Item List 132377 |
Date:05/25/2018 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 132377 | Primary Project Number | MP07600251302 |
Contract Description | RICHMOND BYPASS (US 25) | ||
Primary County | MADISON | Fed/St Number | FD04 SPP 076 0025 016-017 |
Vendor ID | 00129 | Vendor Name | BLUEGRASS CONTRACTING CORPORATION |
Bid Amount | $ 335,408.00 |
SM- Project | MP07600251302 |
Fed/State Number | FD04 SPP 076 0025 016-017 |
Project Description | RICHMOND BYPASS (US 25) |
*********** |
SM- Project | MP07600251302 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0010 | CRUSHED STONE BASE | 00003 | 500.000 |
150.000 |
$27.000 |
TON | 4.0 |
0020 | CRUSHED AGGREGATE SIZE NO 57 | 00071 | 100.000 |
0.000 |
$26.500 |
TON | 0.8 |
0030 | REMOVE CURB AND GUTTER | 01812 | 780.000 |
780.000 |
$9.500 |
LF | 2.2 |
0040 | STANDARD BARRIER MEDIAN TYPE 1 | 01915 | 400.000 |
180.000 |
$52.500 |
SQYD | 6.3 |
0050 | BARRICADE-TYPE III | 02014 | 2.000 |
2.000 |
$76.500 |
EACH | 0.0 |
0060 | JPC PAVEMENT-12 IN/24 | 02026 | 2,300.000 |
2,300.000 |
$79.000 |
SQYD | 54.2 |
0070 | REMOVE PAVEMENT | 02091 | 1,800.000 |
1,800.000 |
$20.000 |
SQYD | 10.7 |
0080 | TEMPORARY SIGNS | 02562 | 230.000 |
230.000 |
$10.000 |
SQFT | 0.7 |
0090 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$16,982.500 |
LS | 5.1 |
0100 | ARROW PANEL | 02775 | 1.000 |
1.000 |
$579.500 |
EACH | 0.2 |
0110 | CONDUIT-1 1/4 IN | 04793 | 50.000 |
50.000 |
$3.500 |
LF | 0.1 |
0120 | ELECTRICAL JUNCTION BOX TYPE B | 04811 | 1.000 |
1.000 |
$2,453.500 |
EACH | 0.7 |
0130 | TRENCHING AND BACKFILLING | 04820 | 50.000 |
50.000 |
$6.000 |
LF | 0.1 |
0140 | CABLE-NO. 14/1 PAIR | 04850 | 1,475.000 |
1,475.000 |
$2.500 |
LF | 1.1 |
0150 | PREFORMED LOOP/LEAD-IN | 04894 | 200.000 |
200.000 |
$6.000 |
LF | 0.4 |
0160 | LOOP SAW SLOT AND FILL | 04895 | 310.000 |
310.000 |
$11.500 |
LF | 1.1 |
0170 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 2,500.000 |
2,500.000 |
$0.400 |
LF | 0.3 |
0180 | PAVE STRIPING-PERM PAINT-8 IN | 06516 | 1,000.000 |
1,000.000 |
$0.800 |
LF | 0.2 |
0190 | PAVE STRIPING-TEMP REM TAPE-B (6 INCH) | 06549 | 1,000.000 |
1,000.000 |
$2.350 |
LF | 0.7 |
0200 | PAVE STRIPING-TEMP REM TAPE-W (4 INCH) | 06550 | 1,000.000 |
1,000.000 |
$1.500 |
LF | 0.4 |
0210 | PAVE STRIPING-TEMP REM TAPE-Y (4 INCH) | 06551 | 1,000.000 |
1,000.000 |
$1.500 |
LF | 0.4 |
0220 | FUEL ADJUSTMENT | 10020NS | 884.000 |
884.000 |
$1.000 |
DOLL | 0.3 |
0230 | PREFORMED LOOPS | 20452ES835 | 48.000 |
48.000 |
$20.500 |
LF | 0.3 |
0240 | PREFORMED QUADRAPOLE LOOPS | 20453ES835 | 102.000 |
102.000 |
$20.500 |
LF | 0.6 |
0250 | RELOCATE SIGNAL HEAD | 21659NN | 8.000 |
8.000 |
$717.000 |
EACH | 1.7 |
0260 | REMOVE NON-MOUNTABLE MEDIAN | 22665EN | 1,800.000 |
1,800.000 |
$7.500 |
SQYD | 4.0 |
0270 | PAVE MARK TY 1 TAPE STOP BAR-24 IN | 23265ES717 | 36.000 |
36.000 |
$27.500 |
LF | 0.3 |
0280 | PAVE MARK TY 1 TAPE-CURV ARROW REVISED: 8-12-13 | 23270ES717 | 10.000 |
10.000 |
$546.000 |
EACH | 1.6 |
8000 | STANDARD CURB AND GUTTER | 01810 | 0.000 |
720.000 |
$28.000 |
LF | 0.0 |
8001 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 0.000 |
11.150 |
$200.000 |
TON | 0.0 |
8002 | PAVE STRIPING REMOVAL-4 IN | 06530 | 0.000 |
500.000 |
$1.500 |
LF | 0.0 |
Category Total $330,451.00 |
SM- Project | MP07600251302 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0290 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$4,957.000 |
LS | 1.5 |
Category Total $4,957.00 |