Contract ID | 020645 | Primary Project Number | X057006805001 |
Contract Description | HARRODSBURG-LEXINGTON ROAD (US68) | ||
Primary County | JESSAMINE | Fed/St Number | STPM 268-1 (21) |
Vendor ID | 02067 | Vendor Name | LEXINGTON QUARRY COMPANY |
Bid Amount | $ 16,332,692.77 |
SM- Project | X057006805001 |
Fed/State Number | STPM 268-1 (21) |
Project Description | HARRODSBURG-LEXINGTON ROAD (US68) |
*********** |
SM- Project | X057006805001 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | JESSAMINE CO / CPES SUBSECTION A |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0001 | GRANULAR EMBANKMENT | 02223M | 298.000 |
298.000 |
$36.250 |
CU M | 0.1 |
0002 | STRUCTURE EXCAVATION-COMMON | 08001M | 863.000 |
863.000 |
$14.000 |
CU M | 0.1 |
0003 | STRUCTURE EXCAV-SOLID ROCK | 08002M | 23.000 |
23.000 |
$45.000 |
CU M | 0.0 |
0004 | MASONRY COATING | 02998M | 178.000 |
178.000 |
$7.000 |
SQ M | 0.0 |
0005 | CONCRETE-CLASS A | 08100M | 494.300 |
68.000 |
$300.000 |
CU M | 0.9 |
0006 | STEEL REINFORCEMENT | 08150M | 53,151.000 |
3,600.000 |
$1.090 |
KG | 0.4 |
0007 | HANDRAIL-TYPE A-2 | 02612M | 21.000 |
0.000 |
$138.000 |
M | 0.0 |
0008 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$4,800.000 |
LS | 0.0 |
0009 | ROADWAY EXCAVATION JES | 02200M | 120,192.000 |
120,192.000 |
$13.060 |
CU M | 9.6 |
0010 | GRANULAR EMBANKMENT | 02223M | 3,240.000 |
3,240.000 |
$21.000 |
CU M | 0.4 |
0011 | WATER | 02242M | 8,895.000 |
8,895.000 |
$0.260 |
CU M | 0.0 |
0012 | CONCRETE-CLASS A | 08100M | 30.060 |
30.060 |
$915.500 |
CU M | 0.2 |
0013 | STEEL REINFORCEMENT | 08150M | 807.900 |
807.900 |
$2.200 |
KG | 0.0 |
0014 | RETAINING WALL | 08018M | 94.000 |
94.000 |
$257.000 |
SQ M | 0.1 |
0015 | HANDRAIL-TYPE A-1 | 02611M | 51.700 |
51.700 |
$118.500 |
M | 0.0 |
0016 | GUARDRAIL-STEEL W BEAM-S FACE | 02351M | 431.000 |
431.000 |
$32.980 |
M | 0.1 |
0017 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 2.000 |
2.000 |
$385.000 |
EACH | 0.0 |
0018 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 2.000 |
2.000 |
$1,475.000 |
EACH | 0.0 |
0019 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 2.000 |
2.000 |
$500.000 |
EACH | 0.0 |
0020 | TEMPORARY GUARDRAIL | 02397M | 135.000 |
135.000 |
$23.000 |
M | 0.0 |
0021 | PAVE STRIPING-TEMP PAINT-100MM | 06510M | 11,990.000 |
26,990.000 |
$0.480 |
M | 0.0 |
0022 | PAVE STRIPING-PERM PAINT-100MM | 06514M | 15,763.200 |
15,763.200 |
$0.480 |
M | 0.0 |
0023 | PAVE STRIPING REMOVAL-100 MM | 06530M | 600.000 |
600.000 |
$1.500 |
M | 0.0 |
0024 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 67.000 |
67.000 |
$85.000 |
EACH | 0.0 |
0025 | PAVE MARKING-PRE THERM COMB ARROW | 06575 | 1.000 |
1.000 |
$125.000 |
EACH | 0.0 |
0026 | PAVE MARKING-THERMO STOP BAR-600 | 06568M | 147.800 |
147.800 |
$21.700 |
M | 0.0 |
0027 | PAVE MARKING-THERMO CROSS-HATCH | 06569M | 244.000 |
244.000 |
$20.000 |
SQ M | 0.0 |
0028 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 212.000 |
212.000 |
$18.000 |
EACH | 0.0 |
0029 | SIGNS | 02562M | 15.240 |
42.740 |
$123.750 |
SQ M | 0.0 |
0030 | BARRICADE-TYPE III | 02014 | 2.000 |
42.000 |
$350.000 |
EACH | 0.0 |
0031 | REMOVE PAVEMENT | 02091M | 151.800 |
1,401.800 |
$6.000 |
SQ M | 0.0 |
0032 | REMOVE & RESET FENCE | 02267M | 73.000 |
73.000 |
$31.000 |
M | 0.0 |
0033 | SEPTIC TANK TREATMENT | 02404 | 1.000 |
1.000 |
$750.000 |
EACH | 0.0 |
0034 | PVC PIPE-50 MM | 03381M | 75.000 |
75.000 |
$58.000 |
M | 0.0 |
0035 | CULVERT PIPE-300 MM | 00460M | 1.200 |
1.200 |
$131.050 |
M | 0.0 |
0036 | CULVERT PIPE-375 MM | 00461M | 12.500 |
12.500 |
$109.900 |
M | 0.0 |
0037 | CULVERT PIPE-450 MM | 00462M | 139.300 |
139.300 |
$131.250 |
M | 0.1 |
0038 | CULVERT PIPE-600 MM | 00464M | 115.900 |
166.500 |
$147.650 |
M | 0.1 |
0039 | CULVERT PIPE-750 MM | 00466M | 101.300 |
50.700 |
$180.400 |
M | 0.1 |
0040 | CULVERT PIPE-1350 MM | 00471M | 62.200 |
62.200 |
$360.900 |
M | 0.1 |
0041 | CULVERT PIPE-900 MM EQUIV | 00496M | 40.000 |
40.000 |
$246.000 |
M | 0.1 |
0042 | DRAIN PIPE-150 MM | 08820M | 6.900 |
6.900 |
$81.900 |
M | 0.0 |
0043 | STORM SEWER PIPE-375 MM | 00521M | 82.300 |
82.300 |
$108.250 |
M | 0.1 |
0044 | STORM SEWER PIPE-450 MM | 00522M | 355.000 |
355.000 |
$129.600 |
M | 0.3 |
0045 | STORM SEWER PIPE-600 MM | 00524M | 178.800 |
206.400 |
$147.650 |
M | 0.2 |
0046 | STORM SEWER PIPE-900 MM | 00528M | 27.600 |
0.000 |
$213.350 |
M | 0.0 |
0047 | ENTRANCE PIPE-375 MM | 00440M | 42.800 |
42.800 |
$82.000 |
M | 0.0 |
0048 | ENTRANCE PIPE-450 MM | 00441M | 36.000 |
36.000 |
$86.950 |
M | 0.0 |
0049 | ENTRANCE PIPE-600 MM | 00443M | 23.500 |
23.500 |
$114.850 |
M | 0.0 |
0050 | PERFORATED PIPE-100 MM | 01000M | 1,596.000 |
1,596.000 |
$14.750 |
M | 0.1 |
0051 | NON-PERFORATED PIPE-100 MM | 01010M | 111.000 |
111.000 |
$32.800 |
M | 0.0 |
0052 | PERFORATED PIPE-150 MM | 01001M | 7,355.000 |
7,355.000 |
$18.050 |
M | 0.8 |
0053 | NON-PERFORATED PIPE-150 MM | 01011M | 209.000 |
209.000 |
$36.100 |
M | 0.0 |
0054 | PERF PIPE HEADWALL TY 4-4 INCH | 01032 | 4.000 |
4.000 |
$425.000 |
EACH | 0.0 |
0055 | PERF PIPE HEADWALL TY 4-6 INCH | 01033 | 6.000 |
6.000 |
$435.000 |
EACH | 0.0 |
0056 | PERF PIPE HEADWALL TY 3-4 INCH | 01028 | 8.000 |
8.000 |
$425.000 |
EACH | 0.0 |
0057 | PERF PIPE HEADWALL TY 3-6 INCH | 01029 | 5.000 |
5.000 |
$435.000 |
EACH | 0.0 |
0058 | PERF PIPE HEADWALL TY 1-6 INCH | 01021 | 4.000 |
4.000 |
$435.000 |
EACH | 0.0 |
0059 | CURB BOX INLET TYPE A | 01456 | 4.000 |
4.000 |
$3,250.000 |
EACH | 0.1 |
0060 | CURB BOX INLET TYPE F | 01487 | 2.000 |
2.000 |
$1,500.000 |
EACH | 0.0 |
0061 | DROP BOX INLET TYPE 1 | 01490 | 1.000 |
1.000 |
$2,800.000 |
EACH | 0.0 |
0062 | DROP BOX INLET TYPE 2 | 01493 | 1.000 |
1.000 |
$2,950.000 |
EACH | 0.0 |
0063 | DROP BOX INLET TYPE 3 | 01496 | 1.000 |
1.000 |
$3,000.000 |
EACH | 0.0 |
0064 | DROP BOX INLET TYPE 5B | 01505 | 12.000 |
12.000 |
$3,550.000 |
EACH | 0.3 |
0065 | DROP BOX INLET TYPE 11 | 01544 | 3.000 |
3.000 |
$1,500.000 |
EACH | 0.0 |
0066 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 2.000 |
2.000 |
$2,100.000 |
EACH | 0.0 |
0067 | MANHOLE TYPE A | 01756 | 2.000 |
2.000 |
$2,150.000 |
EACH | 0.0 |
0068 | MANHOLE TYPE C MODIFIED | 01768 | 1.000 |
1.000 |
$6,000.000 |
EACH | 0.0 |
0069 | MANHOLE TYPE C | 01767 | 3.000 |
3.000 |
$3,500.000 |
EACH | 0.1 |
0070 | SEEDING AND PROTECTION | 05985M | 106,666.000 |
106,666.000 |
$0.350 |
SQ M | 0.2 |
0071 | SPECIAL SEEDING CROWN VETCH | 05989M | 10,189.000 |
10,189.000 |
$0.350 |
SQ M | 0.0 |
0072 | TOPDRESSING FERTILIZER | 05966M | 14.600 |
14.600 |
$340.000 |
MTON | 0.0 |
0073 | EROSION CONTROL BLANKET | 05950M | 23,786.000 |
23,786.000 |
$1.410 |
SQ M | 0.2 |
0074 | SILT TRAP TYPE B | 02704 | 1.000 |
11.000 |
$400.000 |
EACH | 0.0 |
0075 | CLEAN SILT TRAP TYPE B | 02707 | 3.000 |
3.000 |
$125.000 |
EACH | 0.0 |
0076 | SILT CHECK | 02705 | 148.000 |
218.000 |
$100.000 |
EACH | 0.1 |
0077 | CLEAN SILT CHECK | 02708 | 444.000 |
444.000 |
$35.000 |
EACH | 0.1 |
0078 | TEMPORARY SILT FENCE | 02701M | 225.000 |
1,725.000 |
$6.550 |
M | 0.0 |
0079 | CLEAN TEMPORARY SILT FENCE | 02709M | 675.000 |
675.000 |
$2.150 |
M | 0.0 |
0080 | SILT CHECK TY II (MOD) | 09277 | 14.000 |
14.000 |
$200.000 |
EACH | 0.0 |
0081 | CLEAN SILT CHECK TY II (MOD) | 09278 | 42.000 |
42.000 |
$50.000 |
EACH | 0.0 |
0082 | CHANNEL LINING CLASS II | 02483M | 924.000 |
924.000 |
$24.800 |
MTON | 0.1 |
0083 | CHANNEL LINING CLASS III | 02484M | 170.000 |
170.000 |
$26.450 |
MTON | 0.0 |
0084 | FABRIC-GEOTEXTILE TYPE III | 02598M | 10,800.000 |
10,800.000 |
$1.500 |
SQ M | 0.1 |
0085 | R/W MARKER MUNICIPAL TYPE 1 | 02437 | 39.000 |
39.000 |
$65.000 |
EACH | 0.0 |
0086 | FENCE-WOVEN WIRE TYPE 1 | 02262M | 2,567.800 |
2,567.800 |
$13.790 |
M | 0.2 |
0087 | FENCE-WOVEN WIRE TYPE 2 | 02263M | 316.300 |
316.300 |
$18.390 |
M | 0.0 |
0088 | SINGLE VEHICULAR WOVEN WIRE GATE | 02288 | 3.000 |
3.000 |
$675.000 |
EACH | 0.0 |
0089 | DOUBLE VEHICULAR WOVEN WIRE GATE | 02289 | 3.000 |
3.000 |
$995.000 |
EACH | 0.0 |
0090 | STANDARD CURB AND GUTTER MOD TYPE A | 01811M | 143.000 |
143.000 |
$71.350 |
M | 0.1 |
0091 | STANDARD CURB AND GUTTER MOD TYPE B | 01811M | 123.800 |
123.800 |
$71.350 |
M | 0.1 |
0092 | STANDARD CURB AND GUTTER MOD TYPE C | 01811M | 406.900 |
406.900 |
$71.350 |
M | 0.2 |
0093 | STANDARD CURB AND GUTTER MOD TYPE D | 01811M | 146.000 |
146.000 |
$68.100 |
M | 0.1 |
0094 | STANDARD HEADER CURB | 01875M | 216.500 |
216.500 |
$49.200 |
M | 0.1 |
0095 | ISLAND CURB AND GUTTER | 01825M | 27.500 |
27.500 |
$39.500 |
M | 0.0 |
0096 | SIDEWALK-100 MM CONCRETE | 02720M | 234.150 |
234.150 |
$19.750 |
SQ M | 0.0 |
0097 | CEM CONC ENT PAVEMENT-200 MM | 02101M | 201.800 |
201.800 |
$65.750 |
SQ M | 0.1 |
0098 | JPC PAVEMENT-150 MM | 02075M | 113.200 |
113.200 |
$59.800 |
SQ M | 0.0 |
0099 | CRUSHED STONE BASE | 00003M | 46,916.900 |
46,916.900 |
$15.710 |
MTON | 4.5 |
0100 | D G A BASE JES | 00001M | 5,230.900 |
5,230.900 |
$19.010 |
MTON | 0.6 |
0101 | TRAFFIC BOUND BASE | 00020M | 1,000.000 |
3,500.000 |
$17.640 |
MTON | 0.1 |
0102 | ASPHALT CURING SEAL JES | 00358M | 75.300 |
75.300 |
$292.130 |
MTON | 0.1 |
0103 | EMULSIFIED ASPHALT RS-2 JES | 00291M | 33.400 |
33.400 |
$374.900 |
MTON | 0.1 |
0104 | ASPHALT SEAL AGGREGATE | 00100M | 279.900 |
279.900 |
$55.120 |
MTON | 0.1 |
0105 | DRAINAGE BLANKET-TYPE II-ASPH JES | 00018M | 21,919.600 |
21,919.600 |
$30.590 |
MTON | 4.1 |
0106 | SAND FOR BLOTTER | 02702M | 167.300 |
167.300 |
$25.360 |
MTON | 0.0 |
0107 | CL1 ASPH BASE 19.0D PG64-22 JES | 00220M | 2,195.400 |
2,518.010 |
$39.790 |
MTON | 0.5 |
0108 | CL3 ASPH BASE 37.5D PG64-22 JES | 00205M | 19,566.300 |
18,566.205 |
$36.820 |
MTON | 4.4 |
0109 | CL2 ASPH BASE 25.0D PG64-22 JES | 00212M | 3,812.400 |
3,812.400 |
$37.420 |
MTON | 0.9 |
0110 | CL3 ASPH BASE 25.0D PG64-22 JES | 00214M | 12,865.900 |
12,865.900 |
$36.820 |
MTON | 2.9 |
0111 | CL3 ASPH BASE 25.0D PG70-22 JES | 00215M | 12,712.200 |
10,587.357 |
$41.720 |
MTON | 3.2 |
0112 | CL1 ASPH SURF 9.50D PG64-22 JES | 00300M | 709.500 |
709.500 |
$48.500 |
MTON | 0.2 |
0113 | CL2 ASPH SURF 12.5D PG64-22 JES | 00309M | 1,914.700 |
1,914.700 |
$41.560 |
MTON | 0.5 |
0114 | CL3 ASPH SURF 12.5A PG70-22 JES | 00331M | 6,193.500 |
6,193.500 |
$51.150 |
MTON | 1.9 |
0115 | CLEARING AND GRUBBING | 02545 | 1.000 |
1.000 |
$66,600.000 |
LS | 0.4 |
0116 | STAKING | 02726 | 1.000 |
1.000 |
$60,000.000 |
LS | 0.4 |
0117 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$147,895.000 |
LS | 0.9 |
0118 | DIVERSIONS (BY-PASS DETOURS) | 02651 | 1.000 |
1.000 |
$22,515.000 |
LS | 0.1 |
8004 | COST PLUS WORK Drainage Pipe | 10080NS | 0.000 |
1.000 |
$5,084.670 |
LS | 0.0 |
8005 | EW~ Signalization Time Clock | 10090NX | 0.000 |
1.000 |
$545.000 |
LS | 0.0 |
8007 | SAFELOADING | 02690M | 0.000 |
50.000 |
$180.000 |
CU M | 0.0 |
8008 | PAVEMENT MARKER TY IVA-BY TEMP | 06588 | 0.000 |
100.000 |
$7.050 |
EACH | 0.0 |
8009 | REMOVE PAVEMENT MARKER TYPE V | 06600 | 0.000 |
465.000 |
$8.000 |
EACH | 0.0 |
8010 | TEMP SEEDING AND PROTECTION | 05953M | 0.000 |
18,016.000 |
$0.310 |
SQ M | 0.0 |
8031 | RELOCATE SERVICE WATER LINE | 09220M02 | 0.000 |
1.000 |
$875.000 |
EACH | 0.0 |
8032 | WATER-FILLED BARRIERS RENTAL | 02005M | 0.000 |
420.000 |
$17.820 |
M | 0.0 |
8033 | WATER-FILLED BARRIERS Install | 02005M | 0.000 |
1.000 |
$861.300 |
M | 0.0 |
8034 | TUBULAR MARKERS | 03225 | 0.000 |
20.000 |
$65.000 |
EACH | 0.0 |
8035 | ASPHALT PLACEMENT WITH MTV | 00338M | 0.000 |
12,993.500 |
$1.550 |
MTON | 0.0 |
8038 | EW~ Early Signal Installation | 10090NX | 0.000 |
1.000 |
$7,065.000 |
LS | 0.0 |
8044 | EW~ Mowing | 10090NX | 0.000 |
1.000 |
$4,560.000 |
LS | 0.0 |
8058 | FENCE-TEMPORARY | 02259M | 0.000 |
131.500 |
$12.750 |
M | 0.0 |
8061 | SBM ALUM SHEET SIGNS 2 MM | 06406M | 0.000 |
11.710 |
$136.600 |
SQ M | 0.0 |
8062 | SBM ALUM SHEET SIGNS 3 MM | 06407M | 0.000 |
5.720 |
$203.500 |
SQ M | 0.0 |
8063 | STEEL POST TYPE 2 | 06411M | 0.000 |
165.000 |
$20.500 |
M | 0.0 |
8065 | LEVELING & WEDGING PG64-22 JES | 00190M | 0.000 |
600.000 |
$41.560 |
MTON | 0.0 |
8067 | BORROW EXCAVATION Jessamine County | 02210M | 0.000 |
11,250.000 |
$13.060 |
CU M | 0.0 |
8069 | FUEL ADJUSTMENT JESSAMINE | 10020NS | 0.000 |
-0.001 |
$1.000 |
DOLL | 0.0 |
8070 | ASPHALT ADJUSTMENT JESSAMINE CO | 10030NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8073 | EW~ Regrade Frontage at Dogwood Trace | 10090NX | 0.000 |
1.000 |
$5,816.100 |
LS | 0.0 |
8074 | EW~ Sinkhole Repair | 10090NX | 0.000 |
1.000 |
$3,253.340 |
LS | 0.0 |
8075 | RIDE QUALITY ADJUSTMENT ASPH JESSIMINE | 10005NS | 0.000 |
16,888.860 |
$1.000 |
DOLL | 0.0 |
8080 | LOT PAY ADJUSTMENT JESSAMINE | 10000NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $7,030,437.20 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0002 | CATEGORY Description | MOB / DEMOB LN 1 | JESSAMINE CO ROADWAY |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0362 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$209,475.000 |
LS | 1.3 |
0363 | DEMOBILIZATION LN 1 | 02569 | 1.000 |
1.000 |
$105,524.944 |
LS | 0.6 |
Category Total $314,999.94 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0003 | CATEGORY Description | SIGNALIZATION | JESSAMINE CO / CPES SUBSECTION C |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0119 | MESSENGER-48.0 KN | 04885M | 370.000 |
370.000 |
$5.000 |
M | 0.0 |
0120 | JUNCTION BOX TYPE B | 04811 | 16.000 |
16.000 |
$200.000 |
EACH | 0.0 |
0121 | TRENCHING AND BACKFILLING | 04820M | 675.000 |
675.000 |
$5.000 |
M | 0.0 |
0122 | LOOP SAW SLOT AND FILL | 04895M | 550.000 |
550.000 |
$15.000 |
M | 0.1 |
0123 | PEDESTRIAN DETECTOR | 04900 | 4.000 |
4.000 |
$150.000 |
EACH | 0.0 |
0124 | SIGNAL-3 SECTION 12 INCH | 04912 | 16.000 |
0.000 |
$300.000 |
EACH | 0.0 |
0125 | SIGNAL-5 SECTION 12 INCH | 04914 | 2.000 |
0.000 |
$600.000 |
EACH | 0.0 |
0126 | SIGNAL-PEDESTRIAN | 04916 | 4.000 |
4.000 |
$300.000 |
EACH | 0.0 |
0127 | REMOVE SIGNAL EQUIPMENT | 04950 | 1.000 |
1.000 |
$500.000 |
EACH | 0.0 |
0128 | INSTALL CONTROLLER TYPE 170 | 04931 | 2.000 |
2.000 |
$3,500.000 |
EACH | 0.0 |
0129 | INSTALL STEEL STRAIN POLE | 04932 | 8.000 |
8.000 |
$3,000.000 |
EACH | 0.1 |
0130 | TEMP RELOCATION OF SIGNAL HEAD | 09694 | 6.000 |
6.000 |
$200.000 |
EACH | 0.0 |
0131 | CONDUIT-50 MM | 04795M | 630.000 |
630.000 |
$4.000 |
M | 0.0 |
0132 | LOOP WIRE | 04830M | 1,950.000 |
1,950.000 |
$1.000 |
M | 0.0 |
0133 | CABLE-NO. 14/5C | 04844M | 906.000 |
906.000 |
$3.000 |
M | 0.0 |
0134 | CABLE-NO. 14/7C | 04845M | 275.000 |
275.000 |
$3.500 |
M | 0.0 |
0135 | CABLE-NO. 14/1 PAIR | 04850M | 1,661.000 |
1,661.000 |
$3.000 |
M | 0.0 |
8011 | INSTALL LED SIGNAL-3 SECTION 305 MM | 07636 | 0.000 |
16.000 |
$205.000 |
EACH | 0.0 |
8012 | INSTALL LED SIGNAL 5 SECTION 305 | 09800 | 0.000 |
2.000 |
$225.000 |
EACH | 0.0 |
8013 | INSTALL LED SIGNAL PED MODULE CAT 0003 (CPES SECTION C) | 04887 | 0.000 |
4.000 |
$85.000 |
EACH | 0.0 |
8015 | INSTALL LED SIGNAL-3 SECTION 305 CATEGORY 03 | 07636 | 0.000 |
0.000 |
$205.000 |
EACH | 0.0 |
8016 | INSTALL LED SIGNAL 4 SECTION 305 | 09800 | 0.000 |
0.000 |
$215.000 |
EACH | 0.0 |
8017 | INSTALL LED SIGNAL 5 SECTION 305 | 04887 | 0.000 |
0.000 |
$225.000 |
EACH | 0.0 |
8018 | INSTALL LED SIGNAL Inst Ped Signal LED Module | 09800 | 0.000 |
0.000 |
$85.000 |
EACH | 0.0 |
Category Total $70,308.50 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0005 | CATEGORY Description | LANDSCAPING | JESSAMINE CO / CPES SUBSECTION E |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0136 | TREE NORWAY MAPLE | 00500EC | 4.000 |
4.000 |
$561.000 |
EACH | 0.0 |
0137 | TREE OCTOBER GLORY RED MAPLE | 00500EC | 10.000 |
10.000 |
$589.000 |
EACH | 0.0 |
0138 | TREE SUGAR MAPLE | 00500EC | 6.000 |
6.000 |
$589.000 |
EACH | 0.0 |
0139 | TREE AUTUM APPALOUSA WHITE ASH | 00500EC | 3.000 |
3.000 |
$589.000 |
EACH | 0.0 |
0140 | TREE BLOODGOOD LONDON PLANETREE | 00500EC | 5.000 |
5.000 |
$561.000 |
EACH | 0.0 |
0141 | TREE SAWTOOTH OAK | 00500EC | 7.000 |
7.000 |
$561.000 |
EACH | 0.0 |
0142 | TREE SCARLET OAK | 00500EC | 5.000 |
5.000 |
$589.000 |
EACH | 0.0 |
0143 | TREE EASTERN REDBUD | 00500EC | 15.000 |
15.000 |
$250.000 |
EACH | 0.0 |
0144 | TREE CHEROKEE CHIEF DOGWOOD | 00500EC | 10.000 |
10.000 |
$297.000 |
EACH | 0.0 |
0145 | TREE CHEROKEE PRINESS DOGWOOD | 00500EC | 6.000 |
6.000 |
$297.000 |
EACH | 0.0 |
0146 | TREE WINTER KING HAWTHORNE | 00500EC | 8.000 |
8.000 |
$312.000 |
EACH | 0.0 |
0147 | TREE PRAIRIEFIRE CRABAPPLE | 00500EC | 17.000 |
17.000 |
$312.000 |
EACH | 0.0 |
0148 | TREE PROFESSOR SPRENGER CRABAPPLE | 00500EC | 8.000 |
8.000 |
$312.000 |
EACH | 0.0 |
0149 | TREE WHITE PINE (EASTERN) | 00500EC | 89.000 |
89.000 |
$423.000 |
EACH | 0.2 |
0150 | TREE CANADIAN HEMLOCK | 00500EC | 7.000 |
7.000 |
$236.000 |
EACH | 0.0 |
0151 | TREE KY COFFEE TREE | 00500EC | 3.000 |
3.000 |
$9.450 |
EACH | 0.0 |
0152 | TREE OAKLEAF HYDRANGEA | 00500EC | 17.000 |
17.000 |
$61.000 |
EACH | 0.0 |
0153 | TREE DENSE YEW | 00500EC | 168.000 |
168.000 |
$61.000 |
EACH | 0.1 |
0154 | TREE SHASTA DOUBLEFILE VIBURNUM | 00500EC | 23.000 |
23.000 |
$56.000 |
EACH | 0.0 |
0155 | TREE ALLEGAHANY VIBURNUM | 00500EC | 24.000 |
24.000 |
$56.000 |
EACH | 0.0 |
Category Total $95,154.35 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0006 | CATEGORY Description | MOB / DEMOB LN 1 | FOR CPES SUBSECTION E |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0361 | DEMOBILIZATION LN 1 | 02569 | 1.000 |
1.000 |
$2,344.999 |
LS | 0.0 |
0368 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$4,655.000 |
LS | 0.0 |
Category Total $6,999.99 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0007 | CATEGORY Description | ROADWAY | FAYETTE CO / CPES SUBSECTION G |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0156 | GRANULAR EMBANKMENT | 02223M | 1,272.000 |
1,174.000 |
$36.250 |
CU M | 0.3 |
0157 | STRUCTURE EXCAVATION-COMMON | 08001M | 5,491.000 |
3,604.000 |
$14.000 |
CU M | 0.5 |
0158 | STRUCTURE EXCAV-SOLID ROCK | 08002M | 365.000 |
43.000 |
$45.000 |
CU M | 0.1 |
0159 | MASONRY COATING | 02998M | 2,479.000 |
1,897.000 |
$7.000 |
SQ M | 0.1 |
0160 | CONCRETE-CLASS A | 08100M | 1,237.700 |
1,372.700 |
$300.000 |
CU M | 2.3 |
0161 | CONCRETE-CLASS AA | 08104M | 182.600 |
182.600 |
$400.000 |
CU M | 0.4 |
0162 | STEEL REINFORCEMENT | 08150M | 98,790.000 |
119,907.000 |
$1.090 |
KG | 0.7 |
0163 | HANDRAIL-TYPE A-2 | 02612M | 123.500 |
21.000 |
$138.000 |
M | 0.1 |
0164 | ARCHITECTURAL TREATMENT | 07318M | 1,646.000 |
1,236.000 |
$34.500 |
SQ M | 0.3 |
0165 | STONE MASONRY VENEER | 08004M | 243.000 |
243.000 |
$185.000 |
SQ M | 0.3 |
0166 | ROADWAY EXCAVATION | 02200M | 108,116.000 |
114,216.000 |
$13.060 |
CU M | 8.6 |
0167 | GRANULAR EMBANKMENT | 02223M | 3,330.000 |
3,330.000 |
$21.000 |
CU M | 0.4 |
0168 | WATER | 02242M | 8,037.000 |
8,037.000 |
$0.260 |
CU M | 0.0 |
0169 | CONCRETE-CLASS A | 08100M | 27.870 |
40.860 |
$915.500 |
CU M | 0.2 |
0170 | STEEL REINFORCEMENT | 08150M | 713.200 |
1,244.800 |
$2.200 |
KG | 0.0 |
0171 | GUARDRAIL-STEEL W BEAM-S FACE | 02351M | 1,669.400 |
1,641.840 |
$32.980 |
M | 0.3 |
0172 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 12.000 |
11.000 |
$33.000 |
EACH | 0.0 |
0173 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 2.000 |
0.000 |
$500.000 |
EACH | 0.0 |
0174 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 3.000 |
3.000 |
$385.000 |
EACH | 0.0 |
0175 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 4.000 |
3.000 |
$1,475.000 |
EACH | 0.0 |
0176 | GUARDRAIL CONNECTOR TO CONC MED BARR | 02359 | 2.000 |
0.000 |
$1,000.000 |
EACH | 0.0 |
0177 | GUARDRAIL CONNECTOR TO BRIDGE END TY A | 02363 | 1.000 |
1.000 |
$425.000 |
EACH | 0.0 |
0178 | GUARDRAIL CONNECTOR TO BRIDGE END TY A-1 | 02387 | 2.000 |
2.000 |
$170.000 |
EACH | 0.0 |
0179 | TEMPORARY GUARDRAIL | 02397M | 125.000 |
125.000 |
$23.000 |
M | 0.0 |
0180 | CONCRETE BARRIER WALL TYPE 9T | 03171M | 45.000 |
109.800 |
$180.400 |
M | 0.0 |
0181 | DELINEATOR FOR BARRIER-WHITE | 01984 | 9.000 |
9.000 |
$20.000 |
EACH | 0.0 |
0182 | PAVE STRIPING-TEMP PAINT-100MM | 06510M | 23,190.000 |
38,190.000 |
$0.480 |
M | 0.1 |
0183 | PAVE STRIPING-PERM PAINT-100MM | 06514M | 17,237.500 |
17,237.500 |
$0.480 |
M | 0.1 |
0184 | PAVE STRIPING REMOVAL-100 MM | 06530M | 3,240.000 |
3,240.000 |
$1.500 |
M | 0.0 |
0185 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 64.000 |
64.000 |
$85.000 |
EACH | 0.0 |
0186 | PAVE MARKING-PRE THERM COMB ARROW | 06575 | 4.000 |
4.000 |
$125.000 |
EACH | 0.0 |
0187 | PAVE MARKING-THERMO X-WALK-150 MM | 06565M | 257.000 |
257.000 |
$5.500 |
M | 0.0 |
0188 | PAVE MARKING-THERMO STOP BAR-600 | 06568M | 181.000 |
181.000 |
$21.700 |
M | 0.0 |
0189 | PAVE MARKING-THERMO CROSS-HATCH | 06569M | 99.000 |
99.000 |
$20.000 |
SQ M | 0.0 |
0190 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 222.000 |
222.000 |
$18.000 |
EACH | 0.0 |
0191 | SIGNS | 02562M | 11.990 |
39.490 |
$123.750 |
SQ M | 0.0 |
0192 | BARRICADE-TYPE III | 02014 | 6.000 |
32.000 |
$350.000 |
EACH | 0.0 |
0193 | REMOVE PAVEMENT | 02091M | 834.000 |
834.000 |
$6.000 |
SQ M | 0.0 |
0194 | REMOVE & RESET FENCE | 02267M | 108.000 |
108.000 |
$31.000 |
M | 0.0 |
0195 | PLUG PIPE | 01314 | 6.000 |
6.000 |
$300.000 |
EACH | 0.0 |
0196 | SEPTIC TANK TREATMENT | 02404 | 5.000 |
5.000 |
$750.000 |
EACH | 0.0 |
0197 | REMOVE AND RECONSTRUCT STONE WALL | 74072N | 1.000 |
1.000 |
$71,825.000 |
LS | 0.4 |
0198 | STEEL ENCASEMENT PIPE-600 MM | 01081M | 121.700 |
121.700 |
$328.100 |
M | 0.2 |
0199 | STEEL ENCASEMENT PIPE-900 MM | 01087M | 88.000 |
45.000 |
$656.150 |
M | 0.4 |
0200 | STEEL ENCASEMENT PIPE-1350 MM | 95822M | 44.000 |
44.000 |
$984.550 |
M | 0.3 |
0201 | CULVERT PIPE-300 MM | 00460M | 3.500 |
3.500 |
$131.050 |
M | 0.0 |
0202 | CULVERT PIPE-375 MM | 00461M | 4.900 |
4.900 |
$109.900 |
M | 0.0 |
0203 | CULVERT PIPE-450 MM | 00462M | 232.000 |
232.000 |
$131.250 |
M | 0.2 |
0204 | CULVERT PIPE-600 MM | 00464M | 156.300 |
164.200 |
$147.650 |
M | 0.1 |
0205 | CULVERT PIPE-1350 MM | 00471M | 79.700 |
90.000 |
$360.900 |
M | 0.2 |
0206 | SEWER PIPE-375 MM | 01055M | 180.670 |
180.670 |
$344.500 |
M | 0.4 |
0207 | STORM SEWER PIPE-375 MM | 00521M | 139.700 |
139.700 |
$108.250 |
M | 0.1 |
0208 | STORM SEWER PIPE-450 MM | 00522M | 396.700 |
417.700 |
$129.600 |
M | 0.3 |
0209 | STORM SEWER PIPE-600 MM | 00524M | 494.200 |
518.400 |
$147.650 |
M | 0.4 |
0210 | STORM SEWER PIPE-750 MM | 00526M | 125.100 |
125.100 |
$190.250 |
M | 0.1 |
0211 | ENTRANCE PIPE-375 MM | 00440M | 71.600 |
71.600 |
$82.000 |
M | 0.0 |
0212 | ENTRANCE PIPE-450 MM | 00441M | 60.100 |
60.100 |
$86.950 |
M | 0.0 |
0213 | PERFORATED PIPE-100 MM | 01000M | 1,826.000 |
1,826.000 |
$14.750 |
M | 0.2 |
0214 | NON-PERFORATED PIPE-100 MM | 01010M | 119.000 |
119.000 |
$32.800 |
M | 0.0 |
0215 | PERFORATED PIPE-150 MM | 01001M | 5,037.000 |
5,037.000 |
$18.050 |
M | 0.6 |
0216 | NON-PERFORATED PIPE-150 MM | 01011M | 190.000 |
190.000 |
$36.100 |
M | 0.0 |
0217 | PERF PIPE HEADWALL TY 4-4 INCH | 01032 | 4.000 |
4.000 |
$425.000 |
EACH | 0.0 |
0218 | PERF PIPE HEADWALL TY 4-6 INCH | 01033 | 1.000 |
1.000 |
$435.000 |
EACH | 0.0 |
0219 | PERF PIPE HEADWALL TY 3-4 INCH | 01028 | 6.000 |
6.000 |
$425.000 |
EACH | 0.0 |
0220 | PERF PIPE HEADWALL TY 3-6 INCH | 01029 | 2.000 |
2.000 |
$435.000 |
EACH | 0.0 |
0221 | PERF PIPE HEADWALL TY 1-4 INCH | 01020 | 2.000 |
2.000 |
$425.000 |
EACH | 0.0 |
0222 | PERF PIPE HEADWALL TY 1-6 INCH | 01021 | 3.000 |
3.000 |
$435.000 |
EACH | 0.0 |
0223 | CURB BOX INLET TYPE A | 01456 | 19.000 |
19.000 |
$3,250.000 |
EACH | 0.4 |
0224 | DROP BOX INLET TYPE 1 | 01490 | 7.000 |
7.000 |
$2,800.000 |
EACH | 0.1 |
0225 | DROP BOX INLET TYPE 2 | 01493 | 1.000 |
1.000 |
$2,950.000 |
EACH | 0.0 |
0226 | DROP BOX INLET TYPE 3 | 01496 | 2.000 |
2.000 |
$3,000.000 |
EACH | 0.0 |
0227 | DROP BOX INLET TYPE 5B | 01505 | 9.000 |
9.000 |
$3,550.000 |
EACH | 0.2 |
0228 | DROP BOX INLET TYPE 5D | 01511 | 2.000 |
2.000 |
$3,725.000 |
EACH | 0.0 |
0229 | DROP BOX INLET TYPE 11 | 01544 | 3.000 |
3.000 |
$1,500.000 |
EACH | 0.0 |
0230 | DROP BOX INLET TYPE 13G | 01559 | 6.000 |
6.000 |
$2,200.000 |
EACH | 0.1 |
0231 | SLOPED BOX OUTLET TYPE 1-18 IN | 01433 | 3.000 |
3.000 |
$1,325.000 |
EACH | 0.0 |
0232 | SLOPED BOX OUTLET TYPE 1-24 IN | 01434 | 1.000 |
1.000 |
$1,500.000 |
EACH | 0.0 |
0233 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 1.000 |
1.000 |
$2,100.000 |
EACH | 0.0 |
0234 | S & F BOX INLET-OUTLET-30 INCH | 01452 | 1.000 |
1.000 |
$3,200.000 |
EACH | 0.0 |
0235 | JUNCTION BOX-15 INCH | 01641 | 3.000 |
3.000 |
$1,500.000 |
EACH | 0.0 |
0236 | JUNCTION BOX | 01650 | 3.000 |
4.000 |
$1,750.000 |
EACH | 0.0 |
0237 | RECONSTRUCT MANHOLE | 01789 | 1.000 |
1.000 |
$1,850.000 |
EACH | 0.0 |
0238 | MANHOLE TYPE A | 01756 | 4.000 |
4.000 |
$2,150.000 |
EACH | 0.1 |
0239 | MANHOLE TYPE C | 01767 | 1.000 |
1.000 |
$3,500.000 |
EACH | 0.0 |
0240 | SANITARY SEWER MANHOLE | 01799 | 1.000 |
1.000 |
$2,500.000 |
EACH | 0.0 |
0241 | DROP MANHOLE | 09064 | 1.000 |
1.000 |
$4,000.000 |
EACH | 0.0 |
0242 | SEEDING AND PROTECTION | 05985M | 103,971.000 |
103,971.000 |
$0.350 |
SQ M | 0.2 |
0243 | SPECIAL SEEDING CROWN VETCH | 05989M | 22,729.000 |
22,729.000 |
$0.350 |
SQ M | 0.0 |
0244 | TOPDRESSING FERTILIZER | 05966M | 14.000 |
14.000 |
$340.000 |
MTON | 0.0 |
0245 | EROSION CONTROL BLANKET | 05950M | 19,629.000 |
19,629.000 |
$1.410 |
SQ M | 0.2 |
0246 | SILT TRAP TYPE B | 02704 | 2.000 |
13.000 |
$400.000 |
EACH | 0.0 |
0247 | CLEAN SILT TRAP TYPE B | 02707 | 6.000 |
6.000 |
$125.000 |
EACH | 0.0 |
0248 | SILT CHECK | 02705 | 121.000 |
201.000 |
$100.000 |
EACH | 0.1 |
0249 | CLEAN SILT CHECK | 02708 | 363.000 |
363.000 |
$35.000 |
EACH | 0.1 |
0250 | TEMPORARY SILT FENCE | 02701M | 673.000 |
1,273.000 |
$6.550 |
M | 0.0 |
0251 | CLEAN TEMPORARY SILT FENCE | 02709M | 2,019.000 |
2,019.000 |
$2.150 |
M | 0.0 |
0252 | SILT CHECK TY II (MOD) | 09277 | 25.000 |
25.000 |
$200.000 |
EACH | 0.0 |
0253 | CLEAN SILT CHECK TY II (MOD) | 09278 | 75.000 |
75.000 |
$50.000 |
EACH | 0.0 |
0254 | CHANNEL LINING CLASS II | 02483M | 123.000 |
263.000 |
$24.800 |
MTON | 0.0 |
0255 | CHANNEL LINING CLASS III | 02484M | 1,017.000 |
1,017.000 |
$26.450 |
MTON | 0.2 |
0256 | FABRIC-GEOTEXTILE TYPE III | 02598M | 11,100.000 |
11,100.000 |
$1.500 |
SQ M | 0.1 |
0257 | R/W MARKER MUNICIPAL TYPE 1 | 02437 | 42.000 |
42.000 |
$65.000 |
EACH | 0.0 |
0258 | FENCE-WOVEN WIRE TYPE 1 | 02262M | 59.000 |
59.000 |
$13.790 |
M | 0.0 |
0259 | MOUNTABLE MEDIAN TYPE 6A | 01949M | 906.700 |
906.700 |
$45.000 |
SQ M | 0.2 |
0260 | STANDARD CURB AND GUTTER MOD TYPE D | 01811M | 23.000 |
23.000 |
$68.100 |
M | 0.0 |
0261 | STANDARD CURB AND GUTTER | 01810M | 1,525.800 |
1,614.800 |
$41.000 |
M | 0.4 |
0262 | STANDARD HEADER CURB | 01875M | 15.000 |
15.000 |
$49.200 |
M | 0.0 |
0263 | ISLAND CURB AND GUTTER | 01825M | 442.000 |
442.000 |
$39.500 |
M | 0.1 |
0264 | LIP CURB AND GUTTER | 01820M | 157.400 |
157.400 |
$44.300 |
M | 0.0 |
0265 | LIP INTEGRAL CURB | 01840M | 64.000 |
64.000 |
$39.500 |
M | 0.0 |
0266 | EDGE KEY MODIFIED | 02585M | 6.000 |
6.000 |
$49.250 |
M | 0.0 |
0267 | SIDEWALK-100 MM CONCRETE | 02720M | 1,965.500 |
1,965.500 |
$19.750 |
SQ M | 0.2 |
0268 | CEM CONC ENT PAVEMENT-200 MM | 02101M | 115.000 |
115.000 |
$65.750 |
SQ M | 0.0 |
0269 | JPC PAVEMENT-250 MM | 02069M | 1,212.000 |
0.000 |
$66.700 |
SQ M | 0.5 |
0270 | JPC PAVEMENT-150 MM | 02075M | 523.000 |
523.000 |
$59.800 |
SQ M | 0.2 |
0271 | ASPH PAVE MILLING & TEXTURING | 02677M | 256.700 |
530.729 |
$24.250 |
MTON | 0.0 |
0272 | CRUSHED AGGREGATE SIZE NO 57 | 00071M | 20.000 |
20.000 |
$33.000 |
MTON | 0.0 |
0273 | CRUSHED STONE BASE | 00003M | 33,082.600 |
33,082.600 |
$15.710 |
MTON | 3.2 |
0274 | D G A BASE | 00001M | 5,978.700 |
6,154.100 |
$19.010 |
MTON | 0.7 |
0275 | TRAFFIC BOUND BASE | 00020M | 1,000.000 |
3,000.000 |
$17.640 |
MTON | 0.1 |
0276 | ASPHALT CURING SEAL | 00358M | 55.600 |
55.600 |
$292.130 |
MTON | 0.1 |
0277 | EMULSIFIED ASPHALT RS-2 | 00291M | 23.100 |
23.100 |
$374.900 |
MTON | 0.1 |
0278 | ASPHALT SEAL AGGREGATE | 00100M | 191.900 |
191.900 |
$55.120 |
MTON | 0.1 |
0279 | DRAINAGE BLANKET-TYPE II-ASPH | 00018M | 18,231.300 |
18,231.300 |
$30.590 |
MTON | 3.4 |
0280 | SAND FOR BLOTTER | 02702M | 123.600 |
123.600 |
$25.360 |
MTON | 0.0 |
0281 | CL1 ASPH BASE 19.0D PG64-22 | 00220M | 4,730.700 |
5,094.470 |
$39.790 |
MTON | 1.2 |
0282 | CL3 ASPH BASE 37.5D PG64-22 | 00205M | 15,201.200 |
15,201.200 |
$36.820 |
MTON | 3.4 |
0283 | CL2 ASPH BASE 25.0D PG64-22 | 00212M | 3,722.700 |
3,722.700 |
$37.420 |
MTON | 0.9 |
0284 | CL3 ASPH BASE 25.0D PG64-22 | 00214M | 9,702.300 |
9,702.300 |
$36.820 |
MTON | 2.2 |
0285 | CL3 ASPH BASE 25.0D PG70-22 FAY | 00215M | 9,583.400 |
9,583.400 |
$41.720 |
MTON | 2.4 |
0286 | CL1 ASPH SURF 9.50D PG64-22 | 00300M | 1,111.400 |
2,983.703 |
$48.500 |
MTON | 0.3 |
0287 | CL2 ASPH SURF 12.5D PG64-22 | 00309M | 1,848.900 |
1,848.900 |
$41.560 |
MTON | 0.5 |
0288 | CL3 ASPH SURF 12.5A PG70-22 | 00331M | 5,098.100 |
5,818.012 |
$51.150 |
MTON | 1.6 |
0289 | CLEARING AND GRUBBING | 02545 | 1.000 |
1.000 |
$121,215.000 |
LS | 0.7 |
0290 | STAKING | 02726 | 1.000 |
1.000 |
$55,000.000 |
LS | 0.3 |
0291 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$193,965.000 |
LS | 1.2 |
0292 | REMOVE STRUCTURE | 02731 | 1.000 |
1.000 |
$48,000.000 |
LS | 0.3 |
0293 | DIVERSIONS (BY-PASS DETOURS) | 02651 | 1.000 |
1.000 |
$1,580.000 |
LS | 0.0 |
0294 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$550.000 |
LS | 0.0 |
8000 | BORED & JACKED ENCASEMENT PIPE | 09736M01 | 0.000 |
43.000 |
$1,470.000 |
M | 0.0 |
8001 | STEEL ENCASEMENT PIPE-350 MM | 01071M | 0.000 |
115.700 |
$315.000 |
M | 0.0 |
8002 | VALUE ENGINEERING | 10120NS | 0.000 |
1.000 |
$99,052.780 |
LS | 0.0 |
8003 | COST PLUS WORK | 10080NS | 0.000 |
1.000 |
$3,297.000 |
LS | 0.0 |
8023 | CRASH CUSHION TYPE VI-T | 02894 | 0.000 |
2.000 |
$11,275.000 |
EACH | 0.0 |
8024 | CL3 ASPH BASE 25.0D PG76-22 | 00216M | 0.000 |
285.000 |
$48.500 |
MTON | 0.0 |
8025 | CL3 ASPH SURF 12.5A PG76-22 | 00332M | 0.000 |
107.000 |
$55.150 |
MTON | 0.0 |
8026 | MAINTAIN & CONTROL TRAFFIC SPECIAL | 02650 | 0.000 |
1.000 |
$14,770.000 |
LS | 0.0 |
8027 | PAVE STRIPING-TEMP REM TAPE-W | 06550M | 0.000 |
89.000 |
$10.400 |
M | 0.0 |
8028 | PAVE STRIPING-TEMP REM TAPE-Y | 06551M | 0.000 |
89.000 |
$10.400 |
M | 0.0 |
8029 | GUARDRAIL END TREATMENT TYPE 7 | 02371 | 0.000 |
4.000 |
$605.000 |
EACH | 0.0 |
8030 | COST PLUS WORK Stabilize Solution Cavity | 10080NS | 0.000 |
1.000 |
$8,226.980 |
LS | 0.0 |
8036 | ASPHALT PLACEMENT WITH MTV | 00338M | 0.000 |
7,098.100 |
$1.550 |
MTON | 0.0 |
8037 | RETAINING WALL | 08018M | 0.000 |
19.810 |
$390.000 |
SQ M | 0.0 |
8039 | EW~ EMBANKMENT-IN-PLACE CONSTR REV 1 | 10090NX | 0.000 |
1.000 |
$24,500.000 |
LS | 0.0 |
8040 | DROP BOX INLET TYPE 7 | 01538 | 0.000 |
1.000 |
$4,825.000 |
EACH | 0.0 |
8041 | EW~ Remove Headwall | 10094NX | 0.000 |
2.000 |
$565.000 |
EACH | 0.0 |
8042 | STAKING CONSTR REV. 1 | 02726 | 0.000 |
1.000 |
$3,000.000 |
LS | 0.0 |
8043 | FLUME INLET TYPE 1 | 01690 | 0.000 |
1.000 |
$3,285.000 |
EACH | 0.0 |
8045 | EW~ Remove and Reset Headwall | 10094NX | 0.000 |
3.000 |
$475.000 |
EACH | 0.0 |
8046 | EW~ Raise Manhole | 10090NX | 0.000 |
1.000 |
$1,500.000 |
LS | 0.0 |
8047 | COST PLUS WORK Stabilize Rock Cut | 10080NS | 0.000 |
1.000 |
$13,054.430 |
LS | 0.0 |
8048 | GUARDRAIL-STEEL W BEAM-S FACE Double Ply Guardrail | 02351M | 0.000 |
30.500 |
$80.000 |
M | 0.0 |
8049 | GUARDRAIL-STEEL W BEAM-S FACE Double Ply Guardrail-Modified | 02351M | 0.000 |
41.940 |
$155.000 |
M | 0.0 |
8050 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 0.000 |
1.000 |
$600.000 |
EACH | 0.0 |
8051 | REMOVE GUARDRAIL | 02381M | 0.000 |
53.380 |
$5.450 |
M | 0.0 |
8052 | EW~ Flatten Slope | 10090NX | 0.000 |
1.000 |
$1,465.000 |
LS | 0.0 |
8054 | EW~ Police Officers | 10103NX | 0.000 |
10.750 |
$33.660 |
HOUR | 0.0 |
8055 | STORM SEWER PIPE-300 MM | 00520M | 0.000 |
36.600 |
$172.500 |
M | 0.0 |
8056 | METAL END SECTION TY 1-15 INCH Metal End Section-300MM | 01370 | 0.000 |
2.000 |
$595.000 |
EACH | 0.0 |
8059 | SBM ALUM SHEET SIGNS 2 MM | 06406M | 0.000 |
11.330 |
$136.600 |
SQ M | 0.0 |
8060 | SBM ALUM SHEET SIGNS 3 MM | 06407M | 0.000 |
0.360 |
$203.500 |
SQ M | 0.0 |
8064 | STEEL POST TYPE 2 | 06411M | 0.000 |
135.000 |
$20.500 |
M | 0.0 |
8066 | LEVELING & WEDGING PG64-22 | 00190M | 0.000 |
400.000 |
$41.560 |
MTON | 0.0 |
8068 | BORROW EXCAVATION FAYETTE CO | 02210M | 0.000 |
11,250.000 |
$13.060 |
CU M | 0.0 |
8071 | FUEL ADJUSTMENT FAYETTE | 10020NS | 0.000 |
-0.001 |
$1.000 |
DOLL | 0.0 |
8072 | ASPHALT ADJUSTMENT FAYETTE | 10030NS | 0.000 |
0.001 |
$1.000 |
DOLL | 0.0 |
8076 | RIDE QUALITY ADJUSTMENT ASPH FAYETTE CO | 10005NS | 0.000 |
16,888.860 |
$1.000 |
DOLL | 0.0 |
8081 | LOT PAY ADJUSTMENT FAYETTE | 10000NS | 0.000 |
-0.001 |
$1.000 |
DOLL | 0.0 |
Category Total $7,505,112.73 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0008 | CATEGORY Description | MOB / DEMOB LN 2 | FOR CPES SUBSECTION G |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0364 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$223,440.000 |
LS | 1.4 |
0400 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$112,559.940 |
LS | 0.7 |
Category Total $335,999.94 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0009 | CATEGORY Description | BRIDGE | FAYETTE CO / CPES SUBSECTION I |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0295 | STRUCTURE GRANULAR BACKFILL | 02231M | 344.000 |
0.000 |
$30.000 |
CU M | 0.1 |
0296 | STRUCTURE EXCAVATION-COMMON | 08001M | 319.000 |
319.000 |
$14.000 |
CU M | 0.0 |
0297 | STRUCTURE EXCAV-SOLID ROCK | 08002M | 174.000 |
174.000 |
$45.000 |
CU M | 0.0 |
0298 | MASONRY COATING | 02998M | 837.000 |
1,737.000 |
$7.000 |
SQ M | 0.0 |
0299 | CONCRETE-CLASS A | 08100M | 476.000 |
476.000 |
$300.000 |
CU M | 0.9 |
0300 | CONCRETE-CLASS AA | 08104M | 564.600 |
564.600 |
$400.000 |
CU M | 1.4 |
0301 | CYCLOPEAN STONE RIP RAP | 08019M | 936.000 |
936.000 |
$27.000 |
MTON | 0.2 |
0302 | PILES-STEEL HP310X79 | 08046M | 142.700 |
142.700 |
$94.000 |
M | 0.1 |
0303 | PRE-DRILLING FOR PILES | 08039M | 139.000 |
139.000 |
$186.000 |
M | 0.2 |
0304 | TEST PILES | 08033M | 17.800 |
17.800 |
$94.000 |
M | 0.0 |
0305 | STEEL REINF-EPOXY COATED | 08151M | 82,009.000 |
82,009.000 |
$1.220 |
KG | 0.6 |
0306 | STEEL REINFORCEMENT | 08150M | 38,853.000 |
38,853.000 |
$1.090 |
KG | 0.3 |
0307 | PRECAST PC I BEAM TYPE 3 | 08633M | 539.300 |
539.300 |
$250.000 |
M | 0.8 |
0308 | FABRIC-GEOTEXTILE TYPE I | 02596M | 1,294.000 |
1,294.000 |
$1.200 |
SQ M | 0.0 |
0309 | ARCHITECTURAL TREATMENT | 07318M | 251.000 |
251.000 |
$34.500 |
SQ M | 0.1 |
0310 | STRUCTURAL STEEL | 08160 | 1.000 |
1.000 |
$12,000.000 |
LS | 0.1 |
8006 | PILE POINTS-310 MM | 08094M | 0.000 |
36.000 |
$136.370 |
EACH | 0.0 |
8014 | STRUCTURE GRANULAR BACKFILL SPECIAL | 02231M | 0.000 |
344.000 |
$91.460 |
CU M | 0.0 |
Category Total $762,766.05 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0010 | CATEGORY Description | MOB / DEMOB LN 2 | FOR CPES SUBSECTION I |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0365 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$23,275.000 |
LS | 0.1 |
0369 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$11,724.994 |
LS | 0.1 |
Category Total $34,999.99 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0011 | CATEGORY Description | SIGNALIZATION | FAYETTE CO / CPES SUBSECTION K SIGNALS |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0311 | MESSENGER-48.0 KN | 04885M | 780.000 |
780.000 |
$5.000 |
M | 0.0 |
0312 | JUNCTION BOX TYPE B | 04811 | 16.000 |
16.000 |
$200.000 |
EACH | 0.0 |
0313 | TRENCHING AND BACKFILLING | 04820M | 561.000 |
561.000 |
$5.000 |
M | 0.0 |
0314 | LOOP SAW SLOT AND FILL | 04895M | 522.000 |
522.000 |
$15.000 |
M | 0.0 |
0315 | PEDESTRIAN DETECTOR | 04900 | 8.000 |
8.000 |
$150.000 |
EACH | 0.0 |
0316 | SIGNAL-8 INCH | 04910 | 4.000 |
4.000 |
$500.000 |
EACH | 0.0 |
0317 | SIGNAL-3 SECTION 12 INCH | 04912 | 12.000 |
0.000 |
$300.000 |
EACH | 0.0 |
0318 | SIGNAL-4 SECTION 12 INCH | 04913 | 2.000 |
0.000 |
$450.000 |
EACH | 0.0 |
0319 | SIGNAL-5 SECTION 12 INCH | 04914 | 5.000 |
0.000 |
$600.000 |
EACH | 0.0 |
0320 | SIGNAL-PEDESTRIAN | 04916 | 8.000 |
8.000 |
$300.000 |
EACH | 0.0 |
0321 | BEACON CONTROLLER-2 CIRCUIT | 04930 | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.0 |
0322 | REMOVE SIGNAL EQUIPMENT | 04950 | 3.000 |
3.000 |
$500.000 |
EACH | 0.0 |
0323 | INSTALL CONTROLLER TYPE 170 | 04931 | 2.000 |
2.000 |
$3,500.000 |
EACH | 0.0 |
0324 | INSTALL STEEL STRAIN POLE | 04932 | 12.000 |
12.000 |
$3,000.000 |
EACH | 0.2 |
0325 | TEMP RELOCATION OF SIGNAL HEAD | 09182M01 | 18.000 |
18.000 |
$200.000 |
EACH | 0.0 |
0326 | INSTALL TEMP VIDEO CAMERA | 20456NS835 | 4.000 |
6.000 |
$750.000 |
EACH | 0.0 |
0327 | CONDUIT-50 MM | 04795M | 551.000 |
551.000 |
$4.000 |
M | 0.0 |
0328 | LOOP WIRE | 04830M | 1,912.000 |
1,912.000 |
$1.000 |
M | 0.0 |
0329 | CABLE-NO. 14/5C | 04844M | 785.000 |
785.000 |
$3.000 |
M | 0.0 |
0330 | CABLE-NO. 14/7C | 04845M | 315.000 |
315.000 |
$3.500 |
M | 0.0 |
0331 | CABLE-NO. 14/1 PAIR | 04850M | 1,724.000 |
1,724.000 |
$3.000 |
M | 0.0 |
8019 | INSTALL LED SIGNAL 3 Section 305 | 09800 | 0.000 |
12.000 |
$205.000 |
EACH | 0.0 |
8020 | INSTALL LED SIGNAL 4 Section 305 | 09800 | 0.000 |
2.000 |
$215.000 |
EACH | 0.0 |
8021 | INSTALL LED SIGNAL 5 Section 305 | 09800 | 0.000 |
5.000 |
$225.000 |
EACH | 0.0 |
8022 | INST PEDESTRIAN HEAD-LED Module | 09619 | 0.000 |
8.000 |
$85.000 |
EACH | 0.0 |
8057 | SIGNAL PEDESTAL | 04882 | 0.000 |
4.000 |
$775.000 |
EACH | 0.0 |
Category Total $99,680.50 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0012 | CATEGORY Description | MOB / DEMOB | FOR CPES SUBSECTION K |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0366 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$2,344.999 |
LS | 0.0 |
0367 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$4,655.000 |
LS | 0.0 |
Category Total $6,999.99 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0013 | CATEGORY Description | LANDSCAPING | FAYETTE CO / CPES SUBSECTION M LANDSCAPING |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0332 | TREE NORWAY MAPLE | 00500EC | 5.000 |
5.000 |
$561.000 |
EACH | 0.0 |
0333 | TREE OCTOBER GLORY RED MAPLE | 00500EC | 7.000 |
7.000 |
$589.000 |
EACH | 0.0 |
0334 | TREE SUGAR MAPLE | 00500EC | 11.000 |
11.000 |
$589.000 |
EACH | 0.0 |
0335 | TREE AUTUM APPALOUSA WHITE ASH | 00500EC | 14.000 |
14.000 |
$589.000 |
EACH | 0.1 |
0336 | TREE KY COFFEE TREE | 00500EC | 7.000 |
7.000 |
$561.000 |
EACH | 0.0 |
0337 | TREE BLOODGOOD LONDON PLANETREE | 00500EC | 5.000 |
5.000 |
$561.000 |
EACH | 0.0 |
0338 | TREE SAWTOOTH OAK | 00500EC | 13.000 |
13.000 |
$561.000 |
EACH | 0.0 |
0339 | TREE SCARLET OAK | 00500EC | 16.000 |
16.000 |
$589.000 |
EACH | 0.1 |
0340 | TREE EASTERN REDBUD | 00500EC | 12.000 |
12.000 |
$250.000 |
EACH | 0.0 |
0341 | TREE CHEROKEE PRINESS DOGWOOD | 00500EC | 12.000 |
12.000 |
$297.000 |
EACH | 0.0 |
0342 | TREE WINTER KING HAWTHORNE | 00500EC | 9.000 |
9.000 |
$312.000 |
EACH | 0.0 |
0343 | TREE PRAIRIEFIRE CRABAPPLE | 00500EC | 16.000 |
16.000 |
$312.000 |
EACH | 0.0 |
0344 | TREE PROFESSOR SPRENGER CRABAPPLE | 00500EC | 3.000 |
3.000 |
$312.000 |
EACH | 0.0 |
0345 | TREE EASTERN READ CEDAR | 00500EC | 8.000 |
8.000 |
$236.000 |
EACH | 0.0 |
0346 | TREE WHITE PINE (EASTERN) | 00500EC | 8.000 |
8.000 |
$423.000 |
EACH | 0.0 |
0347 | TREE COMMON ALDER | 00500EC | 12.000 |
12.000 |
$9.450 |
EACH | 0.0 |
0348 | SILKY DOGWOOD | 09133 | 10.000 |
10.000 |
$9.450 |
EACH | 0.0 |
0349 | WHITE ASH | 09102 | 9.000 |
9.000 |
$9.450 |
EACH | 0.0 |
0350 | TREE KY COFFEE TREE | 00500EC | 1.000 |
1.000 |
$9.450 |
EACH | 0.0 |
0351 | TREE WITCH HAZEL | 00500EC | 3.000 |
3.000 |
$9.450 |
EACH | 0.0 |
0352 | TREE BLACK GUM | 00500EC | 13.000 |
13.000 |
$9.450 |
EACH | 0.0 |
0353 | TREE SASSAFRAS | 00500EC | 7.000 |
7.000 |
$9.450 |
EACH | 0.0 |
0354 | TREE POSSUM HAW VIBURNUM | 00500EC | 4.000 |
4.000 |
$9.450 |
EACH | 0.0 |
0355 | TREE OAKLEAF HYDRANGEA | 00500EC | 4.000 |
4.000 |
$61.000 |
EACH | 0.0 |
0356 | TREE DENSE YEW | 00500EC | 14.000 |
14.000 |
$61.000 |
EACH | 0.0 |
0357 | TREE SHASTA DOUBLEFILE VIBURNUM | 00500EC | 5.000 |
5.000 |
$56.000 |
EACH | 0.0 |
0358 | TREE ALLEGAHANY VIBURNUM | 00500EC | 4.000 |
4.000 |
$56.000 |
EACH | 0.0 |
Category Total $67,833.55 |
SM- Project | X057006805001 | CATEGORY NUMBER | 0015 | CATEGORY Description | TRAINEES | CPES SUBSECTION O TRAINEE |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0359 | TRAINEE PAYMENT REIMBURSEMENT | 02742 | 1,400.000 |
1,400.000 |
$1.000 |
HOUR | 0.0 |
Category Total $1,400.00 |