Item List 194212 |
Date:07/11/2025 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 194212 | Primary Project Number | 1009900111901 |
Contract Description | CAMPTON ROAD (KY 11) | ||
Primary County | POWELL | Fed/St Number | HSIP 5260 (045) |
Vendor ID | 03229 | Vendor Name | HINKLE CONTRACTING COMPANY LLC |
Bid Amount | $ 1,999,645.47 |
SM- Project | 1009900111901 |
Fed/State Number | HSIP 5260 (045) |
Project Description | CAMPTON ROAD (KY 11) |
*********** |
SM- Project | 1009900111901 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0005 | DGA BASE | 00001 | 21.000 |
21.000 |
$45.000 |
TON | 0.0 |
0010 | LEVELING & WEDGING PG64-22 | 00190 | 1,145.000 |
1,145.000 |
$105.000 |
TON | 6.0 |
0015 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 7.000 |
7.000 |
$475.000 |
TON | 0.2 |
0020 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 6,386.000 |
6,386.000 |
$87.000 |
TON | 27.8 |
0025 | ASPHALT MATERIAL FOR TACK | 00356 | 50.000 |
50.000 |
$10.000 |
TON | 0.0 |
0030 | MOBILIZATION FOR MILL & TEXT (POWELL KY 11) | 02676 | 1.000 |
1.000 |
$2,000.000 |
LS | 0.1 |
0035 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 443.000 |
443.000 |
$10.000 |
TON | 0.2 |
0040 | BASE FAILURE REPAIR | 03240 | 837.000 |
837.000 |
$105.000 |
SQYD | 4.4 |
0045 | FUEL ADJUSTMENT | 10020NS | 11,741.000 |
11,741.000 |
$1.000 |
DOLL | 0.6 |
0050 | ASPHALT ADJUSTMENT | 10030NS | 29,471.000 |
29,471.000 |
$1.000 |
DOLL | 1.5 |
0055 | JOINT ADHESIVE | 20071EC | 34,832.000 |
34,832.000 |
$0.850 |
LF | 1.5 |
0060 | LONGITUDINAL EDGE KEY | 21289ED | 9,926.000 |
9,926.000 |
$1.500 |
LF | 0.7 |
Category Total $860,600.20 |
SM- Project | 1009900111901 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0065 | DELINEATOR FOR GUARDRAIL BI DIRECTIONAL WHITE | 01987 | 193.000 |
193.000 |
$10.000 |
EACH | 0.1 |
0070 | TEMP DITCH | 02159 | 17,416.000 |
17,416.000 |
$0.100 |
LF | 0.1 |
0075 | DITCHING | 02237 | 55,720.000 |
55,720.000 |
$2.500 |
LF | 7.0 |
0080 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 9,450.000 |
9,450.000 |
$16.550 |
LF | 7.8 |
0085 | GUARDRAIL-STEEL W BEAM-S FACE A | 02355 | 100.000 |
100.000 |
$31.000 |
LF | 0.2 |
0090 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 5.000 |
5.000 |
$45.000 |
EACH | 0.0 |
0095 | GUARDRAIL CONNECTOR TO BRIDGE END TY A | 02363 | 4.000 |
4.000 |
$2,400.000 |
EACH | 0.5 |
0100 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 24.000 |
24.000 |
$2,200.000 |
EACH | 2.6 |
0105 | GUARDRAIL CONNECTOR TO BRIDGE END TY C | 02377 | 4.000 |
4.000 |
$1,600.000 |
EACH | 0.3 |
0110 | REMOVE GUARDRAIL | 02381 | 8,620.500 |
8,620.500 |
$1.100 |
LF | 0.5 |
0115 | REMOVE TREES OR STUMPS | 02460 | 2.000 |
2.000 |
$1,500.000 |
EACH | 0.2 |
0120 | CHANNEL LINING CLASS II | 02483 | 500.000 |
500.000 |
$48.000 |
TON | 1.2 |
0125 | TEMPORARY SIGNS | 02562 | 230.000 |
230.000 |
$9.000 |
SQFT | 0.1 |
0130 | DITCHING AND SHOULDERING | 02575 | 13,944.000 |
13,944.000 |
$15.000 |
LF | 10.5 |
0135 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 90.000 |
90.000 |
$2.000 |
SQYD | 0.0 |
0140 | MAINTAIN & CONTROL TRAFFIC (POWELL KY 11) | 02650 | 1.000 |
1.000 |
$186,500.000 |
LS | 9.3 |
0145 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.3 |
0150 | EDGELINE RUMBLE STRIPS | 02697 | 69,664.000 |
69,664.000 |
$0.130 |
LF | 0.5 |
0155 | TEMP SILT FENCE | 02701 | 17,416.000 |
17,416.000 |
$1.500 |
LF | 1.3 |
0160 | SILT TRAP TYPE A | 02703 | 22.000 |
22.000 |
$80.000 |
EACH | 0.1 |
0165 | SILT TRAP TYPE B | 02704 | 22.000 |
22.000 |
$50.000 |
EACH | 0.1 |
0170 | SILT TRAP TYPE C | 02705 | 22.000 |
22.000 |
$250.000 |
EACH | 0.3 |
0175 | CLEAN SILT TRAP TYPE A | 02706 | 22.000 |
22.000 |
$50.000 |
EACH | 0.1 |
0180 | CLEAN SILT TRAP TYPE B | 02707 | 22.000 |
22.000 |
$25.000 |
EACH | 0.0 |
0185 | CLEAN SILT TRAP TYPE C | 02708 | 22.000 |
22.000 |
$100.000 |
EACH | 0.1 |
0190 | STAKING (POWELL KY 11) | 02726 | 1.000 |
1.000 |
$28,000.000 |
LS | 1.4 |
0195 | RAILROAD RAILS-DRILLED | 03234 | 439.000 |
439.000 |
$35.000 |
LF | 0.8 |
0200 | EXCAVATION AND BACKFILL | 03235 | 45.000 |
45.000 |
$100.000 |
CUYD | 0.2 |
0205 | CRIBBING | 03236 | 450.000 |
450.000 |
$7.250 |
SQFT | 0.2 |
0210 | EROSION CONTROL BLANKET | 05950 | 5,000.000 |
5,000.000 |
$1.000 |
SQYD | 0.3 |
0215 | TEMP MULCH | 05952 | 69,720.000 |
69,720.000 |
$0.130 |
SQYD | 0.5 |
0220 | TEMP SEEDING AND PROTECTION | 05953 | 52,030.000 |
52,030.000 |
$0.140 |
SQYD | 0.4 |
0225 | MAINTENANCE FERTILIZER | 05964 | 5.400 |
5.400 |
$650.000 |
TON | 0.2 |
0230 | SEEDING AND PROTECTION | 05985 | 104,060.000 |
104,060.000 |
$0.310 |
SQYD | 1.6 |
0235 | AGRICULTURAL LIMESTONE | 05992 | 64.500 |
64.500 |
$55.000 |
TON | 0.2 |
0240 | SBM ALUM SHEET SIGNS .080 IN | 06406 | 425.800 |
425.800 |
$14.000 |
SQFT | 0.3 |
0245 | STEEL POST TYPE 1 | 06410 | 1,120.000 |
1,120.000 |
$9.000 |
LF | 0.5 |
0250 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 20,000.000 |
20,000.000 |
$0.140 |
LF | 0.1 |
0255 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 132,490.000 |
132,490.000 |
$0.130 |
LF | 0.9 |
0260 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 108.000 |
108.000 |
$10.500 |
LF | 0.1 |
0265 | GUARDRAIL-BRIDGE CASE I | 08805 | 66.000 |
66.000 |
$68.000 |
LF | 0.2 |
0270 | REMOVE & RELOCATE SIGNS | 20418ED | 25.000 |
25.000 |
$100.000 |
EACH | 0.1 |
0275 | REMOVE SIGN | 21373ND | 15.000 |
15.000 |
$10.000 |
EACH | 0.0 |
0280 | BARCODE SIGN INVENTORY | 24631EC | 115.000 |
115.000 |
$8.000 |
EACH | 0.0 |
8001 | MAINTAIN & CONTROL TRAFFIC Maintain & Control Traffic GR LS | 02650 | 0.000 |
1.000 |
$2,500.000 |
LS | 0.0 |
8002 | GUARDRAIL END TREATMENT TYPE 7 GR End Treatment Ty 7 | 02371 | 0.000 |
2.000 |
$1,400.000 |
EACH | 0.0 |
8003 | ADJUST GUARDRAIL Adjust GR | 02350 | 0.000 |
4.000 |
$1,500.000 |
LF | 0.0 |
8004 | REMOVE & RESET GUARDRAIL R&R GR | 02383 | 0.000 |
8.000 |
$500.000 |
LF | 0.0 |
8005 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 0.000 |
1.000 |
$650.000 |
EACH | 0.0 |
Category Total $1,015,325.27 |
SM- Project | 1009900111901 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0285 | CULVERT PIPE-12 IN | 00460 | 8.000 |
8.000 |
$150.000 |
LF | 0.1 |
0290 | CULVERT PIPE-15 IN | 00461 | 4.000 |
4.000 |
$250.000 |
LF | 0.1 |
0295 | CULVERT PIPE-18 IN | 00462 | 20.000 |
20.000 |
$175.000 |
LF | 0.2 |
0300 | CULVERT PIPE-24 IN | 00464 | 70.000 |
70.000 |
$170.000 |
LF | 0.6 |
0305 | REMOVE PIPE | 01310 | 61.000 |
61.000 |
$20.000 |
LF | 0.1 |
0310 | S & F BOX INLET-OUTLET-24 IN | 01451 | 1.000 |
1.000 |
$4,100.000 |
EACH | 0.2 |
0315 | DROP BOX INLET TYPE 3 | 01496 | 12.000 |
12.000 |
$4,400.000 |
EACH | 2.6 |
0320 | DROP BOX INLET TYPE 12A | 01550 | 50.000 |
50.000 |
$150.000 |
LF | 0.4 |
0325 | SAFETY BOX INLET-24 IN DBL SDB-5 | 01729 | 1.000 |
1.000 |
$6,500.000 |
EACH | 0.3 |
0330 | REMOVE HEADWALL | 02625 | 10.000 |
10.000 |
$500.000 |
EACH | 0.3 |
Category Total $94,720.00 |
SM- Project | 1009900111901 | CATEGORY NUMBER | 0004 | CATEGORY Description | DEMOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0335 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$29,000.000 |
LS | 1.5 |
Category Total $29,000.00 |