KENTUCKY TRANSPORTATION CABINET
Contract ID | 030713 | Primary Project Number | X115015004001 |
Contract Description | SPRINGFIELD BY-PASS (US 150) | ||
Primary County | WASHINGTON | Fed/St Number | STPR 150-1 (89) |
Vendor ID | 02457 | Vendor Name | NALLY & HAYDON LLC AND SUBSIDIARIES |
Bid Amount | $ 6,115,876.92 |
SM- Project | X115015004001 |
Fed/State Number | STPR 150-1 (89) |
Project Description | SPRINGFIELD BY-PASS (US 150) |
*********** |
SM- Project | X115015004001 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | CPES SUBSECTION A |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0010 | D G A BASE | 00001 | 6,218.000 |
4,052.000 |
$13.850 |
TON | 1.4 |
0020 | CRUSHED STONE BASE | 00003 | 72,455.000 |
72,751.750 |
$13.850 |
TON | 16.4 |
0030 | TRAFFIC BOUND BASE | 00020 | 2,129.000 |
2,129.000 |
$14.000 |
TON | 0.5 |
0040 | ASPHALT SEAL AGGREGATE | 00100 | 388.000 |
388.000 |
$40.000 |
TON | 0.3 |
0050 | CL1 ASPH BASE 1.00D PG64-22 | 00211 | 10,621.000 |
10,621.000 |
$34.340 |
TON | 6.0 |
0060 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 26,920.000 |
26,920.000 |
$35.480 |
TON | 15.6 |
0070 | CL1 ASPH BASE 0.75D PG64-22 | 00220 | 529.000 |
644.100 |
$35.480 |
TON | 0.3 |
0080 | EMULSIFIED ASPHALT RS-2 | 00291 | 47.000 |
47.000 |
$375.000 |
TON | 0.3 |
0090 | CL1 ASPH SURF 0.38D PG64-22 | 00300 | 3,801.000 |
3,873.200 |
$38.380 |
TON | 2.4 |
0100 | CL2 ASPH SURF 0.38D PG76-22 | 00340 | 4,334.000 |
4,334.000 |
$45.970 |
TON | 3.3 |
0110 | ENTRANCE PIPE-15 INCH | 00440 | 549.000 |
549.000 |
$22.000 |
LF | 0.2 |
0120 | ENTRANCE PIPE-18 INCH | 00441 | 150.000 |
150.000 |
$25.000 |
LF | 0.1 |
0130 | ENTRANCE PIPE-24 INCH | 00443 | 36.000 |
36.000 |
$30.000 |
LF | 0.0 |
0140 | CULVERT PIPE-15 INCH | 00461 | 59.000 |
59.000 |
$30.000 |
LF | 0.0 |
0150 | CULVERT PIPE-18 INCH | 00462 | 565.700 |
565.700 |
$40.000 |
LF | 0.4 |
0160 | CULVERT PIPE-24 INCH | 00464 | 1,785.300 |
1,785.300 |
$46.000 |
LF | 1.3 |
0170 | CULVERT PIPE-36 INCH | 00468 | 200.800 |
200.800 |
$66.000 |
LF | 0.2 |
0180 | CULVERT PIPE-72 INCH | 00474 | 172.000 |
172.000 |
$185.000 |
LF | 0.5 |
0190 | CULVERT PIPE-42 INCH EQUIV | 00498 | 89.300 |
0.000 |
$168.000 |
LF | 0.2 |
0200 | PERFORATED PIPE-4 INCH | 01000 | 729.000 |
729.000 |
$8.000 |
LF | 0.1 |
0210 | PERFORATED PIPE-6 INCH | 01001 | 575.000 |
575.000 |
$12.000 |
LF | 0.1 |
0220 | NON-PERFORATED PIPE-4 INCH | 01010 | 168.000 |
168.000 |
$10.000 |
LF | 0.0 |
0230 | NON-PERFORATED PIPE-6 INCH | 01011 | 269.000 |
269.000 |
$14.000 |
LF | 0.1 |
0240 | PERF PIPE HEADWALL TY 1-6 INCH | 01021 | 4.000 |
4.000 |
$600.000 |
EACH | 0.0 |
0250 | PERF PIPE HEADWALL TY 3-4 INCH | 01028 | 11.000 |
11.000 |
$500.000 |
EACH | 0.1 |
0260 | PERF PIPE HEADWALL TY 3-6 INCH | 01029 | 2.000 |
2.000 |
$600.000 |
EACH | 0.0 |
0270 | PERF PIPE HEADWALL TY 4-4 INCH | 01032 | 3.000 |
3.000 |
$600.000 |
EACH | 0.0 |
0280 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 6.000 |
6.000 |
$2,000.000 |
EACH | 0.2 |
0290 | S & F BOX INLET-OUTLET-24 INCH | 01451 | 14.000 |
14.000 |
$2,500.000 |
EACH | 0.6 |
0300 | S & F BOX INLET-OUTLET-36 INCH | 01453 | 4.000 |
4.000 |
$5,000.000 |
EACH | 0.3 |
0310 | DROP BOX INLET TYPE 5F | 01517 | 1.000 |
1.000 |
$3,300.000 |
EACH | 0.1 |
0320 | REMOVE TEMP CONC BARRIER WALL | 02002 | 160.000 |
160.000 |
$10.000 |
LF | 0.0 |
0330 | BARRICADE-TYPE III | 02014 | 27.000 |
27.000 |
$230.000 |
EACH | 0.1 |
0340 | REMOVE PAVEMENT | 02091 | 2,582.000 |
2,582.000 |
$3.000 |
SQYD | 0.1 |
0350 | ROADWAY EXCAVATION | 02200 | 324,008.000 |
325,397.000 |
$2.340 |
CUYD | 12.4 |
0360 | GRANULAR EMBANKMENT | 02223 | 1,590.000 |
1,595.000 |
$23.000 |
CUYD | 0.6 |
0370 | WATER | 02242 | 1,500.000 |
1,500.000 |
$0.010 |
MGAL | 0.0 |
0380 | FENCE-WOVEN WIRE TYPE 1 | 02262 | 26,608.000 |
14,640.000 |
$3.500 |
LF | 1.5 |
0390 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 8,248.000 |
8,248.000 |
$9.950 |
LF | 1.3 |
0400 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 9.000 |
10.000 |
$32.400 |
EACH | 0.0 |
0410 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 2.000 |
2.000 |
$380.000 |
EACH | 0.0 |
0420 | REMOVE GUARDRAIL | 02381 | 1,117.000 |
1,117.000 |
$2.000 |
LF | 0.0 |
0430 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 18.000 |
17.000 |
$1,450.000 |
EACH | 0.4 |
0440 | R/W MARKER RURAL TYPE 1 | 02434 | 57.000 |
57.000 |
$72.000 |
EACH | 0.1 |
0450 | R/W MARKER MUNICIPAL TYPE 1 | 02437 | 7.000 |
7.000 |
$67.000 |
EACH | 0.0 |
0460 | REMOVE & RESET R/W MARKER | 02446 | 2.000 |
2.000 |
$46.000 |
EACH | 0.0 |
0470 | CHANNEL LINING CLASS II | 02483 | 455.000 |
455.000 |
$18.000 |
TON | 0.1 |
0480 | CHANNEL LINING CLASS III | 02484 | 11,157.000 |
11,157.000 |
$20.000 |
TON | 3.6 |
0490 | CLEARING AND GRUBBING (68.17 ACRES) | 02545 | 1.000 |
1.000 |
$37,000.000 |
LS | 0.6 |
0500 | SIGNS | 02562 | 1,220.000 |
1,220.000 |
$5.500 |
SQFT | 0.1 |
0510 | EDGE KEY | 02585 | 170.000 |
170.000 |
$40.000 |
LF | 0.1 |
0520 | FABRIC-GEOTEXTILE TYPE I | 02596 | 6,078.000 |
6,078.000 |
$3.000 |
SQYD | 0.3 |
0530 | FABRIC-GEOTEXTILE TYPE III | 02598 | 2,385.000 |
2,400.000 |
$2.000 |
SQYD | 0.1 |
0540 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$27,000.000 |
LS | 0.4 |
0550 | DIVERSIONS (BY-PASS DETOURS) | 02651 | 1.000 |
1.000 |
$20,000.000 |
LS | 0.3 |
0560 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$800.000 |
LS | 0.0 |
0570 | ASPH PAVE MILLING & TEXTURING | 02677 | 1,443.000 |
1,443.000 |
$14.500 |
TON | 0.3 |
0580 | TEMPORARY SILT FENCE | 02701 | 4,800.000 |
4,800.000 |
$2.000 |
LF | 0.2 |
0590 | SILT TRAP TYPE B | 02704 | 67.000 |
67.000 |
$350.000 |
EACH | 0.4 |
0600 | SILT CHECK | 02705 | 124.000 |
124.000 |
$100.000 |
EACH | 0.2 |
0610 | CLEAN SILT TRAP TYPE B | 02707 | 201.000 |
201.000 |
$200.000 |
EACH | 0.7 |
0620 | CLEAN SILT CHECK | 02708 | 372.000 |
372.000 |
$40.000 |
EACH | 0.2 |
0630 | CLEAN TEMPORARY SILT FENCE | 02709 | 14,400.000 |
14,400.000 |
$1.000 |
LF | 0.2 |
0640 | STAKING | 02726 | 1.000 |
1.000 |
$60,000.000 |
LS | 1.0 |
0650 | CONCRETE BARRIER WALL TYPE 9T | 03171 | 160.000 |
160.000 |
$50.000 |
LF | 0.1 |
0660 | PVC PIPE-2 INCH | 03381 | 225.000 |
225.000 |
$35.000 |
LF | 0.1 |
0670 | PVC PIPE-4 INCH | 03383 | 120.000 |
120.000 |
$40.000 |
LF | 0.1 |
0680 | TIE-IN 2 INCH | 03463 | 2.000 |
2.000 |
$1,000.000 |
EACH | 0.0 |
0690 | EROSION CONTROL BLANKET | 05950 | 5,470.000 |
5,903.000 |
$1.160 |
SQYD | 0.1 |
0700 | EROSION CONTROL BLANKET | 05950 | 9,755.000 |
9,755.000 |
$1.650 |
SQYD | 0.3 |
0710 | TEMP SEEDING AND PROTECTION | 05953 | 21,000.000 |
21,000.000 |
$0.180 |
SQYD | 0.1 |
0720 | SEEDING AND PROTECTION REVISED 10 | 05985 | 221,000.000 |
223,015.000 |
$0.270 |
SQYD | 1.0 |
0730 | SPECIAL SEEDING CROWN VETCH | 05989 | 3,222.000 |
65,132.000 |
$0.230 |
SQYD | 0.0 |
0740 | TOPSOIL FURNISHED AND PLACED | 05997 | 3,550.000 |
3,550.000 |
$10.000 |
CUYD | 0.6 |
0750 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 18,450.000 |
18,450.000 |
$0.120 |
LF | 0.0 |
0760 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 61,374.000 |
61,374.000 |
$0.200 |
LF | 0.2 |
0770 | PAVE STRIPING REMOVAL-4 INCH | 06530 | 18,450.000 |
18,450.000 |
$0.500 |
LF | 0.2 |
0780 | PAVE MARKING-THERMO STOP BAR-12IN | 06567 | 125.000 |
125.000 |
$6.000 |
LF | 0.0 |
0790 | PAVE MARKING-PAINT CROSS-HATCH | 06570 | 8,669.000 |
8,669.000 |
$0.500 |
SQFT | 0.1 |
0800 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 16.000 |
16.000 |
$70.000 |
EACH | 0.0 |
0810 | PAVEMENT MARKER TYPE V-MW | 06589 | 24.000 |
24.000 |
$17.000 |
EACH | 0.0 |
0820 | PAVEMENT MARKER TYPE V-BY | 06591 | 684.000 |
684.000 |
$17.000 |
EACH | 0.2 |
0830 | J-HOOK VANE | 07535 | 30.000 |
30.000 |
$1,700.000 |
EACH | 0.8 |
0840 | CORALBERRY SHRUB | 07549 | 262.000 |
262.000 |
$12.600 |
EACH | 0.1 |
0850 | GRASS SEEDING | 07550 | 46.000 |
46.000 |
$23.370 |
EACH | 0.0 |
0860 | CROSS VANE | 07551 | 10.000 |
10.000 |
$1,900.000 |
EACH | 0.3 |
0870 | CONCRETE-CLASS A | 08100 | 47.800 |
47.800 |
$700.000 |
CUYD | 0.5 |
0880 | STEEL REINFORCEMENT | 08150 | 2,342.000 |
2,342.000 |
$1.000 |
LB | 0.0 |
0890 | SILKY DOGWOOD | 09133 | 131.000 |
131.000 |
$12.600 |
EACH | 0.0 |
0900 | HACKBERRY | 09208 | 131.000 |
131.000 |
$12.600 |
EACH | 0.0 |
0910 | CL 2 ASPH BASE 1.0D PG 76-22 | 09339 | 11,938.000 |
11,938.000 |
$39.880 |
TON | 7.8 |
0920 | GREEN ASH TREE | 09533 | 230.000 |
230.000 |
$12.600 |
EACH | 0.0 |
0930 | SHELLBARK HICKORY TREE | 09691 | 99.000 |
99.000 |
$12.600 |
EACH | 0.0 |
0940 | BLACK CHERRY TREE | 09746 | 197.000 |
197.000 |
$12.600 |
EACH | 0.0 |
0950 | TEMPORARY DAM AND PUMP | 09749 | 1.000 |
1.000 |
$5,000.000 |
LS | 0.1 |
0960 | ENERGY DISSIPATING POOL | 09752 | 1.000 |
1.000 |
$1,000.000 |
EACH | 0.0 |
0970 | LIVE STAKES | 09753 | 13,200.000 |
13,200.000 |
$5.050 |
EACH | 1.1 |
0980 | ELDERBERRY SHRUB | 09758 | 262.000 |
262.000 |
$12.600 |
EACH | 0.1 |
8000 | EW~ Fencing-Diamond Mesh 58" | 10093EX | 0.000 |
11,968.000 |
$8.950 |
LF | 0.0 |
8001 | CLEAN SINKHOLE | 02469 | 0.000 |
1.000 |
$1,600.000 |
EACH | 0.0 |
8003 | CONCRETE-CLASS B | 02555 | 0.000 |
3.000 |
$350.000 |
CUYD | 0.0 |
8004 | STEEL REINFORCEMENT | 08150 | 0.000 |
100.000 |
$1.500 |
LB | 0.0 |
8005 | EMBANKMENT IN PLACE | 02230 | 0.000 |
1,850.000 |
$3.000 |
CUYD | 0.0 |
8006 | CONCRETE-CLASS A | 08100 | 0.000 |
56.000 |
$303.500 |
CUYD | 0.0 |
8007 | STEEL REINFORCEMENT | 08150 | 0.000 |
5,200.000 |
$0.840 |
LB | 0.0 |
8008 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 0.000 |
15.000 |
$50.000 |
CUYD | 0.0 |
8009 | FOUNDATION PREPARATION | 08003 | 0.000 |
1.000 |
$5,500.000 |
LS | 0.0 |
8010 | STEEL ENCASEMENT PIPE-12 INCH | 01069 | 0.000 |
234.000 |
$105.000 |
LF | 0.0 |
8011 | CULVERT PIPE-42 INCH EQUIV | 00498 | 0.000 |
89.300 |
$163.000 |
LF | 0.0 |
8012 | RIFFLE ROCK | 21747EN | 0.000 |
326.290 |
$30.000 |
TON | 0.0 |
8013 | RIFFLE STRUCTURE-DUMPED STONE | 02738 | 0.000 |
9.000 |
$743.340 |
EACH | 0.0 |
8014 | RIPARIAN ZONE SEEDING | 20368ES724 | 0.000 |
1.000 |
$11,662.200 |
LS | 0.0 |
8015 | SANDBAR WILLOWS #3 Black Willow Trees | 09202 | 0.000 |
44.000 |
$41.500 |
EACH | 0.0 |
8016 | STEEL PRICE ADJUSTMENT | 10100NS | 0.000 |
0.000 |
$27,000.000 |
DOLL | 0.0 |
Category Total $5,546,167.46 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0003 | CATEGORY Description | BRIDGE | CPES SUBSECTION C |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0990 | FOUNDATION PREPARATION (STA 32+25 | 08003 | 1.000 |
1.000 |
$4,000.000 |
LS | 0.1 |
1000 | CONCRETE-CLASS A | 08100 | 239.500 |
239.500 |
$298.000 |
CUYD | 1.2 |
1010 | STEEL REINFORCEMENT | 08150 | 35,810.000 |
35,810.000 |
$0.540 |
LB | 0.3 |
Category Total $94,708.40 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0005 | CATEGORY Description | BRIDGE | CPES SUBSECTION E |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1020 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 196.000 |
226.760 |
$50.000 |
CUYD | 0.2 |
1030 | FOUNDATION PREPARATION (STA 135+8 | 08003 | 1.000 |
1.000 |
$5,500.000 |
LS | 0.1 |
1040 | CONCRETE-CLASS A | 08100 | 113.600 |
113.600 |
$298.000 |
CUYD | 0.6 |
1050 | STEEL REINFORCEMENT | 08150 | 13,060.000 |
13,060.000 |
$0.540 |
LB | 0.1 |
Category Total $56,205.20 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0007 | CATEGORY Description | BRIDGE | CPES SUBSECTION G |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1060 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 10.000 |
49.410 |
$50.000 |
CUYD | 0.0 |
1070 | FOUNDATION PREPARATION (STA 149 +1 | 08003 | 1.000 |
1.000 |
$5,500.000 |
LS | 0.1 |
1080 | CONCRETE-CLASS A | 08100 | 206.400 |
206.400 |
$298.000 |
CUYD | 1.0 |
1090 | STEEL REINFORCEMENT | 08150 | 21,470.000 |
21,470.000 |
$0.540 |
LB | 0.2 |
1100 | LOW FLOW DIVERSION CURB (STA 149+ | 08410 | 1.000 |
1.000 |
$1,200.000 |
LS | 0.0 |
Category Total $80,301.00 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0009 | CATEGORY Description | BRIDGE | CPES SUBSECTION I |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1110 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 4.000 |
4.000 |
$50.000 |
CUYD | 0.0 |
1120 | FOUNDATION PREPARATION (STA 131+2 | 08003 | 1.000 |
1.000 |
$1,800.000 |
LS | 0.0 |
1130 | CONCRETE-CLASS A | 08100 | 36.300 |
36.300 |
$298.000 |
CUYD | 0.2 |
1140 | STEEL REINFORCEMENT | 08150 | 2,960.000 |
2,960.000 |
$0.540 |
LB | 0.0 |
1150 | GUARDRAIL-STEEL W BEAM-S FACE BR | 08801 | 16.000 |
16.000 |
$79.700 |
LF | 0.0 |
Category Total $15,691.00 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0011 | CATEGORY Description | BRIDGE | CPES SUBSECTION K |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1160 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 27.000 |
27.000 |
$50.000 |
CUYD | 0.0 |
1170 | FOUNDATION PREPARATION (STA 158+0 | 08003 | 1.000 |
1.000 |
$2,000.000 |
LS | 0.0 |
1180 | CONCRETE-CLASS A | 08100 | 62.400 |
62.400 |
$298.000 |
CUYD | 0.3 |
1190 | STEEL REINFORCEMENT | 08150 | 6,440.000 |
6,440.000 |
$0.540 |
LB | 0.1 |
1200 | LOW FLOW DIVERSION CURB (STA 158+ | 08410 | 1.000 |
1.000 |
$1,200.000 |
LS | 0.0 |
1210 | GUARDRAIL-STEEL W BEAM-S FACE BR | 08801 | 42.000 |
42.000 |
$79.700 |
LF | 0.1 |
Category Total $29,970.20 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0013 | CATEGORY Description | BRIDGE | CPES SUBSECTION M |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1220 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 27.000 |
60.200 |
$50.000 |
CUYD | 0.0 |
1230 | FOUNDATION PREPARATION (STA 175+8 | 08003 | 1.000 |
1.000 |
$2,000.000 |
LS | 0.0 |
1240 | CONCRETE-CLASS A | 08100 | 62.400 |
62.400 |
$298.000 |
CUYD | 0.3 |
1250 | STEEL REINFORCEMENT | 08150 | 6,440.000 |
6,440.000 |
$0.540 |
LB | 0.1 |
1260 | LOW FLOW DIVERSION CURB (STA 175* | 08410 | 1.000 |
1.000 |
$1,200.000 |
LS | 0.0 |
1270 | GUARDRAIL-STEEL W BEAM-S FACE BR | 08801 | 42.000 |
42.000 |
$79.700 |
LF | 0.1 |
Category Total $29,970.20 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0015 | CATEGORY Description | TRAINEES | CPES SUBSECTION O |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1280 | TRAINEE PAYMENT REIMBURSEMENT | 02742 | 1,600.000 |
1,600.000 |
$1.000 |
HOUR | 0.0 |
Category Total $1,600.00 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0017 | CATEGORY Description | MOB /DEMOB | CPES SUBSECTION Q |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1290 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$175,575.410 |
LS | 2.9 |
1300 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$87,787.700 |
LS | 1.4 |
Category Total $263,363.11 |
SM- Project | X115015004001 | CATEGORY NUMBER | 0018 | CATEGORY Description | NON PARTICIPATING |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
8017 | STEEL PRICE ADJUSTMENT NON PARTICIPATING | 10100NS | 0.000 |
27,000.000 |
$1.000 |
DOLL | 0.0 |
Category Total $0.00 |