Report_Id:ESTIMATE FINAL updated 6-26-09

Date:11/29/2011

COMMONWEALTH OF KENTUCKY

TRANSPORTATION CABINET


Contract ID 071016 Estimate Number 0026 Estimate Type  FINAL
District Office LOUISVILLE (05300)  Bailey, Kevin J., P.E.

Contractor GOHMANN ASPHALT AND CONSTRUCTION INC ADDR SN 1 VC Code VC0000027232
1630 BROADYWAY
P O BOX 2428
CLARKSVILLE , IN , 47131-2428
Pay Period 04/29/2011  TO  06/03/2011
Date Approved 07/12/2011
Primary Proj Number DE05600640716
Project No. IM 64-2(157), IM 64-2 (157) NON
Primary County JEFFERSON
Name of Road RIVERSIDE EXPRESSWAY (I-64)
Description I-64 BRIDGE AND ASPHALT RESTORATION ON THE RIVERSIDE EX-WAY BETWEEN PRESTON STREET AND THE SHAWNEE EXPRESSWAY
     
     
Date Let 03/23/2007 Formal Acceptance 04/25/2008
Date Awarded 03/30/2007 Date Work Began 05/07/2007
Date Contract Executed 04/19/2007 Open To Traffic 11/13/2007
Date NTP Issued 04/19/2007 Actual Completion Date 11/13/2007

Current Contract Amount

$54,674,042.31

Total to Date

Prev to Date

This Estimate

Original Amount

$53,100,000.00

Total Earnings

$54,754,551.33

$54,713,160.86

$41,390.47

Percent Complete

99.67

Stockpiled Materials

$-0.01

$-0.01

$0.00

Funds Available

$182,721.62

Gross Earnings

$54,754,551.32

$54,713,160.85

$41,390.47

Total Change Orders

$1,574,042.31

Other Adjustments

$0.00

$0.00

$0.00

TOTAL

$54,491,320.69

$54,449,930.22

$41,390.47

Contract Id 071016

Change Order Summary

County JEFFERSON
Estimate Nbr 0026 Project Number IM 64-2(157), IM 64-2 (157) NON
Contractor GOHMANN ASPHALT AND CONSTRUCTION INC Period 04/29/2011  TO  06/03/2011
 
 
CHANGE ORDERS HISTORY  
CHANGE ORDER NBR DESCRIPTION STATUS APPROVAL DATE TOTAL CO AMOUNT CONTRACT TIME ADJUSTED
001 Multiple Items from Pre-Project Meetings Approved 06/29/2007 $319,915.16 0.0
002 Weekend 3 / MTV Change / Milling Approved 10/08/2007 $-158.55 0.0
003 Extra Studs / Signing / Project Additions / Incentive Approved 09/22/2008 $1,205,547.78 0.0
004 Drain and Trough Cleaning Approved 03/04/2010 $48,737.92 0.0
 
 
 
 

CONTRACT ADJUSTMENTS HISTORY

Contract Adjustments

 

 

Adjustment Description

Est No

Adjustment Amount

Line Item Adjustments History
PROJECT ITEM NBR DESCRPITION TYPE EST NO

ADJ QUANTITY

UNIT PRICE

ADJUSTED AMOUNT

DE05600640716 0530 ASPHALT WATERPROOFING MIX OTHER 0014

0.00

$0.00

$0.12

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-31,008.60

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-18,760.90

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-4,932.40

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-12,388.32

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-22,833.72

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-4,330.62

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-17,302.82

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-13,431.60

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-14,726.88

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-26,328.46

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-14,142.24

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-18,280.58

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-17,458.56

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-1,234.80

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-41,159.66

DE05600640716 0530 ASPHALT WATERPROOFING MIX RIDEABILITY 0014

0.00

$0.00

$-4,085.42

DE05600640716 0540 PAVE STRIPING PERM-6 IN HD21A-WHITE SUBSTANDARD ITEM 0019

-1,058.64

$0.26

$-275.25

DE05600640716 0540 PAVE STRIPING PERM-6 IN HD21A-WHITE SUBSTANDARD ITEM 0019

-1,320.00

$0.26

$-343.20

DE05600640716 0540 PAVE STRIPING PERM-6 IN HD21A-WHITE SUBSTANDARD ITEM 0019

-794.64

$0.26

$-206.61

Contract Id 071016

COMMONWEALTH OF KENTUCKY

County JEFFERSON
Contract No E1, E2, E3, E5

TRANSPORTATION CABINET

Primary Project Number DE05600640716
Estimate Nbr 0026 Period 04/29/2011  TO  06/03/2011
Contractor GOHMANN ASPHALT AND CONSTRUCTION INC
 
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0001 ROADWAY
LINE ITEM NUMBER ITEM DESCRIPTION ITEM NO. UNIT PLAN QTY CURRENT QUANTITY QUANTITY PAID THIS EST QUANTITY PAID PREV. EST QUANTITY PAID TO DATE UNIT PRICE AMOUNT PAID THIS EST AMOUNT PAID TO DATE
0010 CRUSHED STONE BASE 00003 TON 16,940.00 16,940.000 20,885.610 20,885.610 30.00 626,568.30
0020 LEVELING & WEDGING PG64-22 00190 TON 600.00 600.000 471.070 471.070 90.00 42,396.30
0030 CL4 ASPH BASE 1.50D PG64-22 00208 TON 40,495.00 40,495.000 19.930 39,204.000 39,223.930 55.00 1,096.15 2,157,316.15
0040 CL4 ASPH BASE 1.00D PG76-22 00219 TON 14,714.00 14,714.000 15,934.000 15,934.000 65.00 1,035,710.00
0050 CL1 ASPH SURF 0.38D PG64-22 00300 TON 300.00 300.000 0.000 0.000 95.00 0.00
0060 ASPHALT PLACEMENT WITH MTV 00338 TON 63,076.00 63,076.010 225.730 63,651.390 63,877.120 4.00 902.92 255,508.48
0070 CL4 ASPH SURF 0.38A PG76-22 00342 TON 2.00 2.000 0.000 0.000 250.00 0.00
0080 DELINEATOR FOR BARRIER-WHITE 01984 EACH 600.00 440.000 413.000 413.000 10.00 4,130.00
0090 DELINEATOR FOR BARRIER-YELLOW 01985 EACH 610.00 440.000 448.000 448.000 10.00 4,480.00
0100 RELOCATE TEMP CONC MED BARRIER 02003 LF 600.00 600.000 880.000 880.000 14.00 12,320.00
0110 REMOVE ASPHALT MEDIAN 02009 SQYD 20.00 20.000 20.000 20.000 220.00 4,400.00
0120 BARRICADE-TYPE III 02014 EACH 100.00 100.000 98.000 98.000 300.00 29,400.00
0130 JPC PAVEMENT-8 INCH 02084 SQYD 20.00 20.000 0.000 0.000 350.00 0.00
0140 REMOVE PAVEMENT JPC PAVEMENT 02091 SQYD 73,627.00 73,627.000 73,631.620 73,631.620 12.00 883,579.44
0150 WATER 02242 MGAL 7,000.00 7,000.000 7,000.000 7,000.000 1.00 7,000.00
0160 GUARDRAIL CONNECTOR TO CONC MED BARR 02359 EACH 1.00 0.000 0.000 0.000 2,500.00 0.00
0170 SIGNS 02562 SQFT 9,500.00 5,250.000 5,248.690 5,248.690 19.50 102,349.45
0180 PROJECT CPM SCHEDULE 02570 LS 1.00 1.000 1.000 1.000 16,000.00 16,000.00
0190 EDGE KEY 02585 LF 186.00 186.000 188.250 188.250 100.00 18,825.00
0200 FABRIC-GEOTEXTILE TYPE IV 02599 SQYD 73,627.00 73,627.000 73,631.620 73,631.620 2.50 184,079.05
0210 MAINTAIN & CONTROL TRAFFIC 02650 LS 1.00 1.000 1.000 1.000 2,540,000.00 2,540,000.00
0220 LANE CLOSURE 02653 EACH 30.00 30.000 27.000 27.000 1,200.00 32,400.00
0230 CROSSOVER EB1 02655 LS 1.00 1.000 1.000 1.000 2,000.00 2,000.00
0240 CROSSOVER EB2 02655 LS 1.00 1.000 1.000 1.000 2,000.00 2,000.00
0250 CROSSOVER WB1 02655 LS 1.00 1.000 1.000 1.000 10,000.00 10,000.00
0260 CROSSOVER WB2 02655 LS 1.00 1.000 1.000 1.000 10,000.00 10,000.00
0270 VAR MESSAGE SIGN-PORT 3 LINE 02671 EACH 25.00 25.000 24.000 24.000 5,000.00 120,000.00
0280 MOBILIZATION FOR MILL & TEXT 02676 LS 1.00 1.000 1.000 1.000 2,500.00 2,500.00
0290 STAKING 02726 LS 1.00 1.000 1.000 1.000 120,000.00 120,000.00
0300 FLASHING ARROW 02775 EACH 12.00 7.000 7.000 7.000 1,500.00 10,500.00
0310 CRASH CUSHION TYPE VI-T 02894 EACH 4.00 0.000 0.000 0.000 10,000.00 0.00
0320 RELOCATE CRASH CUSHION 02898 EACH 4.00 0.000 0.000 0.000 1,500.00 0.00
0330 CONCRETE BARRIER WALL TYPE 9T 03171 LF 14,300.00 10,980.000 10,980.000 10,980.000 50.00 549,000.00
0340 PAVE STRIPING-TEMP PAINT-6 IN 06511 LF 26,000.00 26,000.000 119,148.000 119,148.000 0.19 22,638.12
0350 PAVE STRIPING REMOVAL-6 INCH 06531 LF 25,000.00 25,000.000 4,507.000 4,507.000 0.44 1,983.08
0360 PAVE STRIPING-TEMP REM TAPE-B 06549 LF 75,000.00 1,720.000 1,718.000 1,718.000 2.50 4,295.00
0370 PAVE STRIPING-TEMP REM TAPE-W 06550 LF 45,000.00 45,000.000 20,880.000 20,880.000 1.60 33,408.00
0380 PAVE STRIPING-TEMP REM TAPE-Y 06551 LF 45,000.00 45,000.000 27,550.000 27,550.000 1.60 44,080.00
0390 PAVE MARKING-THERMO STOP BAR-12IN 06567 LF 36.00 0.000 0.000 0.000 10.00 0.00
0400 PAVEMENT MARKER TY IVA-MW TEMP 06585 EACH 500.00 500.000 0.000 0.000 10.00 0.00
0410 PAVEMENT MARKER TY IVA-MY TEMP 06586 EACH 1,500.00 1,500.000 0.000 0.000 10.00 0.00
0420 PAVEMENT MARKER TYPE V-B W/R 06592 EACH 1,462.00 1,462.000 1,504.000 1,504.000 14.00 21,056.00
0430 PAVEMENT MARKER TYPE V-B Y/R 06593 EACH 1,129.00 1,129.000 1,336.000 1,336.000 14.00 18,704.00
0440 REMOVE PAVEMENT MARKER TYPE V 06600 EACH 2,500.00 2,500.000 0.000 0.000 8.00 0.00
0450 LOT PAY ADJUSTMENT 10000NS DOLL 127,952.00 127,952.000 11.420 -4,076.110 -4,064.690 1.00 11.42 -4,064.69
0460 FUEL ADJUSTMENT 10020NS DOLL 59,612.00 59,612.000 4,382.140 59.480 4,441.620 1.00 4,382.14 4,441.62
0470 ASPHALT ADJUSTMENT 10030NS DOLL 115,157.00 5,000.000 -6,199.100 -41,131.380 -47,330.480 1.00 -6,199.10 -47,330.48
0480 SHOULDER CLOSURE 20068ES112 EACH 30.00 30.000 40.000 40.000 500.00 20,000.00
0490 MILLING CONCRETE PAVEMENT 20353ED TON 94.00 94.000 192.960 192.960 50.00 9,648.00
0500 LAW ENFORCMENT OFFICER 20411ED HOUR 29,900.00 25,075.000 25,074.000 25,074.000 29.00 727,146.00
0510 SAW CUT 20430ED LF 55,000.00 37,500.000 37,478.000 37,478.000 3.50 131,173.00
0520 INSTALL PROJECT ID SIGN (72 IN X 120 IN) 21132NC EACH 22.00 22.000 0.000 0.000 500.00 0.00
0530 ASPHALT WATERPROOFING MIX 21138ED TON 8,405.00 8,405.000 8,719.190 8,719.190 240.00 2,092,605.60
0540 PAVE STRIPING PERM-6 IN HD21A-WHITE 21339ED LF 75,627.00 75,627.000 91,439.000 91,439.000 0.26 23,774.14
0550 PAVE STRIPING PERM-6 IN HD21A-YELLOW 21340ED LF 52,488.00 52,488.000 53,410.000 53,410.000 0.28 14,954.80
0560 THIN FILM COATING 21592EN SQFT 36,500.00 0.000 0.000 0.000 2.35 0.00
0570 PAVE STRIPING PERM- 12 IN HD21A-WHITE 21667EN LF 5,388.00 5,388.000 0.000 0.000 0.52 0.00
0580 CONC MED BARRIER TY 9 D1 21883EN LF 1,421.00 1,041.000 2,167.000 2,167.000 80.00 173,360.00
0590 REMOVE CONC MEDIAN BARRIER 21935EN LF 1,421.00 1,041.000 1,241.500 1,241.500 35.00 43,452.50
0600 CLEAN OUT PERFORATED PIPE HEADWALL 21936NN EACH 24.00 24.000 30.000 30.000 750.00 22,500.00
0610 TEMP BARRIER WALL Y SECTION 21937NN EACH 2.00 0.000 0.000 0.000 10,000.00 0.00
2350 GORE CRASH CUSHION 13TH TO 7TH;9TH ST. RAMPS;2ND TOPRESTON 22145ND LS 1.00 1.000 1.000 1.000 47,456.77 47,456.77
8002 EW~ REMOVE & REPAIR DAMAGED MEDIAN BARRIER WALL 10091EX CUYD 0.00 1.000 4.910 4.910 5,100.00 25,041.00
8003 RETROFIT PIER Retrofit Bearings / Pier on SW Flyover to I-64 @ I-264 21986NN LS 0.00 1.000 1.000 1.000 107,247.60 107,247.60
8006 EW~ Towing Service for Phase 2 10103NX HOUR 0.00 523.000 0.000 0.000 97.75 0.00
8007 EW~ Temporary Entrance to Science Center Parking Lot 10094NX EACH 0.00 3.000 2.000 2.000 2,783.33 5,566.66
8008 EW~ Lane Rental Fee for Lane Closure 10103NX HOUR 0.00 14.000 14.000 14.000 -1,200.00 -16,800.00
8010 MASONRY COATING 02998 SQYD 0.00 4,055.550 4,278.400 4,278.400 18.90 80,861.76
8032 EW~ Lane Rental for Completion of Weekend 3 Work 10103NX HOUR 0.00 23.000 23.000 23.000 -3,600.00 -82,800.00
8049 REMOVE AND RESET LUMINAIRE Install New Pole - Department Supplied 20193ED EACH 0.00 20.000 20.000 20.000 1,094.10 21,882.00
8050 INSTALL Luminaire Arm - Department Supplied 93312N EACH 0.00 23.000 23.000 23.000 131.25 3,018.75
8052 EW~ Furnish & Install New Anchor Bolt Plates for Luminaire Poles 10094NX EACH 0.00 16.000 20.000 20.000 1,848.00 36,960.00
8058 CRASH CUSHION REPLACEMENT ELEMENTS Replace Nose End and Object Marker 20998ND EACH 0.00 4.000 4.000 4.000 1,063.75 4,255.00
8060 INSTALL Install Safety Shoes on Crash Cushions 93312N EACH 0.00 5.000 5.000 5.000 115.00 575.00
8067 EW~ Patching Spalled Areas in Plinth Walls 10097EX SQFT 0.00 100.000 427.300 427.300 300.00 128,190.00
8068 FLEXIBLE DELINEATOR POST-W 06417 EACH 0.00 148.000 156.000 156.000 33.60 5,241.60
8069 FLEXIBLE DELINEATOR POST-Y 06418 EACH 0.00 78.000 85.000 85.000 33.60 2,856.00
8070 DELINEATOR FOR GUARDRAIL-WHITE 01982 EACH 0.00 138.000 138.000 138.000 15.75 2,173.50
8071 DELINEATOR FOR GUARDRAIL-YELLOW 01983 EACH 0.00 58.000 58.000 58.000 15.75 913.50
8072 DEMOBILIZATION Removal of Painting Containment on River Road 02569 LS 0.00 1.000 1.000 1.000 14,720.92 14,720.92
8073 REMOBILIZATION Remobilize Painting Containment on River Road 10100NX LS 0.00 1.000 1.000 1.000 51,393.38 51,393.38
8077 INSTALL TRIMARC SUPPLIED ITEMS Reference Mile Marker Signs 22942NN LS 0.00 1.000 1.000 1.000 1,750.00 1,750.00
8078 SBM ALUMINUM PANEL SIGNS Retrofit Overhead Signs - Install Overlays 06405 SQFT 0.00 49.500 49.500 49.500 295.80 14,642.10
8080 PAVE MARKING-THERMO STOP BAR-24IN 06568 LF 0.00 36.000 36.000 36.000 12.50 450.00
8095 INSTALL SIGN Furnish and Install HazMat Signs for Detour Routes 09507 EACH 0.00 5.000 5.000 5.000 12,621.00 63,105.00
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0002 TRAFFIC LOOPS
0620 CONDUIT-1 1/4 INCH 04793 LF 160.00 160.000 43.000 43.000 7.00 301.00
0630 CONDUIT-2 INCH 04795 LF 170.00 170.000 138.000 138.000 9.00 1,242.00
0640 TRENCHING AND BACKFILLING 04820 LF 980.00 220.000 218.000 218.000 5.00 1,090.00
0650 PIEZOELECTRIC SENSOR 04829 EACH 25.00 18.000 18.000 18.000 2,600.00 46,800.00
0660 LOOP WIRE 04830 LF 7,140.00 7,140.000 6,796.000 6,796.000 0.45 3,058.20
0670 CABLE-NO. 14/1 PAIR 04850 LF 400.00 0.000 0.000 0.000 1.50 0.00
0680 LOOP SAW SLOT AND FILL 04895 LF 1,435.00 1,435.000 1,502.000 1,502.000 15.00 22,530.00
0690 ELECTRICAL SERVICE 04899 EACH 2.00 1.000 1.000 1.000 1,800.00 1,800.00
0700 INSTALL PAD MOUNT ENCLOSURE 20213EC EACH 2.00 1.000 1.000 1.000 3,000.00 3,000.00
0710 GALVANIZED STEEL CABINET 20359EC EACH 6.00 2.000 2.000 2.000 1,157.00 2,314.00
0720 JUNCTION BOX TYPE A 20391ES835 EACH 10.00 5.000 5.000 5.000 970.00 4,850.00
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0003 BRIDGE K & I TRR TRESTLE
0730 PARTIAL DEPTH PATCHING 02110 CUFT 1,552.00 12.000 3.320 3.320 110.00 365.20
0740 ADJUST GUARDRAIL 02350 LF 75.00 75.000 75.000 75.000 9.68 726.00
0750 GUARDRAIL-STEEL W BEAM-S FACE 02351 LF 75.00 75.000 75.000 75.000 25.00 1,875.00
0770 GUARDRAIL CONNECTOR TO BRIDGE END TY A 02363 EACH 2.00 2.000 2.000 2.000 7,000.00 14,000.00
0780 REMOVE GUARDRAIL 02381 LF 75.00 75.000 75.000 75.000 2.00 150.00
0790 GUARDRAIL CONNECTOR TO BRIDGE END TY A-1 02387 EACH 1.00 1.000 1.000 1.000 5,000.00 5,000.00
0800 FUSED CONNECTOR KIT 04780 EACH 46.00 46.000 52.000 52.000 151.36 7,870.72
0810 CONDUIT-2 INCH 04795 LF 275.00 275.000 165.840 165.840 154.28 25,585.79
0820 WIRE-NO. 4 04835 LF 12,600.00 12,600.000 8,956.840 8,956.840 3.91 35,021.24
0830 WIRE-NO. 4 GROUND 04835 LF 6,300.00 6,300.000 4,443.420 4,443.420 3.35 14,885.45
0840 REM EPOXY BIT FOREIGN OVERLAY 08510 SQYD 25,869.00 25,869.000 25,662.500 25,662.500 8.00 205,300.00
0850 CONC CLASS M FULL DEPTH PATCH 08526 CUYD 2.00 2.000 0.000 0.000 5,000.00 0.00
0860 ASPHALT WATERPROOFING MIX 21138ED TON 2,039.00 2,054.000 2,140.000 2,140.000 240.00 513,600.00
0870 THIN FILM COATING 21592EN SQFT 73,200.00 0.000 0.000 0.000 2.35 0.00
0880 EXPANSION JOINT RECONSTRUCTION 21984EN LF 799.20 799.200 801.960 801.960 3,000.00 2,405,880.00
0890 G/R END CONN RETROFIT 21985NN EACH 3.00 3.000 3.000 3.000 5,000.00 15,000.00
0900 JUNCTION BOX-6 IN X 6 IN X 16 IN 21988NN EACH 4.00 4.000 1.000 1.000 991.00 991.00
2040 REMOVE AND TRANSPORT HANDRAIL 20173ED LF 5,320.00 5,320.000 5,368.000 5,368.000 10.00 53,680.00
2050 FASCIA RETROFIT 22144ED LF 5,320.00 5,320.000 5,368.000 5,368.000 100.00 536,800.00
2060 ASPHALT PLACEMENT WITH MTV 00338 TON 2,039.00 2,039.010 2,140.000 2,140.000 6.00 12,840.00
8004 EW~ Railroad Protective Insurance - CSX 10090NX LS 0.00 1.000 1.000 1.000 19,107.00 19,107.00
8011 MASONRY COATING 02998 SQYD 0.00 8,133.330 7,577.750 7,577.750 18.90 143,219.47
8035 REPAIR CONCRETE CURB Pneumatic Mortar 03302 LF 0.00 100.000 0.000 0.000 200.00 0.00
8041 REM EPOXY BIT FOREIGN OVERLAY Hand Work- Small Areas 08510 SQYD 0.00 105.500 101.760 101.760 315.00 32,054.40
8053 REM EPOXY BIT FOREIGN OVERLAY 1/4 Inch Additional Removal 08510 SQYD 0.00 48,970.000 48,933.100 48,933.100 0.64 31,317.18
8054 MACHINE PREP OF SLAB Additional Pass for Overlay Removal 08551 SQYD 0.00 5,310.000 5,306.000 5,306.000 7.00 37,142.00
8079 FLAGMEN AND R/R PROTECTIVE SERVICES 21461ND LS 0.00 1.000 1.000 1.000 983.19 983.19
8081 EW~ Shear Connector 10094NX EACH 0.00 47.000 47.000 47.000 1.58 74.26
8082 EW~ Mobilization to Joint for Shear Connector Installation 10094NX EACH 0.00 3.000 3.000 3.000 1,510.00 4,530.00
8083 EW~ Clean and Prep Beams for Shear Connectors 10103NX HOUR 0.00 1.500 1.500 1.500 130.81 196.21
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0004 SIGNING
0910 SBM ALUMINUM PANEL SIGNS 06405 SQFT 8,268.00 8,692.750 9,115.075 9,115.075 29.50 268,894.71
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0005 DEMOBILIZATION
0920 MOBILIZATION 02568 LS 1.00 1.000 1.000 1.000 2,450,000.00 2,450,000.00
0930 DEMOBILIZATION 02569 LS 1.00 1.000 0.050 0.950 1.000 823,938.78 41,196.93 823,938.78
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0006 BRIDGE K & I TRR & 27TH STREET
0940 PARTIAL DEPTH PATCHING 02110 CUFT 591.00 11.000 5.440 5.440 110.00 598.40
0950 ADJUST GUARDRAIL 02350 LF 50.00 50.000 50.000 50.000 9.68 484.00
0960 GUARDRAIL-STEEL W BEAM-S FACE 02351 LF 50.00 50.000 50.000 50.000 25.00 1,250.00
0980 GUARDRAIL CONNECTOR TO BRIDGE END TY A 02363 EACH 2.00 2.000 2.000 2.000 7,000.00 14,000.00
0990 REMOVE GUARDRAIL 02381 LF 50.00 50.000 50.000 50.000 2.00 100.00
1000 FUSED CONNECTOR KIT 04780 EACH 16.00 16.000 24.000 24.000 151.36 3,632.64
1010 CONDUIT-2 INCH 04795 LF 200.00 0.000 55.420 55.420 154.28 8,550.19
1020 WIRE-NO. 4 04835 LF 4,600.00 4,600.000 3,755.670 3,755.670 3.91 14,684.66
1030 WIRE-NO. 4 GROUND 04835 LF 2,300.00 2,300.000 1,877.840 1,877.840 3.35 6,290.76
1040 REM EPOXY BIT FOREIGN OVERLAY 08510 SQYD 9,848.00 9,848.000 9,044.300 9,044.300 8.00 72,354.40
1050 CONC CLASS M FULL DEPTH PATCH 08526 CUYD 2.00 2.000 0.000 0.000 5,000.00 0.00
1060 ASPHALT WATERPROOFING MIX 21138ED TON 776.00 786.000 800.000 800.000 240.00 192,000.00
1070 THIN FILM COATING 21592EN SQFT 28,400.00 0.000 0.000 0.000 2.35 0.00
1080 EXPANSION JOINT RECONSTRUCTION 21984EN LF 444.00 444.000 445.490 445.490 3,000.00 1,336,470.00
1090 G/R END CONN RETROFIT 21985NN EACH 2.00 2.000 2.000 2.000 5,000.00 10,000.00
1100 JUNCTION BOX-6 IN X 6 IN X 16 IN 21988NN EACH 4.00 4.000 0.000 0.000 991.00 0.00
2070 REMOVE AND TRANSPORT HANDRAIL 20173ED LF 2,040.00 2,040.000 2,073.000 2,073.000 10.00 20,730.00
2080 FASCIA RETROFIT 22144ED LF 2,040.00 2,040.000 2,073.000 2,073.000 100.00 207,300.00
2090 ASPHALT PLACEMENT WITH MTV 00338 TON 776.00 776.010 800.000 800.000 6.00 4,800.00
8012 MASONRY COATING 02998 SQYD 0.00 3,155.550 2,922.160 2,922.160 18.90 55,228.82
8036 REPAIR CONCRETE CURB Pneumatic Mortar 03302 LF 0.00 150.000 0.000 0.000 200.00 0.00
8042 REM EPOXY BIT FOREIGN OVERLAY Hand Work - Small Areas 08510 SQYD 0.00 51.000 66.050 66.050 315.00 20,805.75
8055 REM EPOXY BIT FOREIGN OVERLAY 1/4 Inch Additional Removal 08510 SQYD 0.00 18,831.780 18,813.350 18,813.350 0.64 12,040.54
8056 MACHINE PREP OF SLAB Additional Pass for Overlay Removal 08551 SQYD 0.00 2,042.000 2,040.000 2,040.000 7.00 14,280.00
8084 EW~ Shear Connector 10094NX EACH 0.00 30.000 30.000 30.000 1.58 47.40
8085 EW~ Mobilization to Joint for Shear Connector Installation 10094NX EACH 0.00 2.000 2.000 2.000 1,510.00 3,020.00
8086 EW~ Clean and Prep Beams for Shear Connectors 10103NX HOUR 0.00 1.250 1.250 1.250 130.81 163.51
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0007 BRIDGE NW PKWY & 22ND STREET
1110 PARTIAL DEPTH PATCHING 02110 CUFT 361.00 11.000 7.120 7.120 110.00 783.20
1120 ADJUST GUARDRAIL 02350 LF 25.00 25.000 50.000 50.000 9.68 484.00
1130 GUARDRAIL-STEEL W BEAM-S FACE 02351 LF 25.00 25.000 50.000 50.000 25.00 1,250.00
1150 GUARDRAIL CONNECTOR TO BRIDGE END TY A 02363 EACH 1.00 1.000 2.000 2.000 7,000.00 14,000.00
1160 REMOVE GUARDRAIL 02381 LF 25.00 25.000 50.000 50.000 2.00 100.00
1170 FUSED CONNECTOR KIT 04780 EACH 12.00 12.000 14.000 14.000 151.36 2,119.04
1180 CONDUIT-2 INCH 04795 LF 275.00 275.000 253.200 253.200 154.28 39,063.69
1190 WIRE-NO. 4 04835 LF 3,000.00 3,000.000 4,032.000 4,032.000 3.91 15,765.12
1200 WIRE-NO. 4 GROUND 04835 LF 1,500.00 1,500.000 1,486.000 1,486.000 3.35 4,978.10
1210 REM EPOXY BIT FOREIGN OVERLAY 08510 SQYD 6,010.00 6,010.000 5,681.000 5,681.000 8.00 45,448.00
1220 CONC CLASS M FULL DEPTH PATCH 08526 CUYD 2.00 2.000 0.000 0.000 5,000.00 0.00
1230 ASPHALT WATERPROOFING MIX 21138ED TON 474.00 480.000 500.000 500.000 240.00 120,000.00
1240 THIN FILM COATING 21592EN SQFT 18,000.00 0.000 0.000 0.000 2.35 0.00
1250 EXPANSION JOINT RECONSTRUCTION 21984EN LF 1,069.20 1,046.450 1,024.290 1,024.290 3,000.00 3,072,870.00
1260 G/R END CONN RETROFIT 21985NN EACH 1.00 1.000 2.000 2.000 5,000.00 10,000.00
1270 REPAIR SIGN TRUSS TRUSS 147 21987NN LS 1.00 1.000 1.000 1.000 30,066.90 30,066.90
1280 JUNCTION BOX-6 IN X 6 IN X 16 IN 21988NN EACH 4.00 4.000 0.000 0.000 991.00 0.00
2100 REMOVE AND TRANSPORT HANDRAIL 20173ED LF 980.00 980.000 1,602.800 1,602.800 10.00 16,028.00
2110 FASCIA RETROFIT 22144ED LF 980.00 980.000 1,602.800 1,602.800 100.00 160,280.00
2120 ASPHALT PLACEMENT WITH MTV 00338 TON 474.00 474.010 500.000 500.000 6.00 3,000.00
8009 ELIMINATE TRANSVERSE JOINT Joint on 22nd Street Offramp 03300 LF 0.00 25.500 24.000 24.000 2,889.23 69,341.52
8013 MASONRY COATING 02998 SQYD 0.00 2,000.000 1,989.290 1,989.290 18.90 37,597.58
8043 REM EPOXY BIT FOREIGN OVERLAY Hand Work - Small Areas 08510 SQYD 0.00 29.000 28.330 28.330 315.00 8,923.95
8057 REM EPOXY BIT FOREIGN OVERLAY 1/4 Inch Additional Removal 08510 SQYD 0.00 4,859.550 6,216.660 6,216.660 0.64 3,978.66
8087 EW~ Shear Connector 10094NX EACH 0.00 857.000 857.000 857.000 1.58 1,354.06
8088 EW~ Mobilization to joint for Shear Connector Installation 10094NX EACH 0.00 6.000 6.000 6.000 1,510.00 9,060.00
8089 EW~ Clean and Prep Beams for Shear Connectors 10103NX HOUR 0.00 31.500 31.500 31.500 130.81 4,120.51
8093 MECHANICAL REINF COUPLER #6 Furnish and Install 08131 EACH 0.00 177.000 177.000 177.000 65.50 11,593.50
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0008 BRIDGE 17TH ST & 13TH ST
1290 PARTIAL DEPTH PATCHING 02110 CUFT 1,245.00 75.000 45.790 45.790 110.00 5,036.90
1300 ADJUST GUARDRAIL 02350 LF 25.00 25.000 25.000 25.000 9.68 242.00
1310 GUARDRAIL-STEEL W BEAM-S FACE 02351 LF 25.00 25.000 25.000 25.000 25.00 625.00
1330 GUARDRAIL CONNECTOR TO BRIDGE END TY A 02363 EACH 1.00 1.000 1.000 1.000 7,000.00 7,000.00
1340 REMOVE GUARDRAIL 02381 LF 25.00 25.000 25.000 25.000 2.00 50.00
1350 FUSED CONNECTOR KIT 04780 EACH 36.00 36.000 34.000 34.000 151.36 5,146.24
1360 CONDUIT-2 INCH 04795 LF 175.00 175.000 78.500 78.500 154.28 12,110.98
1370 WIRE-NO. 4 04835 LF 9,400.00 9,400.000 4,800.000 4,800.000 3.91 18,768.00
1380 WIRE-NO. 4 GROUND 04835 LF 4,700.00 4,700.000 2,400.000 2,400.000 3.35 8,040.00
1390 REM EPOXY BIT FOREIGN OVERLAY 08510 SQYD 20,741.00 20,741.000 16,275.300 16,275.300 8.00 130,202.40
1400 CONC CLASS M FULL DEPTH PATCH 08526 CUYD 2.00 2.000 0.007 0.007 5,000.00 35.00
1410 ASPHALT WATERPROOFING MIX 21138ED TON 1,635.00 1,640.000 1,700.000 1,700.000 240.00 408,000.00
1420 THIN FILM COATING 21592EN SQFT 47,600.00 0.000 0.000 0.000 2.35 0.00
1430 EXPANSION JOINT RECONSTRUCTION 21984EN LF 641.30 641.300 644.790 644.790 3,000.00 1,934,370.00
1440 G/R END CONN RETROFIT 21985NN EACH 1.00 1.000 1.000 1.000 5,000.00 5,000.00
1450 JUNCTION BOX-6 IN X 6 IN X 16 IN 21988NN EACH 4.00 4.000 0.000 0.000 991.00 0.00
2130 REMOVE AND TRANSPORT HANDRAIL 20173ED LF 3,520.00 3,520.000 3,633.000 3,633.000 10.00 36,330.00
2140 FASCIA RETROFIT 22144ED LF 3,520.00 3,520.000 3,633.000 3,633.000 100.00 363,300.00
2150 ASPHALT PLACEMENT WITH MTV 00338 TON 1,635.00 1,635.010 1,700.000 1,700.000 6.00 10,200.00
8005 EW~ Railroad Protective Insurance - Norfolk Southern 10090NX LS 0.00 1.000 1.000 1.000 29,972.00 29,972.00
8014 MASONRY COATING 02998 SQYD 0.00 5,288.880 6,711.510 6,711.510 18.90 126,847.53
8028 EW~ Shear Connector 10094NX EACH 0.00 100.000 1,442.000 1,442.000 1.58 2,278.36
8029 EW~ Mobilization to joint for Shear Connectors 10094NX EACH 0.00 3.000 10.000 10.000 1,510.00 15,100.00
8030 EW~ Clean and Prep Beams for Shear Connectors 10103NX HOUR 0.00 5.000 40.000 40.000 130.81 5,232.40
8044 REM EPOXY BIT FOREIGN OVERLAY Hand Work - Small Areas 08510 SQYD 0.00 42.500 41.320 41.320 315.00 13,015.80
8059 REM EPOXY BIT FOREIGN OVERLAY 1/4 Inch Additional Removal 08510 SQYD 0.00 20,740.620 22,624.000 22,624.000 0.64 14,479.36
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0009 BRIDGE 13TH ST & 7TH ST
1460 PARTIAL DEPTH PATCHING 02110 CUFT 1,930.00 340.000 23.430 23.430 110.00 2,577.30
1470 FUSED CONNECTOR KIT 04780 EACH 58.00 58.000 36.000 36.000 151.36 5,448.96
1480 CONDUIT-2 INCH 04795 LF 275.00 275.000 283.730 283.730 154.28 43,773.86
1490 WIRE-NO. 4 04835 LF 11,600.00 11,600.000 5,870.000 5,870.000 3.91 22,951.70
1500 WIRE-NO. 4 GROUND 04835 LF 5,800.00 5,800.000 2,780.000 2,780.000 3.35 9,313.00
1510 REM EPOXY BIT FOREIGN OVERLAY 08510 SQYD 32,170.00 32,170.000 31,309.800 31,309.800 8.00 250,478.40
1520 CONC CLASS M FULL DEPTH PATCH 08526 CUYD 2.00 2.000 0.000 0.000 5,000.00 0.00
1530 ASPHALT WATERPROOFING MIX 21138ED TON 2,535.00 2,540.000 2,600.000 2,600.000 240.00 624,000.00
1540 THIN FILM COATING 21592EN SQFT 82,900.00 0.000 0.000 0.000 2.35 0.00
1550 EXPANSION JOINT RECONSTRUCTION 21984EN LF 997.70 997.700 999.960 999.960 3,000.00 2,999,880.00
1560 JUNCTION BOX-6 IN X 6 IN X 16 IN 21988NN EACH 4.00 4.000 1.000 1.000 991.00 991.00
2160 REMOVE AND TRANSPORT HANDRAIL 20173ED LF 7,270.00 7,270.000 9,435.500 9,435.500 10.00 94,355.00
2170 FASCIA RETROFIT 22144ED LF 7,270.00 7,270.000 8,270.000 8,270.000 100.00 827,000.00
2180 ASPHALT PLACEMENT WITH MTV 00338 TON 2,535.00 2,535.010 2,600.000 2,600.000 6.00 15,600.00
8015 MASONRY COATING 02998 SQYD 0.00 9,211.100 10,697.210 10,697.210 18.90 202,177.26
8025 EW~ Shear Connectors 10094NX EACH 0.00 200.000 2,390.000 2,390.000 1.58 3,776.20
8026 EW~ Mobilization to Joint for Shear Connectors 10094NX EACH 0.00 5.000 21.000 21.000 1,510.00 31,710.00
8027 EW~ Clean and Prep Beams for Shear Connectors 10103NX HOUR 0.00 5.000 73.750 73.750 130.81 9,647.23
8045 REM EPOXY BIT FOREIGN OVERLAY Hand Work - Small Areas 08510 SQYD 0.00 45.000 44.000 44.000 315.00 13,860.00
8061 REM EPOXY BIT FOREIGN OVERLAY 1/4 Inch Additional Removal 08510 SQYD 0.00 32,168.890 40,822.220 40,822.220 0.64 26,126.22
8062 MACHINE PREP OF SLAB Additional Pass for Overlay Removal 08551 SQYD 0.00 2,400.000 0.000 0.000 7.00 0.00
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0010 BRIDGE NINTH ST RAMPS
1570 PARTIAL DEPTH PATCHING 02110 CUFT 850.00 15.000 0.000 0.000 110.00 0.00
1580 FUSED CONNECTOR KIT 04780 EACH 60.00 60.000 69.000 69.000 151.36 10,443.84
1590 CONDUIT-2 INCH 04795 LF 275.00 550.000 443.000 443.000 154.28 68,346.04
1600 WIRE-NO. 4 04835 LF 8,000.00 8,000.000 6,636.000 6,636.000 3.91 25,946.76
1610 WIRE-NO. 4 GROUND 04835 LF 4,000.00 4,000.000 2,828.000 2,828.000 3.35 9,473.80
1620 CONC CLASS M FULL DEPTH PATCH 08526 CUYD 2.00 2.000 0.000 0.000 5,000.00 0.00
1630 MACHINE PREP OF SLAB 08551 SQYD 13,829.00 13,829.000 17,551.000 17,551.000 7.00 122,857.00
1640 ASPHALT WATERPROOFING MIX 21138ED TON 1,090.00 1,095.000 1,090.000 1,090.000 240.00 261,600.00
1650 THIN FILM COATING 21592EN SQFT 79,300.00 0.000 0.000 0.000 2.35 0.00
1660 EXPANSION JOINT RECONSTRUCTION 21984EN LF 631.00 631.000 636.330 636.330 3,000.00 1,908,990.00
1670 REPAIR SIGN TRUSS TRUSS 115 21987NN LS 1.00 1.000 1.000 1.000 20,142.50 20,142.50
1680 JUNCTION BOX-6 IN X 6 IN X 16 IN 21988NN EACH 12.00 12.000 0.000 0.000 991.00 0.00
1690 TERMINAL JOINT RECONSTRUCTION 21989EN LF 92.50 92.500 92.170 92.170 800.00 73,736.00
2190 GUARDRAIL CONNECTOR TO BRIDGE END TY A 02363 EACH 4.00 4.000 4.000 4.000 7,000.00 28,000.00
2200 GUARDRAIL CONNECTOR TO BRIDGE END TY A-1 02387 EACH 4.00 4.000 4.000 4.000 5,000.00 20,000.00
2210 REMOVE GUARDRAIL 02381 LF 237.50 237.500 237.500 237.500 2.00 475.00
2220 GUARDRAIL-STEEL W BEAM-S FACE 02351 LF 237.50 237.500 237.500 237.500 25.00 5,937.50
2230 RELOCATE GUARDRAIL SYSTEM 02385 LF 75.00 75.000 75.000 75.000 10.05 753.75
2240 GUARDRAIL END TREATMENT TYPE 4A 02391 EACH 1.00 1.000 1.000 1.000 2,935.00 2,935.00
2250 GUARDRAIL END TREATMENT TYPE 1 02367 EACH 1.00 1.000 1.000 1.000 3,000.00 3,000.00
2260 REPAIR CONCRETE CURB 03302 LF 26.00 0.000 658.270 658.270 250.00 164,567.50
2270 REMOVE AND TRANSPORT HANDRAIL 20173ED LF 8,350.00 8,350.000 9,696.000 9,696.000 10.00 96,960.00
2280 FASCIA RETROFIT 22144ED LF 8,350.00 8,350.000 8,350.000 8,350.000 100.00 835,000.00
2290 ASPHALT PLACEMENT WITH MTV 00338 TON 1,090.00 1,090.010 1,090.000 1,090.000 6.00 6,540.00
8016 MASONRY COATING 02998 SQYD 0.00 8,811.100 7,965.900 7,965.900 18.90 150,555.51
8031 ADJUST INLET Raise Type IV Drains on 9th Street Ramps 01719 EACH 0.00 262.000 262.000 262.000 73.06 19,141.72
8040 REMOVE Heating Equipment on 9th Street Ramps 74072N LS 0.00 1.000 1.000 1.000 26,977.65 26,977.65
8046 REM EPOXY BIT FOREIGN OVERLAY Hand Work - Small Areas 08510 SQYD 0.00 20.000 18.710 18.710 315.00 5,893.65
8090 EW~ Shear Connector 10094NX EACH 0.00 464.000 464.000 464.000 1.58 733.12
8091 EW~ Mobilization to Joint for Shear Connector Installation 10094NX EACH 0.00 17.000 17.000 17.000 1,510.00 25,670.00
8092 EW~ Clean and Prep Beams for Shear Connectors 10103NX HOUR 0.00 24.500 24.500 24.500 130.81 3,204.84
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0011 BRIDGE 7TH ST TO 2ND ST
1700 PARTIAL DEPTH PATCHING 02110 CUFT 1,616.00 46.000 30.470 30.470 110.00 3,351.70
1710 FUSED CONNECTOR KIT 04780 EACH 44.00 44.000 55.000 55.000 151.36 8,324.80
1720 CONDUIT-2 INCH 04795 LF 275.00 71.500 89.920 89.920 154.28 13,872.85
1730 WIRE-NO. 4 04835 LF 12,200.00 10,400.000 6,824.000 6,824.000 3.91 26,681.84
1740 WIRE-NO. 4 GROUND 04835 LF 6,100.00 3,420.000 3,412.000 3,412.000 3.35 11,430.20
1750 REM EPOXY BIT FOREIGN OVERLAY 08510 SQYD 26,888.00 26,888.000 27,058.800 27,058.800 8.00 216,470.40
1760 CONC CLASS M FULL DEPTH PATCH 08526 CUYD 2.00 0.000 0.000 0.000 5,000.00 0.00
1770 ASPHALT WATERPROOFING MIX 21138ED TON 2,119.00 2,134.000 2,225.000 2,225.000 240.00 534,000.00
1780 THIN FILM COATING 21592EN SQFT 74,000.00 0.000 0.000 0.000 2.35 0.00
1790 EXPANSION JOINT RECONSTRUCTION 21984EN LF 801.50 801.500 803.540 803.540 3,000.00 2,410,620.00
1800 JUNCTION BOX-6 IN X 6 IN X 16 IN 21988NN EACH 4.00 4.000 0.000 0.000 991.00 0.00
1810 CROSSFRAME REMOVAL 21990NN EACH 92.00 92.000 91.000 91.000 600.00 54,600.00
1820 WEB REPAIR TY A 21991NN EACH 59.00 59.000 57.000 57.000 400.00 22,800.00
1830 WEB REPAIR TY B 21992NN EACH 38.00 38.000 38.000 38.000 1,000.00 38,000.00
2300 REMOVE AND TRANSPORT HANDRAIL 20173ED LF 5,500.00 4,665.000 2,114.100 2,114.100 10.00 21,141.00
2310 FASCIA RETROFIT 22144ED LF 5,500.00 5,340.000 5,338.160 5,338.160 100.00 533,816.00
2320 ASPHALT PLACEMENT WITH MTV 00338 TON 2,119.00 2,119.010 2,225.000 2,225.000 6.00 13,350.00
8017 MASONRY COATING 02998 SQYD 0.00 6,862.220 6,858.850 6,858.850 18.90 129,632.26
8019 EW~ Shear Connector 10094NX EACH 0.00 150.000 374.000 374.000 1.58 590.92
8020 EW~ Mobilization to Joint for Shear Connectors 10094NX EACH 0.00 5.000 17.000 17.000 1,510.00 25,670.00
8021 EW~ Clean and Prep Beams for Shear Connectors 10103NX HOUR 0.00 5.000 19.500 19.500 130.81 2,550.79
8034 REPAIR CONCRETE CURB Pneumatic Mortar 03302 LF 0.00 150.000 0.000 0.000 200.00 0.00
8037 REPAIR/PATCH BARRIER Median Wall and Curb under Belvedere 21758NN LS 0.00 1.000 1.000 1.000 81,300.00 81,300.00
8047 REM EPOXY BIT FOREIGN OVERLAY Hand Work - Small Areas 08510 SQYD 0.00 185.000 182.970 182.970 315.00 57,635.55
8063 REM EPOXY BIT FOREIGN OVERLAY 1/4 Inch Additional Removal 08510 SQYD 0.00 26,887.910 14,032.000 14,032.000 0.64 8,980.48
8064 MACHINE PREP OF SLAB Additional Pass for Overlay Removal 08551 SQYD 0.00 13,443.960 14,032.000 14,032.000 7.00 98,224.00
8076 CASTING W/LID Replacement Grates for DBI Structures on Bridge Decks 20147EC EACH 0.00 9.000 9.000 9.000 428.00 3,852.00
8096 RETROFIT PIER Piers in 3rd/ River Road Parking Areas 21986NN LS 0.00 1.000 1.000 1.000 30,000.00 30,000.00
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0012 BRIDGE 3RD ST TO PRESTON
1840 PARTIAL DEPTH PATCHING 02110 CUFT 1,855.00 155.000 149.900 149.900 110.00 16,489.00
1850 ADJUST GUARDRAIL 02350 LF 50.00 50.000 50.000 50.000 9.68 484.00
1860 GUARDRAIL-STEEL W BEAM-S FACE 02351 LF 50.00 50.000 50.000 50.000 25.00 1,250.00
1880 GUARDRAIL CONNECTOR TO BRIDGE END TY A 02363 EACH 2.00 2.000 2.000 2.000 7,000.00 14,000.00
1890 REMOVE GUARDRAIL 02381 LF 50.00 50.000 50.000 50.000 2.00 100.00
1900 FUSED CONNECTOR KIT 04780 EACH 36.00 36.000 40.000 40.000 151.36 6,054.40
1910 CONDUIT-2 INCH 04795 LF 250.00 1,185.000 1,025.190 1,025.190 154.28 158,166.31
1920 WIRE-NO. 4 04835 LF 12,600.00 12,600.000 8,866.330 8,866.330 3.91 34,667.35
1930 WIRE-NO. 4 GROUND 04835 LF 6,300.00 6,300.000 4,433.170 4,433.170 3.35 14,851.11
1940 REM EPOXY BIT FOREIGN OVERLAY 08510 SQYD 30,903.00 30,903.000 31,157.720 31,157.720 8.00 249,261.76
1950 CONC CLASS M FULL DEPTH PATCH 08526 CUYD 2.00 2.000 0.000 0.000 5,000.00 0.00
1960 ASPHALT WATERPROOFING MIX 21138ED TON 2,436.00 2,455.000 2,550.000 2,550.000 240.00 612,000.00
1970 THIN FILM COATING 21592EN SQFT 97,600.00 0.000 0.000 0.000 2.35 0.00
1980 EXPANSION JOINT RECONSTRUCTION 21984EN LF 1,183.10 1,183.100 1,186.250 1,186.250 3,000.00 3,558,750.00
1990 G/R END CONN RETROFIT 21985NN EACH 2.00 2.000 2.000 2.000 5,000.00 10,000.00
2000 RETROFIT PIER PIER 109 21986NN LS 1.00 1.000 1.000 1.000 100,000.00 100,000.00
2010 JUNCTION BOX-6 IN X 6 IN X 16 IN 21988NN EACH 4.00 4.000 0.000 0.000 991.00 0.00
2330 REMOVE AND TRANSPORT HANDRAIL 20173ED LF 6,750.00 6,750.000 7,462.560 7,462.560 10.00 74,625.60
2340 FASCIA RETROFIT 22144ED LF 6,750.00 6,750.000 6,750.000 6,750.000 100.00 675,000.00
2360 ASPHALT PLACEMENT WITH MTV 00338 TON 2,436.00 2,436.010 2,550.000 2,550.000 6.00 15,300.00
8018 MASONRY COATING 02998 SQYD 0.00 11,544.440 11,991.230 11,991.230 18.90 226,634.24
8022 EW~ Shear Connectors 10094NX EACH 0.00 150.000 0.000 0.000 1.58 0.00
8023 EW~ Mobilization to Joint for Shear Connectors 10094NX EACH 0.00 3.000 0.000 0.000 1,510.00 0.00
8024 EW~ Clean and Prep Beams for Shear Connectors 10103NX HOUR 0.00 5.000 0.000 0.000 130.81 0.00
8033 REPAIR CONCRETE CURB Pneumatic Mortar 03302 LF 0.00 150.000 0.000 0.000 200.00 0.00
8038 REMOVE CONC MEDIAN BARRIER 2nd Street Ramp 21935EN LF 0.00 120.000 120.000 120.000 35.00 4,200.00
8039 CONCRETE BARRIER WALL MODIFIED 10-D-1 Wall at 2nd Street 02000 LF 0.00 850.000 880.000 880.000 80.00 70,400.00
8048 REM EPOXY BIT FOREIGN OVERLAY Hand Work - Small Areas 08510 SQYD 0.00 225.000 216.220 216.220 315.00 68,109.30
8065 REM EPOXY BIT FOREIGN OVERLAY 1/4 Additional Removal 08510 SQYD 0.00 30,902.830 33,028.620 33,028.620 0.64 21,138.31
8066 MACHINE PREP OF SLAB Additional Pass for Overlay Removal 08551 SQYD 0.00 1.000 0.000 0.000 7.00 0.00
8094 CONCRETE BARRIER WALL CONNECTOR Remove and Replace Retrofit Wall Transition 20396ED EACH 0.00 1.000 1.000 1.000 4,100.74 4,100.74
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0013 BRIDGE KENNEDY PIER 5
2020 RETROFIT PIER KENNEDY PIER 5 21986NN LS 1.00 1.000 1.000 1.000 190,000.00 190,000.00
8001 PIER CAP REPAIR Pier No. 5 - Kennedy Bridge 21527ND LS 0.00 1.000 1.000 1.000 68,882.40 68,882.40
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0014 BRIDGE CLEAN & PAINT STRUCTURAL STEEL
2030 CLEAN & PAINT STRUCTURAL STEEL 08434 LS 1.00 1.000 1.000 1.000 3,750,000.00 3,750,000.00
Project DE05600640716 Fed/State Project Number IM 64-2(157) Category 0016 INCENTIVE/DISINCENTIVE
3000 INCENTIVE/DISINCENTIVE DISINCENTIVE FOR WORK OVER OR OUTSIDE OF HOURS BID 02571 DOLL 0.00 0.001 0.000 0.000 -1.00 -0.00
3010 INCENTIVE/DISINCENTIVE DISINCENTIVE FOR ROAD CLOSURES 02571 DOLL 0.00 0.001 27,000.000 27,000.000 -1.00 -27,000.00
3020 INCENTIVE/DISINCENTIVE INCENTIVE PAYMENT 02571 DOLL 0.00 2,000,000.001 2,000,000.000 2,000,000.000 1.00 2,000,000.00
3030 INCENTIVE/DISINCENTIVE DISINCENTIVE AFTER FIXED DATE COMPLETION 02571 DOLL 0.00 0.001 0.000 0.000 -1.00 -0.00

SUBTOT

$41,390.46

$54,585,325.85

LNNBR STOCKPILE ADJUSTMENTS

UNIT

ADJ. QUANTITY

EST NBR

UNIT PRICE

ADJUSTED AMOUNT

0530-1-0I

Rosphalt Material

TON

2,015.00 0002 $97.850000 $197,167.75

0880-1-0I

Expansion Joints and Seals

LF

517.20 0002 $37.375000 $19,330.35

1080-1-0I

Expansion Joints and Seals

LF

444.00 0002 $37.375000 $16,594.50

1230-1-0I

Rosphalt Material

TON

225.00 0002 $97.850000 $22,016.25

1250-1-0I

Expansion Joints and Seals

LF

1,069.20 0002 $37.375000 $39,961.35

1430-1-0I

Expansion Joints and Seals

LF

359.30 0002 $37.375000 $13,428.83

1550-1-0I

Expansion Joints and Seals

LF

997.70 0002 $37.375000 $37,289.03

1660-1-0I

Expansion Joints and Seals

LF

631.00 0002 $37.375000 $23,583.62

1770-1-0I

Rosphalt Material

TON

375.00 0002 $97.850000 $36,693.75

1790-1-0I

Expansion Joint and Seals

LF

801.50 0002 $37.375000 $29,956.06

1960-1-0I

Rosphalt Material

TON

1,000.00 0002 $97.850000 $97,850.00

1980-1-0I

EXPANSION JOINT RECONSTRUCTION

LF

1,183.10 0002 $37.375000 $44,218.36

0530-2-0I

Rosphalt Materials

TON

140.00 0003 $97.850000 $13,699.00

0620-1-0I

CONDUIT

LF

160.00 0003 $1.982100 $317.13

0630-1-0I

CONDUIT

LF

170.00 0003 $2.814400 $478.44

0660-1-0I

WIRE, ELECTRICAL

LF

7,140.00 0003 $0.133000 $949.62

0800-1-0I

Fuse Holder and Fuse

EACH

46.00 0003 $30.580000 $1,406.68

0810-1-0I

CONDUIT

LF

275.00 0003 $2.814400 $773.96

0820-1-0I

WIRE, ELECTRICAL

LF

12,600.00 0003 $0.784500 $9,884.70

0830-1-0I

WIRE, ELECTRICAL

LF

6,300.00 0003 $0.784500 $4,942.35

1000-1-0I

Fuse Holder and Fuse

EACH

16.00 0003 $30.580000 $489.28

1010-1-0I

CONDUIT

LF

200.00 0003 $2.814400 $562.88

1020-2-0I

WIRE, ELECTRICAL

LF

1,400.00 0003 $0.784500 $1,098.30

1020-1-0I

WIRE, ELECTRICAL

LF

3,200.00 0003 $0.784500 $2,510.40

1030-1-0I

WIRE, ELECTRICAL

LF

2,300.00 0003 $0.784500 $1,804.35

1170-1-0I

Fuse Holder and Fuse

EACH

12.00 0003 $30.580000 $366.96

1180-1-0I

CONDUIT

LF

275.00 0003 $2.814400 $773.96

1190-1-0I

WIRE, ELECTRICAL

LF

3,000.00 0003 $0.784500 $2,353.50

1200-1-0I

WIRE, ELECTRICAL

LF

1,500.00 0003 $0.784500 $1,176.75

1230-2-0I

Rosphalt Materials

TON

20.00 0003 $97.850000 $1,957.00

1350-1-0I

Fuse Holder and Fuse

EACH

36.00 0003 $30.580000 $1,100.88

1360-1-0I

CONDUIT

LF

175.00 0003 $2.814400 $492.52

1370-1-0I

WIRE, ELECTRICAL

LF

8,400.00 0003 $0.784500 $6,589.80

1380-1-0I

WIRE, ELECTRICAL

LF

4,700.00 0003 $0.784500 $3,687.15

1410-1-0I

Rosphalt Materials

TON

610.00 0003 $97.850000 $59,688.50

1470-1-0I

Fuse Holder and Fuse

EACH

58.00 0003 $30.580000 $1,773.64

1480-1-0I

CONDUIT

LF

265.00 0003 $2.814400 $745.81

1490-1-0I

WIRE, ELECTRICAL

LF

11,600.00 0003 $0.784500 $9,100.20

1500-1-0I

WIRE, ELECTRICAL

LF

5,800.00 0003 $0.784500 $4,550.10

1580-1-0I

Fuse Holder and Fuse

EACH

60.00 0003 $30.580000 $1,834.80

1590-1-0I

CONDUIT

LF

275.00 0003 $2.814400 $773.96

1600-1-0I

WIRE, ELECTRICAL

LF

8,000.00 0003 $0.784500 $6,276.00

1610-1-0I

WIRE, ELECTRICAL

LF

4,000.00 0003 $0.784500 $3,138.00

1640-1-0I

Rosphalt Materials

TON

905.00 0003 $97.850000 $88,554.25

1710-1-0I

Fuse Holder and Fuse

EACH

44.00 0003 $30.580000 $1,345.52

1720-1-0I

CONDUIT

LF

275.00 0003 $2.814400 $773.96

1730-1-0I

WIRE, ELECTRICAL

LF

12,200.00 0003 $0.784500 $9,570.90

1740-1-0I

WIRE, ELECTRICAL

LF

6,100.00 0003 $0.784500 $4,785.45

1770-3-0I

Rosphalt Materials

TON

930.00 0003 $97.850000 $91,000.50

1770-2-0I

Rosphalt Materials

TON

685.00 0003 $97.850000 $67,027.25

1900-1-0I

Fuse Holder and Fuse

EACH

36.00 0003 $30.580000 $1,100.88

1910-1-0I

CONDUIT

LF

250.00 0003 $2.814400 $703.60

1920-1-0I

WIRE, ELECTRICAL

LF

12,600.00 0003 $0.784500 $9,884.70

1930-1-0I

WIRE, ELECTRICAL

LF

6,300.00 0003 $0.784500 $4,942.35

1960-3-0I

Rosphalt Materials

TON

930.00 0003 $97.850000 $91,000.50

1960-2-0I

Rosphalt Materials

TON

320.00 0003 $97.850000 $31,312.00

0530-1-3I

Rosphalt Material

TON

930.00 0004 $97.850000 $91,000.50

0530-1-2I

Rosphalt Material

TON

930.00 0004 $97.850000 $91,000.50

0530-1-1I

Rosphalt Material

TON

930.00 0004 $97.850000 $91,000.50

0530-3-0I

Edge Sealer

BBL

10.00 0005 $79.800000 $798.00

0860-1-0I

Rosphalt Material

TON

930.00 0005 $97.850000 $91,000.50

1060-1-0I

Edge Sealer

BBL

10.00 0005 $79.800000 $798.00

1230-3-0I

Edge Sealer

BBL

26.00 0005 $79.800000 $2,074.00

1410-2-0I

Edge Sealer

BBL

50.00 0005 $79.800000 $3,990.00

1640-2-0I

Edge Sealer

BBL

48.00 0005 $79.800000 $3,830.40

1770-4-0I

Edge Sealer

BBL

50.00 0005 $79.800000 $3,990.00

1960-4-0I

Edge Sealer

BBL

50.00 0005 $79.800000 $3,990.00

0800-1-0A

Fuse Holder and Fuse

EACH

8.00 0003 $30.580000 $-244.64

0810-1-0A

CONDUIT

LF

86.84 0003 $2.814400 $-244.40

0820-1-0A

WIRE, ELECTRICAL

LF

1,896.84 0003 $0.784500 $-1,488.07

0830-1-0A

WIRE, ELECTRICAL

LF

948.42 0003 $0.784500 $-744.04

0880-1-0A

Expansion Joints and Seals

LF

178.40 0003 $37.375000 $-6,667.92

1000-1-0A

Fuse Holder and Fuse

EACH

10.00 0003 $30.580000 $-305.80

1010-1-0A

CONDUIT

LF

17.67 0003 $2.814400 $-49.73

1020-2-0A

WIRE, ELECTRICAL

LF

1,400.00 0003 $0.784500 $-1,098.30

1020-1-0A

WIRE, ELECTRICAL

LF

1,547.67 0003 $0.784500 $-1,214.15

1030-1-0A

WIRE, ELECTRICAL

LF

773.84 0003 $0.784500 $-607.08

1080-1-0A

Expansion Joints and Seals

LF

178.84 0003 $37.375000 $-6,684.15

1170-1-0A

Fuse Holder and Fuse

EACH

4.00 0003 $30.580000 $-122.32

1180-1-0A

CONDUIT

LF

93.20 0003 $2.814400 $-262.30

1190-1-0A

WIRE, ELECTRICAL

LF

692.00 0003 $0.784500 $-542.87

1200-1-0A

WIRE, ELECTRICAL

LF

346.00 0003 $0.784500 $-271.44

1250-1-0A

Expansion Joints and Seals

LF

145.40 0003 $37.375000 $-5,434.33

1580-1-0A

Fuse Holder and Fuse

EACH

4.00 0003 $30.580000 $-122.32

1590-1-0A

CONDUIT

LF

43.00 0003 $2.814400 $-121.02

1600-1-0A

WIRE, ELECTRICAL

LF

150.00 0003 $0.784500 $-117.68

1610-1-0A

WIRE, ELECTRICAL

LF

75.00 0003 $0.784500 $-58.84

1900-1-0A

Fuse Holder and Fuse

EACH

24.00 0003 $30.580000 $-733.92

1910-1-0A

CONDUIT

LF

57.69 0003 $2.814400 $-162.36

1920-1-0A

WIRE, ELECTRICAL

LF

4,494.33 0003 $0.784500 $-3,525.80

1930-1-0A

WIRE, ELECTRICAL

LF

2,247.17 0003 $0.784500 $-1,762.90

1960-3-0A

Rosphalt Materials

TON

909.98 0003 $97.850000 $-89,041.54

1960-2-0A

Rosphalt Materials

TON

320.00 0003 $97.850000 $-31,312.00

1960-1-0A

Rosphalt Material

TON

909.98 0003 $97.850000 $-89,041.54

1980-1-0A

EXPANSION JOINT RECONSTRUCTION

LF

1,096.56 0003 $37.375000 $-40,983.93

0530-2-0A

Rosphalt Materials

TON

140.00 0004 $97.850000 $-13,699.00

0530-1-1A

Rosphalt Material

TON

115.14 0004 $97.850000 $-11,266.45

0530-1-0A

Rosphalt Material

TON

2,015.00 0004 $97.850000 $-197,167.75

0800-1-0A

Fuse Holder and Fuse

EACH

8.00 0004 $30.580000 $-244.64

0810-1-0A

CONDUIT

LF

23.00 0004 $2.814400 $-64.73

0820-1-0A

WIRE, ELECTRICAL

LF

3,360.00 0004 $0.784500 $-2,635.92

0830-1-0A

WIRE, ELECTRICAL

LF

1,680.00 0004 $0.784500 $-1,317.96

0880-1-0A

Expansion Joints and Seals

LF

221.92 0004 $37.375000 $-8,294.26

1010-1-0A

CONDUIT

LF

7.75 0004 $2.814400 $-21.81

1020-1-0A

WIRE, ELECTRICAL

LF

480.00 0004 $0.784500 $-376.56

1030-1-0A

WIRE, ELECTRICAL

LF

240.00 0004 $0.784500 $-188.28

1080-1-0A

Expansion Joints and Seals

LF

44.33 0004 $37.375000 $-1,656.83

1550-1-0A

Expansion Joints and Seals

LF

48.50 0004 $37.375000 $-1,812.69

1710-1-0A

Fuse Holder and Fuse

EACH

14.00 0004 $30.580000 $-428.12

1720-1-0A

CONDUIT

LF

35.92 0004 $2.814400 $-101.09

1730-1-0A

WIRE, ELECTRICAL

LF

2,254.00 0004 $0.784500 $-1,768.26

1740-1-0A

WIRE, ELECTRICAL

LF

1,127.00 0004 $0.784500 $-884.13

1790-1-0A

Expansion Joint and Seals

LF

229.99 0004 $37.375000 $-8,595.88

1900-1-0A

Fuse Holder and Fuse

EACH

8.00 0004 $30.580000 $-244.64

1910-1-0A

CONDUIT

LF

11.50 0004 $2.814400 $-32.37

1920-1-0A

WIRE, ELECTRICAL

LF

2,418.00 0004 $0.784500 $-1,896.92

1930-1-0A

WIRE, ELECTRICAL

LF

1,209.00 0004 $0.784500 $-948.46

1980-1-0A

EXPANSION JOINT RECONSTRUCTION

LF

86.50 0004 $37.375000 $-3,232.94

0530-3-0A

Edge Sealer

BBL

10.00 0005 $79.800000 $-798.00

0530-1-3A

Rosphalt Material

TON

930.00 0005 $97.850000 $-91,000.50

0530-1-2A

Rosphalt Material

TON

930.00 0005 $97.850000 $-91,000.50

0530-1-1A

Rosphalt Material

TON

814.86 0005 $97.850000 $-79,734.05

1170-1-0A

Fuse Holder and Fuse

EACH

6.00 0005 $30.580000 $-183.48

1180-1-0A

CONDUIT

LF

160.00 0005 $2.814400 $-450.30

1190-1-0A

WIRE, ELECTRICAL

LF

2,308.00 0005 $0.784500 $-1,810.63

1200-1-0A

WIRE, ELECTRICAL

LF

1,140.00 0005 $0.784500 $-894.33

1250-1-0A

Expansion Joints and Seals

LF

872.33 0005 $37.375000 $-32,603.33

1350-1-0A

Fuse Holder and Fuse

EACH

34.00 0005 $30.580000 $-1,039.72

1360-1-0A

CONDUIT

LF

78.50 0005 $2.814400 $-220.93

1370-1-0A

WIRE, ELECTRICAL

LF

4,800.00 0005 $0.784500 $-3,765.60

1380-1-0A

WIRE, ELECTRICAL

LF

2,400.00 0005 $0.784500 $-1,882.80

1430-1-0A

Expansion Joints and Seals

LF

359.30 0005 $37.375000 $-13,428.83

1470-1-0A

Fuse Holder and Fuse

EACH

36.00 0005 $30.580000 $-1,100.88

1480-1-0A

CONDUIT

LF

132.00 0005 $2.814400 $-371.50

1490-1-0A

WIRE, ELECTRICAL

LF

5,870.00 0005 $0.784500 $-4,605.01

1500-1-0A

WIRE, ELECTRICAL

LF

2,780.00 0005 $0.784500 $-2,180.91

1550-1-0A

Expansion Joints and Seals

LF

930.70 0005 $37.375000 $-34,784.91

1580-1-0A

Fuse Holder and Fuse

EACH

22.00 0005 $30.580000 $-672.76

1590-1-0A

CONDUIT

LF

125.00 0005 $2.814400 $-351.80

1600-1-0A

WIRE, ELECTRICAL

LF

4,240.00 0005 $0.784500 $-3,326.28

1610-1-0A

WIRE, ELECTRICAL

LF

1,630.00 0005 $0.784500 $-1,278.74

1640-2-0A

Edge Sealer

BBL

48.00 0005 $79.800000 $-3,830.40

1640-1-0A

Rosphalt Materials

TON

528.17 0005 $97.850000 $-51,681.43

1660-1-0A

Expansion Joints and Seals

LF

483.60 0005 $37.375000 $-18,074.55

1710-1-0A

Fuse Holder and Fuse

EACH

24.00 0005 $30.580000 $-733.92

1720-1-0A

CONDUIT

LF

54.00 0005 $2.814400 $-151.98

1730-1-0A

WIRE, ELECTRICAL

LF

4,110.00 0005 $0.784500 $-3,224.30

1740-1-0A

WIRE, ELECTRICAL

LF

2,055.00 0005 $0.784500 $-1,612.15

1770-4-0A

Edge Sealer

BBL

50.00 0005 $79.800000 $-3,990.00

1770-3-0A

Rosphalt Materials

TON

930.00 0005 $97.850000 $-91,000.50

1770-2-0A

Rosphalt Materials

TON

685.00 0005 $97.850000 $-67,027.25

1770-1-0A

Rosphalt Material

TON

375.00 0005 $97.850000 $-36,693.75

1790-1-0A

Expansion Joint and Seals

LF

405.00 0005 $37.375000 $-15,136.87

1910-1-0A

CONDUIT

LF

21.00 0005 $2.814400 $-59.10

1960-3-0A

Rosphalt Materials

TON

20.02 0005 $97.850000 $-1,958.96

1960-4-0A

Edge Sealer

BBL

50.00 0005 $79.800000 $-3,990.00

1960-1-0A

Rosphalt Material

TON

90.02 0005 $97.850000 $-8,808.46

0660-1-0A

WIRE, ELECTRICAL

LF

1,124.00 0006 $0.133000 $-149.49

0800-1-0A

Fuse Holder and Fuse

EACH

26.00 0006 $30.580000 $-795.08

0810-1-0A

CONDUIT

LF

53.00 0006 $2.814400 $-149.16

0820-1-0A

WIRE, ELECTRICAL

LF

3,400.00 0006 $0.784500 $-2,667.30

0830-1-0A

WIRE, ELECTRICAL

LF

1,700.00 0006 $0.784500 $-1,333.65

0860-1-0A

Rosphalt Material

TON

930.00 0006 $97.850000 $-91,000.50

0880-1-0A

Expansion Joints and Seals

LF

116.87 0006 $37.375000 $-4,368.17

1000-1-0A

Fuse Holder and Fuse

EACH

6.00 0006 $30.580000 $-183.48

1010-1-0A

CONDUIT

LF

30.00 0006 $2.814400 $-84.43

1020-1-0A

WIRE, ELECTRICAL

LF

1,172.33 0006 $0.784500 $-919.69

1030-1-0A

WIRE, ELECTRICAL

LF

864.00 0006 $0.784500 $-677.81

1080-1-0A

Expansion Joints and Seals

LF

220.83 0006 $37.375000 $-8,253.52

1250-1-0A

Expansion Joints and Seals

LF

6.56 0006 $37.375000 $-245.18

1410-2-0A

Edge Sealer

BBL

50.00 0006 $79.800000 $-3,990.00

1410-1-0A

Rosphalt Materials

TON

610.00 0006 $97.850000 $-59,688.50

1550-1-0A

Expansion Joints and Seals

LF

18.50 0006 $37.375000 $-691.44

1580-1-0A

Fuse Holder and Fuse

EACH

14.00 0006 $30.580000 $-428.12

1590-1-0A

CONDUIT

LF

107.00 0006 $2.814400 $-301.14

1600-1-0A

WIRE, ELECTRICAL

LF

2,246.00 0006 $0.784500 $-1,761.99

1610-1-0A

WIRE, ELECTRICAL

LF

1,123.00 0006 $0.784500 $-880.99

1640-1-0A

Rosphalt Materials

TON

171.50 0006 $97.850000 $-16,781.27

1660-1-0A

Expansion Joints and Seals

LF

147.40 0006 $37.375000 $-5,509.07

1710-1-0A

Fuse Holder and Fuse

EACH

6.00 0006 $30.580000 $-183.48

1790-1-0A

Expansion Joint and Seals

LF

166.51 0006 $37.375000 $-6,223.31

1900-1-0A

Fuse Holder and Fuse

EACH

4.00 0006 $30.580000 $-122.32

1910-1-0A

CONDUIT

LF

159.81 0006 $2.814400 $-449.77

1920-1-0A

WIRE, ELECTRICAL

LF

1,894.00 0006 $0.784500 $-1,485.84

1930-1-0A

WIRE, ELECTRICAL

LF

947.00 0006 $0.784500 $-742.92

1980-1-0A

EXPANSION JOINT RECONSTRUCTION

LF

0.04 0006 $37.375000 $-1.49

0620-1-0A

CONDUIT

LF

43.00 0007 $1.982100 $-85.23

0630-1-0A

CONDUIT

LF

18.00 0007 $2.814400 $-50.66

0660-1-0A

WIRE, ELECTRICAL

LF

3,388.00 0007 $0.133000 $-450.60

0810-1-0A

CONDUIT

LF

3.00 0007 $2.814400 $-8.44

0820-1-0A

WIRE, ELECTRICAL

LF

300.00 0007 $0.784500 $-235.35

0830-1-0A

WIRE, ELECTRICAL

LF

115.00 0007 $0.784500 $-90.22

1170-1-0A

Fuse Holder and Fuse

EACH

2.00 0007 $30.580000 $-61.16

1730-1-0A

WIRE, ELECTRICAL

LF

460.00 0007 $0.784500 $-360.87

1740-1-0A

WIRE, ELECTRICAL

LF

230.00 0007 $0.784500 $-180.44

1920-1-0A

WIRE, ELECTRICAL

LF

60.00 0007 $0.784500 $-47.07

1930-1-0A

WIRE, ELECTRICAL

LF

30.00 0007 $0.784500 $-23.54

1060-10C

Edge Sealer

BBL

0.00 0007 $79.800000 $-798.00

1230-10C

Rosphalt Material

TON

0.00 0007 $97.850000 $-22,016.25

1230-20C

Rosphalt Materials

TON

0.00 0007 $97.850000 $-1,957.00

1230-30C

Edge Sealer

BBL

0.00 0007 $79.769231 $-2,074.00

1250-10C

Expansion Joints and Seals

LF

0.00 0007 $37.375000 $-1,678.51

1640-10C

Rosphalt Materials

TON

0.00 0007 $97.850000 $-20,091.55

0620-10C

CONDUIT

LF

0.00 0008 $1.982063 $-231.90

0630-10C

CONDUIT

LF

0.00 0008 $2.814353 $-427.78

0660-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.133000 $-349.53

0800-10C

Fuse Holder and Fuse

EACH

0.00 0008 $30.580000 $-122.32

0810-10C

CONDUIT

LF

0.00 0008 $2.814400 $-307.23

0820-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-2,858.06

0830-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-1,456.48

1010-10C

CONDUIT

LF

0.00 0008 $2.814400 $-406.91

1030-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-331.18

1180-10C

CONDUIT

LF

0.00 0008 $2.814400 $-61.36

1350-10C

Fuse Holder and Fuse

EACH

0.00 0008 $30.580000 $-61.16

1360-10C

CONDUIT

LF

0.00 0008 $2.814400 $-271.59

1370-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-2,824.20

1380-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-1,804.35

1470-10C

Fuse Holder and Fuse

EACH

0.00 0008 $30.580000 $-672.76

1480-10C

CONDUIT

LF

0.00 0008 $2.814377 $-374.31

1490-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-4,495.19

1500-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-2,369.19

1580-10C

Fuse Holder and Fuse

EACH

0.00 0008 $30.580000 $-611.60

1600-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-1,070.05

1610-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-919.43

1720-10C

CONDUIT

LF

0.00 0008 $2.814400 $-520.89

1730-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-4,217.47

1740-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-2,108.73

1920-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-2,929.07

1930-10C

WIRE, ELECTRICAL

LF

0.00 0008 $0.784500 $-1,464.53

1200-10C

WIRE, ELECTRICAL

LF

0.00 0009 $0.784500 $-10.98
SUBTOT

$-0.01

 

 

 

Project DE05600640718 Fed/State Project Number IM 64-2 (157) NON Category 0017 NON PARTICIPATING FEDERAL FUNDS
LINE ITEM NUMBER ITEM DESCRIPTION ITEM NO. UNIT PLAN QTY CURRENT QUANTITY QUANTITY PAID THIS EST QUANTITY PAID PREV. EST QUANTITY PAID TO DATE UNIT PRICE AMOUNT PAID THIS EST AMOUNT PAID TO DATE
8051 REMOVE AND RESET LUMINAIRE Install New Pole - Department Supplied 20193ED EACH 0.00 25.000 25.000 25.000 1,094.10 27,352.50
8072 INSTALL Luminaire Arm - Department Supplied 93312N EACH 0.00 22.000 22.000 22.000 131.25 2,887.50
8073 HPS LUMINAIRE 04770 EACH 0.00 225.000 225.000 225.000 401.10 90,247.50
Project DE05600640718 Fed/State Project Number IM 64-2 (157) NON Category 0018 NON PARTICIPATING FEDERAL FUNDS
8001 CLEAN OUT PIPE STORM SYSTEM DOWNSPOUTS AND TROUGHS UNDER I-64 20464EC LS 0.00 1.000 1.000 1.000 48,737.92 48,737.92

SUBTOT

$0.00

$54,754,551.27

LNNBR STOCKPILE ADJUSTMENTS

UNIT

ADJ. QUANTITY

EST NBR

UNIT PRICE

ADJUSTED AMOUNT

SUBTOT

$0.00