|
Item List 174115 |
Date:01/22/2021 |
|
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 174115 | Primary Project Number | 0601900101601 |
| Contract Description | FLAGG SPRINGS PIKE (KY 10) | ||
| Primary County | CAMPBELL | Fed/St Number | HSIP 9010 (271) |
| Vendor ID | 00117 | Vendor Name | EATON ASPHALT PAVING CO INC AND SUBSIDIARY |
| Bid Amount | $ 1,608,255.00 | ||
| SM- Project | 0601900101601 |
| Fed/State Number | HSIP 9010 (271) |
| Project Description | FLAGG SPRINGS PIKE (KY 10) |
| *********** |
| SM- Project | 0601900101601 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0005 | DGA BASE | 00001 | 1,519.000 |
1,519.000 |
$20.000 |
TON | 1.9 |
| 0010 | TRAFFIC BOUND BASE | 00020 | 684.000 |
684.000 |
$20.000 |
TON | 0.9 |
| 0015 | ASPHALT SEAL AGGREGATE | 00100 | 163.000 |
163.000 |
$100.000 |
TON | 1.0 |
| 0020 | ASPHALT SEAL COAT | 00103 | 20.000 |
20.000 |
$600.000 |
TON | 0.7 |
| 0025 | CL2 ASPH BASE 0.75D PG64-22 | 00221 | 2,023.000 |
2,023.000 |
$62.000 |
TON | 7.8 |
| 0030 | CL2 ASPH SURF 0.38B PG64-22 | 00307 | 1,962.000 |
1,962.000 |
$62.000 |
TON | 7.6 |
| 0035 | ENTRANCE PIPE-15 IN | 00440 | 244.000 |
804.000 |
$45.000 |
LF | 0.7 |
| 0040 | CULVERT PIPE-18 IN | 00462 | 219.000 |
379.000 |
$115.000 |
LF | 1.6 |
| 0045 | CULVERT PIPE-24 IN | 00464 | 149.000 |
149.000 |
$130.000 |
LF | 1.2 |
| 0050 | CULVERT PIPE-30 IN | 00466 | 97.000 |
97.000 |
$148.000 |
LF | 0.9 |
| 0055 | CULVERT PIPE-36 IN | 00468 | 43.000 |
43.000 |
$198.000 |
LF | 0.5 |
| 0060 | CULVERT PIPE-48 IN | 00470 | 7.000 |
7.000 |
$230.000 |
LF | 0.1 |
| 0065 | CULVERT PIPE-36 IN EQUIV | 00496 | 36.000 |
36.000 |
$210.000 |
LF | 0.5 |
| 0070 | PIPE CULVERT HEADWALL-15 IN | 01202 | 1.000 |
1.000 |
$1,100.000 |
EACH | 0.1 |
| 0075 | PIPE CULVERT HEADWALL-18 IN | 01204 | 1.000 |
1.000 |
$1,200.000 |
EACH | 0.1 |
| 0080 | DROP BOX INLET TYPE 3 MOD | 01497 | 11.000 |
11.000 |
$2,600.000 |
EACH | 1.8 |
| 0085 | DROP BOX INLET TYPE 4 MOD | 01500 | 1.000 |
1.000 |
$2,800.000 |
EACH | 0.2 |
| 0090 | DROP BOX INLET TYPE 11 | 01544 | 4.000 |
7.000 |
$2,100.000 |
EACH | 0.5 |
| 0095 | SAFETY BOX INLET-18 IN DBL SDB-5 | 01728 | 15.000 |
15.000 |
$4,300.000 |
EACH | 4.0 |
| 0100 | SAFETY BOX INLET-24 IN DBL SDB-5 | 01729 | 4.000 |
4.000 |
$4,910.000 |
EACH | 1.2 |
| 0105 | DELINEATOR FOR GUARDRAIL MONO DIRECTIONAL WHITE | 01982 | 90.000 |
90.000 |
$14.000 |
EACH | 0.1 |
| 0110 | CEM CONC ENT PAVEMENT-6 IN | 02099 | 324.000 |
324.000 |
$57.000 |
SQYD | 1.1 |
| 0115 | REMOVE & REPLACE FENCE (IN LIKE KIND) | 02268 | 300.000 |
300.000 |
$23.000 |
LF | 0.4 |
| 0120 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 8.000 |
8.000 |
$44.000 |
EACH | 0.0 |
| 0125 | GUARDRAIL CONNECTOR TO BRIDGE END TY A | 02363 | 8.000 |
8.000 |
$2,600.000 |
EACH | 1.3 |
| 0130 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 15.000 |
15.000 |
$2,300.000 |
EACH | 2.1 |
| 0135 | REMOVE GUARDRAIL | 02381 | 4,915.000 |
4,915.000 |
$1.500 |
LF | 0.5 |
| 0140 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 4.000 |
4.000 |
$2,200.000 |
EACH | 0.5 |
| 0145 | CHANNEL LINING CLASS II | 02483 | 256.000 |
256.000 |
$66.000 |
TON | 1.1 |
| 0150 | TEMPORARY SIGNS | 02562 | 225.000 |
225.000 |
$4.000 |
SQFT | 0.1 |
| 0155 | DITCHING AND SHOULDERING | 02575 | 26,265.000 |
26,265.000 |
$3.000 |
LF | 4.9 |
| 0160 | EDGE KEY | 02585 | 1,963.000 |
1,963.000 |
$6.000 |
LF | 0.7 |
| 0165 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 540.000 |
540.000 |
$3.000 |
SQYD | 0.1 |
| 0170 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$69,000.000 |
LS | 4.3 |
| 0175 | STAKING | 02726 | 1.000 |
1.000 |
$70,535.000 |
LS | 4.4 |
| 0180 | REMOVE STRUCTURE 530+99 | 02731 | 1.000 |
1.000 |
$3,000.000 |
LS | 0.2 |
| 0185 | RAILROAD RAILS-DRILLED | 03234 | 4,750.000 |
4,750.000 |
$26.000 |
LF | 7.7 |
| 0190 | EXCAVATION AND BACKFILL | 03235 | 270.000 |
270.000 |
$40.000 |
CUYD | 0.7 |
| 0195 | CRIBBING | 03236 | 750.000 |
750.000 |
$5.000 |
SQFT | 0.2 |
| 0200 | TRIM & REMOVE TREES & BRUSH | 03269 | 4,400.000 |
4,400.000 |
$10.000 |
LF | 2.7 |
| 0205 | EROSION CONTROL BLANKET | 05950 | 16,000.000 |
16,000.000 |
$2.000 |
SQYD | 2.0 |
| 0210 | SBM ALUM SHEET SIGNS .080 IN | 06406 | 510.000 |
510.000 |
$15.000 |
SQFT | 0.5 |
| 0215 | STEEL POST TYPE 1 | 06410 | 600.000 |
600.000 |
$10.000 |
LF | 0.4 |
| 0220 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 76,184.000 |
76,184.000 |
$0.170 |
LF | 0.8 |
| 0225 | PAVE MARKING-THERMO STOP BAR-12IN | 06567 | 10.000 |
10.000 |
$10.000 |
LF | 0.0 |
| 0230 | PAVE MARKING-THERMO CROSS-HATCH | 06569 | 710.000 |
710.000 |
$6.000 |
SQFT | 0.3 |
| 0235 | GUARDRAIL-STEEL W BEAM-S FACE BR | 08801 | 100.000 |
100.000 |
$187.000 |
LF | 1.2 |
| 0240 | GUARDRAIL-BRIDGE CASE II | 08808 | 50.000 |
50.000 |
$78.000 |
LF | 0.2 |
| 0245 | FUEL ADJUSTMENT | 10020NS | 6,203.000 |
6,203.000 |
$1.000 |
DOLL | 0.4 |
| 0250 | ASPHALT ADJUSTMENT | 10030NS | 15,580.000 |
15,580.000 |
$1.000 |
DOLL | 1.0 |
| 0255 | W AIR RELEASE VALVE 1 INCH | 14000 | 12.000 |
8.000 |
$2,000.000 |
EACH | 1.5 |
| 0260 | W MAIN POINT RELOCATE | 14024 | 17.000 |
8.000 |
$12,500.000 |
EACH | 13.2 |
| 0265 | W METER RELOCATE | 14030 | 1.000 |
1.000 |
$1,557.000 |
EACH | 0.1 |
| 0270 | W REMOVE TRANSITE (AC) PIPE | 14076 | 100.000 |
100.000 |
$28.000 |
LF | 0.2 |
| 0275 | W SERVICE RELOCATE | 14081 | 4.000 |
4.000 |
$1,600.000 |
EACH | 0.4 |
| 0280 | W VALVE 06 INCH | 14105 | 1.000 |
0.000 |
$1,199.000 |
EACH | 0.1 |
| 0285 | W VALVE 08 INCH | 14106 | 2.000 |
1.000 |
$1,800.000 |
EACH | 0.2 |
| 0290 | REMOVE SIGN | 21373ND | 60.000 |
60.000 |
$55.000 |
EACH | 0.2 |
| 0295 | EROSION CONTROL | 21415ND | 1.000 |
1.000 |
$33,000.000 |
LS | 2.1 |
| 0300 | G/R STEEL W BEAM-S FACE (7 FT POST) | 21802EN | 5,871.000 |
5,871.000 |
$18.000 |
LF | 6.6 |
| 0305 | HEADWALL SLOPED AND MITERED CONCRETE - 18" PIPE | 24575ES610 | 2.000 |
2.000 |
$2,200.000 |
EACH | 0.3 |
| 0310 | HEADWALL SLOPED AND MITERED CONCRETE - 24"PIPE | 24575ES610 | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.3 |
| 0315 | HEADWALL SLOPED AND MITERED CONCRETE - 30" PIPE | 24575ES610 | 2.000 |
2.000 |
$3,300.000 |
EACH | 0.4 |
| 0320 | BARCODE SIGN INVENTORY | 24631EC | 55.000 |
55.000 |
$11.000 |
EACH | 0.0 |
| 8000 | BASE FAILURE REPAIR | 03240 | 0.000 |
330.000 |
$84.500 |
SQYD | 0.0 |
| 8001 | OBJECT MARKER TY 3 | 20191ED | 0.000 |
286.000 |
$157.500 |
EACH | 0.0 |
Category Total $1,584,254.78 |
| SM- Project | 0601900101601 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0325 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$24,000.220 |
LS | 1.5 |
Category Total $24,000.22 |