| Item List 040070 | Date:06/01/2018 | 
| 
 | RTF Report: CATITEM | 
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 040070 | Primary Project Number | X021038905001 | 
| Contract Description | CARROLLTON-GRATZ ROAD (KY389) | ||
| Primary County | CARROLL | Fed/St Number | BRZ 0603 (164) | 
| Vendor ID | 02395 | Vendor Name | OHIO VALLEY ASPHALT LLC | 
| Bid Amount | $ 1,594,224.09 | ||
| SM- Project | X021038905001 | 
| Fed/State Number | BRZ 0603 (164) | 
| Project Description | CARROLLTON-GRATZ ROAD (KY389) | 
| *********** | 
| SM- Project | X021038905001 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | CPES SUBSECTION A | 
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt | 
| 0001 | EMBANKMENT IN PLACE | 02230 | 55,451.000 | 55,451.000 | $4.550 | CUYD | 15.8 | 
| 0002 | WATER | 02242 | 0.170 | 0.170 | $3.000 | MGAL | 0.0 | 
| 0003 | CONCRETE-CLASS A | 08100 | 13.130 | 13.130 | $625.000 | CUYD | 0.5 | 
| 0004 | STEEL REINFORCEMENT | 08150 | 748.000 | 748.000 | $1.000 | LB | 0.0 | 
| 0005 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 10,321.000 | 10,626.000 | $0.240 | LF | 0.2 | 
| 0006 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 7,310.000 | 7,310.000 | $1.750 | LF | 0.8 | 
| 0007 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 3,170.000 | 3,170.000 | $1.750 | LF | 0.3 | 
| 0008 | PAVEMENT MARKER TYPE V-BY | 06591 | 103.000 | 103.000 | $41.500 | EACH | 0.3 | 
| 0009 | BARRICADE-TYPE III | 02014 | 4.000 | 4.000 | $120.000 | EACH | 0.0 | 
| 0010 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 1,970.000 | 1,970.000 | $14.900 | LF | 1.8 | 
| 0011 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 2.000 | 2.000 | $70.000 | EACH | 0.0 | 
| 0012 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 4.000 | 4.000 | $2,700.000 | EACH | 0.7 | 
| 0013 | GUARDRAIL END TREATMENT TYPE 7 | 02371 | 2.000 | 2.000 | $700.000 | EACH | 0.1 | 
| 0014 | GUARDRAIL CONNECTOR TO BRIDGE END TY A | 02363 | 4.000 | 4.000 | $1,800.000 | EACH | 0.5 | 
| 0015 | TEMPORARY GUARDRAIL | 02397 | 2,480.000 | 2,480.000 | $8.500 | LF | 1.3 | 
| 0016 | REMOVE PAVEMENT | 02091 | 927.000 | 927.000 | $1.200 | SQYD | 0.1 | 
| 0017 | CULVERT PIPE-18 INCH | 00462 | 26.670 | 26.670 | $61.500 | LF | 0.1 | 
| 0018 | CULVERT PIPE-24 INCH | 00464 | 85.870 | 85.870 | $52.400 | LF | 0.3 | 
| 0019 | CULVERT PIPE-54 INCH | 00471 | 60.010 | 60.010 | $120.000 | LF | 0.5 | 
| 0020 | STORM SEWER PIPE-18 INCH | 00522 | 252.910 | 252.910 | $35.000 | LF | 0.6 | 
| 0021 | STORM SEWER PIPE-30 INCH | 00526 | 144.340 | 144.340 | $49.000 | LF | 0.4 | 
| 0022 | ENTRANCE PIPE-18 INCH | 00441 | 56.000 | 56.000 | $50.000 | LF | 0.2 | 
| 0023 | DROP BOX INLET TYPE 1 | 01490 | 1.000 | 1.000 | $1,200.000 | EACH | 0.1 | 
| 0024 | DROP BOX INLET TYPE 2 | 01493 | 1.000 | 1.000 | $1,600.000 | EACH | 0.1 | 
| 0025 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 3.000 | 3.000 | $1,500.000 | EACH | 0.3 | 
| 0026 | S & F BOX INLET-OUTLET-24 INCH | 01451 | 2.000 | 2.000 | $2,100.000 | EACH | 0.3 | 
| 0027 | S & F BOX INLET-OUTLET-30 INCH | 01452 | 1.000 | 1.000 | $2,900.000 | EACH | 0.2 | 
| 0028 | JUNCTION BOX-30 INCH | 01644 | 1.000 | 1.000 | $1,600.000 | EACH | 0.1 | 
| 0029 | SEEDING AND PROTECTION | 05985 | 35,191.000 | 35,191.000 | $0.350 | SQYD | 0.8 | 
| 0030 | TEMP SEEDING AND PROTECTION | 05953 | 3,519.000 | 3,519.000 | $0.300 | SQYD | 0.1 | 
| 0031 | SPECIAL SEEDING CROWN VETCH | 05989 | 3,519.000 | 3,519.000 | $0.300 | SQYD | 0.1 | 
| 0032 | EROSION CONTROL BLANKET | 05950 | 880.000 | 880.000 | $1.700 | SQYD | 0.1 | 
| 0033 | SILT CHECK | 02705 | 27.000 | 27.000 | $140.000 | EACH | 0.2 | 
| 0034 | CLEAN SILT CHECK | 02708 | 54.000 | 54.000 | $95.000 | EACH | 0.3 | 
| 0035 | TEMPORARY SILT FENCE | 02701 | 150.000 | 150.000 | $2.950 | LF | 0.0 | 
| 0036 | CLEAN TEMPORARY SILT FENCE | 02709 | 300.000 | 300.000 | $1.300 | LF | 0.0 | 
| 0037 | SILT CHECK TY II (MOD) | 09277 | 4.000 | 4.000 | $200.000 | EACH | 0.1 | 
| 0038 | CLEAN SILT CHECK TY II (MOD) | 09278 | 8.000 | 8.000 | $70.000 | EACH | 0.0 | 
| 0039 | CHANNEL LINING CLASS II | 02483 | 1,317.700 | 1,317.700 | $17.750 | TON | 1.5 | 
| 0040 | CHANNEL LINING CLASS III | 02484 | 124.400 | 124.400 | $24.000 | TON | 0.2 | 
| 0041 | R/W MARKER RURAL TYPE 1 | 02434 | 21.000 | 21.000 | $100.000 | EACH | 0.1 | 
| 0042 | STANDARD CURB AND GUTTER | 01810 | 150.000 | 150.000 | $30.000 | LF | 0.3 | 
| 0043 | ISLAND CURB AND GUTTER | 01825 | 100.000 | 100.000 | $30.000 | LF | 0.2 | 
| 0044 | EDGE KEY | 02585 | 80.000 | 80.000 | $7.500 | LF | 0.0 | 
| 0045 | SCARIFYING PAVEMENT | 02678 | 927.000 | 927.000 | $0.750 | SQYD | 0.0 | 
| 0046 | CRUSHED STONE BASE | 00003 | 2,419.000 | 2,419.000 | $16.750 | TON | 2.5 | 
| 0047 | TRAFFIC BOUND BASE | 00020 | 211.000 | 211.000 | $11.500 | TON | 0.2 | 
| 0048 | LEVELING & WEDGING PG64-22 | 00190 | 69.000 | 69.000 | $49.750 | TON | 0.2 | 
| 0049 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 3,046.000 | 3,417.870 | $47.500 | TON | 9.1 | 
| 0050 | CL2 ASPH SURF 0.38C PG64-22 | 00304 | 710.000 | 980.340 | $49.750 | TON | 2.2 | 
| 0051 | CLEARING AND GRUBBING | 02545 | 1.000 | 1.000 | $16,000.000 | LS | 1.0 | 
| 0052 | STAKING | 02726 | 1.000 | 1.000 | $10,000.000 | LS | 0.6 | 
| 0053 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 | 1.000 | $20,000.000 | LS | 1.3 | 
| 0054 | REMOVE STRUCTURE | 02731 | 1.000 | 1.000 | $35,000.000 | LS | 2.2 | 
| 0055 | DIVERSIONS (BY-PASS DETOURS) | 02651 | 1.000 | 1.000 | $15,000.000 | LS | 0.9 | 
| 0056 | TEMPORARY SIGNAL | 04935 | 1.000 | 1.000 | $11,500.000 | LS | 0.7 | 
| 8000 | SIGNS | 02562 | 0.000 | 300.000 | $7.500 | SQFT | 0.0 | 
| 8001 | CONCRETE BARRIER WALL TYPE 9T | 03171 | 0.000 | 460.000 | $37.000 | LF | 0.0 | 
| 8002 | DELINEATOR FOR BARRIER-YELLOW | 01985 | 0.000 | 40.000 | $15.000 | EACH | 0.0 | 
| 8003 | CRASH CUSHION TYPE VI-T | 02894 | 0.000 | 2.000 | $11,850.000 | EACH | 0.0 | 
| 8004 | SAFELOADING | 02690 | 0.000 | 13.000 | $260.000 | CUYD | 0.0 | 
| 8005 | SPRING BOX INLET SPECIAL Spring Box Inlet Special | 01659 | 0.000 | 1.000 | $6,300.000 | EACH | 0.0 | 
| 8006 | REMOVE TEMPORARY SIGNAL TRAFFIC | 20272MC | 0.000 | 1.000 | $3,000.000 | LS | 0.0 | 
| 8010 | ASPHALT ADJUSTMENT | 10030NS | 0.000 | 1,139.300 | $1.000 | DOLL | 0.0 | 
| 8011 | FUEL ADJUSTMENT | 10020NS | 0.000 | 4,723.940 | $1.000 | DOLL | 0.0 | 
| 8012 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 0.000 | 14,241.000 | $0.240 | LF | 0.0 | 
| Category Total $804,161.02 | 
| SM- Project | X021038905001 | CATEGORY NUMBER | 0003 | CATEGORY Description | BRIDGE | CPES SUBSECTION C | 
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt | 
| 0057 | STRUCTURE GRANULAR BACKFILL | 02231 | 172.000 | 172.000 | $26.000 | CUYD | 0.3 | 
| 0058 | MASONRY COATING | 02998 | 1,257.000 | 1,257.000 | $8.000 | SQYD | 0.6 | 
| 0059 | CONCRETE-CLASS A | 08100 | 342.200 | 342.200 | $255.000 | CUYD | 5.5 | 
| 0060 | CYCLOPEAN STONE RIP RAP | 08019 | 2,196.000 | 2,196.000 | $24.000 | TON | 3.3 | 
| 0061 | PILES-STEEL HP14X89 | 08051 | 3,201.000 | 3,201.000 | $38.000 | LF | 7.6 | 
| 0062 | CONCRETE-CLASS AA HPC MOD | 07307 | 426.700 | 426.700 | $370.000 | CUYD | 9.9 | 
| 0063 | TEST PILES | 08033 | 415.000 | 415.000 | $38.000 | LF | 1.0 | 
| 0064 | STEEL REINF-EPOXY COATED | 08151 | 113,566.000 | 113,566.000 | $0.800 | LB | 5.7 | 
| 0065 | STEEL REINFORCEMENT | 08150 | 19,652.000 | 19,652.000 | $0.720 | LB | 0.9 | 
| 0066 | PILE POINTS-14 INCH | 08095 | 48.000 | 48.000 | $109.000 | EACH | 0.3 | 
| 0067 | PRECAST PC I BEAM TYPE 4 | 08634 | 1,077.300 | 1,077.300 | $165.000 | LF | 11.1 | 
| 0068 | ARMORED EDGE FOR CONCRETE | 03299 | 90.500 | 90.500 | $45.000 | LF | 0.3 | 
| 0069 | FOUNDATION PREPARATION | 08003 | 1.000 | 1.000 | $5,000.000 | LS | 0.3 | 
| Category Total $746,841.24 | 
| SM- Project | X021038905001 | CATEGORY NUMBER | 0005 | CATEGORY Description | WATERLINE | CPES SUBSECTION E | 
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt | 
| 0070 | PVC CLASS 200 WATER LINE-4" | 07643 | 997.280 | 997.280 | $10.350 | LF | 0.6 | 
| 0071 | CONNECT TO EXISTING LINE 4"PVC | 09254 | 2.000 | 2.000 | $500.000 | EACH | 0.1 | 
| 0072 | THRUST BLOCK | 09773 | 2.000 | 2.000 | $100.000 | EACH | 0.0 | 
| 0073 | GATE VALVE-4 INCH | 03524 | 2.000 | 2.000 | $500.000 | EACH | 0.1 | 
| 0074 | STEEL ENCASEMENT PIPE-12 INCH | 01069 | 40.000 | 40.000 | $75.000 | LF | 0.2 | 
| 0075 | STEEL ENCASEMENT PIPE-16 INCH | 01073 | 40.000 | 40.000 | $80.000 | LF | 0.2 | 
| 0076 | CONC ENCASEMENT | 09289 | 2.000 | 2.000 | $450.000 | CUYD | 0.1 | 
| Category Total $19,621.84 | 
| SM- Project | X021038905001 | CATEGORY NUMBER | 0007 | CATEGORY Description | DEMOBILIZATION | CPES SUBSECTION G | 
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt | 
| 0077 | DEMOBILIZATION | 02569 | 1.000 | 1.000 | $23,599.970 | LS | 1.5 | 
| Category Total $23,599.97 |