29.000 |
$110.250 |
TON | 0.2 |
0050 | CONCRETE-CLASS A | 08100 | 2.500 |
6.270 |
$2,940.000 |
CUYD | 0.4 |
0055 | CONCRETE-CLASS AA | 08104 | 12.500 |
12.500 |
$2,782.500 |
CUYD | 1.9 |
0060 | STEEL REINFORCEMENT | 08150 | 500.000 |
500.000 |
$6.300 |
LB | 0.2 |
0065 | STEEL REINFORCEMENT-EPOXY COATED | 08151 | 1,861.000 |
1,861.000 |
$8.400 |
LB | 0.9 |
0070 | REMOVE SUPERSTRUCTURE | 08301 | 1.000 |
1.000 |
$36,750.000 |
LS | 2.0 |
0075 | PRECAST PC BOX BEAM CB17-48 | 08662 | 174.000 |
174.000 |
$372.750 |
LF | 3.5 |
0080 | GUARDRAIL-STEEL W BEAM-S FACE BR | 08801 | 116.000 |
0.000 |
$190.000 |
LF | 1.2 |
0085 | EROSION CONTROL | 21415ND | 1.000 |
1.000 |
$6,510.000 |
LS | 0.4 |
0090 | CONCRETE PATCHING REPAIR | 22146EN | 25.000 |
25.000 |
$215.250 |
SQFT | 0.3 |
0095 | EPOXY INJECTION CRACK REPAIR | 23744EC | 30.000 |
0.000 |
$110.250 |
LF | 0.2 |
0100 | CONCRETE COATING Approx. 1435 sf | 24982EC | 1.000 |
1.000 |
$16,275.000 |
LS | 0.9 |
8000 | NON-SPEC MATERIAL Concrete Coating | 10070NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8001 | REMOVE CONCRETE MASONRY | 02403 | 0.000 |
1.850 |
$900.000 |
CUYD | 0.0 |
8020 | RAIL SYSTEM TYPE II MOD | 25022ED | 0.000 |
100.000 |
$190.000 |
LF | 0.0 |
Category Total $298,476.15 |
SM- Project | BR06714331901 | CATEGORY NUMBER | 0002 | CATEGORY Description | MOBILIZATION/DEMOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0105 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$20,750.000 |
LS | 1.1 |
0110 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$7,500.000 |
LS | 0.4 |
Category Total $28,250.00 |
SM- Project | BR08804601900 |
Fed/State Number | STP BRZ 9030 (166) |
Project Description | US-460 |
*********** |
SM- Project | BR08804601900 | CATEGORY NUMBER | 0001 | CATEGORY Description | BRIDGE - 088B00021N |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0115 | GRANULAR EMBANKMENT | 02223 | 28.000 |
28.000 |
$75.000 |
CUYD | 0.1 |
0120 | EXTRA LENGTH GUARDRAIL POST | 02399 | 32.000 |
32.000 |
$50.000 |
EACH | 0.1 |
0125 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$25,000.000 |
LS | 1.4 |
0130 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 2.000 |
2.000 |
$2,250.000 |
EACH | 0.2 |
0135 | ARMORED EDGE FOR CONCRETE | 03299 | 52.000 |
52.000 |
$115.000 |
LF | 0.3 |
0140 | BRIDGE OVERLAY APPROACH PAVEMENT (REVISED: 10-22-19) | 03304 | 145.000 |
123.150 |
$250.000 |
SQYD | 2.0 |
0145 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$30,000.000 |
LS | 1.6 |
0150 | CYCLOPEAN STONE RIP RAP | 08019 | 12.000 |
12.000 |
$75.000 |
TON | 0.0 |
0155 | CONCRETE-CLASS A | 08100 | 14.800 |
14.800 |
$2,800.000 |
CUYD | 2.3 |
0160 | CONCRETE-CLASS AA | 08104 | 83.000 |
83.000 |
$1,250.000 |
CUYD | 5.7 |
0165 | STEEL REINFORCEMENT | 08150 | 2,702.000 |
2,702.000 |
$3.000 |
LB | 0.4 |
0170 | STEEL REINFORCEMENT-EPOXY COATED | 08151 | 10,700.000 |
10,700.000 |
$2.000 |
LB | 1.2 |
0175 | REMOVE SUPERSTRUCTURE | 08301 | 1.000 |
1.000 |
$60,000.000 |
LS | 3.3 |
0180 | PRECAST PC BOX BEAM CB33-36 | 08625 | 318.000 |
318.000 |
$350.000 |
LF | 6.1 |
0185 | PRECAST PC BOX BEAM CB33-48 | 08665 | 795.000 |
795.000 |
$320.000 |
LF | 13.9 |
0190 | EROSION CONTROL | 21415ND | 1.000 |
1.000 |
$10,000.000 |
LS | 0.5 |
0195 | G/R STEEL W BEAM-S FACE (7 FT POST) | 21802EN | 100.000 |
100.000 |
$18.000 |
LF | 0.1 |
0200 | CONCRETE PATCHING REPAIR | 22146EN | 110.000 |
110.000 |
$150.000 |
SQFT | 0.9 |
0205 | CONCRETE SEALING | 23378EC | 4,135.000 |
4,135.000 |
$6.000 |
SQFT | 1.4 |
0210 | EPOXY INJECTION CRACK REPAIR | 23744EC | 30.000 |
30.000 |
$200.000 |
LF | 0.3 |
0215 | UTILITY COORDINATION | 24845EC | 1.000 |
1.000 |
$15,000.000 |
LS | 0.8 |
0220 | CONCRETE COATING Approx 2780 sf | 24982EC | 1.000 |
1.000 |
$26,000.000 |
LS | 1.4 |
0225 | RAIL SYSTEM SIDE MOUNTED MGS | 25017ED | 318.000 |
318.000 |
$155.000 |
LF | 2.7 |
8050 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 0.000 |
2.000 |
$2,600.000 |
EACH | 0.0 |
Category Total $856,126.00 |
SM- Project | BR08804601900 | CATEGORY NUMBER | 0002 | CATEGORY Description | MOBILIZATION/DEMOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0230 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$20,750.000 |
LS | 1.1 |
0235 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$7,500.000 |
LS | 0.4 |
Category Total $28,250.00 |
SM- Project | BR09720141900 |
Fed/State Number | STP BRZ 9030 (168) |
Project Description | CR 2014 |
*********** |
SM- Project | BR09720141900 | CATEGORY NUMBER | 0001 | CATEGORY Description | BRIDGE - 097C00053N |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0240 | GRANULAR EMBANKMENT | 02223 | 28.000 |
28.000 |
$189.000 |
CUYD | 0.3 |
0245 | OBJECT MARKER TYPE 2 | 02565 | 4.000 |
4.000 |
$210.000 |
EACH | 0.0 |
0250 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$44,100.000 |
LS | 2.4 |
0255 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 2.000 |
2.000 |
$2,520.000 |
EACH | 0.3 |
0260 | REMOVE STRUCTURE | 02731 | 1.000 |
1.000 |
$31,500.000 |
LS | 1.7 |
0265 | ARMORED EDGE FOR CONCRETE | 03299 | 24.100 |
24.100 |
$110.250 |
LF | 0.1 |
0270 | BRIDGE OVERLAY APPROACH PAVEMENT | 03304 | 73.000 |
73.000 |
$189.000 |
SQYD | 0.8 |
0275 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$7,875.000 |
LS | 0.4 |
0280 | CYCLOPEAN STONE RIP RAP | 08019 | 30.000 |
30.000 |
$157.500 |
TON | 0.3 |
0285 | CONCRETE-CLASS AA | 08104 | 16.000 |
16.000 |
$2,520.000 |
CUYD | 2.2 |
0290 | STEEL REINFORCEMENT-EPOXY COATED | 08151 | 4,325.000 |
4,325.000 |
$5.780 |
LB | 1.4 |
0295 | EROSION CONTROL | 21415ND | 1.000 |
1.000 |
$6,825.000 |
LS | 0.4 |
0300 | CONCRETE PATCHING REPAIR | 22146EN | 8.000 |
8.000 |
$315.000 |
SQFT | 0.1 |
0305 | CONCRETE SEALING | 23378EC | 313.000 |
313.000 |
$10.500 |
SQFT | 0.2 |
0310 | CONCRETE COATING Estimated at 350 S.F. | 24982EC | 1.000 |
1.000 |
$6,300.000 |
LS | 0.3 |
8000 | NON-SPEC MATERIAL Concrete Coating | 10070NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $200,076.02 |
SM- Project | BR09720141900 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION &/OR MOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0315 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$20,750.000 |
LS | 1.1 |
0320 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$7,500.000 |
LS | 0.4 |
Category Total $28,250.00 |