Report_Id:   111312   Est NO  0031

Date:03/28/2013

COMMONWEALTH OF KENTUCKY

TRANSPORTATION CABINET


Contract ID 111312 Estimate Number 0031 Estimate Type PROGRESS
District Office PIKEVILLE (12300)  Weddington, Derrick P. (Paxton), P.E.

Contractor KAY & KAY CONTRACTING LLC ADDR SN 0 VC Code VC0000094651
P O BOX 2478
LONDON , KY , 40743
Pay Period 02/11/2013  TO  02/24/2013
Date Approved 03/07/2013
Primary Proj Number DE09816411112
Project No. APD 80-6 (035)
Primary County PIKE
Name of Road POND CREEK ROAD (CR 1641) AT KY 80-US 460
Description CONSTRUCT A BRIDGE AND APPROACHES ON POND CREEK ROAD OVER RUSSELL FORK AND CSX RAILROAD AT KY 80-US 460 NEAR DRAFFIN
     
     
Date Let 04/29/2011 Formal Acceptance
Date Awarded 05/16/2011 Date Work Began 12/06/2011
Date Contract Executed 06/13/2011 Open To Traffic
Date NTP Issued 06/13/2011 Actual Completion Date

Current Contract Amount

$8,347,398.77

Total to Date

Prev to Date

This Estimate

Original Amount

$8,240,711.00

Total Earnings

$4,694,335.64

$4,597,873.10

$96,462.54

Percent Complete

66.88

Stockpiled Materials

$888,772.92

$888,772.92

$0.00

Funds Available

$2,764,290.21

Gross Earnings

$5,583,108.56

$5,486,646.02

$96,462.54

Total Change Orders

$106,687.77

Other Adjustments

$0.00

$0.00

$0.00

TOTAL

$5,583,108.56

$5,486,646.02

$96,462.54

Contract Id 111312

Change Order Summary

County PIKE
Estimate Nbr 0031 Project Number APD 80-6 (035)
Contractor KAY & KAY CONTRACTING LLC Period 02/11/2013  TO  02/24/2013
 
 
CHANGE ORDERS HISTORY  
CHANGE ORDER NBR DESCRIPTION STATUS APPROVAL DATE TOTAL CO AMOUNT CONTRACT TIME ADJUSTED
001 Mass Concrete, Asphalt Surface and Flowable Fill Approved 12/06/2012 $106,687.77 10.0
 
 
 
 

CONTRACT ADJUSTMENTS HISTORY

Contract Adjustments

 

 

Adjustment Description

Est No

Adjustment Amount

Line Item Adjustments History
PROJECT ITEM NBR DESCRPITION TYPE EST NO

ADJ QUANTITY

UNIT PRICE

ADJUSTED AMOUNT

Contract Id 111312

COMMONWEALTH OF KENTUCKY

County PIKE
Contract Type BRGS   BRIDGE WITH GRADE, DRAIN & SURFACE

TRANSPORTATION CABINET

Primary Project Number DE09816411112
Estimate Nbr 0031 Period 02/11/2013  TO  02/24/2013
Contractor KAY & KAY CONTRACTING LLC
 
Project DE09816411112 Fed/State Project Number APD 80-6 (035) Category 0001 PAVING
LINE ITEM NUMBER ITEM DESCRIPTION ITEM NO. UNIT PLAN QTY CURRENT QUANTITY QUANTITY PAID THIS EST QUANTITY PAID PREV. EST QUANTITY PAID TO DATE UNIT PRICE AMOUNT PAID THIS EST AMOUNT PAID TO DATE
1001 CL3 ASPH SURF 0.38D PG64-22 00339 TON 647.00 647.000 0.000 0.000 97.85 0.00
1002 CL2 ASPH SURF 0.38D PG64-22 00301 TON 594.00 1,101.920 746.310 746.310 97.85 73,026.43
1003 CL3 ASPH BASE 1.00D PG64-22 00214 TON 4,763.00 4,763.000 5,419.840 5,419.840 86.35 468,003.18
1004 CL2 ASPH BASE 1.00D PG64-22 00212 TON 2,504.00 2,504.000 428.000 428.000 86.35 36,957.80
1005 CRUSHED STONE BASE 00003 TON 9,705.00 9,705.000 5,130.360 5,130.360 26.90 138,006.68
1006 EMULSIFIED ASPHALT RS-2 00291 TON 4.00 4.000 0.000 0.000 1,000.00 0.00
1007 ASPHALT SEAL AGGREGATE 00100 TON 38.00 38.000 0.000 0.000 250.00 0.00
Project DE09816411112 Fed/State Project Number APD 80-6 (035) Category 0002 ROADWAY
2001 CLEARING AND GRUBBING (26 ACRES) 02545 LS 1.00 1.000 0.850 0.850 160,000.00 136,000.00
2002 REMOVE PAVEMENT 02091 SQYD 1,127.00 1,127.000 555.600 555.600 5.00 2,778.00
2003 REMOVE GUARDRAIL 02381 LF 2,385.00 2,385.000 1,875.000 1,875.000 1.50 2,812.50
2004 PLUG WATER WELL 02475 EACH 1.00 1.000 0.000 0.000 4,000.00 0.00
2005 SEPTIC TANK TREATMENT 02404 EACH 1.00 1.000 2.000 2.000 3,000.00 6,000.00
2006 ROADWAY EXCAVATION 02200 CUYD 271,584.00 271,584.000 16,950.000 219,668.890 236,618.890 4.75 80,512.50 1,123,939.72
2007 STAKING 02726 LS 1.00 1.000 0.550 0.550 42,000.00 23,100.00
2008 PORTABLE CHANGEABLE MESSAGE SIGN 02671 EACH 4.00 4.000 2.000 2.000 12,500.00 25,000.00
2009 MAINTAIN & CONTROL TRAFFIC 02650 LS 1.00 1.000 0.500 0.500 85,000.00 42,500.00
2010 DIVERSIONS (BY-PASS DETOURS) 02651 LS 1.00 1.000 1.000 1.000 12,000.00 12,000.00
2011 SIGNS 02562 SQFT 486.75 486.750 320.000 320.000 15.00 4,800.00
2012 CONCRETE BARRIER WALL TYPE 9T 03171 LF 1,300.00 1,300.000 1,860.000 1,860.000 42.50 79,050.00
2013 CRASH CUSHION TY VI CLASS BT TL2 08901 EACH 4.00 4.000 4.000 4.000 7,750.00 31,000.00
2014 DELINEATOR FOR BARRIER-WHITE 01984 EACH 50.00 50.000 59.000 59.000 7.50 442.50
2015 DELINEATOR FOR BARRIER-YELLOW 01985 EACH 5.00 5.000 0.000 0.000 7.50 0.00
2016 BARRICADE-TYPE III 02014 EACH 2.00 2.000 2.000 2.000 275.00 550.00
2017 ARROW PANEL 02775 EACH 2.00 2.000 0.000 0.000 3,500.00 0.00
2018 PAVE STRIPING-TEMP PAINT-4 IN 06510 LF 20,009.00 20,009.000 33,376.000 33,376.000 0.28 9,345.28
2019 CHANNEL LINING CLASS IA 02482 TON 5.00 5.000 0.000 0.000 150.00 0.00
2020 CHANNEL LINING CLASS II 02483 TON 116.00 116.000 72.860 72.860 36.75 2,677.60
2021 CHANNEL LINING CLASS III 02484 TON 288.00 288.000 550.220 550.220 38.75 21,321.02
2022 CHANNEL LINING CLASS IV 02488 CUYD 58.00 58.000 0.000 0.000 31.75 0.00
2023 FABRIC GEOTEXTILE TY IV FOR PIPE 02600 SQYD 4,600.00 4,600.000 1,370.000 1,370.000 2.25 3,082.50
2024 TEMP SILT FENCE 02701 LF 1,895.00 1,895.000 192.000 1,934.000 2,126.000 2.50 480.00 5,315.00
2025 CLEAN TEMP SILT FENCE 02709 LF 1,895.00 1,895.000 162.000 0.000 162.000 2.50 405.00 405.00
2026 SILT TRAP TYPE A 02703 EACH 24.00 24.000 1.000 0.000 1.000 350.00 350.00 350.00
2027 CLEAN SILT TRAP TYPE A 02706 EACH 72.00 72.000 0.000 0.000 150.00 0.00
2028 SILT TRAP TYPE B 02704 EACH 24.00 24.000 23.000 23.000 325.00 7,475.00
2029 CLEAN SILT TRAP TYPE B 02707 EACH 72.00 72.000 32.000 32.000 150.00 4,800.00
2030 SILT TRAP TYPE C 02705 EACH 24.00 24.000 11.000 11.000 350.00 3,850.00
2031 CLEAN SILT TRAP TYPE C 02708 EACH 72.00 72.000 8.000 8.000 150.00 1,200.00
2032 TEMP DITCH 02159 LF 1,895.00 1,895.000 1,800.000 1,800.000 2.00 3,600.00
2033 EROSION CONTROL BLANKET 05950 SQYD 3,359.00 3,359.000 7,288.900 7,288.900 1.50 10,933.35
2034 TEMP MULCH 05952 SQYD 107,487.00 107,487.000 0.000 0.000 0.20 0.00
2035 TEMP SEEDING AND PROTECTION 05953 SQYD 53,653.00 53,653.000 9,680.000 9,680.000 0.20 1,936.00
2036 TOPDRESSING FERTILIZER 05966 TON 4.02 4.020 0.000 0.000 750.00 0.00
2037 SEEDING AND PROTECTION 05985 SQYD 107,487.00 107,487.000 31,804.400 31,804.400 0.38 12,085.67
2038 SPECIAL SEEDING CROWN VETCH 05989 SQYD 26,872.00 26,872.000 19,360.000 19,360.000 0.25 4,840.00
2039 GUARDRAIL-STEEL W BEAM-S FACE 02351 LF 1,587.50 1,587.500 0.000 0.000 18.50 0.00
2040 G/R STEEL W BEAM-S FACE (7 FT POST) 21802EN LF 2,687.50 2,687.500 0.000 0.000 20.00 0.00
2041 DELINEATOR FOR GUARDRAIL-WHITE 01982 EACH 43.00 43.000 0.000 0.000 6.00 0.00
2042 GUARDRAIL TERMINAL SECTION NO 1 02360 EACH 8.00 8.000 0.000 0.000 50.00 0.00
2043 GUARDRAIL CONNECTOR TO BRIDGE END TY A 02363 EACH 4.00 4.000 0.000 0.000 2,300.00 0.00
2044 PERFORATED PIPE-4 IN 01000 LF 299.00 299.000 285.000 285.000 15.00 4,275.00
2045 NON-PERFORATED PIPE-4 IN 01010 LF 50.00 50.000 0.000 0.000 15.00 0.00
2046 PERF PIPE HEADWALL TY 1-4 IN 01020 EACH 1.00 1.000 0.000 0.000 550.00 0.00
2047 PERF PIPE HEADWALL TY 2-4 IN 01024 EACH 1.00 1.000 0.000 0.000 550.00 0.00
2048 PERF PIPE HEADWALL TY 3-4 IN 01028 EACH 3.00 3.000 0.000 0.000 550.00 0.00
2049 CRUSHED AGGREGATE SIZE NO 2 00078 TON 5.00 5.000 0.000 0.000 100.00 0.00
2050 PAVE STRIPING-PERM PAINT-4 IN 06514 LF 19,694.00 19,694.000 0.000 0.000 0.28 0.00
2051 PAVE MARKING-THERMO STOP BAR-24IN 06568 LF 76.00 76.000 0.000 0.000 16.65 0.00
2052 PAVE MARKING-THERMO CURV ARROW 06574 EACH 11.00 11.000 0.000 0.000 215.00 0.00
2053 PAVEMENT MARKER TYPE V-BY 06591 EACH 152.00 152.000 0.000 0.000 50.00 0.00
2054 PAVEMENT MARKER TYPE V-MW 06589 EACH 23.00 23.000 0.000 0.000 50.00 0.00
2055 PAVE MARKING-PAINT CROSS-HATCH 06570 SQFT 9,981.00 9,981.000 0.000 0.000 1.40 0.00
2056 WATER 02242 MGAL 460.00 460.000 0.000 0.000 10.00 0.00
2057 EDGE KEY 02585 LF 75.00 75.000 0.000 0.000 65.00 0.00
2058 CONCRETE-CLASS A 08100 CUYD 8.24 8.240 4.610 4.610 700.00 3,227.00
2059 STEEL REINFORCEMENT 08150 LB 367.50 367.500 343.500 343.500 1.00 343.50
2060 MILLED RUMBLE STRIPS 20314ED LF 5,340.00 5,340.000 0.000 0.000 1.25 0.00
2061 PIPELINE VIDEO INSPECTION 23131ER701 LF 229.50 229.500 0.000 0.000 10.02 0.00
2062 R/W MARKER RURAL TYPE 1 02434 EACH 43.00 43.000 0.000 0.000 100.00 0.00
2063 ISLAND CURB AND GUTTER 01825 LF 35.00 35.000 0.000 0.000 50.00 0.00
2064 PILES-STEEL WF 14 X 176 23640EC LF 1,158.00 1,158.000 1,191.640 1,191.640 178.00 212,111.92
2065 PILES-STEEL WF 14 X 132 23641EC LF 806.00 806.000 882.260 882.260 122.00 107,635.72
2066 PRE-DRILLING FOR PILES 08039 LF 1,732.00 1,732.000 1,219.750 1,219.750 65.00 79,283.75
2067 STRUCTURE GRANULAR BACKFILL 02231 CUYD 2,247.00 2,247.000 2,170.300 2,170.300 46.50 100,918.95
2068 FABRIC-GEOTEXTILE TYPE IV 02599 SQYD 1,711.00 1,711.000 1,688.900 1,688.900 2.15 3,631.13
2069 CONCRETE LAGGING 23642EC SQFT 7,268.00 7,268.000 6,442.860 6,442.860 63.25 407,510.89
2070 STRUCTURE EXCAV-UNCLASSIFIED 02203 CUYD 888.00 888.000 888.000 888.000 20.00 17,760.00
2071 FUEL ADJUSTMENT 10020NS DOLL 29,845.00 29,845.000 -306.960 -5,527.080 -5,834.040 1.00 -306.96 -5,834.04
2072 ASPHALT ADJUSTMENT 10030NS DOLL 18,032.00 18,032.000 0.000 0.000 1.00 0.00
2073 FENCE-4 FT CHAIN LINK (ADDED: 4-25-11) 02273 LF 608.00 608.000 0.000 0.000 20.00 0.00
8005 TRAFFIC BOUND BASE 00020 TON 0.00 1,000.000 208.310 208.310 28.95 6,030.57
Project DE09816411112 Fed/State Project Number APD 80-6 (035) Category 0003 DRAINAGE
3001 CULVERT PIPE-18 IN 00462 LF 47.00 47.000 12.000 12.000 45.50 546.00
3002 CULVERT PIPE-24 IN 00464 LF 363.00 363.000 313.000 313.000 58.00 18,154.00
3003 CULVERT PIPE-60 IN 00472 LF 49.00 49.000 49.000 49.000 225.00 11,025.00
3004 ENTRANCE PIPE-15 IN 00440 LF 173.00 173.000 130.000 130.000 39.00 5,070.00
3005 DROP BOX INLET TYPE 1 01490 EACH 5.00 5.000 4.500 4.500 3,000.00 13,500.00
3006 REMOVE HEADWALL 02625 EACH 1.00 1.000 0.000 0.000 1,500.00 0.00
3007 FLUME INLET TYPE 2 01691 EACH 2.00 2.000 0.000 0.000 4,750.00 0.00
3008 JUNCTION BOX-24 IN 01643 EACH 1.00 1.000 1.000 1.000 1,900.00 1,900.00
3009 JUNCTION BOX-SPECIAL 01653 EACH 2.00 2.000 1.000 1.000 4,100.00 4,100.00
3010 REMOVE CONCRETE MASONRY 02403 CUYD 2.70 2.700 0.000 0.000 1,500.00 0.00
3011 CHANNEL LINING CLASS III 02484 TON 92.00 92.000 0.000 0.000 40.00 0.00
3012 S & F BOX INLET-OUTLET-24 IN 01451 EACH 1.00 1.000 0.000 0.000 2,700.00 0.00
8000 FLOWABLE FILL 02220 CUYD 0.00 110.000 131.000 131.000 127.75 16,735.25
Project DE09816411112 Fed/State Project Number APD 80-6 (035) Category 0004 BRIDGE
4001 CONCRETE-CLASS A 08100 CUYD 771.30 771.300 647.830 647.830 530.00 343,349.90
4002 CONCRETE-CLASS AA 08104 CUYD 686.70 686.700 0.000 0.000 550.00 0.00
4003 STEEL REINFORCEMENT 08150 LB 137,454.00 137,454.000 132,832.600 132,832.600 0.90 119,549.34
4004 STEEL REINFORCEMENT-EPOXY COATED 08151 LB 200,841.00 200,841.000 0.000 0.000 0.96 0.00
4005 STRUCTURE EXCAVATION-COMMON 08001 CUYD 428.00 428.000 640.400 640.400 1.00 640.40
4006 STRUCTURE EXCAV-SOLID ROCK 08002 CUYD 60.00 60.000 163.390 163.390 1.00 163.39
4007 CRUSHED AGGREGATE SLOPE PROT 08020 TON 100.00 100.000 0.000 0.000 40.00 0.00
4008 STRUCTURE GRANULAR BACKFILL 02231 CUYD 116.00 116.000 0.000 0.000 50.00 0.00
4009 MASONRY COATING 02998 SQYD 2,618.00 2,618.000 0.000 0.000 8.50 0.00
4010 PILES-STEEL HP12X53 08046 LF 1,522.00 1,522.000 1,191.788 1,191.788 55.00 65,548.34
4011 TEST PILES 08033 LF 96.00 96.000 72.000 72.000 65.00 4,680.00
4012 STRUCTURAL STEEL (817,624 LBS) 08160 LS 1.00 1.000 0.000 0.000 1,510,000.00 0.00
4013 ARMORED EDGE FOR CONCRETE 03299 LF 56.00 56.000 0.000 0.000 110.00 0.00
4014 RAIL SYSTEM TYPE III 21532ED LF 1,536.00 1,536.000 0.000 0.000 82.00 0.00
4015 PRE-DRILLING FOR PILES 08039 LF 717.00 717.000 392.450 392.450 120.00 47,094.00
4016 PILE POINTS-12 IN 08094 EACH 39.00 39.000 21.000 21.000 1,100.00 23,100.00
4017 SHEAR CONNECTORS (2,520 LBS) 08170 LS 1.00 1.000 0.000 0.000 18,000.00 0.00
4018 APPROACH SLAB 08500 SQYD 168.00 168.000 0.000 0.000 205.00 0.00
8001 MASS CONCRETE for Pier #1 Left 10040ES CUYD 0.00 9.500 9.500 9.500 210.00 1,995.00
8002 MASS CONCRETE for Pier #1 Right 10040ES CUYD 0.00 20.000 20.000 20.000 209.88 4,197.60
8003 MASS CONCRETE for Pier #2 Left 10040ES CUYD 0.00 10.000 10.000 10.000 212.00 2,120.00
8004 MASS CONCRETE for Pier #2 Right 10040ES CUYD 0.00 27.000 27.000 27.000 210.10 5,672.70
Project DE09816411112 Fed/State Project Number APD 80-6 (035) Category 0005 BRIDGE
5001 CONCRETE-CLASS A 08100 CUYD 287.00 287.000 287.000 287.000 530.00 152,110.00
5002 STEEL REINFORCEMENT 08150 LB 43,221.00 43,221.000 43,221.000 43,221.000 0.90 38,898.90
5003 FOUNDATION PREPARATION 08003 LS 1.00 1.000 1.000 1.000 35,000.00 35,000.00
5004 STRUCTURE EXCAV-SOLID ROCK 08002 CUYD 5.00 5.000 91.100 91.100 1.00 91.10
Project DE09816411112 Fed/State Project Number APD 80-6 (035) Category 0006 WATERLINE
6001 TIE-IN TO WATER LINE (EXISTING) 03460 EACH 5.00 5.000 2.000 2.000 1,550.00 3,100.00
6002 DUCTILE IRON PIPE-10 IN (PJ WATER LINE) 01097 LF 3,000.00 3,000.000 188.000 2,704.000 2,892.000 55.00 10,340.00 159,060.00
6003 GATE VALVE-10 IN (RESILIENT WEDGE) 03530 EACH 5.00 5.000 3.000 3.000 1,800.00 5,400.00
6004 DUCTILE IRON PIPE-6 IN (PJ WATER LINE) 01093 LF 630.00 630.000 16.000 615.000 631.000 37.00 592.00 23,347.00
6005 GATE VALVE-6 IN (RESILIENT WEDGE) 03526 EACH 5.00 5.000 1.000 4.000 5.000 900.00 900.00 4,500.00
6007 SERVICE LINE - 1 IN 21558EC LF 700.00 700.000 30.000 540.000 570.000 13.00 390.00 7,410.00
6008 BORE AND JACK PIPE-6 IN (ENCASED) 21384ED LF 80.00 80.000 80.000 80.000 130.00 10,400.00
6009 AIR RELEASE VALVE 03495 EACH 1.00 1.000 1.000 1.000 1,000.00 1,000.00
6010 BLOW-OFF ASSEMBLY 01315 EACH 1.00 1.000 2.000 2.000 3,500.00 7,000.00
6011 GATE VALVE-4 IN (RESILIENT WEDGE) 03524 EACH 1.00 1.000 0.000 0.000 800.00 0.00
6012 WATER SERVICE RECONNECT-3/4 IN-1 IN 21346ND EACH 8.00 8.000 7.000 0.000 7.000 400.00 2,800.00 2,800.00
Project DE09816411112 Fed/State Project Number APD 80-6 (035) Category 0007 MOBILIZATION / DEMOBILIZATION
7001 MOBILIZATION 02568 LS 1.00 1.000 1.000 1.000 319,000.00 319,000.00
7002 DEMOBILIZATION 02569 LS 1.00 1.000 0.000 0.000 121,077.90 0.00
Project DE09816411112 Fed/State Project Number APD 80-6 (035) Category 0008 TRAINEES
7003 TRAINEE PAYMENT REIMBURSEMENT 1 ARTICULATOR TRUCK DRIVER 02742 HOUR 1,600.00 1,600.000 0.000 0.000 1.00 0.00

SUBTOT

$96,462.54

$4,694,335.58

LNNBR STOCKPILE ADJUSTMENTS

UNIT

ADJ. QUANTITY

EST NBR

UNIT PRICE

ADJUSTED AMOUNT

2064-1-0I

PILES

LF

1,195.00 0001 $117.216260 $140,073.43

2065-1-0I

PILES

LF

884.00 0001 $61.185060 $54,087.59

4010-1-0I

PILES

LF

1,122.88 0006 $21.700000 $24,366.49

4016-1-0I

PILE POINTS

EACH

39.00 0006 $78.370000 $3,056.43

4012-1-0I

STEEL, STRUCTURAL

LB

835,639.00 0018 $1.000210 $835,814.48

2039-1-0I

GDRAIL GALV AW .109

LF

1,587.50 0029 $9.842000 $15,624.18

2040-1-0I

GUARDRAIL, POST STE

EACH

2,687.50 0029 $10.514500 $28,257.71

2065-1-0A

PILES

LF

465.11 0020 $61.185060 $-28,457.78

2064-1-0A

PILES

LF

940.01 0021 $117.216260 $-110,184.46

2065-1-0A

PILES

LF

417.15 0021 $61.185060 $-25,523.35

2064-1-0A

PILES

LF

251.63 0022 $117.216260 $-29,495.13

4010-1-0A

PILES

LF

418.44 0026 $21.700000 $-9,080.15

4010-1-0A

PILES

LF

374.22 0030 $21.700000 $-8,120.75

4016-1-0A

PILE POINTS

EACH

21.00 0030 $78.370000 $-1,645.77
SUBTOT

$888,772.92