Item List 111054 |
Date:08/10/2018 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 111054 | Primary Project Number | DE00900681154 |
Contract Description | PARIS-MAYSVILLE ROAD (US 68) | ||
Primary County | BOURBON | Fed/St Number | NH 0681(025) |
Vendor ID | 03229 | Vendor Name | HINKLE CONTRACTING COMPANY LLC |
Bid Amount | $ 26,491,970.87 |
SM- Project | DE00900681154 |
Fed/State Number | NH 0681(025) |
Project Description | PARIS-MAYSVILLE ROAD (US 68) |
*********** |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0010 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 118.000 |
118.000 |
$71.000 |
TON | 0.0 |
0020 | ENTRANCE PIPE-15 IN | 00440 | 146.000 |
146.000 |
$35.000 |
LF | 0.0 |
0030 | ENTRANCE PIPE-18 IN | 00441 | 287.000 |
287.000 |
$38.000 |
LF | 0.0 |
0040 | ENTRANCE PIPE-24 IN | 00443 | 159.000 |
159.000 |
$40.000 |
LF | 0.0 |
0050 | CULVERT PIPE-15 IN | 00461 | 208.000 |
208.000 |
$68.000 |
LF | 0.1 |
0060 | CULVERT PIPE-18 IN | 00462 | 1,931.000 |
2,030.000 |
$52.000 |
LF | 0.4 |
0070 | CULVERT PIPE-24 IN | 00464 | 261.000 |
229.000 |
$56.000 |
LF | 0.1 |
0080 | CULVERT PIPE-30 IN | 00466 | 525.000 |
525.000 |
$66.000 |
LF | 0.1 |
0090 | CULVERT PIPE-36 IN | 00468 | 1,247.000 |
1,247.000 |
$75.000 |
LF | 0.4 |
0100 | CULVERT PIPE-42 IN | 00469 | 491.000 |
491.000 |
$85.000 |
LF | 0.2 |
0110 | CULVERT PIPE-48 IN | 00470 | 221.000 |
221.000 |
$100.000 |
LF | 0.1 |
0120 | CULVERT PIPE-15 IN EQUIV | 00490 | 235.000 |
235.000 |
$48.000 |
LF | 0.0 |
0130 | STORM SEWER PIPE-18 IN | 00522 | 893.000 |
893.000 |
$40.000 |
LF | 0.1 |
0140 | STORM SEWER PIPE-24 IN | 00524 | 2,035.000 |
2,035.000 |
$43.000 |
LF | 0.3 |
0150 | STORM SEWER PIPE-30 IN | 00526 | 359.000 |
359.000 |
$58.000 |
LF | 0.1 |
0160 | STORM SEWER PIPE-36 IN | 00528 | 370.000 |
370.000 |
$68.000 |
LF | 0.1 |
0170 | STORM SEWER PIPE-42 IN | 00529 | 158.000 |
158.000 |
$88.000 |
LF | 0.1 |
0180 | PERFORATED PIPE-4 IN | 01000 | 107,765.000 |
92,565.000 |
$3.400 |
LF | 1.4 |
0190 | PERFORATED PIPE-6 IN | 01001 | 17,105.000 |
11,536.000 |
$3.900 |
LF | 0.3 |
0200 | NON-PERFORATED PIPE-4 IN | 01010 | 1,948.000 |
2,147.000 |
$9.150 |
LF | 0.1 |
0210 | NON-PERFORATED PIPE-6 IN | 01011 | 185.000 |
83.000 |
$12.000 |
LF | 0.0 |
0220 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 1.000 |
1.000 |
$15,040.000 |
LS | 0.1 |
0230 | PERF PIPE HEADWALL TY 1-4 IN | 01020 | 11.000 |
11.000 |
$399.650 |
EACH | 0.0 |
0240 | PERF PIPE HEADWALL TY 1-6 IN | 01021 | 2.000 |
2.000 |
$400.000 |
EACH | 0.0 |
0250 | PERF PIPE HEADWALL TY 3-4 IN | 01028 | 25.000 |
25.000 |
$410.000 |
EACH | 0.0 |
0260 | PERF PIPE HEADWALL TY 3-6 IN | 01029 | 5.000 |
5.000 |
$410.000 |
EACH | 0.0 |
0270 | PERF PIPE HEADWALL TY 4-4 IN | 01032 | 69.000 |
69.000 |
$410.000 |
EACH | 0.1 |
0280 | PERF PIPE HEADWALL TY 4-6 IN | 01033 | 6.000 |
6.000 |
$410.000 |
EACH | 0.0 |
0290 | STEEL ENCASEMENT PIPE-6 IN | 01063 | 948.000 |
1,258.000 |
$40.000 |
LF | 0.1 |
0300 | METAL END SECTION TY 1-18 IN | 01371 | 1.000 |
1.000 |
$1,550.000 |
EACH | 0.0 |
0310 | METAL END SECTION TY 3-30 IN | 01394 | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.0 |
0320 | METAL END SECTION TY 3-42 IN | 01396 | 2.000 |
2.000 |
$4,200.000 |
EACH | 0.0 |
0330 | METAL END SECTION TY 4-15 IN | 01410 | 2.000 |
2.000 |
$900.000 |
EACH | 0.0 |
0340 | SLOPED BOX OUTLET TYPE 1-15 IN | 01432 | 3.000 |
3.000 |
$1,500.000 |
EACH | 0.0 |
0350 | SLOPED BOX OUTLET TYPE 1-18 IN | 01433 | 5.000 |
5.000 |
$1,600.000 |
EACH | 0.0 |
0360 | SLOPED BOX OUTLET TYPE 1-24 IN | 01434 | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.0 |
0370 | SLOPED BOX INLET-OUTLET TYPE 2 | 01441 | 4.000 |
4.000 |
$1,825.000 |
EACH | 0.0 |
0380 | S & F BOX INLET-OUTLET-18 IN | 01450 | 4.000 |
4.000 |
$2,400.000 |
EACH | 0.0 |
0390 | S & F BOX INLET-OUTLET-24 IN | 01451 | 7.000 |
7.000 |
$2,800.000 |
EACH | 0.1 |
0400 | S & F BOX INLET-OUTLET-30 IN | 01452 | 4.000 |
4.000 |
$4,000.000 |
EACH | 0.1 |
0410 | S & F BOX INLET-OUTLET-36 IN | 01453 | 2.000 |
2.000 |
$7,000.000 |
EACH | 0.1 |
0420 | CURB BOX INLET TYPE A | 01456 | 6.000 |
6.000 |
$3,800.000 |
EACH | 0.1 |
0430 | DROP BOX INLET TYPE 1 | 01490 | 6.000 |
6.000 |
$2,600.000 |
EACH | 0.1 |
0440 | DROP BOX INLET TYPE 2 | 01493 | 1.000 |
1.000 |
$2,600.000 |
EACH | 0.0 |
0450 | DROP BOX INLET TYPE 5B | 01505 | 26.000 |
26.000 |
$2,700.000 |
EACH | 0.3 |
0460 | DROP BOX INLET TYPE 5C | 01508 | 4.000 |
4.000 |
$2,700.000 |
EACH | 0.0 |
0470 | DROP BOX INLET TYPE 5F | 01517 | 1.000 |
1.000 |
$2,700.000 |
EACH | 0.0 |
0480 | DROP BOX INLET TYPE 7 | 01538 | 3.000 |
3.000 |
$6,200.000 |
EACH | 0.1 |
0490 | DROP BOX INLET TYPE 14 | 01577 | 4.000 |
4.000 |
$1,000.000 |
EACH | 0.0 |
0500 | REMOVE CURB & GUTTER BOX INLET | 01705 | 1.000 |
1.000 |
$1,000.000 |
EACH | 0.0 |
0510 | CORED HOLE DRAINAGE BOX CON-4 IN | 01740 | 61.000 |
61.000 |
$160.000 |
EACH | 0.0 |
0520 | CORED HOLE DRAINAGE BOX CON-6 IN | 01741 | 7.000 |
7.000 |
$200.000 |
EACH | 0.0 |
0530 | ISLAND CURB AND GUTTER | 01825 | 638.000 |
638.000 |
$40.000 |
LF | 0.1 |
0540 | DELINEATOR FOR GUARDRAIL-YELLOW | 01983 | 198.000 |
198.000 |
$5.000 |
EACH | 0.0 |
0550 | BARRICADE-TYPE III | 02014 | 10.000 |
10.000 |
$190.000 |
EACH | 0.0 |
0560 | REMOVE PAVEMENT | 02091 | 9,916.000 |
9,916.000 |
$2.500 |
SQYD | 0.1 |
0570 | TEMP DITCH | 02159 | 16,877.000 |
16,877.000 |
$0.470 |
LF | 0.0 |
0580 | CLEAN TEMP DITCH | 02160 | 16,877.000 |
16,877.000 |
$0.080 |
LF | 0.0 |
0590 | GRANULAR EMBANKMENT | 02223 | 66,820.000 |
62,709.000 |
$20.750 |
CUYD | 5.2 |
0600 | EMBANKMENT IN PLACE | 02230 | 689,238.000 |
714,980.670 |
$6.110 |
CUYD | 15.9 |
0610 | WATER | 02242 | 6,392.000 |
6,392.000 |
$0.100 |
MGAL | 0.0 |
0620 | FENCE-WOVEN WIRE TYPE 1 | 02262 | 7,893.000 |
7,893.000 |
$4.600 |
LF | 0.1 |
0630 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 13,162.000 |
13,137.000 |
$15.300 |
LF | 0.8 |
0640 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 22.000 |
22.000 |
$40.000 |
EACH | 0.0 |
0650 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 14.000 |
14.000 |
$500.000 |
EACH | 0.0 |
0660 | GUARDRAIL END TREATMENT TYPE 7 | 02371 | 4.000 |
4.000 |
$800.000 |
EACH | 0.0 |
0670 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 2.000 |
2.000 |
$500.000 |
EACH | 0.0 |
0680 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 10.000 |
10.000 |
$1,700.000 |
EACH | 0.1 |
0690 | TEMP GUARDRAIL | 02397 | 487.500 |
487.500 |
$9.000 |
LF | 0.0 |
0700 | RIGHT-OF-WAY MONUMENT TYPE 1 | 02429 | 295.000 |
295.000 |
$55.000 |
EACH | 0.1 |
0710 | WITNESS POST | 02432 | 23.000 |
23.000 |
$65.000 |
EACH | 0.0 |
0720 | PLUG WATER WELL | 02475 | 1.000 |
1.000 |
$1,200.000 |
EACH | 0.0 |
0730 | CHANNEL LINING CLASS II | 02483 | 3,145.000 |
3,145.000 |
$23.300 |
TON | 0.3 |
0740 | CHANNEL LINING CLASS III | 02484 | 3,071.000 |
3,071.000 |
$28.850 |
TON | 0.3 |
0750 | CLEARING AND GRUBBING 228 ACRES | 02545 | 1.000 |
1.000 |
$164,000.000 |
LS | 0.6 |
0760 | SIGNS | 02562 | 390.250 |
390.250 |
$4.500 |
SQFT | 0.0 |
0770 | PROJECT CPM SCHEDULE | 02570 | 1.000 |
1.000 |
$9,980.000 |
LS | 0.0 |
0780 | EDGE KEY | 02585 | 162.000 |
162.000 |
$98.000 |
LF | 0.1 |
0790 | FABRIC-GEOTEXTILE TYPE III | 02598 | 14,847.000 |
14,847.000 |
$1.110 |
SQYD | 0.1 |
0800 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 182,575.000 |
368,909.000 |
$1.180 |
SQYD | 0.8 |
0810 | FABRIC GEOTEXTILE TY IV FOR PIPE | 02600 | 34,135.000 |
34,135.000 |
$2.000 |
SQYD | 0.3 |
0820 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$166,500.000 |
LS | 0.6 |
0830 | DIVERSIONS (BY-PASS DETOURS) NO. 1 | 02651 | 1.000 |
0.000 |
$3,350.000 |
LS | 0.0 |
0840 | DIVERSIONS (BY-PASS DETOURS) NO. 2 | 02651 | 1.000 |
0.000 |
$8,650.000 |
LS | 0.0 |
0850 | DIVERSIONS (BY-PASS DETOURS) NO. 3 | 02651 | 1.000 |
1.000 |
$3,350.000 |
LS | 0.0 |
0860 | DIVERSIONS (BY-PASS DETOURS) NO. 4 | 02651 | 1.000 |
0.000 |
$2,350.000 |
LS | 0.0 |
0870 | DIVERSIONS (BY-PASS DETOURS) NO. 5 | 02651 | 1.000 |
1.000 |
$19,200.000 |
LS | 0.1 |
0880 | DIVERSIONS (BY-PASS DETOURS) NO. 6 | 02651 | 1.000 |
1.000 |
$3,350.000 |
LS | 0.0 |
0890 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 3.000 |
3.000 |
$6,000.000 |
EACH | 0.1 |
0900 | SAFELOADING | 02690 | 20.200 |
20.200 |
$225.000 |
CUYD | 0.0 |
0910 | TEMP SILT FENCE | 02701 | 16,877.000 |
16,877.000 |
$2.050 |
LF | 0.1 |
0920 | SILT TRAP TYPE A | 02703 | 228.000 |
228.000 |
$20.000 |
EACH | 0.0 |
0930 | SILT TRAP TYPE B | 02704 | 228.000 |
228.000 |
$196.800 |
EACH | 0.2 |
0940 | SILT TRAP TYPE C | 02705 | 228.000 |
228.000 |
$20.000 |
EACH | 0.0 |
0950 | CLEAN SILT TRAP TYPE A | 02706 | 684.000 |
684.000 |
$5.000 |
EACH | 0.0 |
0960 | CLEAN SILT TRAP TYPE B | 02707 | 684.000 |
684.000 |
$23.800 |
EACH | 0.1 |
0970 | CLEAN SILT TRAP TYPE C | 02708 | 684.000 |
684.000 |
$5.000 |
EACH | 0.0 |
0980 | CLEAN TEMP SILT FENCE | 02709 | 16,877.000 |
16,877.000 |
$0.050 |
LF | 0.0 |
0990 | STAKING | 02726 | 1.000 |
1.000 |
$69,000.000 |
LS | 0.3 |
1000 | REMOVE STRUCTURE 5.8' X 12 ' RCBC | 02731 | 1.000 |
1.000 |
$4,300.000 |
LS | 0.0 |
1010 | REMOVE STRUCTURE 6.6' X 3.2' RCBC | 02731 | 1.000 |
1.000 |
$4,300.000 |
LS | 0.0 |
1020 | REMOVE STRUCTURE 8.5' X 5.5' STONE WALL | 02731 | 1.000 |
1.000 |
$1,350.000 |
LS | 0.0 |
1030 | ARROW PANEL | 02775 | 4.000 |
4.000 |
$2,500.000 |
EACH | 0.0 |
1040 | EROSION CONTROL BLANKET | 05950 | 76,652.000 |
76,430.000 |
$1.100 |
SQYD | 0.3 |
1050 | TEMP MULCH | 05952 | 1,101,301.000 |
1,101,301.000 |
$0.180 |
SQYD | 0.7 |
1060 | TEMP SEEDING AND PROTECTION | 05953 | 110,130.000 |
110,130.000 |
$0.200 |
SQYD | 0.1 |
1070 | TOPDRESSING FERTILIZER | 05966 | 57.000 |
57.000 |
$200.000 |
TON | 0.0 |
1080 | SEEDING AND PROTECTION | 05985 | 1,101,301.000 |
1,101,301.000 |
$0.300 |
SQYD | 1.2 |
1090 | SPECIAL SEEDING CROWN VETCH | 05989 | 78,511.000 |
78,511.000 |
$0.050 |
SQYD | 0.0 |
1100 | SODDING | 05990 | 7,348.000 |
7,348.000 |
$5.200 |
SQYD | 0.1 |
1110 | PAVE STRIPING-TEMP PAINT-4 IN WHITE | 06510 | 136,640.000 |
136,640.000 |
$0.140 |
LF | 0.1 |
1120 | PAVE STRIPING-TEMP PAINT-4 IN YELLOW | 06510 | 136,640.000 |
136,640.000 |
$0.140 |
LF | 0.1 |
1130 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 160,151.000 |
160,151.000 |
$0.160 |
LF | 0.1 |
1140 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 500.000 |
500.000 |
$2.500 |
LF | 0.0 |
1150 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 500.000 |
500.000 |
$1.250 |
LF | 0.0 |
1160 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 500.000 |
500.000 |
$1.250 |
LF | 0.0 |
1170 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 550.000 |
550.000 |
$8.000 |
LF | 0.0 |
1180 | PAVE MARKING-THERMO CROSS-HATCH | 06569 | 8,272.000 |
8,272.000 |
$2.750 |
SQFT | 0.1 |
1190 | PAVE MARKING-THERMO STR ARROW | 06573 | 16.000 |
16.000 |
$80.000 |
EACH | 0.0 |
1200 | PAVE MARKING-THERMO CURV ARROW | 06574 | 41.000 |
41.000 |
$80.000 |
EACH | 0.0 |
1210 | PAVEMENT MARKER TY IVA-BY TEMP | 06588 | 157.000 |
157.000 |
$9.000 |
EACH | 0.0 |
1220 | PAVEMENT MARKER TYPE V-MW | 06589 | 156.000 |
156.000 |
$19.000 |
EACH | 0.0 |
1230 | PAVEMENT MARKER TYPE V-BY | 06591 | 68.000 |
68.000 |
$19.000 |
EACH | 0.0 |
1240 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 743.000 |
743.000 |
$19.000 |
EACH | 0.1 |
1250 | CONCRETE-CLASS A | 08100 | 110.000 |
109.580 |
$900.000 |
CUYD | 0.4 |
1260 | STEEL REINFORCEMENT | 08150 | 5,751.500 |
5,751.500 |
$2.500 |
LB | 0.1 |
1270 | GUARDRAIL STEEL W BEAM-S FACE CR | 20060ES719 | 2,063.000 |
2,063.000 |
$19.500 |
LF | 0.2 |
1280 | GUARDRAIL TERMINAL SECT NO.1 CR | 20062ES719 | 2.000 |
2.000 |
$60.000 |
EACH | 0.0 |
1290 | DRY-LAID ROCK FENCE | 20063EN9T | 1,010.000 |
1,050.000 |
$175.000 |
LF | 0.7 |
1300 | GUARDRAIL END TREATMENT TY 2A-CR | 20285ES719 | 1.000 |
1.000 |
$700.000 |
EACH | 0.0 |
1310 | GUARDRAIL END TREAT TY 4A-CR | 20312ES719 | 1.000 |
1.000 |
$2,100.000 |
EACH | 0.0 |
1320 | JUNCTION BOX TYPE A | 20391NS835 | 2.000 |
4.000 |
$1,000.000 |
EACH | 0.0 |
1330 | ENTRANCE PIPE-48 IN | 21257ED | 46.000 |
46.000 |
$92.000 |
LF | 0.0 |
1340 | BORE AND JACK PIPE-24 IN | 21799EN | 20.000 |
0.000 |
$375.000 |
LF | 0.0 |
1350 | PIPELINE VIDEO INSPECTION | 23131ER701 | 4,370.000 |
4,370.000 |
$4.150 |
LF | 0.1 |
8001 | DEMOLITION Includes 2 Barns and 1 Trailer | 22829NN | 0.000 |
1.000 |
$24,850.000 |
LS | 0.0 |
8002 | PVC PIPE-2 IN | 03381 | 0.000 |
250.000 |
$4.990 |
LF | 0.0 |
8003 | PVC PIPE-4 IN SCHEDULE 80 | 03383 | 0.000 |
30.000 |
$18.000 |
LF | 0.0 |
8004 | TIE-IN TO WATER LINE | 03460 | 0.000 |
2.000 |
$400.000 |
EACH | 0.0 |
8005 | EW~ DRAIN DRY-LAID ROCK FENCE | 10094NX | 0.000 |
1.000 |
$1,050.000 |
EACH | 0.0 |
8006 | REMOVE FENCE DRY-LAID STONE | 02265 | 0.000 |
8.000 |
$39.380 |
LF | 0.0 |
8007 | REMOVE & RESET FENCE | 02267 | 0.000 |
124.000 |
$3.250 |
LF | 0.0 |
8008 | GUARDRAIL END TREATMENT TYPE 7 Temporary | 02371 | 0.000 |
2.000 |
$825.000 |
EACH | 0.0 |
8010 | PERFORATED PIPE-4 IN | 01000 | 0.000 |
15,200.001 |
$5.400 |
LF | 0.0 |
8011 | NON-PERFORATED PIPE-4 IN | 01010 | 0.000 |
199.001 |
$11.150 |
LF | 0.0 |
8012 | PERFORATED PIPE-6 IN | 01001 | 0.000 |
5,569.001 |
$5.900 |
LF | 0.0 |
8013 | NON-PERFORATED PIPE-6 IN | 01011 | 0.000 |
102.001 |
$14.000 |
LF | 0.0 |
8014 | CONDUIT-1 1/4 INCH | 04793 | 0.000 |
60.000 |
$7.780 |
LF | 0.0 |
8015 | CONDUIT-2 INCH | 04795 | 0.000 |
125.000 |
$11.110 |
LF | 0.0 |
8016 | JUNCTION BOX TYPE B | 04811 | 0.000 |
2.000 |
$527.780 |
EACH | 0.0 |
8017 | TRENCHING AND BACKFILLING | 04820 | 0.000 |
180.000 |
$4.440 |
LF | 0.0 |
8018 | PIEZOELECTRIC SENSOR | 04829 | 0.000 |
8.000 |
$1,611.110 |
EACH | 0.0 |
8019 | LOOP WIRE | 04830 | 0.000 |
2,200.000 |
$0.670 |
LF | 0.0 |
8020 | POLE 35 FT WOODEN | 04871 | 0.000 |
1.000 |
$1,000.000 |
EACH | 0.0 |
8021 | LOOP SAW SLOT AND FILL | 04895 | 0.000 |
370.000 |
$13.330 |
LF | 0.0 |
8022 | ELECTRICAL SERVICE | 04899 | 0.000 |
1.000 |
$2,666.670 |
EACH | 0.0 |
8023 | ELECTRICAL JUNCTION BOX TYPE A | 20391NS835 | 0.000 |
4.000 |
$722.220 |
EACH | 0.0 |
8024 | INSTALL CONTROLLER CABINET | 23206EC | 0.000 |
1.000 |
$3,111.110 |
EACH | 0.0 |
8025 | MAINTAIN & CONTROL TRAFFIC for ATR installation | 02650 | 0.000 |
1.000 |
$2,223.000 |
LS | 0.0 |
8026 | BORE AND JACK PIPE-6 IN | 21384ED | 0.000 |
310.000 |
$200.000 |
LF | 0.0 |
8027 | PVC PIPE-2 IN Parcel 43 | 03381 | 0.000 |
375.000 |
$9.000 |
LF | 0.0 |
8028 | TIE-IN TO WATERLINE Parcel 43 | 03479 | 0.000 |
2.000 |
$830.000 |
EACH | 0.0 |
8029 | REMOVE FENCE | 02265 | 0.000 |
900.000 |
$1.750 |
LF | 0.0 |
8030 | GEOGRID REINFORCEMENT | 20263ED | 0.000 |
211,000.000 |
$1.800 |
SQYD | 0.0 |
8031 | SHOULDERING | 02714 | 0.000 |
15,687.760 |
$1.310 |
LF | 0.0 |
8032 | VALUE ENGINEERING | 10121NX | 0.000 |
120,809.990 |
$1.000 |
DOLL | 0.0 |
8033 | DIVERSIONS (BY-PASS DETOURS) NO. 1 (REVISED) | 02651 | 0.000 |
1.000 |
$5,598.480 |
LS | 0.0 |
8034 | DIVERSIONS (BY-PASS DETOURS) NO. 2 (REVISED) | 02651 | 0.000 |
1.000 |
$16,730.220 |
LS | 0.0 |
8035 | DIVERSIONS (BY-PASS DETOURS) NO. 4 (REVISED) | 02651 | 0.000 |
1.000 |
$31,916.740 |
LS | 0.0 |
8036 | ASPHALT ADJUSTMENT | 10030NS | 0.000 |
36,596.920 |
$1.000 |
DOLL | 0.0 |
8037 | FUEL ADJUSTMENT | 10020NS | 0.000 |
-13,678.230 |
$1.000 |
DOLL | 0.0 |
8038 | CULVERT PIPE-21 IN -Temporary | 00463 | 0.000 |
80.000 |
$23.000 |
LF | 0.0 |
8039 | SECURITY PLATE ASSEMBLY | 24585EC | 0.000 |
74.000 |
$206.250 |
EACH | 0.0 |
8040 | MOWING OF SLOPES | 20527EC | 0.000 |
38.700 |
$89.110 |
ACRE | 0.0 |
8041 | MILLED RUMBLE STRIPS | 20314ED | 0.000 |
130,000.000 |
$0.250 |
LF | 0.0 |
8042 | WATER BLASTING EXISTING STRIPE | 22664EN | 0.000 |
185.000 |
$5.320 |
LF | 0.0 |
8043 | PAVE MARKING-THERMO MERGE ARROW | 06578 | 0.000 |
5.000 |
$360.000 |
EACH | 0.0 |
8044 | PAVE MARKING-THERMO R 6 FT | 06562 | 0.000 |
8.000 |
$135.000 |
EACH | 0.0 |
8045 | PAVE MARK TY 1 TAPE R/R X BUCKS-16 IN | 23266ES717 | 0.000 |
160.000 |
$8.900 |
LF | 0.0 |
8046 | MAINTAIN & CONTROL TRAFFIC FOR R/R MARKINGS | 02650 | 0.000 |
1.000 |
$850.000 |
LS | 0.0 |
8047 | PIPE DEFLECTION DEDUCTION | 10065NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8048 | RIDE QUALITY ADJUSTMENT ASPHALT | 10005NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $9,567,851.36 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0002 | CATEGORY Description | PAVING-ASPH ALT |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1360 | CRUSHED STONE BASE | 00003 | 104,940.000 |
126,899.000 |
$18.850 |
TON | 7.5 |
1370 | LIME STABILIZED ROADBED | 00013 | 339,611.000 |
40,036.300 |
$2.300 |
SQYD | 2.9 |
1380 | LIME | 00014 | 6,284.000 |
466.208 |
$124.000 |
TON | 2.9 |
1390 | LEVELING & WEDGING PG64-22 | 00190 | 635.000 |
635.000 |
$74.000 |
TON | 0.2 |
1400 | CL2 ASPH BASE 1.50D PG64-22 | 00203 | 1,664.000 |
1,664.000 |
$63.000 |
TON | 0.4 |
1410 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 15,098.000 |
15,063.000 |
$58.800 |
TON | 3.4 |
1420 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 115,935.000 |
115,778.000 |
$58.800 |
TON | 25.7 |
1430 | CL2 ASPH BASE 0.75D PG64-22 | 00221 | 6,569.000 |
6,572.000 |
$66.000 |
TON | 1.6 |
1440 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 7,411.000 |
9,296.000 |
$71.000 |
TON | 2.0 |
1450 | CL3 ASPH SURF 0.38D PG64-22 | 00339 | 81.000 |
57.000 |
$95.000 |
TON | 0.0 |
1460 | ASPHALT CURING SEAL | 00358 | 339.000 |
1.213 |
$475.000 |
TON | 0.6 |
1470 | CL3 ASPH SURF 0.38B PG64-22 | 00388 | 13,860.000 |
13,868.000 |
$73.750 |
TON | 3.9 |
1480 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$2,400.000 |
LS | 0.0 |
1490 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 81.000 |
81.000 |
$95.000 |
TON | 0.0 |
1500 | SAND FOR BLOTTER | 02702 | 849.000 |
3.033 |
$30.000 |
TON | 0.1 |
1510 | PAVEMENT ADJUSTMENT ASPH | 10203ND | 1.000 |
1.000 |
$0.000 |
LS | 0.0 |
1520 | SAWCUT PAVEMENT | 20550ND | 3,087.000 |
3,087.000 |
$1.000 |
LF | 0.0 |
Category Total $13,584,284.70 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0004 | CATEGORY Description | BRIDGE-CULVERT | 26765 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1710 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 26.000 |
26.000 |
$40.000 |
CUYD | 0.0 |
1720 | FOUNDATION PREPARATION 26765 | 08003 | 1.000 |
1.000 |
$5,700.000 |
LS | 0.0 |
1730 | CONCRETE-CLASS A | 08100 | 208.500 |
208.500 |
$405.000 |
CUYD | 0.3 |
1740 | STEEL REINFORCEMENT | 08150 | 22,540.000 |
22,540.000 |
$0.900 |
LB | 0.1 |
Category Total $111,468.50 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0005 | CATEGORY Description | BRIDGE-CULVERT | 26766 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1750 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 11.000 |
11.000 |
$40.000 |
CUYD | 0.0 |
1760 | FOUNDATION PREPARATION 26766 | 08003 | 1.000 |
1.000 |
$1,800.000 |
LS | 0.0 |
1770 | CONCRETE-CLASS A | 08100 | 65.200 |
65.200 |
$405.000 |
CUYD | 0.1 |
1780 | STEEL REINFORCEMENT | 08150 | 5,837.000 |
5,837.000 |
$0.900 |
LB | 0.0 |
Category Total $33,899.30 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0006 | CATEGORY Description | BRIDGE-CULVERT | 26767 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1790 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 70.000 |
70.000 |
$40.000 |
CUYD | 0.0 |
1800 | FOUNDATION PREPARATION 26767 | 08003 | 1.000 |
1.000 |
$6,400.000 |
LS | 0.0 |
1810 | CONCRETE-CLASS A | 08100 | 246.400 |
246.400 |
$405.000 |
CUYD | 0.4 |
1820 | STEEL REINFORCEMENT | 08150 | 19,798.000 |
19,798.000 |
$0.900 |
LB | 0.1 |
1830 | LOW FLOW DIVERSION CURB 26767 | 08410 | 1.000 |
1.000 |
$2,000.000 |
LS | 0.0 |
Category Total $128,810.20 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0007 | CATEGORY Description | BRIDGE-CULVERT | 26768 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1840 | GRANULAR EMBANKMENT | 02223 | 186.000 |
186.000 |
$36.000 |
CUYD | 0.0 |
1850 | FOUNDATION PREPARATION 26768 | 08003 | 1.000 |
1.000 |
$1,000.000 |
LS | 0.0 |
1860 | CONCRETE-CLASS A | 08100 | 97.600 |
97.600 |
$405.000 |
CUYD | 0.1 |
1870 | STEEL REINFORCEMENT | 08150 | 7,509.000 |
7,509.000 |
$0.900 |
LB | 0.0 |
Category Total $53,982.10 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0008 | CATEGORY Description | BRIDGE-CULVERT | 26769 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1880 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 23.000 |
23.000 |
$40.000 |
CUYD | 0.0 |
1890 | FOUNDATION PREPARATION 26769 | 08003 | 1.000 |
1.000 |
$2,500.000 |
LS | 0.0 |
1900 | CONCRETE-CLASS A | 08100 | 113.900 |
113.900 |
$405.000 |
CUYD | 0.2 |
1910 | STEEL REINFORCEMENT | 08150 | 9,893.000 |
9,893.000 |
$0.900 |
LB | 0.0 |
Category Total $58,453.20 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0009 | CATEGORY Description | BRIDGE-CULVERT | 26770 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1920 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 103.000 |
103.000 |
$40.000 |
CUYD | 0.0 |
1930 | FOUNDATION PREPARATION 26770 | 08003 | 1.000 |
1.000 |
$12,000.000 |
LS | 0.0 |
1940 | CONCRETE-CLASS A | 08100 | 393.300 |
393.300 |
$405.000 |
CUYD | 0.6 |
1950 | STEEL REINFORCEMENT | 08150 | 35,980.000 |
35,980.000 |
$0.900 |
LB | 0.1 |
Category Total $207,788.50 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0010 | CATEGORY Description | BRIDGE-CULVERT | 26771 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1960 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 14.000 |
14.000 |
$40.000 |
CUYD | 0.0 |
1970 | FOUNDATION PREPARATION 26771 | 08003 | 1.000 |
1.000 |
$1,100.000 |
LS | 0.0 |
1980 | CONCRETE-CLASS A | 08100 | 77.400 |
77.400 |
$405.000 |
CUYD | 0.1 |
1990 | STEEL REINFORCEMENT | 08150 | 7,645.000 |
7,645.000 |
$0.900 |
LB | 0.0 |
2000 | LOW FLOW DIVERSION CURB 26771 | 08410 | 1.000 |
1.000 |
$2,500.000 |
LS | 0.0 |
Category Total $42,387.50 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0011 | CATEGORY Description | BRIDGE-CULVERT | 26772 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2010 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 68.000 |
68.000 |
$40.000 |
CUYD | 0.0 |
2020 | FOUNDATION PREPARATION 26772 | 08003 | 1.000 |
1.000 |
$5,000.000 |
LS | 0.0 |
2030 | CONCRETE-CLASS A | 08100 | 58.900 |
58.900 |
$405.000 |
CUYD | 0.1 |
2040 | STEEL REINFORCEMENT | 08150 | 4,769.000 |
4,769.000 |
$0.900 |
LB | 0.0 |
2050 | LOW FLOW DIVERSION CURB 26772 | 08410 | 1.000 |
1.000 |
$2,500.000 |
LS | 0.0 |
Category Total $38,366.60 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0012 | CATEGORY Description | BRIDGE-CULVERT | 26773 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2060 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 23.000 |
23.000 |
$40.000 |
CUYD | 0.0 |
2070 | FOUNDATION PREPARATION 26773 | 08003 | 1.000 |
1.000 |
$10,000.000 |
LS | 0.0 |
2080 | CONCRETE-CLASS A | 08100 | 166.400 |
166.400 |
$405.000 |
CUYD | 0.3 |
2090 | STEEL REINFORCEMENT | 08150 | 11,476.000 |
11,476.000 |
$0.900 |
LB | 0.0 |
8009 | GRANULAR EMBANKMENT | 02223 | 0.000 |
164.360 |
$36.000 |
CUYD | 0.0 |
Category Total $88,640.40 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0013 | CATEGORY Description | SIGNING |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2100 | SBM ALUM SHEET SIGNS .080 IN | 06406 | 329.000 |
329.000 |
$14.000 |
SQFT | 0.0 |
2110 | SBM ALUM SHEET SIGNS .125 IN | 06407 | 682.000 |
682.000 |
$16.000 |
SQFT | 0.0 |
2120 | STEEL POST TYPE 1 | 06410 | 5.000 |
5.000 |
$8.500 |
LF | 0.0 |
2130 | STEEL POST TYPE 2 | 06411 | 1,580.000 |
1,580.000 |
$5.000 |
LF | 0.0 |
2140 | REMOVE AND RELOCATE SHEET SIGNS | 21813NN | 21.000 |
21.000 |
$150.000 |
EACH | 0.0 |
Category Total $26,610.50 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0014 | CATEGORY Description | MOB AND DEMOB |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2150 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$1,200,000.000 |
LS | 4.5 |
2160 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$385,000.000 |
LS | 1.5 |
Category Total $1,585,000.00 |
SM- Project | DE00900681154 | CATEGORY NUMBER | 0015 | CATEGORY Description | LANDSCAPING |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2170 | SPECIAL EXCAVATION | 02204 | 26,430.000 |
26,430.000 |
$6.500 |
CUYD | 0.6 |
2180 | BOULDER CLUSTER | 02713 | 50.000 |
50.000 |
$100.000 |
EACH | 0.0 |
2190 | BOULDER OVERHANG | 02713 | 6.000 |
6.000 |
$100.000 |
EACH | 0.0 |
2200 | EASTERN WHITE PINE | 05026 | 25.000 |
25.000 |
$25.000 |
EACH | 0.0 |
2210 | SUGAR MAPLE | 05226 | 37.000 |
37.000 |
$25.000 |
EACH | 0.0 |
2220 | CHANNEL CHANGE SEEDING | 05982 | 100,458.000 |
100,458.000 |
$1.000 |
SQYD | 0.4 |
2230 | J-HOOK VANE | 07535 | 23.000 |
23.000 |
$4,500.000 |
EACH | 0.4 |
2240 | COLORADO SPRUCE | 20009ES724 | 36.000 |
36.000 |
$25.000 |
EACH | 0.0 |
2250 | BALD CYPRESS | 20051ES724 | 12.000 |
12.000 |
$25.000 |
EACH | 0.0 |
2260 | EROSION CONTROL BLANKET (SPECIAL) TY 1 COCONUT FIBER | 20327ES212 | 20,390.000 |
20,390.000 |
$4.500 |
SQYD | 0.3 |
2270 | EROSION CONTROL BLANKET (SPECIAL) TY 2 | 20327ES212 | 80,068.000 |
80,068.000 |
$2.500 |
SQYD | 0.8 |
2280 | SHAGBARK HICKORY | 20449NS724 | 13.000 |
13.000 |
$25.000 |
EACH | 0.0 |
2290 | PIN OAK RPM | 20511NS724 | 242.000 |
242.000 |
$30.000 |
EACH | 0.0 |
2300 | TULIP POPLAR | 20516NS724 | 33.000 |
33.000 |
$25.000 |
EACH | 0.0 |
2310 | FLOWERING DOGWOOD | 20566NS724 | 67.000 |
67.000 |
$25.000 |
EACH | 0.0 |
2320 | AMERICAN ELM TREE | 20684NS724 | 19.000 |
19.000 |
$25.000 |
EACH | 0.0 |
2330 | AMERICAN ELM TREE RPM | 20684NS724 | 242.000 |
242.000 |
$30.000 |
EACH | 0.0 |
2340 | ROUGH LEAF DOGWOOD SHRUB | 20923NS724 | 2,020.000 |
2,020.000 |
$20.000 |
EACH | 0.2 |
2350 | WEED BARRIER MAT | 20976ND | 1,210.000 |
1,210.000 |
$10.000 |
EACH | 0.0 |
2360 | INSTALL DO NOT MOW SIGNS | 20978ND | 48.000 |
48.000 |
$50.000 |
EACH | 0.0 |
2370 | SHELLBARK HICKORY RPM | 21568ES724 | 242.000 |
242.000 |
$30.000 |
EACH | 0.0 |
2380 | ROOT WADS | 21569ES724 | 10.000 |
10.000 |
$350.000 |
EACH | 0.0 |
2390 | SNOWDRIFT CRABAPPLE | 21664NS724 | 65.000 |
65.000 |
$25.000 |
EACH | 0.0 |
2400 | SWAMP WHITE OAK RPM | 21744NS724 | 242.000 |
242.000 |
$30.000 |
EACH | 0.0 |
2410 | LOG WEIR NOTCHED | 21745NN | 1.000 |
1.000 |
$1,500.000 |
EACH | 0.0 |
2420 | DOUBLE CROSS VANE | 21746NN | 7.000 |
7.000 |
$7,000.000 |
EACH | 0.2 |
2430 | RIFFLE ROCK | 21747EN | 60.000 |
60.000 |
$50.000 |
TON | 0.0 |
2440 | SHINGLE OAK | 22915NS724 | 27.000 |
27.000 |
$25.000 |
EACH | 0.0 |
2450 | SHINGLE OAK RPM | 22915NS724 | 242.000 |
242.000 |
$30.000 |
EACH | 0.0 |
2460 | BASSWOOD | 22916NS724 | 12.000 |
12.000 |
$25.000 |
EACH | 0.0 |
2470 | YELLOWWOOD | 24392ES724 | 11.000 |
11.000 |
$25.000 |
EACH | 0.0 |
2480 | AMERICAN HOLLY | 24393ES724 | 30.000 |
30.000 |
$25.000 |
EACH | 0.0 |
2490 | HAWTHORN | 24394ES724 | 33.000 |
33.000 |
$25.000 |
EACH | 0.0 |
2500 | STRAWBERRY BUSH | 24396NS724 | 2,020.000 |
2,020.000 |
$20.000 |
EACH | 0.2 |
2510 | ARROWWOOD BUSH | 24397NS724 | 2,020.000 |
2,020.000 |
$20.000 |
EACH | 0.2 |
2520 | FALSE INDIGO BUSH | 24398NS724 | 2,020.000 |
2,020.000 |
$20.000 |
EACH | 0.2 |
2530 | LOG VANE WITH BOULDER J-HOOK | 24399EC | 2.000 |
2.000 |
$3,000.000 |
EACH | 0.0 |
2540 | SUBMERGED LOG STRUCTURE | 24400EC | 3.000 |
3.000 |
$1,750.000 |
EACH | 0.0 |
Category Total $964,428.00 |