Item List 041210 |
Date:04/05/2019 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 041210 | Primary Project Number | D019002704210 |
Contract Description | FALMOUTH-NEWPORT ROAD (US27) | ||
Primary County | CAMPBELL | Fed/St Number | STPR 27-2 (98) |
Vendor ID | 00137 | Vendor Name | HINKLE CONTRACTING CORPORATION |
Bid Amount | $ 25,677,750.20 |
SM- Project | D019002704210 |
Fed/State Number | STPR 27-2 (98) |
Project Description | FALMOUTH-NEWPORT ROAD (US27) |
*********** |
SM- Project | D019002704210 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0010 | DGA BASE | 00001M | 69,205.900 |
67,127.100 |
$15.230 |
MTON | 4.1 |
0020 | LIME STABILIZED ROADBED | 00013M | 162,901.800 |
162,901.800 |
$1.880 |
SQ M | 1.2 |
0030 | LIME | 00014M | 3,284.100 |
3,284.100 |
$90.900 |
MTON | 1.2 |
0040 | PCC PAVEMENT DRAINAGE BLANKET | 00022M | 32,126.700 |
0.000 |
$15.000 |
MTON | 1.9 |
0050 | CRUSHED AGGREGATE SIZE NO 2 | 00078M | 83.000 |
83.000 |
$41.240 |
MTON | 0.0 |
0060 | ASPHALT SEAL AGGREGATE | 00100M | 290.000 |
290.000 |
$125.000 |
MTON | 0.1 |
0070 | CL1 ASPH BASE 25.0D PG64-22 | 00211M | 10,689.900 |
10,689.900 |
$37.250 |
MTON | 1.6 |
0080 | CL2 ASPH BASE 25.0D PG64-22 | 00212M | 22,368.600 |
16,545.400 |
$36.350 |
MTON | 3.2 |
0090 | CL1 ASPH BASE 19.0D PG64-22 | 00220M | 206.100 |
206.100 |
$43.600 |
MTON | 0.0 |
0100 | EMULSIFIED ASPHALT RS-2 | 00291M | 34.800 |
34.800 |
$255.000 |
MTON | 0.0 |
0110 | CL1 ASPH SURF 9.50D PG64-22 | 00300M | 1,896.200 |
1,896.200 |
$43.150 |
MTON | 0.3 |
0120 | CL2 ASPH SURF 9.50D PG64-22 | 00301M | 475.200 |
475.200 |
$42.000 |
MTON | 0.1 |
0130 | CL2 ASPH SURF 9.50B PG64-22 | 00307M | 2,084.000 |
1,472.300 |
$39.950 |
MTON | 0.3 |
0140 | ASPHALT CURING SEAL | 00358M | 154.900 |
349.900 |
$240.000 |
MTON | 0.1 |
0150 | ENTRANCE PIPE-375 MM | 00440M | 128.600 |
128.600 |
$85.690 |
M | 0.0 |
0160 | ENTRANCE PIPE-450 MM | 00441M | 69.100 |
69.100 |
$88.180 |
M | 0.0 |
0170 | ENTRANCE PIPE-750 MM | 00445M | 17.000 |
17.000 |
$119.420 |
M | 0.0 |
0180 | CULVERT PIPE-300 MM | 00460M | 3.100 |
3.100 |
$154.250 |
M | 0.0 |
0190 | CULVERT PIPE-375 MM | 00461M | 93.800 |
218.800 |
$101.390 |
M | 0.0 |
0200 | CULVERT PIPE-450 MM | 00462M | 754.600 |
754.600 |
$119.830 |
M | 0.4 |
0210 | CULVERT PIPE-525 MM | 00463M | 23.700 |
23.700 |
$122.720 |
M | 0.0 |
0220 | CULVERT PIPE-600 MM | 00464M | 217.200 |
217.200 |
$134.820 |
M | 0.1 |
0230 | CULVERT PIPE-750 MM | 00466M | 67.300 |
67.300 |
$185.920 |
M | 0.0 |
0240 | CULVERT PIPE-825 MM | 00467M | 3.600 |
3.600 |
$586.340 |
M | 0.0 |
0250 | CULVERT PIPE-900 MM | 00468M | 270.800 |
270.800 |
$199.990 |
M | 0.2 |
0260 | CULVERT PIPE-1050 MM | 00469M | 183.300 |
149.600 |
$249.310 |
M | 0.2 |
0270 | CULVERT PIPE-1200 MM | 00470M | 685.400 |
685.400 |
$272.710 |
M | 0.7 |
0280 | CULVERT PIPE-1350 MM | 00471M | 102.600 |
76.600 |
$271.410 |
M | 0.1 |
0290 | CULVERT PIPE-1500 MM | 00472M | 249.200 |
249.200 |
$356.560 |
M | 0.3 |
0300 | CULVERT PIPE-1650 MM | 00473M | 327.200 |
327.200 |
$457.640 |
M | 0.6 |
0310 | CULVERT PIPE-600 MM EQUIV | 00492M | 22.900 |
22.900 |
$141.680 |
M | 0.0 |
0320 | CULVERT PIPE-1500 MM EQUIV | 00501M | 16.200 |
16.200 |
$711.410 |
M | 0.0 |
0330 | CULVERT PIPE-2250 MM EQUIV | 00507M | 20.600 |
20.600 |
$1,256.660 |
M | 0.1 |
0340 | STORM SEWER PIPE-375 MM | 00521M | 137.000 |
137.000 |
$86.140 |
M | 0.0 |
0350 | STORM SEWER PIPE-450 MM | 00522M | 71.500 |
71.500 |
$88.010 |
M | 0.0 |
0360 | STORM SEWER PIPE-600 MM | 00524M | 68.500 |
68.500 |
$100.990 |
M | 0.0 |
0370 | PERFORATED PIPE-100 MM | 01000M | 23,175.000 |
23,175.000 |
$9.870 |
M | 0.9 |
0380 | NON-PERFORATED PIPE-100 MM | 01010M | 1,958.000 |
1,958.000 |
$23.810 |
M | 0.2 |
0390 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 1.000 |
1.000 |
$8,762.890 |
LS | 0.0 |
0400 | PERF PIPE HEADWALL TY 1-100 MM | 01020M | 1.000 |
1.000 |
$340.210 |
EACH | 0.0 |
0410 | PERF PIPE HEADWALL TY 2-100 MM | 01024M | 1.000 |
3.000 |
$365.980 |
EACH | 0.0 |
0420 | PERF PIPE HEADWALL TY 3-100 MM | 01028M | 39.000 |
64.000 |
$391.750 |
EACH | 0.1 |
0430 | PERF PIPE HEADWALL TY 4-100 MM | 01032M | 42.000 |
154.000 |
$433.820 |
EACH | 0.1 |
0440 | STEEL ENCASEMENT PIPE-300 MM | 01069M | 39.000 |
39.000 |
$137.870 |
M | 0.0 |
0450 | REMOVE PIPE | 01310M | 122.500 |
122.500 |
$38.590 |
M | 0.0 |
0460 | PLUG PIPE | 01314 | 2.000 |
2.000 |
$280.320 |
EACH | 0.0 |
0470 | S & F BOX INLET-OUTLET-24 INCH | 01451 | 3.000 |
3.000 |
$2,221.830 |
EACH | 0.0 |
0480 | DROP BOX INLET TYPE 1 | 01490 | 5.000 |
5.000 |
$2,298.040 |
EACH | 0.0 |
0490 | DROP BOX INLET TYPE 2 | 01493 | 2.000 |
2.000 |
$2,163.830 |
EACH | 0.0 |
0500 | DROP BOX INLET TYPE 4 MODIFIED | 01500 | 1.000 |
1.000 |
$2,649.850 |
EACH | 0.0 |
0510 | DROP BOX INLET TYPE 5B | 01505 | 20.000 |
20.000 |
$2,132.780 |
EACH | 0.2 |
0520 | DROP BOX INLET TYPE 7 | 01538 | 3.000 |
3.000 |
$3,084.620 |
EACH | 0.0 |
0530 | DROP BOX INLET TYPE 11 | 01544 | 1.000 |
1.000 |
$1,204.160 |
EACH | 0.0 |
0540 | DROP BOX INLET TYPE 13G | 01559 | 6.000 |
6.000 |
$1,992.560 |
EACH | 0.0 |
0550 | DROP BOX INLET TYPE 13S | 01568 | 3.000 |
3.000 |
$2,934.130 |
EACH | 0.0 |
0560 | DROP BOX INLET TYPE 14 | 01577 | 2.000 |
2.000 |
$1,212.160 |
EACH | 0.0 |
0570 | JUNCTION BOX-60 INCH | 01649 | 1.000 |
1.000 |
$3,134.580 |
EACH | 0.0 |
0580 | FLUME INLET TYPE 2 | 01691 | 1.000 |
1.000 |
$3,239.740 |
EACH | 0.0 |
0590 | REMOVE CURB & GUTTER BOX INLET | 01705 | 2.000 |
2.000 |
$434.540 |
EACH | 0.0 |
0600 | REMOVE CATCH BASIN | 01706 | 2.000 |
2.000 |
$217.270 |
EACH | 0.0 |
0610 | MANHOLE TYPE C | 01767 | 3.000 |
3.000 |
$2,769.580 |
EACH | 0.0 |
0620 | ADJUST MANHOLE FRAME TO GRADE | 01791 | 1.000 |
1.000 |
$509.460 |
EACH | 0.0 |
0630 | STANDARD CURB AND GUTTER | 01810M | 412.000 |
412.000 |
$52.600 |
M | 0.1 |
0640 | REMOVE CURB AND GUTTER | 01812M | 243.000 |
243.000 |
$10.450 |
M | 0.0 |
0650 | STANDARD INTEGRAL CURB | 01830M | 22.000 |
22.000 |
$23.300 |
M | 0.0 |
0660 | STANDARD HEADER CURB | 01875M | 419.000 |
419.000 |
$61.400 |
M | 0.1 |
0670 | DELINEATOR FOR GUARDRAIL-WHITE | 01982 | 75.000 |
75.000 |
$10.200 |
EACH | 0.0 |
0680 | DELINEATOR FOR BARRIER-WHITE | 01984 | 12.000 |
12.000 |
$10.200 |
EACH | 0.0 |
0690 | JPC PAVEMENT-275 MM | 02071M | 156,198.200 |
0.000 |
$39.500 |
SQ M | 24.0 |
0700 | JPC PAVEMENT-225 MM | 02073M | 14,965.100 |
0.000 |
$34.500 |
SQ M | 2.0 |
0710 | JPC PAVEMENT-200 MM | 02084M | 948.300 |
0.000 |
$36.000 |
SQ M | 0.1 |
0720 | REMOVE PAVEMENT | 02091M | 14,086.000 |
14,086.000 |
$2.910 |
SQ M | 0.2 |
0725 | CEM CONC ENT PAVEMENT-200 MM 1 | 02101M | 122.500 |
122.500 |
$63.700 |
SQ M | 0.0 |
0730 | PAVED DITCH TYPE 1 | 02157M | 100.000 |
0.000 |
$77.320 |
SQ M | 0.0 |
0740 | ROADWAY EXCAVATION | 02200M | 999,265.000 |
1,007,671.000 |
$4.230 |
CU M | 16.5 |
0750 | SPECIAL EXCAVATION | 02204M | 268,723.000 |
270,519.000 |
$4.540 |
CU M | 4.8 |
0760 | GRANULAR EMBANKMENT | 02223M | 23,370.000 |
20,370.000 |
$26.770 |
CU M | 2.4 |
0770 | STRUCTURE GRANULAR BACKFILL | 02231M | 4.000 |
4.000 |
$47.260 |
CU M | 0.0 |
0780 | WATER | 02242M | 15,000.000 |
15,000.000 |
$1.000 |
CU M | 0.1 |
0790 | REMOVE FENCE | 02265M | 2,174.000 |
2,174.000 |
$5.150 |
M | 0.0 |
0800 | REMOVE & RESET FENCE | 02267M | 15.000 |
15.000 |
$27.810 |
M | 0.0 |
0810 | FENCE-1.8 M CHAIN LINK | 02274M | 92.000 |
92.000 |
$99.300 |
M | 0.0 |
0820 | FENCE-2.4 M CHAIN LINK | 02275M | 831.000 |
831.000 |
$60.900 |
M | 0.2 |
0830 | DOUBLE VEHICULAR CHAIN LINK GATE | 02287 | 1.000 |
1.000 |
$2,842.600 |
EACH | 0.0 |
0840 | GUARDRAIL-STEEL W BEAM-S FACE | 02351M | 1,466.850 |
1,466.850 |
$41.900 |
M | 0.2 |
0850 | GUARDRAIL CONNECTOR TO BRIDGE END TY A | 02363 | 1.000 |
1.000 |
$2,030.500 |
EACH | 0.0 |
0860 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 5.000 |
5.000 |
$2,842.600 |
EACH | 0.1 |
0870 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 9.000 |
9.000 |
$609.100 |
EACH | 0.0 |
0880 | REMOVE GUARDRAIL | 02381M | 873.000 |
873.000 |
$5.860 |
M | 0.0 |
0890 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 6.000 |
6.000 |
$1,827.400 |
EACH | 0.0 |
0900 | REMOVE STONE MASONRY | 02402M | 5.600 |
5.600 |
$86.420 |
CU M | 0.0 |
0910 | REMOVE CONCRETE MASONRY | 02403M | 4.000 |
4.000 |
$120.990 |
CU M | 0.0 |
0920 | R/W MARKER RURAL TYPE 1 | 02434 | 66.000 |
66.000 |
$72.600 |
EACH | 0.0 |
0930 | R/W MARKER RURAL TYPE 2 | 02435 | 98.000 |
98.000 |
$82.700 |
EACH | 0.0 |
0940 | R/W MARKER MUNICIPAL TYPE 1 | 02437 | 35.000 |
35.000 |
$62.400 |
EACH | 0.0 |
0950 | R/W MARKER MUNICIPAL TYPE 2 | 02438 | 18.000 |
18.000 |
$72.600 |
EACH | 0.0 |
0960 | CHANNEL LINING CLASS II | 02483M | 12,124.000 |
17,424.000 |
$23.450 |
MTON | 1.1 |
0970 | CHANNEL LINING CLASS III | 02484M | 12,846.000 |
12,846.000 |
$26.310 |
MTON | 1.3 |
0980 | CLEARING AND GRUBBING 73 HECTARES | 02545 | 1.000 |
1.000 |
$230,000.000 |
LS | 0.9 |
0990 | QUALITY CONTROL | 02572 | 1.000 |
1.000 |
$160,000.000 |
LS | 0.6 |
1000 | FABRIC-GEOTEXTILE TYPE III | 02598M | 38,950.000 |
38,950.000 |
$1.250 |
SQ M | 0.2 |
1010 | REMOVE HEADWALL | 02625 | 1.000 |
1.000 |
$343.810 |
EACH | 0.0 |
1020 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$167,800.000 |
LS | 0.7 |
1030 | PRECAST VEHICLE STOP | 02673M | 190.320 |
190.320 |
$18.000 |
M | 0.0 |
1040 | RUMBLE STRIPS TYPE 3 | 02695M | 1,010.800 |
52.000 |
$15.000 |
M | 0.1 |
1050 | SAND FOR BLOTTER | 02702M | 442.300 |
442.300 |
$36.000 |
MTON | 0.1 |
1060 | SILT TRAP TYPE B | 02704 | 106.000 |
0.000 |
$719.030 |
EACH | 0.3 |
1070 | SILT CHECK | 02705 | 50.000 |
50.000 |
$76.380 |
EACH | 0.0 |
1080 | CLEAN SILT TRAP TYPE B | 02707 | 318.000 |
318.000 |
$85.130 |
EACH | 0.1 |
1090 | CLEAN SILT CHECK | 02708 | 150.000 |
150.000 |
$33.710 |
EACH | 0.0 |
1100 | SIDEWALK-100 MM CONCRETE | 02720M | 935.800 |
935.800 |
$42.500 |
SQ M | 0.2 |
1110 | REMOVE CONCRETE SIDEWALK | 02721M | 215.000 |
215.000 |
$11.810 |
SQ M | 0.0 |
1120 | STAKING | 02726 | 1.000 |
1.000 |
$100,000.000 |
LS | 0.4 |
1125 | PRECAST CONC BOX SECT 3.0X1.5 | 03026M | 24.400 |
24.400 |
$2,437.440 |
M | 0.2 |
1130 | EROSION CONTROL BLANKET | 05950M | 139,144.000 |
139,144.000 |
$1.200 |
SQ M | 0.7 |
1140 | TEMP SEEDING AND PROTECTION | 05953M | 242,055.000 |
242,055.000 |
$0.220 |
SQ M | 0.2 |
1150 | TOPDRESSING FERTILIZER | 05966M | 26.900 |
26.900 |
$380.700 |
MTON | 0.0 |
1160 | SEEDING AND PROTECTION | 05985M | 490,435.000 |
490,435.000 |
$0.300 |
SQ M | 0.6 |
1170 | SPECIAL SEEDING CROWN VETCH | 05989M | 54,800.000 |
54,800.000 |
$0.220 |
SQ M | 0.0 |
1180 | PAVE STRIPING-PERM PAINT-100MM | 06514M | 46,620.000 |
46,620.000 |
$0.300 |
M | 0.1 |
1190 | PAVE STRIPING-PERM PAINT-200MM | 06516M | 4,790.000 |
4,790.000 |
$1.000 |
M | 0.0 |
1200 | PAVE STRIPING-PERM PAINT-300MM | 06517M | 555.000 |
555.000 |
$2.540 |
M | 0.0 |
1210 | PAVE STRIPING-TEMP REM TAPE-W | 06550M | 19,750.000 |
1,000.000 |
$3.200 |
M | 0.2 |
1220 | PAVE STRIPING-TEMP REM TAPE-Y | 06551M | 18,935.000 |
1,000.000 |
$3.200 |
M | 0.2 |
1230 | PAVE MARKING-THERMO X-WALK-300 MM | 06566M | 68.000 |
68.000 |
$6.400 |
M | 0.0 |
1240 | PAVE MARKING-THERMO STOP BAR-600 | 06568M | 331.000 |
331.000 |
$16.600 |
M | 0.0 |
1250 | PAVE MARKING-PRE THERM STR ARROW | 06573 | 1.000 |
1.000 |
$71.100 |
EACH | 0.0 |
1260 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 102.000 |
102.000 |
$72.100 |
EACH | 0.0 |
1270 | PAVE MARKING-PRE THERM COMB ARROW | 06575 | 25.000 |
25.000 |
$123.900 |
EACH | 0.0 |
1280 | PAVE MARKING-PREF THERMO ONLY | 06576 | 54.000 |
54.000 |
$91.400 |
EACH | 0.0 |
1290 | PAVEMENT MARKER TYPE V-MW | 06589 | 565.000 |
565.000 |
$18.200 |
EACH | 0.0 |
1300 | PAVEMENT MARKER TYPE V-BY | 06591 | 483.000 |
483.000 |
$18.200 |
EACH | 0.0 |
1310 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 431.000 |
431.000 |
$18.200 |
EACH | 0.0 |
1320 | STRUCTURE EXCAVATION-COMMON | 08001M | 4.000 |
4.000 |
$20.220 |
CU M | 0.0 |
1330 | CYCLOPEAN STONE RIP RAP | 08019M | 1,336.000 |
1,336.000 |
$29.210 |
MTON | 0.2 |
1340 | CONCRETE-CLASS A | 08100M | 343.890 |
343.890 |
$643.990 |
CU M | 0.9 |
1350 | STEEL REINFORCEMENT | 08150M | 14,560.100 |
14,560.100 |
$2.030 |
KG | 0.1 |
1360 | SILT CHECK(MOD) MODIFIED | 20073MS213 | 45.000 |
45.000 |
$579.950 |
EACH | 0.1 |
1370 | CLEAN SILT CHECK(MOD) MODIFIED | 20074MS213 | 135.000 |
135.000 |
$21.270 |
EACH | 0.0 |
1380 | DROP BOX INLET TY 7(MOD) MODIFIED | 20216MD | 1.000 |
1.000 |
$5,093.020 |
EACH | 0.0 |
1390 | CATCH BASIN | 20217MS710 | 6.000 |
6.000 |
$3,300.730 |
EACH | 0.1 |
1400 | ROLLED CURB AND GUTTER | 20218MS506 | 435.000 |
435.000 |
$52.600 |
M | 0.1 |
1410 | HANDRAIL TY P-1 | 20219MS720 | 8.500 |
8.500 |
$336.570 |
M | 0.0 |
1420 | FLANGED PIPE SPOOL W/COVER 205MM | 20220MD | 1.000 |
1.000 |
$454.220 |
EACH | 0.0 |
1430 | TUNNEL-1600MM | 20221MD | 44.000 |
44.000 |
$4,786.480 |
M | 0.8 |
1440 | TUNNEL-1800MM | 20222MD | 24.000 |
24.000 |
$4,794.180 |
M | 0.4 |
1450 | PAVE MARK PREF THERM HANDICAP SYMBOL | 20223MS714 | 8.000 |
8.000 |
$203.000 |
EACH | 0.0 |
1460 | GAS & UTILITY COORDINATION | 20224MD | 1.000 |
1.000 |
$17,265.000 |
LS | 0.1 |
8000 | SIGNS | 02562M | 0.000 |
120.000 |
$71.050 |
SQ M | 0.0 |
8001 | BARRICADE-TYPE III | 02014 | 0.000 |
50.000 |
$265.000 |
EACH | 0.0 |
8002 | TEMPORARY SILT FENCE | 02701M | 0.000 |
8,000.000 |
$8.500 |
M | 0.0 |
8003 | CLEAN TEMPORARY SILT FENCE | 02709M | 0.000 |
4,000.000 |
$1.700 |
M | 0.0 |
8004 | TEMPORARY DITCH | 02159M | 0.000 |
500.000 |
$6.000 |
M | 0.0 |
8005 | RIDE QUALITY ADJUSTMENT ASPH | 10005NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8006 | NON-SPEC MATERIAL - | 10070NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8007 | DRAINAGE BLANKET-TYPE III-CEM | 00019M | 0.000 |
35,115.230 |
$26.600 |
MTON | 0.0 |
8008 | CULVERT PIPE-900 MM Temporary | 00468M | 0.000 |
240.000 |
$154.000 |
M | 0.0 |
8009 | CULVERT PIPE-600 MM Temporary | 00464M | 0.000 |
10.000 |
$109.000 |
M | 0.0 |
8010 | EW~ Replace Box Tops | 10094NX | 0.000 |
3.000 |
$2,836.000 |
EACH | 0.0 |
8011 | SAFELOADING | 02690M | 0.000 |
352.000 |
$117.000 |
CU M | 0.0 |
8012 | JPC PAVEMENT-275 MM Unsealed Joints | 02071M | 0.000 |
156,198.200 |
$38.040 |
SQ M | 0.0 |
8013 | JPC PAVEMENT-225 MM Unsealed Joints | 02073M | 0.000 |
14,965.100 |
$33.050 |
SQ M | 0.0 |
8014 | JPC PAVEMENT-200 MM Unsealed Joints | 02084M | 0.000 |
948.300 |
$34.400 |
SQ M | 0.0 |
8015 | EW~ Remove Barrier Wall | 10094NX | 0.000 |
63.000 |
$27.500 |
EACH | 0.0 |
8025 | EW~ Salt Loading Ramp | 10090NX | 0.000 |
1.000 |
$20,022.100 |
LS | 0.0 |
8026 | TEMPORARY GUARDRAIL Drilled Posts | 02397M | 0.000 |
150.000 |
$52.000 |
M | 0.0 |
8027 | PAVE STRIPING-TEMP PAINT-100MM | 06510M | 0.000 |
46,685.000 |
$0.600 |
M | 0.0 |
8028 | PAVE STRIPING REMOVAL-100 MM | 06530M | 0.000 |
41,685.000 |
$2.250 |
M | 0.0 |
8029 | EW~ Variable Message Board | 10101NX | 0.000 |
48.000 |
$1,390.000 |
MONT | 0.0 |
8030 | VALLEY GUTTER | 01895M | 0.000 |
40.000 |
$225.000 |
M | 0.0 |
8031 | EW~ Purchase Catch Basin | 10094NX | 0.000 |
1.000 |
$1,609.080 |
EACH | 0.0 |
8032 | EW~ Rumble Strips | 10094NX | 0.000 |
826.000 |
$10.290 |
EACH | 0.0 |
8033 | VALUE ENGINEERING Rumble Strips Type 3 | 10121NX | 0.000 |
5,192.730 |
$1.000 |
DOLL | 0.0 |
8034 | FUEL ADJUSTMENT | 10020NS | 0.000 |
305,053.290 |
$1.000 |
DOLL | 0.0 |
8035 | ASPHALT ADJUSTMENT | 10030NS | 0.000 |
133,234.310 |
$1.000 |
DOLL | 0.0 |
8038 | SLOTTED DRAIN PIPE-375 MM | 00981M | 0.000 |
80.000 |
$500.000 |
M | 0.0 |
8039 | METAL END SECTION TY 1-375 MM | 01370M | 0.000 |
2.000 |
$372.250 |
EACH | 0.0 |
8040 | EW~ Connect to Existing Box | 10094NX | 0.000 |
2.000 |
$600.000 |
EACH | 0.0 |
8041 | EW~ Re-Grade Southern Tie-In | 10090NX | 0.000 |
1.000 |
$10,350.000 |
LS | 0.0 |
8042 | EW~ Additional Engineering | 10090NX | 0.000 |
1.000 |
$7,820.000 |
LS | 0.0 |
8043 | VALUE ENGINEERING Southern Tie-In | 10120NS | 0.000 |
1.000 |
$97,491.300 |
LS | 0.0 |
8044 | EW~ Purchase Pipe 1050 mm | 10093MX | 0.000 |
33.700 |
$102.510 |
M | 0.0 |
8045 | PAVE MARKING TEMP PAINT STOP BAR-600MM | 22577MN | 0.000 |
300.000 |
$1.900 |
M | 0.0 |
8046 | PAVE MARK-PAINT ARROWS | 20208EC | 0.000 |
32.000 |
$55.000 |
EACH | 0.0 |
8047 | EW~ Remove Symbol | 10094NX | 0.000 |
6.000 |
$45.000 |
EACH | 0.0 |
8051 | EW~ Shoulder Baskets | 10090NX | 0.000 |
1.000 |
$157,375.500 |
LS | 0.0 |
8052 | LOT PAY ADJUSTMENT | 10000NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $20,844,791.30 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0002 | CATEGORY Description | GAS LINE |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1470 | TIE-IN 6" | 03479 | 6.000 |
6.000 |
$3,500.000 |
EACH | 0.1 |
1480 | INSTALL GAS MAIN 6" | 20254MC | 1,220.000 |
1,220.000 |
$101.680 |
M | 0.5 |
1490 | INSTALL SERVICE PIPING LONG-SIDE (1" OR 1 1/4") | 20255MC | 4.000 |
4.000 |
$600.000 |
EACH | 0.0 |
1500 | INSTALL SERVICE PIPING SHORT-SIDE (1" OR 1 1/4") | 20255MC | 8.000 |
8.000 |
$400.000 |
EACH | 0.0 |
1510 | LOWER EXIST MAIN IN PLACE | 20256MC | 202.000 |
202.000 |
$55.760 |
M | 0.0 |
Category Total $161,913.12 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0003 | CATEGORY Description | SIGNALS |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1520 | INSTALL LED SIGNAL-3 SECTION | 07636 | 9.000 |
9.000 |
$238.600 |
EACH | 0.0 |
1530 | MESSENGER-48.0 KN | 04885M | 163.000 |
163.000 |
$12.200 |
M | 0.0 |
1540 | CABLE-NO. 14/1 PAIR | 04850M | 1,515.000 |
1,515.000 |
$4.400 |
M | 0.0 |
1550 | CABLE-NO. 14/5C | 04844M | 367.000 |
367.000 |
$3.900 |
M | 0.0 |
1560 | TRENCHING AND BACKFILLING | 04820M | 253.000 |
253.000 |
$10.100 |
M | 0.0 |
1570 | JUNCTION BOX TYPE B | 04811 | 8.000 |
8.000 |
$454.800 |
EACH | 0.0 |
1580 | CONDUIT-50 MM | 04795M | 7.000 |
7.000 |
$22.400 |
M | 0.0 |
1590 | CONDUIT-31 MM | 04793M | 256.000 |
256.000 |
$11.500 |
M | 0.0 |
1600 | INSTALL LED SIGNAL- 4 SECTION | 20266ES835 | 1.000 |
1.000 |
$238.600 |
EACH | 0.0 |
1610 | INSTALL STEEL STRAIN POLE | 04932 | 4.000 |
4.000 |
$2,583.800 |
EACH | 0.0 |
1620 | INSTALL CONTROLLER TYPE 170 | 04931 | 1.000 |
1.000 |
$2,274.100 |
EACH | 0.0 |
1630 | LOOP SAW SLOT AND FILL | 04895M | 489.000 |
489.000 |
$28.600 |
M | 0.1 |
1640 | LOOP WIRE | 04830M | 945.000 |
945.000 |
$1.800 |
M | 0.0 |
8048 | REMOVE SIGNAL EQUIPMENT | 04950 | 0.000 |
1.000 |
$1,260.000 |
EACH | 0.0 |
Category Total $50,062.10 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0004 | CATEGORY Description | WATERLINE |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1650 | DUCTILE IRON PIPE-150 MM | 01093M | 55.000 |
55.000 |
$166.000 |
M | 0.0 |
1660 | DUCTILE IRON PIPE-200 MM | 01095M | 1,378.000 |
1,378.000 |
$171.600 |
M | 0.9 |
1670 | DUCTILE IRON PIPE-300 MM | 01099M | 1,170.000 |
1,170.000 |
$201.500 |
M | 0.9 |
1680 | DUCTILE IRON PIPE-400 MM | 01103M | 4.000 |
4.000 |
$494.900 |
M | 0.0 |
1690 | FIRE HYDRANT | 02606 | 5.000 |
5.000 |
$1,979.700 |
EACH | 0.0 |
1700 | COPPER PIPE-19 MM | 03360M | 82.000 |
82.000 |
$59.900 |
M | 0.0 |
1710 | COPPER PIPE-25 MM | 03361M | 342.000 |
172.000 |
$73.100 |
M | 0.1 |
1720 | ADJUST WATER VALVE | 03425 | 6.000 |
6.000 |
$203.000 |
EACH | 0.0 |
1730 | RELOCATE WATER METER | 03431 | 11.000 |
11.000 |
$507.600 |
EACH | 0.0 |
1740 | RELOCATE FIRE HYDRANT | 03433 | 6.000 |
6.000 |
$1,015.200 |
EACH | 0.0 |
1750 | RECONNECT SERVICE | 03437 | 11.000 |
9.000 |
$355.300 |
EACH | 0.0 |
1760 | RECONNECT TO MAIN | 03438 | 11.000 |
9.000 |
$355.300 |
EACH | 0.0 |
1770 | AIR RELEASE VALVE | 03495 | 4.000 |
4.000 |
$1,218.300 |
EACH | 0.0 |
1780 | CONCRETE ENCASEMENT | 20057MS601 | 40.000 |
40.000 |
$166.000 |
M | 0.0 |
1790 | TEST TAP | 20058MC | 1.000 |
1.000 |
$1,015.200 |
EACH | 0.0 |
1800 | CONNECT TO WATER MAIN 150MM | 20081MC | 2.000 |
2.000 |
$1,776.600 |
EACH | 0.0 |
1810 | CONNECT TO WATER MAIN 200MM | 20081MC | 9.000 |
9.000 |
$2,436.500 |
EACH | 0.1 |
1820 | CONNECT TO WATER MAIN 300MM | 20081MC | 7.000 |
7.000 |
$2,791.900 |
EACH | 0.1 |
1830 | CONNECT TO WATER MAIN 400MM | 20081MC | 1.000 |
1.000 |
$3,553.300 |
EACH | 0.0 |
1840 | DUCTILE IRON ANCHOR TEE & BLOCK 200X200X150MM | 20246MD | 6.000 |
6.000 |
$304.600 |
EACH | 0.0 |
1850 | DUCTILE IRON ANCHOR TEE & BLOCK 300X300X150MM | 20246MD | 2.000 |
2.000 |
$355.300 |
EACH | 0.0 |
1860 | DUCTILE IRON TEE & BLOCK 200X200X200MM | 20247MD | 1.000 |
1.000 |
$329.900 |
EACH | 0.0 |
1870 | DUCTILE IRON TEE & BLOCK 300X300X200MM | 20247MD | 2.000 |
2.000 |
$380.700 |
EACH | 0.0 |
1880 | DUCTILE IRON CROSS | 20248MD | 1.000 |
1.000 |
$507.600 |
EACH | 0.0 |
1890 | DUCTILE IRON SEATED GATE VALVE 150MM | 20249MD | 10.000 |
10.000 |
$583.800 |
EACH | 0.0 |
1900 | DUCTILE IRON SEATED GATE VALVE 200MM | 20249MD | 13.000 |
13.000 |
$761.400 |
EACH | 0.0 |
1910 | DUCTILE IRON SEATED GATE VALVE 300MM | 20249MD | 5.000 |
5.000 |
$1,294.400 |
EACH | 0.0 |
1920 | DUCTILE IRON BEND & BLOCK 150MM | 20250MD | 4.000 |
4.000 |
$279.200 |
EACH | 0.0 |
1930 | DUCTILE IRON BEND & BLOCK 200MM | 20250MD | 30.000 |
30.000 |
$304.600 |
EACH | 0.0 |
1940 | DUCTILE IRON BEND & BLOCK 300MM | 20250MD | 17.000 |
17.000 |
$406.100 |
EACH | 0.0 |
1950 | DUCTILE IRON BEND & BLOCK 400MM | 20250MD | 1.000 |
1.000 |
$964.500 |
EACH | 0.0 |
1960 | DUCTILE IRON REDUCER 200X150MM | 20251MD | 3.000 |
3.000 |
$253.800 |
EACH | 0.0 |
1970 | DUCTILE IRON REDUCER 400X300MM | 20251MD | 1.000 |
1.000 |
$456.900 |
EACH | 0.0 |
1980 | TAPPING SLEEVE & VALVE | 20252MC | 1.000 |
1.000 |
$3,553.300 |
EACH | 0.0 |
1990 | PLUG & BLOCK | 20253MC | 1.000 |
1.000 |
$253.800 |
EACH | 0.0 |
8016 | COPPER PIPE-50 MM | 03363M | 0.000 |
120.000 |
$105.000 |
M | 0.0 |
8017 | COPPER PIPE-38 MM | 03362M | 0.000 |
50.000 |
$92.400 |
M | 0.0 |
8018 | RECONNECT SERVICE 50 mm | 03437 | 0.000 |
1.000 |
$525.000 |
EACH | 0.0 |
8019 | RECONNECT SERVICE 38 mm | 03437 | 0.000 |
1.000 |
$472.500 |
EACH | 0.0 |
8020 | RECONNECT TO MAIN 50 mm | 03438 | 0.000 |
1.000 |
$525.000 |
EACH | 0.0 |
8021 | RECONNECT TO MAIN 38 mm | 03438 | 0.000 |
1.000 |
$472.500 |
EACH | 0.0 |
Category Total $654,449.70 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0005 | CATEGORY Description | SEWER |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2000 | DGA BASE SEWER | 00001M | 38.000 |
38.000 |
$22.300 |
MTON | 0.0 |
2010 | CRUSHED AGGREGATE SIZE NO 2 | 00078M | 38.000 |
38.000 |
$22.300 |
MTON | 0.0 |
2020 | DUCTILE IRON PIPE-200 MM | 01095M | 65.400 |
65.400 |
$341.100 |
M | 0.1 |
2030 | DUCTILE IRON PIPE-200 MM FORCE MAIN | 01095M | 1,616.900 |
1,616.900 |
$204.600 |
M | 1.3 |
2040 | DUCTILE IRON PIPE-300 MM | 01099M | 796.700 |
796.700 |
$371.100 |
M | 1.2 |
2050 | DUCTILE IRON PIPE-300 MM FORCE MAIN | 01099M | 1,664.500 |
1,664.500 |
$217.800 |
M | 1.4 |
2060 | SANITARY SEWER MANHOLE | 01799 | 25.000 |
25.000 |
$2,791.900 |
EACH | 0.3 |
2070 | EMBANKMENT IN PLACE | 02230M | 200.000 |
200.000 |
$19.800 |
CU M | 0.0 |
2080 | PVC PIPE-100 MM | 03383M | 150.000 |
150.000 |
$133.000 |
M | 0.1 |
2090 | PVC PIPE-150 MM | 03385M | 150.000 |
150.000 |
$141.600 |
M | 0.1 |
2100 | PVC PIPE-200 MM | 03387M | 136.600 |
136.600 |
$299.500 |
M | 0.2 |
2110 | PVC PIPE-300 MM | 03391M | 796.100 |
796.100 |
$324.900 |
M | 1.0 |
2120 | PVC PIPE-300 MM TRUSS PIPE | 03391M | 237.100 |
237.100 |
$324.900 |
M | 0.3 |
2130 | AIR RELEASE VALVE | 03495 | 16.000 |
16.000 |
$2,639.600 |
EACH | 0.2 |
2140 | CONCRETE ENCASEMENT | 20057MS601 | 14.000 |
14.000 |
$248.700 |
M | 0.0 |
2150 | DROP MANHOLE | 20240MS408 | 4.000 |
4.000 |
$6,599.000 |
EACH | 0.1 |
2160 | DUCTILE IRON CAP | 20241MD | 1.000 |
1.000 |
$253.800 |
EACH | 0.0 |
2170 | PLUG MANHOLE | 20242MD | 2.000 |
2.000 |
$253.800 |
EACH | 0.0 |
2180 | CREEK CROSSING | 20243MD | 6.000 |
6.000 |
$253.800 |
M | 0.0 |
2190 | TAP MANHOLE | 20244MS710 | 8.000 |
8.000 |
$507.600 |
EACH | 0.0 |
2200 | SANITARY SEWER PUMP STATION | 20245MD | 1.000 |
1.000 |
$157,360.400 |
LS | 0.6 |
2460 | STEEL ENCASEMENT PIPE-450 MM | 01075M | 38.300 |
38.300 |
$801.500 |
M | 0.1 |
2470 | STEEL ENCASEMENT PIPE-600 MM | 01081M | 57.800 |
57.800 |
$1,101.500 |
M | 0.2 |
2480 | TEE | 20125EC | 10.000 |
10.000 |
$203.000 |
EACH | 0.0 |
8022 | ADJUST MANHOLE | 01792 | 0.000 |
1.000 |
$735.000 |
EACH | 0.0 |
8023 | EW~ Police Flagman | 10103NX | 0.000 |
160.000 |
$3.550 |
HOUR | 0.0 |
Category Total $1,836,760.78 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0006 | CATEGORY Description | STRUCTURE - NOISE WALL |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2210 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$143,000.000 |
LS | 0.6 |
2220 | SOUND BARRIER WALL | 20225MC | 2,557.000 |
2,557.000 |
$270.000 |
SQ M | 2.7 |
8049 | EW~ Soundwall Engineering | 10090NX | 0.000 |
1.000 |
$7,328.850 |
LS | 0.0 |
8050 | EW~ Soundwall Backfill | 10090NX | 0.000 |
1.000 |
$12,000.000 |
LS | 0.0 |
Category Total $833,390.00 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0007 | CATEGORY Description | STREAM RESTORATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2230 | FABRIC-GEOTEXTILE TYPE I | 02596M | 740.000 |
740.000 |
$1.670 |
SQ M | 0.0 |
2240 | EROSION CONTROL BLANKET | 05950M | 4,550.000 |
4,550.000 |
$1.700 |
SQ M | 0.0 |
2250 | TOPSOIL FURNISHED AND PLACED | 05997M | 2,470.000 |
2,470.000 |
$2.210 |
CU M | 0.0 |
2260 | TREE | 20000MS724 | 760.000 |
760.000 |
$5.600 |
EACH | 0.0 |
2270 | SHRUB | 20001MS724 | 760.000 |
760.000 |
$5.600 |
EACH | 0.0 |
2280 | GRASS SEEDING | 20226MS724 | 1.620 |
1.620 |
$5,015.200 |
HCTR | 0.0 |
2290 | CONSTRUCTED RIFFLES | 20227MD | 560.000 |
560.000 |
$57.140 |
SQ M | 0.1 |
2300 | CROSS VANE | 20228MD | 73.000 |
73.000 |
$128.730 |
M | 0.0 |
2310 | J-HOOK VANE | 20229MD | 23.000 |
23.000 |
$204.290 |
M | 0.0 |
2320 | ENERGY DISSIPATING POOL | 20230MD | 2.000 |
2.000 |
$1,596.250 |
EACH | 0.0 |
2330 | LIVE STAKES | 20231MD | 6,230.000 |
6,230.000 |
$5.600 |
EACH | 0.1 |
2340 | STEP POOL | 20232MD | 2.000 |
2.000 |
$1,614.330 |
EACH | 0.0 |
2350 | BOULDER TOE | 20233MD | 15.000 |
15.000 |
$42.570 |
M | 0.0 |
8024 | EW~ Root Wad | 10094NX | 0.000 |
9.000 |
$800.000 |
EACH | 0.0 |
Category Total $119,108.19 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0008 | CATEGORY Description | WETLAND MITIGATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2360 | WETLAND MITIGATION | 20234MD | 1.000 |
1.000 |
$7,000.000 |
LS | 0.0 |
2370 | GREEN ASH | 20235MS724 | 50.000 |
50.000 |
$10.700 |
EACH | 0.0 |
2380 | SWEET GUM | 20236MS724 | 50.000 |
50.000 |
$10.700 |
EACH | 0.0 |
2390 | SILKY DOGWOOD | 20237MS724 | 50.000 |
50.000 |
$10.700 |
EACH | 0.0 |
2400 | SPICEBUSH | 20238MS724 | 50.000 |
50.000 |
$10.700 |
EACH | 0.0 |
2410 | BUTTONBUSH | 20239MS724 | 50.000 |
50.000 |
$10.700 |
EACH | 0.0 |
Category Total $9,675.00 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0009 | CATEGORY Description | DEMOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2420 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$785,000.000 |
LS | 3.1 |
2430 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$380,000.000 |
LS | 1.5 |
Category Total $1,165,000.00 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0010 | CATEGORY Description | TRAINEES |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
2440 | TRAINEE PAYMENT REIMBURSEMENT 1 CLASS A OR B OPERATOR | 02742 | 1,600.000 |
1,600.000 |
$1.000 |
HOUR | 0.0 |
2450 | TRAINEE PAYMENT REIMBURSEMENT 1 TRUCK DRIVER | 02742 | 1,000.000 |
1,000.000 |
$1.000 |
HOUR | 0.0 |
Category Total $2,600.00 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0011 | CATEGORY Description | NON PARTICIPATING FEDERAL FUNDS | 3-18-08 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
8036 | FUEL ADJUSTMENT Non Participating | 10020NS | 0.000 |
123,160.280 |
$1.000 |
DOLL | 0.0 |
8037 | ASPHALT ADJUSTMENT Non Participating | 10030NS | 0.000 |
7,163.550 |
$1.000 |
DOLL | 0.0 |
Category Total $0.00 |
SM- Project | D019002704210 | CATEGORY NUMBER | 0012 | CATEGORY Description | NON PARTICIPATING FEDERAL FUNDS PART 2 |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
9036 | FUEL ADJUSTMENT NON PARTICIPATING ADDITONAL | 10020NS | 0.000 |
55,310.000 |
$1.000 |
DOLL | 0.0 |
9037 | ASPHALT ADJUSTMENT NON PARTICIPATING 2 | 10030NS | 0.000 |
25,000.000 |
$1.000 |
DOLL | 0.0 |
Category Total $0.00 |