Item List 111343 |
Date:06/01/2018 |
|
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 111343 | Primary Project Number | DE0470NEW11W1 |
| Contract Description | ELIZABETHTOWN-RADCLIFFE CONNECTOR ROAD | ||
| Primary County | HARDIN | Fed/St Number | JP02 047 NEW-ROUTE |
| Vendor ID | 02623 | Vendor Name | HICON CONSTRUCTION LLC |
| Bid Amount | $ 10,002,817.70 | ||
| SM- Project | DE0470NEW11W1 |
| Fed/State Number | JP02 047 NEW-ROUTE |
| Project Description | ELIZABETHTOWN-RADCLIFFE CONNECTOR ROAD |
| *********** |
| SM- Project | DE0470NEW11W1 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1001 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 95.000 |
95.000 |
$55.000 |
TON | 0.1 |
| 1002 | PERFORATED PIPE-4 IN | 01000 | 32,751.000 |
32,751.000 |
$4.500 |
LF | 1.5 |
| 1003 | NON-PERFORATED PIPE-4 IN | 01010 | 4,844.000 |
4,844.000 |
$9.250 |
LF | 0.4 |
| 1004 | PERF PIPE HEADWALL TY 1-4 IN | 01020 | 22.000 |
22.000 |
$400.000 |
EACH | 0.1 |
| 1005 | PERF PIPE HEADWALL TY 2-4 IN | 01024 | 5.000 |
5.000 |
$400.000 |
EACH | 0.0 |
| 1006 | PERF PIPE HEADWALL TY 3-4 IN | 01028 | 65.000 |
65.000 |
$450.000 |
EACH | 0.3 |
| 1007 | PERF PIPE HEADWALL TY 4-4 IN | 01032 | 3.000 |
3.000 |
$375.000 |
EACH | 0.0 |
| 1008 | CORED HOLE DRAINAGE BOX CON-4 IN | 01740 | 34.000 |
34.000 |
$125.000 |
EACH | 0.0 |
| 1009 | VALLEY GUTTER | 01895 | 1,041.000 |
1,041.000 |
$38.500 |
LF | 0.4 |
| 1010 | DELINEATOR FOR GUARDRAIL-WHITE | 01982 | 10.000 |
10.000 |
$7.000 |
EACH | 0.0 |
| 1011 | BARRICADE-TYPE III | 02014 | 10.000 |
10.000 |
$325.000 |
EACH | 0.0 |
| 1012 | REMOVE PAVEMENT | 02091 | 670.000 |
670.000 |
$4.000 |
SQYD | 0.0 |
| 1013 | TEMP DITCH | 02159 | 14,875.000 |
14,875.000 |
$1.000 |
LF | 0.1 |
| 1014 | CLEAN TEMP DITCH | 02160 | 14,875.000 |
14,875.000 |
$0.010 |
LF | 0.0 |
| 1015 | GRANULAR EMBANKMENT | 02223 | 3,490.000 |
3,490.000 |
$20.000 |
CUYD | 0.7 |
| 1016 | WATER | 02242 | 1.000 |
1.000 |
$0.010 |
MGAL | 0.0 |
| 1017 | FENCE-WOVEN WIRE TYPE 1 | 02262 | 26,500.000 |
26,500.000 |
$4.150 |
LF | 1.1 |
| 1018 | G/R STEEL W BEAM-S FACE (7 FT POST) | 21802EN | 9,443.750 |
9,443.750 |
$15.820 |
LF | 1.5 |
| 1019 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 7.000 |
7.000 |
$35.000 |
EACH | 0.0 |
| 1020 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 8.000 |
8.000 |
$650.000 |
EACH | 0.1 |
| 1021 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 2.000 |
2.000 |
$550.000 |
EACH | 0.0 |
| 1022 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 6.000 |
6.000 |
$2,100.000 |
EACH | 0.1 |
| 1023 | RIGHT-OF-WAY MONUMENT TYPE 1 | 02429 | 204.000 |
204.000 |
$86.750 |
EACH | 0.2 |
| 1024 | WITNESS POST | 02432 | 3.000 |
3.000 |
$58.000 |
EACH | 0.0 |
| 1025 | PLUG WATER WELL | 02475 | 6.000 |
6.000 |
$2,500.000 |
EACH | 0.2 |
| 1026 | CHANNEL LINING CLASS II | 02483 | 1,149.000 |
4,649.000 |
$22.000 |
TON | 0.3 |
| 1027 | CHANNEL LINING CLASS III | 02484 | 329.000 |
329.000 |
$26.500 |
TON | 0.1 |
| 1028 | CLEARING AND GRUBBING (103 ACRES) | 02545 | 1.000 |
1.000 |
$75,697.000 |
LS | 0.8 |
| 1029 | SIGNS | 02562 | 261.000 |
261.000 |
$7.500 |
SQFT | 0.0 |
| 1030 | EDGE KEY | 02585 | 173.000 |
173.000 |
$4.800 |
LF | 0.0 |
| 1031 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 5,150.000 |
5,150.000 |
$2.500 |
SQYD | 0.1 |
| 1032 | FABRIC GEOTEXTILE TY IV FOR PIPE | 02600 | 19,546.000 |
19,546.000 |
$2.000 |
SQYD | 0.4 |
| 1033 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$31,250.000 |
LS | 0.3 |
| 1034 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 2.000 |
2.000 |
$1,500.000 |
EACH | 0.0 |
| 1035 | SAFELOADING | 02690 | 8.000 |
8.000 |
$1,000.000 |
CUYD | 0.1 |
| 1036 | TEMP SILT FENCE | 02701 | 14,875.000 |
14,875.000 |
$1.200 |
LF | 0.2 |
| 1037 | SILT TRAP TYPE A | 02703 | 94.000 |
94.000 |
$600.000 |
EACH | 0.6 |
| 1038 | SILT TRAP TYPE B | 02704 | 94.000 |
94.000 |
$140.000 |
EACH | 0.1 |
| 1039 | SILT TRAP TYPE C | 02705 | 94.000 |
94.000 |
$140.000 |
EACH | 0.1 |
| 1040 | CLEAN SILT TRAP TYPE A | 02706 | 282.000 |
282.000 |
$0.010 |
EACH | 0.0 |
| 1041 | CLEAN SILT TRAP TYPE B | 02707 | 282.000 |
282.000 |
$0.010 |
EACH | 0.0 |
| 1042 | CLEAN SILT TRAP TYPE C | 02708 | 282.000 |
282.000 |
$0.010 |
EACH | 0.0 |
| 1043 | CLEAN TEMP SILT FENCE | 02709 | 14,875.000 |
14,875.000 |
$0.010 |
LF | 0.0 |
| 1045 | STAKING | 02726 | 1.000 |
1.000 |
$74,500.000 |
LS | 0.7 |
| 1046 | EROSION CONTROL BLANKET | 05950 | 40,285.000 |
40,285.000 |
$1.050 |
SQYD | 0.4 |
| 1047 | TEMP MULCH | 05952 | 454,960.000 |
454,960.000 |
$0.010 |
SQYD | 0.0 |
| 1048 | TEMP SEEDING AND PROTECTION | 05953 | 30,492.000 |
30,492.000 |
$0.220 |
SQYD | 0.1 |
| 1049 | TOPDRESSING FERTILIZER | 05966 | 16.000 |
16.000 |
$680.000 |
TON | 0.1 |
| 1050 | SEEDING AND PROTECTION | 05985 | 304,920.000 |
304,920.000 |
$0.300 |
SQYD | 0.9 |
| 1051 | SPECIAL SEEDING CROWN VETCH | 05989 | 24,196.000 |
24,196.000 |
$0.170 |
SQYD | 0.0 |
| 1052 | SODDING | 05990 | 1,294.000 |
1,294.000 |
$6.250 |
SQYD | 0.1 |
| 1053 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 17,524.000 |
17,524.000 |
$0.120 |
LF | 0.0 |
| 1054 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 90,693.000 |
90,693.000 |
$0.130 |
LF | 0.1 |
| 1055 | PAVE MARKING-THERMO STOP BAR-12IN | 06567 | 232.000 |
232.000 |
$7.950 |
LF | 0.0 |
| 1056 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 96.000 |
96.000 |
$9.950 |
LF | 0.0 |
| 1057 | PAVE MARKING-THERMO CURV ARROW | 06574 | 29.000 |
29.000 |
$98.000 |
EACH | 0.0 |
| 1058 | TURF REINFORCEMENT MAT 1 | 23274EN11F | 12,527.000 |
12,527.000 |
$4.550 |
SQYD | 0.6 |
| 1059 | PAVE STRIPING-CHEVRON MARKINGS | 23791EC | 3,956.000 |
3,956.000 |
$0.480 |
SQFT | 0.0 |
| 1060 | PIPELINE VIDEO INSPECTION | 23131ER701 | 2,630.000 |
2,630.000 |
$6.000 |
LF | 0.2 |
| 8000 | FUEL ADJUSTMENT | 10020NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
| 8001 | CONDUIT-1 1/4 IN | 04793 | 0.000 |
463.000 |
$6.600 |
LF | 0.0 |
| 8002 | CONDUIT-2 IN | 04795 | 0.000 |
650.000 |
$7.700 |
LF | 0.0 |
| 8003 | ELECTRICAL JUNCTION BOX TYPE B | 04811 | 0.000 |
8.000 |
$330.000 |
EACH | 0.0 |
| 8004 | TRENCHING AND BACKFILLING | 04820 | 0.000 |
1,053.000 |
$4.400 |
LF | 0.0 |
| 8005 | LOOP WIRE | 04830 | 0.000 |
3,863.000 |
$4.400 |
LF | 0.0 |
| 8006 | CABLE-NO. 14/5C | 04844 | 0.000 |
1,235.000 |
$1.100 |
LF | 0.0 |
| 8007 | CABLE-NO. 14/1 PAIR | 04850 | 0.000 |
6,650.000 |
$1.320 |
LF | 0.0 |
| 8008 | MESSENGER-10800 LB | 04885 | 0.000 |
575.000 |
$4.400 |
LF | 0.0 |
| 8009 | LOOP SAW SLOT AND FILL | 04895 | 0.000 |
1,441.000 |
$1.100 |
LF | 0.0 |
| 8010 | INSTALL CONTROLLER TYPE 170 | 04931 | 0.000 |
1.000 |
$3,080.000 |
EACH | 0.0 |
| 8011 | INSTALL STEEL STRAIN POLE | 04932 | 0.000 |
4.000 |
$3,740.000 |
EACH | 0.0 |
| 8012 | INSTALL LED SIGNAL-3 SECTION | 20188NS835 | 0.000 |
8.000 |
$110.000 |
EACH | 0.0 |
| 8013 | INSTALL LED SIGNAL- 4 SECTION | 20266ES835 | 0.000 |
2.000 |
$220.000 |
EACH | 0.0 |
| 8014 | TRAFFIC SIGNAL POLE BASE | 23157EN | 0.000 |
18.840 |
$220.000 |
CUYD | 0.0 |
| 8015 | INSTALL ANTENNA | 23982EC | 0.000 |
1.000 |
$220.000 |
EACH | 0.0 |
| 8016 | MAINTAIN & CONTROL TRAFFIC (Signal) | 02650 | 0.000 |
1.000 |
$1,800.000 |
LS | 0.0 |
| 8017 | STAKING (Signal) | 02726 | 0.000 |
1.000 |
$1,200.000 |
LS | 0.0 |
| 8019 | PIPE UNDERCUT | 02219 | 0.000 |
186.000 |
$20.000 |
CUYD | 0.0 |
| 8020 | CLEAN SINKHOLE | 02469 | 0.000 |
1.000 |
$5,000.000 |
EACH | 0.0 |
| 8021 | ASPHALT ADJUSTMENT | 10030NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
| 8022 | STEEL ENCASEMENT PIPE-16 IN | 01073 | 0.000 |
180.000 |
$155.000 |
LF | 0.0 |
| 8023 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 0.000 |
1.000 |
$9,900.000 |
LS | 0.0 |
| 8024 | CEMENT STABILIZED ROADBED | 00008 | 0.000 |
72,091.000 |
$2.060 |
SQYD | 0.0 |
| 8025 | CEMENT | 02542 | 0.000 |
1,374.620 |
$141.610 |
TON | 0.0 |
| 8026 | FLUME INLET TYPE 2 | 01691 | 0.000 |
7.000 |
$4,150.000 |
EACH | 0.0 |
| 8027 | ASPHALT WEDGE CURB | 01897 | 0.000 |
1,600.000 |
$8.480 |
LF | 0.0 |
| 8028 | NON-SPEC MATERIAL - | 10070NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
| 8029 | LOT PAY ADJUSTMENT | 10000NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
| 8030 | RIDE QUALITY ADJUSTMENT ASPHALT | 10005NS | 0.000 |
1.000 |
$37,540.000 |
DOLL | 0.0 |
Category Total $1,329,380.70 |
| SM- Project | DE0470NEW11W1 | CATEGORY NUMBER | 0002 | CATEGORY Description | PAVING | ASPHALT ALTERNATE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 2001 | DGA BASE | 00001 | 95,410.000 |
95,410.000 |
$12.180 |
TON | 11.6 |
| 2002 | LIME STABILIZED ROADBED | 00013 | 117,138.000 |
66,657.700 |
$2.060 |
SQYD | 2.4 |
| 2003 | LIME | 00014 | 2,109.000 |
987.090 |
$149.240 |
TON | 3.1 |
| 2004 | DRAINAGE BLANKET-TYPE II-ASPH | 00018 | 18,416.000 |
18,416.000 |
$36.470 |
TON | 6.7 |
| 2005 | ASPHALT SEAL AGGREGATE | 00100 | 440.000 |
440.000 |
$65.100 |
TON | 0.3 |
| 2006 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 12,581.000 |
12,581.000 |
$45.000 |
TON | 5.7 |
| 2007 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 47,107.000 |
47,107.000 |
$43.670 |
TON | 20.6 |
| 2008 | EMULSIFIED ASPHALT RS-2 | 00291 | 53.000 |
53.000 |
$828.000 |
TON | 0.4 |
| 2009 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 2,658.000 |
2,658.000 |
$54.900 |
TON | 1.5 |
| 2010 | CL2 ASPH SURF 0.38B PG64-22 | 00307 | 642.000 |
642.000 |
$57.480 |
TON | 0.4 |
| 2011 | ASPHALT CURING SEAL | 00358 | 117.000 |
131.920 |
$404.000 |
TON | 0.5 |
| 2012 | SAND FOR BLOTTER | 02702 | 292.000 |
292.000 |
$27.250 |
TON | 0.1 |
| 2013 | CL3 ASPH SURF 0.38A PG64-22 | 22906ES403 | 6,716.000 |
6,716.000 |
$57.100 |
TON | 3.8 |
| 2014 | ROADWAY EXCAVATION | 02200 | 484,018.000 |
484,018.000 |
$2.220 |
CUYD | 10.7 |
| 2015 | GRANULAR EMBANKMENT | 02223 | 4,185.000 |
4,185.000 |
$20.000 |
CUYD | 0.8 |
| 2016 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 26,650.000 |
26,650.000 |
$1.400 |
SQYD | 0.4 |
| 2017 | PAVEMENT ADJUSTMENT (ASPHALT) | 10203ND | 1.000 |
1.000 |
$589,633.000 |
LS | 5.9 |
Category Total $7,492,310.37 |
| SM- Project | DE0470NEW11W1 | CATEGORY NUMBER | 0005 | CATEGORY Description | DRAINAGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 5001 | ENTRANCE PIPE-15 IN | 00440 | 244.000 |
244.000 |
$30.500 |
LF | 0.1 |
| 5002 | ENTRANCE PIPE-18 IN | 00441 | 104.000 |
104.000 |
$35.000 |
LF | 0.0 |
| 5003 | ENTRANCE PIPE-30 IN | 00445 | 30.000 |
30.000 |
$53.500 |
LF | 0.0 |
| 5004 | CULVERT PIPE-15 IN | 00461 | 235.000 |
235.000 |
$50.500 |
LF | 0.1 |
| 5005 | CULVERT PIPE-18 IN | 00462 | 1,038.000 |
1,038.000 |
$48.000 |
LF | 0.5 |
| 5006 | CULVERT PIPE-24 IN | 00464 | 759.000 |
759.000 |
$61.500 |
LF | 0.5 |
| 5007 | CULVERT PIPE-30 IN | 00466 | 659.000 |
659.000 |
$73.000 |
LF | 0.5 |
| 5008 | CULVERT PIPE-36 IN | 00468 | 359.000 |
359.000 |
$82.500 |
LF | 0.3 |
| 5009 | CULVERT PIPE-54 IN | 00471 | 231.000 |
231.000 |
$158.000 |
LF | 0.4 |
| 5010 | CULVERT PIPE-60 IN | 00472 | 170.000 |
170.000 |
$203.000 |
LF | 0.3 |
| 5011 | CULVERT PIPE-42 IN EQUIV | 00498 | 130.000 |
130.000 |
$163.000 |
LF | 0.2 |
| 5012 | STORM SEWER PIPE-15 IN | 00521 | 583.000 |
583.000 |
$34.500 |
LF | 0.2 |
| 5013 | STORM SEWER PIPE-18 IN | 00522 | 915.000 |
915.000 |
$44.500 |
LF | 0.4 |
| 5014 | STORM SEWER PIPE-24 IN | 00524 | 127.000 |
127.000 |
$51.500 |
LF | 0.1 |
| 5015 | STORM SEWER PIPE-36 IN | 00528 | 122.000 |
122.000 |
$87.500 |
LF | 0.1 |
| 5016 | METAL END SECTION TY 4-42 IN | 01416 | 2.000 |
2.000 |
$6,000.000 |
EACH | 0.1 |
| 5017 | SLOPED BOX OUTLET TYPE 1-15 IN | 01432 | 5.000 |
5.000 |
$1,200.000 |
EACH | 0.1 |
| 5018 | SLOPED BOX OUTLET TYPE 1-18 IN | 01433 | 5.000 |
5.000 |
$1,200.000 |
EACH | 0.1 |
| 5019 | SLOPED BOX OUTLET TYPE 1-24 IN | 01434 | 6.000 |
6.000 |
$1,700.000 |
EACH | 0.1 |
| 5020 | S & F BOX INLET-OUTLET-18 IN | 01450 | 4.000 |
4.000 |
$1,650.000 |
EACH | 0.1 |
| 5021 | S & F BOX INLET-OUTLET-24 IN | 01451 | 2.000 |
2.000 |
$2,100.000 |
EACH | 0.0 |
| 5022 | S & F BOX INLET-OUTLET-30 IN | 01452 | 6.000 |
6.000 |
$3,500.000 |
EACH | 0.2 |
| 5023 | S & F BOX INLET-OUTLET-36 IN | 01453 | 2.000 |
2.000 |
$4,200.000 |
EACH | 0.1 |
| 5024 | DROP BOX INLET TYPE 1 | 01490 | 2.000 |
2.000 |
$2,600.000 |
EACH | 0.1 |
| 5025 | DROP BOX INLET TYPE 3 | 01496 | 1.000 |
1.000 |
$2,000.000 |
EACH | 0.0 |
| 5026 | DROP BOX INLET TYPE 5B | 01505 | 21.000 |
21.000 |
$2,775.000 |
EACH | 0.6 |
| 5027 | DROP BOX INLET TYPE 10 | 01541 | 2.000 |
2.000 |
$1,700.000 |
EACH | 0.0 |
| 5028 | DROP BOX INLET TYPE 15 | 01580 | 5.000 |
5.000 |
$1,200.000 |
EACH | 0.1 |
| 5030 | CONCRETE-CLASS A | 08100 | 81.280 |
81.280 |
$975.000 |
CUYD | 0.8 |
| 5031 | STEEL REINFORCEMENT | 08150 | 4,532.000 |
4,532.000 |
$2.000 |
LB | 0.1 |
Category Total $606,613.00 |
| SM- Project | DE0470NEW11W1 | CATEGORY NUMBER | 0006 | CATEGORY Description | MOBILIZATION / DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 6001 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$441,933.550 |
LS | 4.4 |
| 6002 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$132,580.070 |
LS | 1.3 |
| 8018 | MOBILIZATION (Signal) | 02568 | 0.000 |
1.000 |
$320.000 |
LS | 0.0 |
Category Total $574,513.62 |