Item List 121022 |
Date:06/01/2018 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 121022 | Primary Project Number | DE037AIRP1222 |
Contract Description | CAPITAL CITY AIRPORT | ||
Primary County | FRANKLIN | Fed/St Number | AIP 3-21-0016-012-2012 |
Vendor ID | 02280 | Vendor Name | A S L EXCAVATING INC |
Bid Amount | $ 1,694,912.41 |
SM- Project | DE037AIRP1222 |
Fed/State Number | AIP 3-21-0016-012-2012 |
Project Description | CAPITAL CITY AIRPORT |
*********** |
SM- Project | DE037AIRP1222 | CATEGORY NUMBER | 0001 | CATEGORY Description | RUNWAY SAFETY IMPROVEMENTS |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0010 | SITE PREPARATION | 40000 | 1.000 |
0.000 |
$87,375.000 |
LS | 5.2 |
0020 | MISC DEMO AND DISPOSAL | 40001 | 1.000 |
1.000 |
$9,575.000 |
LS | 0.6 |
0030 | SEEDING | 40002 | 19.000 |
19.000 |
$1,450.000 |
ACRE | 1.6 |
0040 | LOCKOUT-TAGOUT AND CC REGULATOR CAL PRO | 40003 | 1.000 |
1.000 |
$3,681.050 |
LS | 0.2 |
0050 | EX STK MTD EDGE LIGHT-REMOVED | 40004 | 44.000 |
43.000 |
$199.570 |
EACH | 0.5 |
0060 | EX BASE MTD EDGE LIGHT-REMOVED | 40005 | 2.000 |
2.000 |
$199.570 |
EACH | 0.0 |
0070 | EX BASE MTD SIGN-REMOVED | 40006 | 11.000 |
11.000 |
$666.820 |
EACH | 0.4 |
0080 | EX REIL SYS L-849-REMOVED | 40007 | 1.000 |
1.000 |
$4,625.050 |
EACH | 0.3 |
0090 | BASE MTD 1-MOD SIGN L-858-INSTALLED | 40008 | 1.000 |
1.000 |
$4,746.430 |
EACH | 0.3 |
0100 | BASE MTD 3-MOD SIGN L-858-INSTALLED | 40009 | 9.000 |
9.000 |
$5,068.670 |
EACH | 2.7 |
0110 | EX STK MTD LIGHT L-861-NEW LENS SET | 40010 | 4.000 |
0.000 |
$112.930 |
EACH | 0.0 |
0120 | STK MTD EDGE LIGHT L-861-INSTALLED | 40011 | 6.000 |
6.000 |
$331.100 |
EACH | 0.1 |
0130 | BASE MTD EDGE LIGHT L-861-INSTALLED | 40012 | 2.000 |
2.000 |
$1,050.550 |
EACH | 0.1 |
0140 | STK MTD T/W LIGHT L-861T-INSTALLED | 40013 | 33.000 |
39.000 |
$510.620 |
EACH | 1.0 |
0150 | BASE MTD T/W LIGHT L-861T-INSTALLED | 40014 | 4.000 |
2.000 |
$1,039.370 |
EACH | 0.2 |
0160 | EX PAPI SYS L-880-RELOCATED | 40015 | 1.000 |
1.000 |
$10,076.850 |
EACH | 0.6 |
0170 | PAPI AIMING BAR L-880 | 40016 | 1.000 |
1.000 |
$2,855.000 |
EACH | 0.2 |
0180 | TEMPORARY AIRFIELD LIGHTING | 40017 | 1.000 |
1.000 |
$10,788.800 |
LS | 0.6 |
0190 | RCP-18 IN(CLASS IV) | 40018 | 174.000 |
176.000 |
$76.750 |
LF | 0.8 |
0200 | UNDERDRAIN PIPE-6 IN | 40019 | 1,305.000 |
1,300.000 |
$19.000 |
LF | 1.5 |
0210 | NON-PERF COLLECTOR PIPE-6 IN | 40020 | 250.000 |
424.000 |
$19.000 |
LF | 0.3 |
0220 | CONCRETE OUTLET PROTECTOR | 40021 | 3.000 |
3.000 |
$685.000 |
EACH | 0.1 |
0230 | CONCRETE CATCH BASIN W/GRATE-4 FT SQR | 40022 | 1.000 |
1.000 |
$4,280.000 |
EACH | 0.3 |
0240 | KYTC S&F HEADWALL-18 IN | 40023 | 1.000 |
1.000 |
$1,690.000 |
EACH | 0.1 |
0250 | ASPHALT PAVEMENT REMOVAL(ALL DEPTHS) | 40024 | 14,796.000 |
14,877.000 |
$5.440 |
SQYD | 4.7 |
0260 | JOINT AND CRACK REPAIR | 40025 | 14,385.000 |
0.000 |
$0.970 |
LF | 0.8 |
0270 | EMBANKMENT IN PLACE | 40026 | 40,243.000 |
45,168.000 |
$5.590 |
CUYD | 13.3 |
0280 | ROCK EXCAVATION | 40027 | 5,581.000 |
9,502.000 |
$12.350 |
CUYD | 4.1 |
0290 | SELECT ROCK FILL EMBANKMENT | 40028 | 4,248.000 |
4,248.000 |
$29.800 |
CUYD | 7.5 |
0300 | UNSUITABLE EXCAVATION | 40029 | 2,012.000 |
120.000 |
$2.000 |
CUYD | 0.2 |
0310 | TEMPORARY SILT FENCE | 40030 | 2,881.000 |
870.000 |
$6.500 |
LF | 1.1 |
0320 | SILT TRAP TYPE C | 40031 | 2.000 |
2.000 |
$175.000 |
EACH | 0.0 |
0330 | EROSION CONTROL BLANKET | 40032 | 4,720.000 |
4,720.000 |
$1.100 |
SQYD | 0.3 |
0340 | TURF REINFORCEMENT MAT | 40033 | 2,370.000 |
0.000 |
$3.600 |
SQYD | 0.5 |
0350 | TEMP SEED-MULCH AND FERTILIZE | 40034 | 4.000 |
11.000 |
$1,200.000 |
ACRE | 0.3 |
0360 | SLOPE DRAINS | 40035 | 1.000 |
0.000 |
$14,000.000 |
LS | 0.8 |
0370 | CLASS II CHAN LINING-18 IN W/FABRIC | 40036 | 250.000 |
23.730 |
$28.200 |
TON | 0.4 |
0380 | SILT TRAP TYPE B | 40037 | 15.000 |
8.000 |
$125.000 |
EACH | 0.1 |
0390 | CRUSHED AGG BASE COURSE | 40038 | 5,907.000 |
6,547.180 |
$24.700 |
TON | 8.6 |
0400 | BIT SURFACE COURSE-3/4 IN MAX AGG | 40039 | 1,001.000 |
1,001.000 |
$97.230 |
TON | 5.7 |
0410 | BIT BASE COURSE-1 1/2 IN MAX AGG | 40040 | 1,986.000 |
1,954.820 |
$91.070 |
TON | 10.7 |
0420 | TEMP R/W AND T/W PAINT-WHITE WATERBORNE | 40041 | 2,990.000 |
28,127.000 |
$0.180 |
SQFT | 0.0 |
0430 | TEMP R/W & T/W PAINT-YELLOW WATERBORNE | 40042 | 2,460.000 |
2,460.000 |
$0.180 |
SQFT | 0.0 |
0440 | R/W & T/W PAINT-WHITE WATERBORNE | 40043 | 31,230.000 |
0.000 |
$0.470 |
SQFT | 0.9 |
0450 | R/W & T/W PAINT-YELLOW WATERBORNE | 40044 | 3,070.000 |
3,024.000 |
$0.470 |
SQFT | 0.1 |
0460 | PAVEMENT MARKING REMOVAL | 40045 | 39,230.000 |
20,292.000 |
$0.520 |
SQFT | 1.2 |
0470 | REFINED COAL TAR EMUL FOR SLURRY COAT | 40046 | 9,642.000 |
0.000 |
$4.450 |
GAL | 2.5 |
0480 | SODDING | 40047 | 2,802.000 |
3,740.000 |
$4.950 |
SQYD | 0.8 |
0490 | TOPSOILING-6 IN THICK OBTAINED ON SITE REVISED: 7-10-12 | 40096 | 50,671.000 |
75,969.000 |
$1.360 |
SQYD | 4.1 |
0500 | TOPSOILING-6 IN THICK OBTAINED OFF SITE REVISED: 7-10-12 | 40097 | 25,298.000 |
0.000 |
$2.750 |
SQYD | 4.1 |
0510 | SUPP WIND CONE L-806-8 FT-INSTALLED | 40050 | 1.000 |
1.000 |
$2,646.480 |
EACH | 0.2 |
0520 | WIND CONE L-807-12 FT-INSTALLED | 40051 | 1.000 |
1.000 |
$6,432.710 |
EACH | 0.4 |
0530 | SEGMENTED CIRCLE-INSTALLED | 40052 | 1.000 |
1.000 |
$19,862.300 |
EACH | 1.2 |
0540 | CABLE TRENCH-18 IN MIN DEPTH | 40053 | 5,000.000 |
6,070.000 |
$1.610 |
LF | 0.5 |
0550 | AWG 5KV CABLE NO.8 L824C-INSTALLED | 40054 | 12,000.000 |
5,147.000 |
$1.250 |
LF | 0.9 |
0560 | AWG COUNTERPOISE NO.6-INSTALLED | 40055 | 7,800.000 |
2,377.000 |
$1.600 |
LF | 0.7 |
0570 | COUNTERPOISE TRENCH-18 IN MIN DEPTH | 40056 | 2,800.000 |
690.000 |
$1.210 |
LF | 0.2 |
0580 | AWG STRD NO.6 600V-TY XHHW GROUND | 40057 | 4,500.000 |
875.000 |
$1.430 |
LF | 0.4 |
0590 | AWG 25 NO.22-PAIR COMM WIRE-INSTALLED | 40058 | 2,500.000 |
2,224.000 |
$9.400 |
LF | 1.4 |
0600 | AWG 100 NO.22-PAIR COMM WIRE-INSTALLED | 40059 | 2,500.000 |
2,224.000 |
$7.440 |
LF | 1.1 |
0610 | CONC ENCASED ELC COND 1-WAY-2 IN C | 40060 | 120.000 |
120.000 |
$74.120 |
LF | 0.5 |
0620 | CONC ENCASED ELC COND 2-WAY-2 IN C | 40061 | 75.000 |
75.000 |
$84.550 |
LF | 0.4 |
0630 | NON-ENCASED ELEC COND-1-WAY-2 IN C | 40062 | 2,500.000 |
190.000 |
$5.970 |
LF | 0.9 |
0640 | ELEC JCT STRC CLS 1 L-867-16 X 24 IN-INS | 40063 | 2.000 |
2.000 |
$1,822.920 |
EACH | 0.2 |
0650 | REMOVE EXIST ELEC JCT STRUCTURE | 40064 | 1.000 |
1.000 |
$399.140 |
EACH | 0.0 |
0660 | CONC ELEC HANDHOLE-H-20 RATED-INSTALLED | 40065 | 2.000 |
0.000 |
$4,055.530 |
EACH | 0.5 |
8001 | FRENCH DRAIN | 24103EC | 0.000 |
330.000 |
$32.000 |
LF | 0.0 |
8002 | ACCOUNTING ADJUSTMENT | 10206NC | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8003 | BASE MTD OBSTRUCTION LIGHT L-810 | 40098 | 0.000 |
0.000 |
$12,243.940 |
LS | 0.0 |
8004 | SITE PREPARATION REVISED | 40000 | 0.000 |
1.000 |
$103,933.320 |
LS | 0.0 |
8005 | BASE MTD OBSTRUCTION LIGHT L-810 ADJ PRICE | 40098 | 0.000 |
1.000 |
$10,978.940 |
LS | 0.0 |
8006 | REIMBURSEMENT MATERALS PURCHASED BUT NOT USED | 10299N | 0.000 |
9,569.900 |
$1.000 |
DOLL | 0.0 |
Category Total $1,694,912.41 |