| Item List 030444 | Date:06/01/2018 | 
| 
 | RTF Report: CATITEM | 
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 030444 | Primary Project Number | X098002305001 | 
| Contract Description | COUNTRY MUSIC HIGHWAY (US 23) | ||
| Primary County | PIKE | Fed/St Number | FD04 098 0023 026-030 | 
| Vendor ID | 00272 | Vendor Name | MOUNTAIN ENTERPRISES INCORPORATED | 
| Bid Amount | $ 9,774,064.33 | ||
| SM- Project | X098002305001 | 
| Fed/State Number | FD04 098 0023 026-030 | 
| Project Description | COUNTRY MUSIC HIGHWAY (US 23) | 
| *********** | 
| SM- Project | X098002305001 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | CPES SUBSECTION A | 
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt | 
| 0001 | D G A BASE | 00001 | 29,000.000 | 6,843.000 | $18.380 | TON | 5.5 | 
| 0002 | ASPHALT SEAL AGGREGATE | 00100 | 225.000 | 225.000 | $65.000 | TON | 0.1 | 
| 0003 | LEVELING & WEDGING PG64-22 | 00190 | 6,000.000 | 6,000.000 | $44.760 | TON | 2.7 | 
| 0004 | ASPHALT SCRATCH COURSE PG76-22 | 00193 | 4,500.000 | 4,500.000 | $55.230 | TON | 2.5 | 
| 0005 | CL3 ASPH BASE 1.50D PG64-22 | 00205 | 33,300.000 | 41,086.267 | $39.140 | TON | 13.3 | 
| 0006 | CL4 ASPH BASE 1.50D PG76-22 | 00210 | 40,000.000 | 38,037.740 | $46.340 | TON | 19.0 | 
| 0007 | ASPHALT SEAL COAT | 00103 | 27.000 | 27.000 | $400.000 | TON | 0.1 | 
| 0008 | CL3 ASPH SURF 0.50D PG64-22 | 00312 | 1,500.000 | 0.000 | $44.760 | TON | 0.7 | 
| 0009 | CL4 ASPH SURF 0.50A PG76-22 | 00335 | 15,000.000 | 0.000 | $57.110 | TON | 8.8 | 
| 0010 | ASPHALT PLACEMENT WITH MTV | 00338 | 59,500.000 | 59,500.000 | $1.750 | TON | 1.1 | 
| 0011 | STORM SEWER PIPE-36 INCH | 00528 | 1,200.000 | 1,500.000 | $75.000 | LF | 0.9 | 
| 0012 | REMOVE PIPE | 01310 | 180.000 | 405.000 | $10.000 | LF | 0.0 | 
| 0013 | DROP BOX INLET TYPE 1 | 01490 | 9.000 | 9.000 | $3,200.000 | EACH | 0.3 | 
| 0014 | CAP CURB BOX INLET | 01634 | 14.000 | 14.000 | $1,200.000 | EACH | 0.2 | 
| 0015 | STANDARD CURB AND GUTTER | 01810 | 21,291.000 | 10,591.000 | $16.100 | LF | 3.5 | 
| 0016 | PAVED DITCH TYPE 1 | 02157 | 800.000 | 0.000 | $47.300 | SQYD | 0.4 | 
| 0017 | REMOVE PAVED DITCH | 02165 | 800.000 | 800.000 | $5.000 | SQYD | 0.0 | 
| 0018 | ROADWAY EXCAVATION | 02200 | 11,407.000 | 4,837.950 | $15.000 | CUYD | 1.8 | 
| 0019 | DELINEATOR FOR GUARDRAIL-WHITE | 01982 | 120.000 | 120.000 | $7.500 | EACH | 0.0 | 
| 0020 | EMBANKMENT IN PLACE | 02230 | 25,556.000 | 1,771.100 | $15.000 | CUYD | 3.9 | 
| 0021 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 12,837.500 | 0.000 | $10.500 | LF | 1.4 | 
| 0022 | GUARDRAIL-STEEL W BEAM-D FACE | 02352 | 2,000.000 | 1,440.415 | $17.550 | LF | 0.4 | 
| 0023 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 14.000 | 15.000 | $65.000 | EACH | 0.0 | 
| 0024 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 1.000 | 1.000 | $2,200.000 | EACH | 0.0 | 
| 0025 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 7.000 | 7.000 | $600.000 | EACH | 0.0 | 
| 0026 | GUARDRAIL END TREATMENT TYPE 7 | 02371 | 4.000 | 4.000 | $775.000 | EACH | 0.0 | 
| 0027 | REMOVE GUARDRAIL | 02381 | 10,337.500 | 11,300.000 | $1.500 | LF | 0.2 | 
| 0028 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 6.000 | 7.000 | $1,650.000 | EACH | 0.1 | 
| 0029 | EXTRA LENGTH GUARDRAIL POST | 02399 | 20.000 | 20.000 | $20.000 | EACH | 0.0 | 
| 0030 | SIGNS | 02562 | 1,000.000 | 1,000.000 | $10.000 | SQFT | 0.1 | 
| 0031 | DITCHING AND SHOULDERING | 02575 | 18,380.000 | 18,380.000 | $2.500 | LF | 0.5 | 
| 0032 | BARRICADE-TYPE III | 02014 | 10.000 | 10.000 | $350.000 | EACH | 0.0 | 
| 0033 | REMOVE HEADWALL | 02625 | 3.000 | 3.000 | $1,050.000 | EACH | 0.0 | 
| 0034 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 | 1.000 | $275,000.000 | LS | 2.8 | 
| 0035 | LANE CLOSURE | 02653 | 2.000 | 6.000 | $2,500.000 | EACH | 0.1 | 
| 0036 | VAR MESSAGE SIGN-PORT 3 LINE | 02671 | 4.000 | 4.000 | $12,500.000 | EACH | 0.5 | 
| 0037 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 | 1.000 | $750.000 | LS | 0.0 | 
| 0038 | ASPH PAVE MILLING & TEXTURING | 02677 | 41,500.000 | 42,614.000 | $14.950 | TON | 6.3 | 
| 0039 | SAFELOADING | 02690 | 10.000 | 10.000 | $250.000 | CUYD | 0.0 | 
| 0040 | TEMPORARY SILT FENCE | 02701 | 5,000.000 | 5,000.000 | $1.500 | LF | 0.1 | 
| 0041 | SILT CHECK | 02705 | 100.000 | 100.000 | $85.000 | EACH | 0.1 | 
| 0042 | CLEAN SILT CHECK | 02708 | 200.000 | 200.000 | $30.000 | EACH | 0.1 | 
| 0043 | CLEAN TEMPORARY SILT FENCE | 02709 | 10,000.000 | 10,000.000 | $0.750 | LF | 0.1 | 
| 0044 | STAKING | 02726 | 1.000 | 1.000 | $75,250.000 | LS | 0.8 | 
| 0045 | FLASHING ARROW | 02775 | 4.000 | 4.000 | $4,500.000 | EACH | 0.2 | 
| 0046 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 200,000.000 | 209,000.000 | $0.280 | LF | 0.6 | 
| 0047 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 25,000.000 | 42,000.000 | $0.250 | LF | 0.1 | 
| 0048 | PAVE STRIPING-THERMO-6 INCH W | 06542 | 60,000.000 | 60,000.000 | $0.620 | LF | 0.4 | 
| 0049 | PAVE STRIPING-THERMO-6 INCH Y | 06543 | 37,000.000 | 37,000.000 | $0.620 | LF | 0.2 | 
| 0050 | PAVE MARKING-THERMO STOP BAR-12IN | 06567 | 1,000.000 | 0.000 | $3.750 | LF | 0.0 | 
| 0051 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 45.000 | 45.000 | $175.000 | EACH | 0.1 | 
| 0052 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 250.000 | 250.000 | $2.100 | LF | 0.0 | 
| 0053 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 1,000.000 | 1,000.000 | $1.450 | LF | 0.0 | 
| 0054 | PAVEMENT MARKER TYPE V-MW | 06589 | 1,000.000 | 1,000.000 | $32.500 | EACH | 0.3 | 
| 0055 | PAVEMENT MARKER TYPE V-MY | 06590 | 550.000 | 550.000 | $32.500 | EACH | 0.2 | 
| 0056 | PAVEMENT MARKER TYPE V-BY | 06591 | 400.000 | 400.000 | $32.500 | EACH | 0.1 | 
| 0057 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 1,000.000 | 1,000.000 | $1.450 | LF | 0.0 | 
| 0058 | REMOVE PAVEMENT MARKER TYPE V | 06600 | 1,500.000 | 1,500.000 | $5.000 | EACH | 0.1 | 
| 0059 | MILLED RUMBLE STRIPS | 90723EC | 26,291.000 | 26,291.000 | $0.280 | LF | 0.1 | 
| 0060 | RECONSTRUCT INLET CURB BOX | 01720 | 22.000 | 32.000 | $1,875.000 | EACH | 0.4 | 
| 0061 | RECONSTRUCT INLET DROP BOX | 01720 | 8.000 | 8.000 | $2,350.000 | EACH | 0.2 | 
| 0062 | REPLACE GRATE | 09318E03 | 22.000 | 32.000 | $620.000 | EACH | 0.1 | 
| 0063 | DITCH EMBANKMENT | 99083EC | 12,097.000 | 47,097.000 | $14.750 | CUYD | 1.8 | 
| 0064 | CONCRETE-CLASS A | 08100 | 890.000 | 670.000 | $325.000 | CUYD | 3.0 | 
| 8000 | DRAINAGE BLANKET-TYPE II-ASPH | 00018 | 0.000 | 3,711.890 | $33.970 | TON | 0.0 | 
| 8001 | CL3 ASPH SURF 0.38D PG64-22 | 00339 | 0.000 | 6,172.000 | $44.760 | TON | 0.0 | 
| 8002 | CL4 ASPH SURF 0.38A PG76-22 | 00342 | 0.000 | 15,000.000 | $57.110 | TON | 0.0 | 
| 8003 | CULVERT PIPE-48 INCH | 00470 | 0.000 | 40.000 | $88.000 | LF | 0.0 | 
| 8005 | CULVERT PIPE-18 INCH | 00462 | 0.000 | 305.000 | $47.000 | LF | 0.0 | 
| 8006 | CULVERT PIPE-24 INCH | 00464 | 0.000 | 80.000 | $55.000 | LF | 0.0 | 
| 8007 | ASPHALT WEDGE CURB | 01897 | 0.000 | 0.000 | $6.000 | LF | 0.0 | 
| 8008 | PERFORATED PIPE-4 INCH | 01000 | 0.000 | 55,000.000 | $6.650 | LF | 0.0 | 
| 8009 | NON-PERFORATED PIPE-4 INCH | 01010 | 0.000 | 2,800.000 | $8.750 | LF | 0.0 | 
| 8010 | PERF PIPE HEADWALL TY 1-4 INCH | 01020 | 0.000 | 35.000 | $475.000 | EACH | 0.0 | 
| 8011 | PERF PIPE HEADWALL TY 2-4 INCH | 01024 | 0.000 | 35.000 | $475.000 | EACH | 0.0 | 
| 8012 | PERF PIPE HEADWALL TY 3-4 INCH | 01028 | 0.000 | 35.000 | $475.000 | EACH | 0.0 | 
| 8013 | PERF PIPE HEADWALL TY 4-4 INCH | 01032 | 0.000 | 35.000 | $475.000 | EACH | 0.0 | 
| 8014 | DROP BOX INLET TYPE 2 | 01493 | 0.000 | 12.000 | $3,600.000 | EACH | 0.0 | 
| 8015 | DROP BOX INLET TYPE 12A | 01550 | 0.000 | 400.000 | $160.000 | LF | 0.0 | 
| 8016 | ENTRANCE PIPE-12 INCH | 00439 | 0.000 | 200.000 | $42.000 | LF | 0.0 | 
| 8017 | CONC MEDIAN BARRIER TYPE 12C1 | 01955 | 0.000 | 6,500.000 | $60.100 | LF | 0.0 | 
| 8018 | DELINEATOR FOR BARRIER-YELLOW | 01985 | 0.000 | 170.000 | $7.500 | EACH | 0.0 | 
| 8019 | FLOWABLE FILL | 02220 | 0.000 | 150.000 | $150.000 | CUYD | 0.0 | 
| 8020 | TEMPORARY GUARDRAIL | 02397 | 0.000 | 10,000.000 | $7.900 | LF | 0.0 | 
| 8022 | GUARDRAIL CONNECTOR TO BRIDGE END TY A-1 | 02387 | 0.000 | 3.000 | $600.000 | EACH | 0.0 | 
| 8023 | PAVE MARKING-PAINT CROSS-HATCH | 06570 | 0.000 | 22,500.000 | $0.650 | SQFT | 0.0 | 
| 8024 | PAVE MARKING-THERMO CROSS-HATCH | 06569 | 0.000 | 12,000.000 | $2.750 | SQFT | 0.0 | 
| 8025 | STEEL REINFORCEMENT | 08150 | 0.000 | 1,467.000 | $1.500 | LB | 0.0 | 
| 8026 | CONC TERMINAL SECTION TYPE 1 | 01956 | 0.000 | 10.000 | $5,500.000 | EACH | 0.0 | 
| 8027 | CRASH CUSHION TYPE VI D | 02888 | 0.000 | 6.000 | $13,550.000 | EACH | 0.0 | 
| 8028 | CHANNEL LINING CLASS II | 02483 | 0.000 | 300.000 | $25.000 | TON | 0.0 | 
| 8029 | FLUME INLET TYPE 2 | 01691 | 0.000 | 6.000 | $4,100.000 | EACH | 0.0 | 
| 8030 | TRIM & REMOVE TREES & BRUSH | 03269 | 0.000 | 500.000 | $10.000 | LF | 0.0 | 
| 8031 | TUBULAR MARKERS | 03225 | 0.000 | 300.000 | $37.650 | EACH | 0.0 | 
| 8032 | CONC MED BARR BOX INLET TY 12B1 | 01608 | 0.000 | 10.000 | $6,800.000 | EACH | 0.0 | 
| 8033 | MANHOLE TYPE C | 01767 | 0.000 | 1.000 | $6,000.000 | EACH | 0.0 | 
| 8034 | EW~ MAINTAIN AND CONTROL TRAFFIC (SPCL) | 10090NX | 0.000 | 1.000 | $56,646.000 | LS | 0.0 | 
| 8035 | EW~ Not a working item, used for change order conversion | 10098NX | 0.000 | -1.000 | $0.020 | DOLL | 0.0 | 
| 8036 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 0.000 | 11,843.750 | $11.000 | LF | 0.0 | 
| 8037 | EW~ EW-OPEN-GRADED DRAINAGE LAYER | 10092EX | 0.000 | 5,288.110 | $33.970 | TON | 0.0 | 
| 8038 | STANDARD INTEGRAL CURB MOD | 01831 | 0.000 | 1,275.000 | $10.000 | LF | 0.0 | 
| 8039 | REMOVE CURB | 01904 | 0.000 | 221.000 | $46.950 | LF | 0.0 | 
| 8040 | EW~ EW-MAINTAIN AND CONTROL TRAFFIC (SPCL) | 10090NX | 0.000 | 1.000 | $2,528.000 | LS | 0.0 | 
| 8041 | EW~ EW-QUICK KURB SEPARATOR SYSTEM | 10093EX | 0.000 | 820.000 | $68.670 | LF | 0.0 | 
| 8042 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 0.000 | 1,300.000 | $12.000 | LF | 0.0 | 
| 8043 | PAVE MARKING-PRE THERM COMB ARROW | 06575 | 0.000 | 30.000 | $250.000 | EACH | 0.0 | 
| 8044 | PAVE MARKING-PREF THERMO ONLY | 06576 | 0.000 | 1.000 | $225.000 | EACH | 0.0 | 
| 8045 | EW~ PAVE MRKG-PRE THERM U-TURN | 10094NX | 0.000 | 3.000 | $250.000 | EACH | 0.0 | 
| 8046 | EW~ EW-PAVE MRKG-PRE THERM U-TURN | 10094NX | 0.000 | 20.000 | $250.000 | EACH | 0.0 | 
| 8047 | DUCTILE IRON PIPE-12 INCH | 01099 | 0.000 | 200.000 | $65.000 | LF | 0.0 | 
| 8048 | STEEL ENCASEMENT PIPE-18 INCH | 01075 | 0.000 | 90.000 | $80.000 | LF | 0.0 | 
| 8049 | GATE VALVE-12 INCH | 03532 | 0.000 | 1.000 | $1,700.000 | EACH | 0.0 | 
| 8050 | GATE VALVE-6 INCH | 03526 | 0.000 | 1.000 | $800.000 | EACH | 0.0 | 
| 8051 | FIRE HYDRANT | 02606 | 0.000 | 1.000 | $2,200.000 | EACH | 0.0 | 
| 8052 | TIE-IN | 03479 | 0.000 | 0.000 | $1,800.000 | EACH | 0.0 | 
| 8053 | RECONNECT SERVICE | 03437 | 0.000 | 2.000 | $800.000 | EACH | 0.0 | 
| 8073 | EW~ EW-TIE IN | 10094NX | 0.000 | 2.000 | $1,800.000 | EACH | 0.0 | 
| 8074 | DUCTILE IRON PIPE-6 INCH | 01093 | 0.000 | 92.000 | $60.000 | LF | 0.0 | 
| 8075 | STEEL ENCASEMENT PIPE-12 INCH | 01069 | 0.000 | 32.000 | $70.000 | LF | 0.0 | 
| 8076 | EW~ Conc Med. Barr. TY 12C1 Mod | 10093EX | 0.000 | 745.000 | $302.170 | LF | 0.0 | 
| 8083 | LOT PAY ADJUSTMENT | 10000NS | 0.000 | 5,108.120 | $1.000 | DOLL | 0.0 | 
| 8084 | LOT PAY ADJUSTMENT | 10000NS | 0.000 | 31,130.890 | $1.000 | DOLL | 0.0 | 
| 8085 | LOT PAY ADJUSTMENT | 10000NS | 0.000 | -1,112.750 | $1.000 | DOLL | 0.0 | 
| 8086 | LOT PAY ADJUSTMENT | 10000NS | 0.000 | 2,567.400 | $1.000 | DOLL | 0.0 | 
| 8087 | RIDE QUALITY ADJUSTMENT ASPH | 10050NS | 0.000 | 145,161.880 | $1.000 | DOLL | 0.0 | 
| 8088 | REMOVE CURB AND GUTTER | 01812 | 0.000 | 2,300.000 | $10.000 | LF | 0.0 | 
| 8089 | EW~ Salvage Quik Kurb Separator System | 10090NX | 0.000 | 1.000 | $5,056.810 | LS | 0.0 | 
| 8090 | FUEL ADJUSTMENT | 10020NS | 0.000 | 19,149.640 | $1.000 | DOLL | 0.0 | 
| 8091 | ASPHALT ADJUSTMENT | 10030NS | 0.000 | -5,943.530 | $1.000 | DOLL | 0.0 | 
| 8092 | MAINTAIN & CONTROL TRAFFIC KY 3495 | 02650 | 0.000 | 1.000 | $2,528.000 | LS | 0.0 | 
| 8093 | MAINTAIN & CONTROL TRAFFIC Removing Left Turn Lanes on KY3495 | 02650 | 0.000 | 1.000 | $2,528.000 | LS | 0.0 | 
| 8094 | STEEL PRICE ADJUSTMENT | 10100NS | 0.000 | 6,927.740 | $1.000 | DOLL | 0.0 | 
| Category Total $8,439,969.33 | 
| SM- Project | X098002305001 | CATEGORY NUMBER | 0002 | CATEGORY Description | LIGHTING | CPES SUBSECTION B | 
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt | 
| 0065 | POLE 40 FT MTG HT | 04701 | 153.000 | 0.000 | $605.000 | EACH | 0.9 | 
| 0066 | BRACKET 15 FT | 04725 | 153.000 | 0.000 | $231.000 | EACH | 0.4 | 
| 0067 | POLE BASE | 04740 | 153.000 | 0.000 | $525.000 | EACH | 0.8 | 
| 0068 | TRANSFORMER BASE | 04750 | 153.000 | 0.000 | $525.000 | EACH | 0.8 | 
| 0069 | POLE W/SECONDARY CONTROL EQUIP | 04760 | 4.000 | 0.000 | $9,450.000 | EACH | 0.4 | 
| 0070 | HPS LUMINAIRE | 04770 | 153.000 | 0.000 | $235.000 | EACH | 0.4 | 
| 0071 | FUSED CONNECTOR KIT | 04780 | 306.000 | 0.000 | $52.000 | EACH | 0.2 | 
| 0072 | CONDUIT-1 1/4 INCH | 04793 | 36,000.000 | 36,000.000 | $2.200 | LF | 0.8 | 
| 0073 | CONDUIT-2 INCH | 04795 | 2,000.000 | 2,000.000 | $3.400 | LF | 0.1 | 
| 0074 | JUNCTION BOX TYPE B | 04811 | 60.000 | 0.000 | $472.000 | EACH | 0.3 | 
| 0075 | TRENCHING AND BACKFILLING | 04820 | 38,000.000 | 0.000 | $2.100 | LF | 0.8 | 
| 0076 | WIRE-NO. 12 | 04832 | 16,500.000 | 0.000 | $1.300 | LF | 0.2 | 
| 0077 | WIRE-NO. 6 | 04834 | 54,000.000 | 0.000 | $1.370 | LF | 0.8 | 
| 8021 | GUARDRAIL CONNECTOR TO BRIDGE END TY A | 02363 | 0.000 | 4.000 | $1,650.000 | EACH | 0.0 | 
| 8054 | EW~ EW-TIE IN EXISTING BORE | 10094NX | 0.000 | 1.000 | $260.000 | EACH | 0.0 | 
| 8055 | EW~ EW-REMOVE & RESET POLE | 10094NX | 0.000 | 3.000 | $632.500 | EACH | 0.0 | 
| 8056 | WIRE-NO. 8 | 04833 | 0.000 | 1,000.000 | $1.150 | LF | 0.0 | 
| Category Total $667,775.00 | 
| SM- Project | X098002305001 | CATEGORY NUMBER | 0003 | CATEGORY Description | SIGNALIZATION | CPES SUBSECTION C | 
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt | 
| 0078 | CONDUIT-1 1/4 INCH | 04793 | 4,200.000 | -31,800.000 | $2.200 | LF | 0.1 | 
| 0079 | CONDUIT-2 INCH | 04795 | 300.000 | -1,700.000 | $3.400 | LF | 0.0 | 
| 0080 | CONDUIT-3 INCH | 04797 | 200.000 | 200.000 | $4.400 | LF | 0.0 | 
| 0081 | JUNCTION BOX TYPE B | 04811 | 52.000 | 52.000 | $472.000 | EACH | 0.3 | 
| 0082 | TRENCHING AND BACKFILLING | 04820 | 4,700.000 | 4,700.000 | $2.100 | LF | 0.1 | 
| 0083 | LOOP WIRE | 04830 | 14,000.000 | 14,000.000 | $1.260 | LF | 0.2 | 
| 0084 | CABLE-NO. 14/3C | 04842 | 3,900.000 | 3,900.000 | $0.790 | LF | 0.0 | 
| 0085 | CABLE-NO. 14/5C | 04844 | 5,000.000 | 5,000.000 | $1.050 | LF | 0.1 | 
| 0086 | CABLE-NO. 14/7C | 04845 | 1,000.000 | 1,000.000 | $1.160 | LF | 0.0 | 
| 0087 | CABLE-NO. 14/1 PAIR | 04850 | 5,000.000 | 5,000.000 | $1.260 | LF | 0.1 | 
| 0088 | MAST ARM POLE | 04881 | 4.000 | 4.000 | $5,775.000 | EACH | 0.2 | 
| 0089 | MESSENGER-10800 LB | 04885 | 3,800.000 | 3,800.000 | $9.980 | LF | 0.4 | 
| 0090 | LOOP SAW SLOT AND FILL | 04895 | 6,000.000 | 6,000.000 | $6.300 | LF | 0.4 | 
| 0091 | ELECTRICAL SERVICE | 04899 | 5.000 | 5.000 | $368.000 | EACH | 0.0 | 
| 0092 | TELEPHONE SERVICE | 04901 | 1.000 | 1.000 | $262.000 | EACH | 0.0 | 
| 0093 | SIGNAL-12 INCH | 04911 | 12.000 | 12.000 | $262.000 | EACH | 0.0 | 
| 0094 | INSTALL CONTROLLER TYPE 170 | 04931 | 5.000 | 5.000 | $1,260.000 | EACH | 0.1 | 
| 0095 | INSTALL STEEL STRAIN POLE | 04932 | 20.000 | 20.000 | $1,575.000 | EACH | 0.3 | 
| 0096 | REMOVE SIGNAL EQUIPMENT | 04950 | 5.000 | 5.000 | $1,050.000 | EACH | 0.1 | 
| 0097 | INSTALL MASTER CONTROLLER | 91492NC | 1.000 | 1.000 | $1,050.000 | EACH | 0.0 | 
| 0098 | INSTALL COORDINATING UNIT | 91502NC | 5.000 | 5.000 | $1,050.000 | EACH | 0.1 | 
| 0099 | INSTALL SIGNAL (LED) | 09618 | 2.000 | 2.000 | $420.000 | EACH | 0.0 | 
| 0100 | INSTALL SIGNAL (LED) | 09618 | 2.000 | 2.000 | $315.000 | EACH | 0.0 | 
| 0101 | INSTALL SIGNAL (LED) | 09618 | 50.000 | 50.000 | $231.000 | EACH | 0.1 | 
| 8057 | CONCRETE-CLASS A | 08100 | 0.000 | 10.000 | $175.000 | CUYD | 0.0 | 
| 8058 | STEEL REINFORCEMENT | 08150 | 0.000 | 694.200 | $0.430 | LB | 0.0 | 
| 8059 | EW~ EW-BULL RING | 10094NX | 0.000 | 25.000 | $63.250 | EACH | 0.0 | 
| 8060 | EW~ 3/8 INCH STRAND VICE | 10094NX | 0.000 | 88.000 | $35.000 | EACH | 0.0 | 
| 8061 | EW~ EW-EXTRA LABOR | 10094NX | 0.000 | 7.000 | $535.000 | EACH | 0.0 | 
| 8062 | EW~ EW-ROCK ANCHOR | 10094NX | 0.000 | 4.000 | $287.500 | EACH | 0.0 | 
| 8063 | EW~ EW-ADVANCED WARNING-OVERHEAD | 10094NX | 0.000 | 4.000 | $865.000 | EACH | 0.0 | 
| 8064 | EW~ EW-ADVANCED WARNING-GROUND | 10094NX | 0.000 | 4.000 | $635.000 | EACH | 0.0 | 
| 8065 | EW~ EW-STUB POLE | 10094NX | 0.000 | 2.000 | $2,875.000 | EACH | 0.0 | 
| 8066 | EW~ EW-EARTH GUY ANCHOR | 10094NX | 0.000 | 2.000 | $495.000 | EACH | 0.0 | 
| 8067 | EW~ EW-8' ROCKEYE | 10094NX | 0.000 | 11.000 | $1,540.000 | EACH | 0.0 | 
| 8068 | EW~ EW-RAKE POLE | 10094NX | 0.000 | 1.000 | $1,375.000 | EACH | 0.0 | 
| 8069 | EW~ EW-DELIVERING AND RETURNING POLES | 10090NX | 0.000 | 1.000 | $1,235.000 | LS | 0.0 | 
| 8070 | EW~ EW-RETROFIT LED SIGNALS HEADS | 10094NX | 0.000 | 93.000 | $52.500 | EACH | 0.0 | 
| 8071 | EW~ EW-PROGRAMMABLE SIGNAL HEADS | 10094NX | 0.000 | 7.000 | $110.000 | EACH | 0.0 | 
| 8072 | EW~ EW-BORE | 10093EX | 0.000 | 23.000 | $20.700 | LF | 0.0 | 
| 8077 | EW~ Generator Disconnect | 10094NX | 0.000 | 5.000 | $165.000 | EACH | 0.0 | 
| 8079 | EW~ Repair Traffic Signal | 10090NX | 0.000 | 1.000 | $3,307.200 | LS | 0.0 | 
| 8080 | EW~ Mounting Hardware | 10094NX | 0.000 | 7.000 | $115.000 | EACH | 0.0 | 
| 8081 | EW~ Mast Arm Pole Modified | 10090NX | 0.000 | 1.000 | $2,380.000 | LS | 0.0 | 
| 8082 | EW~ Deliver Mast Arm Poles | 10090NX | 0.000 | 1.000 | $2,395.000 | LS | 0.0 | 
| Category Total $245,425.00 | 
| SM- Project | X098002305001 | CATEGORY NUMBER | 0004 | CATEGORY Description | DEMOBILIZATION AND MOBILIZATION | CPES SUBSECTION D | 
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt | 
| 0102 | MOBILIZATION | 02568 | 1.000 | 1.000 | $280,595.000 | LS | 2.9 | 
| 0103 | DEMOBILIZATION | 02569 | 1.000 | 1.000 | $140,300.000 | LS | 1.4 | 
| 8078 | EW~ Lane Advisory Signs | 10094NX | 0.000 | 15.000 | $82.500 | EACH | 0.0 | 
| Category Total $420,895.00 |