Questions and Answers

​​​​​​​​​​​​​​​​​​​​​​​

  
  
County
  
Question
Answer
  
17-2963406Boyd, Greenup
Will there be a pre-bid meeting for this project?
No. There will not be a pre-bid meeting for this project.
11/21/2017 4:06 PM
17-2963406Boyd, Greenup
Can the existing bridge plans be provided?
Yes.  The existing bridge plans will be posted in Project Related Information.
11/21/2017 4:07 PM
17-1260201Christian
In regards to the Portable Changeable Message Signs & Flashing Arrows, the proposal states “the Department WILL take possession upon completion of the work.” Please confirm the Department will take possession of all signs and arrow panels at completion of this project?
Yes.  The Department will take possession of the Portable Changeable Message Signs and Flashing Arrows.
11/21/2017 4:08 PM
17-2310317Jefferson
Page 23 of the proposal shows shoulder preparation by the contractor. Will a bid item for DGA be added?
No.  A DGA bid item will not be added.
11/21/2017 4:10 PM
17-1047105Green
Can a summary of the individual stations that list the volumes of individual material types be made available?
A station by station summary is not available. The information is available on the cross sections.
11/21/2017 4:14 PM
17-1256107Nicholas
Can a summary of the individual stations that list the volumes of individual material types be made available?
Yes.  The spreadsheets have been added to the supplemental download folder in the electronic plan room.
11/21/2017 4:14 PM
17-1260201Christian, Hopkins
There is existing guardrail on this project that is attached to round wooden posts.  Based on the Special Note, guardrail must be delivered to the Bailey Bridge Lot in Frankfort. Are the wooden posts and any other components associated with it to be delivered to the same location as well?
The W-Beam Guardrail and any steel posts must be delivered to the Bailey Bridge Lot. Contrary to Section 719.03.07 of the Standard Specification for Road and Bridge Construction, wood posts and any other guardrail components other than the w-beam rail and steel posts shall become the property of the contractor.  The disposal of these items are incidental to the Remove Guardrail bid item.
11/21/2017 4:27 PM
17-1258101Pike
The roadway excavation is 1,129,131 C.Y. and the embankment is 1,342,503 C.Y. Is the contractor responsible for obtaining the additional material?
See Note 7 on General Summary Sheet R2E.
11/22/2017 7:36 AM
17-2302402Edmonson
Is tack required over the scrub seal prior to the microsurface application?
No.
11/27/2017 1:29 PM
17-2302402Edmonson
Is the proposal correct only requiring the scrub seal to be bid with the mcrosurfacing alternate and not the ultra thin alternate?
No.  An addendum will be posted to correct the bid items.
11/27/2017 1:28 PM
17-2304310Hardin
Is the proposal correct only requiring the scrub seal to be bid with the microsurfacing alternate and not the ultra thin alternate?
No.  An addendum will be posted to correct the bid items.
11/27/2017 1:29 PM
17-2304310Hardin
Is tack required over the scrub seal prior to the microsurface application?
No.
11/27/2017 1:30 PM
17-2294308Calloway
Will the Department add an alternate for asphalt surfacing ultra thin as there are no rut fill requirements listed in the proposal?
No.
11/27/2017 2:59 PM
17-2300314Warren
Is a scrub seal required for both microsurface and ultrathin alternates?
Yes.
11/27/2017 3:02 PM
17-1049100Perry
It appears that there may be utilities present in waste sites B and C.  Does the Department have any additional information detailing what could be present at these locations?
Waste Area C does contain water facilities.  Attached are 2 files which help to clarify what facilities could be present at this site.  The drawings posted in Project Related Information are for informational purposes only and it is up to the contractor to field verify what facilities are present.  Waste Area B may have a private sanitary sewer located in/near the southern/eastern edge of the site.  It is up to the contractor to field verify what facilities may be present.
11/27/2017 3:04 PM
17-2918405Various
Will the Department add an alternate for asphalt surfacing ultra thin to the project?
No.
11/27/2017 3:05 PM
17-2300314Warren
Is tack required over the scrub seal before the microsurface application?
No.
11/27/2017 3:08 PM
17-1050106Clay
The proposal appears to indicate there are utility work items on this project, however, there are no bid items and quantities listed.  Please clarify.
An addendum has been posted to add the utility bid items.
11/27/2017 3:10 PM
17-1053200Hopkins
Will the Department provide a Pavement Summary for M.P. 118.15 to M.P. 124.946? It appears the Pavement Summary for M.P. 107.08 to M.P. 108.5 was mistakenly included twice.
Yes.  An addendum will be posted to add the pavement summary.
11/27/2017 3:12 PM
17-2303311Hardin
Will the median crossovers and field entrances be resurfaced?
The turning lanes will be resurfaced. Field entrances and median crossovers will not be paved other than maintaining the 1’ offset onto the shoulder through them.  Paving to the back of the radius for KY 1904 and the Gaither Station Road ramp will be required.
11/29/2017 7:33 AM
17-1261102Rockcastle
Can the Department clarify the scope of work associated with bid item 0240 Site Preparation under Intelligent Transportation Systems?
See pages 22 and 23 of the proposal.
11/29/2017 7:34 AM
17-1260201Christian, Hopkins
Pages 108 and 177 of the proposal shows a 4 inch Asphalt Cap on the Underdrain Trench, but the Typical Section on page 52 does not show the Asphalt Cap.   Is the Asphalt Cap to be installed?
Yes, the Asphalt Cap is to be installed.
11/29/2017 7:35 AM
17-2286403Larue
Will any side roads or entrances be microsurfaced?
Side roads and entrances will not be microsurfaced.
11/29/2017 7:36 AM
17-2297309Hardin
Will the median crossovers, turning lanes, and side roads be microsurfaced?
Median crossovers will not be resurfaced. Turning lanes and the interior crossing of side roads will be resurfaced. The microsurface does not need to extend back into the approaches.
11/29/2017 7:36 AM
17-1052103Jefferson
Will the Department consider revising the specified completion date of 7/31/2018?
Yes.  An addendum will be posted to revise the completion date.
11/29/2017 8:06 AM
17-1050106Clay
Does the Department have a permitted excess material site for this project?  If not, will the Department extend the completion date by at least 12 months to allow for the contractor to secure a permit? 
The Department has not permitted an excess material site for the project. There are several commercial and residential areas in the project vicinity available for excess material. The Contractor must adhere to Section 205 of the Standard Specifications for Road and Bridge Construction when obtaining an excess excavation or borrow site.
11/29/2017 1:51 PM
17-1050106Clay
Will the Department extend the completion date to allow for the utility work added in Addendum #1?
The project completion date will not be extended.
11/29/2017 1:51 PM
17-1260201Christian, Hopkins
Will the Department pay the contractor to repair or replace any tubular marker dislodged or damaged during construction?
No. See Section 112.04.03 of the Standard Specifications for Road and Bridge Construction.
11/29/2017 3:39 PM
17-1260201Christian, Hopkins
Are dowel load transfer assemblies to be placed for transverse sawed contraction joints for bid item 02073 JPC Pavement - 9 IN?  Are dowel load transfer assemblies to be placed for transverse sawed contraction joints for the required portion of bid item 0130 JPC Pavement - 9 IN Shld that is JPC pavement?
Yes. See Standard Drawings RPN-015 and RPS-010.  Where temporary traffic will not be maintained on the shoulder, load transfer is not required in accordance with Standard Drawings RPN-001 and RPS-010. When temporary traffic will be maintained on the shoulder, load transfer and rumble strips will be required in accordance with Standard Drawings RPN-145 and RPS-010.
11/29/2017 3:40 PM
17-1258101Pike
The proposal does not include 404/401 Clean Water Act permits. Has the Department obtained 404/401 permits for the project and do these permits cover temporary stream crossings for the bridges?
An addendum will be posted to add the permits.
11/29/2017 3:41 PM
17-1049100Perry
Will the Department please provide the existing bridge drawings for the project?
Yes.  The existing bridge drawings will be posted in Project Related Information.
11/29/2017 3:47 PM
17-1260201Christian, Hopkins
Will an item for Ride Quality Adjustment, JPC be added by addendum to the Proposal Bid Items?
No, please read Section 501 of the Standard Specifications regarding Rideability.  The Ride Quality must meet Category A Requirements in accordance with the Standard Specifications for Road and Bridge Construction.
11/29/2017 4:27 PM
17-2304310Hardin
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:46 AM
17-2297309Hardin
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:45 AM
17-2297309Hardin
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:45 AM
17-2294308Calloway
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:43 AM
17-2294308Calloway
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:44 AM
17-2304310Hardin
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:47 AM
17-2298312Logan
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:47 AM
17-2295313Monroe
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:48 AM
17-2298312Logan
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:48 AM
17-2293401Christian
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:50 AM
17-2300314Warren
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:49 AM
17-2293401Christian
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:50 AM
17-2295313Monroe
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:48 AM
17-2302402Edmonson
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:51 AM
17-2302402Edmonson
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:51 AM
17-2290405Carlisle, Graves
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:53 AM
17-2300314Warren
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:49 AM
17-2290405Carlisle, Graves
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:53 AM
17-2286403Larue
Will the Department consider increasing the maximum abrasion resistance from 30 percent to 35 percent?
Yes.  Contrary to ASTM D6372, provide aggregate with a maximum abrasion resistance of 35 percent when tested according to AASHTO T 96.
11/30/2017 11:52 AM
17-2286403Larue
Section 3.6, paragraph 4 of the “SPECIAL NOTE FOR MICROSURFACING” list the application rates of the Micro Surfacing based on lb/yd2 of “paving mixture”. Generally, application rates are based on dry-aggregate weight and not paving mixture, because paving mixture includes emulsion, mineral filler, aggregate and water.  Please clarify if it is the intent of the specification to calculate application rates based on a dry-aggregate or a total paving mixture basis.
The application rate is based on the dry-aggregate weight.
11/30/2017 11:52 AM
17-2615319Knott
Regarding Item 21679EN Fiberglass Drain Pipe 6 Inch.  Are existing clamps to be reused or replaced?  If replaced, how will they be paid?
The existing clamps are to be replaced and will be incidental to Item 21679EN Fiberglass Drain Pipe 6 Inch.
11/30/2017 11:54 AM
17-1256107Nicholas
The RDZ line on the cross sections is consistently several feet below the elevation of the rock line soundings listed on the cut stability sections.  Rock in this area that is below the sounding line typically cannot be excavated without breaking.  What criteria was used to determine the RDZ line?
The RDZ line is determined to be the base of material that is rippable with a D9 Dozer.  The refusal elevations indicated reflect the top of bedded rock material, and may be above the RDZ for weathered rock.  The RDZ line was determined based on available core locations and has been interpolated throughout the cut stability sections.  The RDZ is not exact and may be higher or lower than indicated, especially in karst formations.
11/30/2017 2:45 PM
17-1256107Nicholas
Does the Department expect the Granular Embankment identified in geotechnical note 16 to be purchased from a quarry?
Granular Embankment does not have to be purchased from a quarry if there is enough Roadway Excavation. Roadway Excavation from the project or another source may be used for the Granular Embankment provided it is processed to meet the requirements of Section 805 of the current Standard Specifications for Road and Bridge Construction.
11/30/2017 2:46 PM
17-1256107Nicholas
Cross sections for the temporary tie for KY 36 were provided with no quantities.  Is all of the earthwork required for the temporary tie included in the roadway excavation quantities?
Yes. Final earthwork quantities include the excavation needed for the KY36 Temporary Tie.
11/30/2017 2:45 PM
17-1256107Nicholas
The Special Note For Building Removal indicates the contractor is required to remove any asbestos that may be present.  Has KYTC performed any asbestos inspection on these structures?  If so, please provide the results.  If not, please consider removing the requirement that the contractor remove the asbestos.  There is no way of knowing how to price the quantity of asbestos removal when an inspection has not been performed at the time of bid.
The Department performed an asbestos Inspection on the parcels.  As indicated in the report posted in Project Related Information, no asbestos was found and abatement is not necessary.
11/30/2017 2:45 PM
17-2963406Boyd, Greenup
Will the Department provide the approximate square footage for this project?
Yes.  The approximate square footage will be posted under Project Related Information.  The square footage is for informational purposes only.
11/30/2017 2:47 PM
17-1052103Jefferson
Will the sawing, cleaning and sealing of the JPC PAVEMENT-10 IN joints be paid as SAW-CLEAN-RESEAL TVERSE JOINT and SAW-CLEAN-RESEAL LONGIT JOINT?
Yes.
12/1/2017 8:56 AM
17-1052103Jefferson
Page 143 of the proposal calls for polymer modified material for partial depth repairs.  Has the Department investigated the compatibility of this material with diamond grinding? 
The contractor may choose to place temporary material acceptable to the Engineer in Partial Depth Repair areas prior to Diamond Grinding.  Upon completion of Diamond Grinding, the temporary material shall be removed and replaced with Polymer Modified Partial Depth Patching material as required by the proposal.  No additional payment will be allowed for this alternate method of construction and if this method requires any revisions to the Traffic Control, the Contractor shall submit a new Traffic Control proposal for approval.  No contract extension will be allowed.
12/1/2017 8:56 AM
17-1255104Morgan
How will removing the structure and removal of sidewalk, concrete steps, etc. be paid?
This work will be incidental to Roadway Excavation.
12/1/2017 8:57 AM
17-1258101Pike
In regards to bid item 0970 “Handrail-Type A-1”, is this bid item is set up to cover the aluminum railing that is on bridge drawing number 25226.  The railing as detailed on sheet S19 of the contract plans appears to be an older standard drawing that has not been used in many years.  Because of this, the components are scarce and may require special casting for the post and a special order may be required to procure the railing tube as well, it appears this will be a very expensive system.  Please advise.
The Department will supply the material for the rail specified in the plans.
12/1/2017 10:32 AM
17-1050106Clay
There are 2 Bid Items for REMOVE SIGNAL EQUIPMENT. There is only one intersection. Please clarify.
An addendum will be posted to remove the duplicated bid item.
12/1/2017 10:33 AM
17-1260201Christian, Hopkins
Will it be permissible to install loose dowels in the plastic concrete in lieu of installing load transfer assemblies in transverse contraction joints in the JPC Pavement, 9” item of work?
Contractor may use a mechanical means of inserting dowel bars. The Special Note for Dowel Bar and Tie Bar Placement in JPC Pavement has been added as an addendum and will apply whether the Contractor uses traditional dowel baskets or a mechanical means.
12/1/2017 11:50 AM
17-1260201Christian, Hopkins
Is overhead lighting required at the median crossovers?
No, see Standard Drawing TTC-145 and TTC-146.
12/1/2017 11:50 AM
17-1260201Christian, Hopkins
In section 501.05.02 Ride Quality in the 2012 Standard Specifications, it states: “The sum of the pay value adjustments for the ride quality shall not exceed $0 for the project as a whole”.   Does this mean that positive pay value adjustments can only be used to offset negative pay value adjustments?  Or will the contractor be allowed to keep ride incentives if they earn them?
Positive pay value adjustments can only be used to offset negative pay value adjustments. The sum of the pay value adjustments for the ride quality shall not exceed $0 for the project as a whole.
12/1/2017 11:50 AM
17-1260201Christian, Hopkins
Sheet 4 of 10, 5 of 10, and 6 of 10 lists the reconstructed inlets to be performed.  Will all these inlets need new grates? 
See section 710.03.02 and 710.03.03 of the Standard Specifications for Road and Bridge Construction. Grates may be reused if available and undamaged.  New frames will be installed at the revised elevation with cast in place concrete.  Only structures with damaged grates or grates that are missing will require new grates.
12/1/2017 11:51 AM
17-1260201Christian, Hopkins
Will the median need to be stripped of vegetation prior to constructing the DGA wedge and new graded profile? 
No.
12/1/2017 12:08 PM
17-1260201Christian, Hopkins
Will the outside shoulder area beyond the pavement need to be stripped of vegetation prior to placement of final stone and graded profile?
No.
12/1/2017 12:09 PM
17-1260201Christian, Hopkins
Is the contractor permitted to implant dowels in the concrete pavement by mechanical means in lieu of using dowel basket assemblies?
Yes. The Special Note for Dowel Bar and Tie Bar Placement in JPC Pavement will be added by addendum and will apply whether the Contractor uses traditional dowel baskets or a mechanical means.
12/1/2017 3:12 PM
17-1260201Christian, Hopkins
The pavement removal and tapering details on page 96 of 270 shows the Crushed Aggregate #2 wrapped in Geotextile Fabric Type 3, should that read Geotextile Fabric Type 4? There is a bid item for Type 4 but not Type 3. Please clarify.
Yes. An addendum will be issued to revise the detail on page 96 to illustrate the use of Geotextile Fabric Type 4.
12/1/2017 3:19 PM
17-1260201Christian, Hopkins
It appears the quantity for line item 0210 Paved Ditch Type 1 is incorrect. The bid quantity for the paved ditch type 1 on Proposal sheet 93 are in units of linear feet and the bid quantity for the paved ditch type 1 on Proposal sheet 267 are in square yard units. Please verify.
An addendum will be issued to correct the quantities.
12/1/2017 3:28 PM
17-1049100Perry
There are two pay items for REMOVE LIGHTING. Please clarify.
An addendum has been posted to remove the duplicated item.
12/4/2017 9:20 AM
17-1049100Perry
Regarding Item 23791EC – “Pave Striping-Chevron Markings”, please clarify if this item is paint or thermoplastic.
The item will be thermoplastic.
12/4/2017 9:24 AM
17-1049100Perry
Will the cross-hatching that is indicated on the striping plans be included in the chevron markings or will there be a separate bid item issued?  Please clarify if paint or thermoplastic.
The cross hatching has been quantified in Item 6545 Pavement Striping-Thermo-8” Yellow.
12/4/2017 9:26 AM
17-1261102Rockcastle
Regarding proposal bid items 15132-S CIPP LINER 54 INCH, 15133-S CIPP LINER 60 INCH, and 15135-S CIPP LINER 72 INCH - the quantity shown for each appears to be half of what the field measurements indicate they should be.  Can the Department confirm these culverts are to be CIPP lined from end-to-end and will not be “part-liners”? And can the Department confirm that, if lined, the contractor will be paid for the actual total footage at the bid item unit price even if the line is twice as long as the stated lengths in the proposal?
The lengths of the CIPP liners shown are based on half the length of each size pipe within the project limits.  These are estimated quantities.  The actual needed lengths of lining for each size pipe will be determined by the Engineer during construction.  The Department will make payment per linear foot for material used.
12/4/2017 9:47 AM
17-1052103Jefferson
In accordance with the note on page 106, as well as the Maintenance of Traffic Sections on sheets 114 & 115, existing shoulders are to be used for traffic.  Payment for shoulder preparation and restoration is to be as directed by the Engineer and included in the Maintain and Control Traffic bid item.  Without quantifying this work, the Engineer has sole authority to determine the extent of “preparation” and associated expense.  Will the Department consider revising by adding specific bid item(s) such as Asphalt Level and Wedging?
All modifications to the shoulders for Maintenance of Traffic shall be as directed and/or approved by the Engineer.  If the shoulders require partial depth patching or full depth repairs, payment will be made using the appropriate bid items (partial depth patching, remove PCC pavement, JPC Pavement – 10 IN, ETC.).  Minor, temporary or emergency repairs utilizing leveling and wedging, as Directed by the Engineer, will be considered incidental to the bid item “Maintain and Control Traffic”.  If temporary leveling and wedging is used for shoulder repairs, the temporary repaired areas shall be replaced using partial depth patching or full depth patching as directed by the Engineer.
12/4/2017 11:21 AM
17-1261102Rockcastle
Based on the balance of material in the median, there appears to be a need to provide a significant amount of borrow material from an offsite waste area during phase 1 when there is not access to soil within the disturbed limits.  If offsite borrow material is required to establish grade in the median, what will the requirements be for the soil classification, plasticity index, etc.? 
Borrow material, if required for subgrade, shall meet the minimum CBR value of 3 and have a maximum plasticity index (PI) of 20.
12/4/2017 11:35 AM
17-1258101Pike
In regards to the existing temporary barrier wall on the John Moore Branch Bridge, can the Department provide the location or distance to the location where these wall be taken once the project is complete?
The temp barrier wall is to be delivered to an excess material site on the new US 460 (KY 3174).  The area is approximately 1.25 miles from the interchange with US 23 and US 460 (KY 4174).  The site is approximately 20 miles from the John Moore Branch Bridge.
12/4/2017 11:39 AM
17-1049100Perry
Regarding Items 06530 and 06533 – “Pave Striping Removal 4 In & 12 In, please clarify if paint or thermoplastic is to be removed and specify the method of removal.
REVISED: The 4 Inch Pave Striping Removal item is for Paint and the 12 Inch Pave Striping Removal is for Thermoplastic.  Please see Plan Sheet R69 – Note 8. REMOVAL OF PAVEMENT MARKINGS for the removal methods.
 
 
12/4/2017 9:44 AM
17-1048304Hopkins
The project has a pump station bid item and is shown on the plans, however, there are no details or specifications for this pump station. Can the Department clarify what will be required as far as pumps, electrical, etc.?
The existing pump station is a small residential station in a small diameter basin. It only serves the lower floor of the T & T Square building. The contractor shall abandon the existing station and replace in kind as shown on the drawings. The same make, model, and size of the pumps shall be used or equivalent.  The contractor shall submit shop drawings for approval prior to construction.  All electrical required shall be the responsibility of the contractor.
12/4/2017 2:29 PM
17-1260201Christian, Hopkins
Standard drawing RDD-001-06 and Section 709.03 of the Standard Specifications reference placing sod adjacent to the Paved Ditch. Will this be required and if so how will the will the sod be paid?
Contrary to Standard Drawing RDD-001-06, sod will not be required.  Erosion control blanket will be used for all seeding applications in the medians including areas adjacent to the proposed paved ditches.
12/4/2017 11:36 AM
17-1260201Christian, Hopkins
How is the asphalt cap for the underdrain to be paid and what is the estimated quantity?
See Note 5 on the Paving Summary for both Christian and Hopkins Counties.
12/4/2017 3:08 PM
17-1048304Hopkins
On page 109 of the proposal, a note states that there are construction drawings and exhibits for the Electrical Utility Relocation. Where is this information located?
An addendum will be posted to add the information.
12/4/2017 3:12 PM
17-1048304Hopkins
Is the quantity for Cement Concrete Entrance Pavement 8 inch correct?
No.  An addendum will be posted to correct the quantity.
12/4/2017 3:18 PM
17-1052103Jefferson
There are several areas where the travel lanes are currently lower than the shoulder by at least 3/8 inch. The plans call for a four foot feather pass of diamond grinding. Does the diamond grinder have to match the travel lane in areas where it is depressed and no patching will occur?
Areas in which the roadway are lower than the shoulder, and not being repaired with this contract will be further evaluated by department engineers to determine the best course of action.  If drainage problems exist, additional removal of pavement may be necessary.  At this time, it is not anticipated having to diamond grind 3/8 inch on the shoulders.  If additional diamond grinding is required, the Department will pay the additional quantities per additional pass using the bid item and price established.
12/4/2017 3:39 PM
17-1052103Jefferson
Regarding the nightly 9am -5pm work hours, are the first couple of loads being tested, allowing the contractor approximately a four hour cure time before the cylinders are broken (2 hours prior to the road opening)?  Will the contractor be allowed to pour concrete during the weeknight?
Cylinders are made, in addition to those used for the random acceptance testing, on the LAST pour to ensure all concrete has met the open to traffic requirement.  Full depth concrete pours will not be allowed during the weeknight closures unless approval is given by the engineer.  The intent is that all full depth concrete pours shall take place during the weekend closures.
12/4/2017 3:42 PM
17-1048304Hopkins
There is no bid item for INSTALL STEEL STRAIN POLE. Please advise.
An addendum has been posted to add the bid item.
12/4/2017 4:16 PM
17-1256107Nicholas
There is some confusion regarding the phasing in the area of the KY 36 Connector.   Phasing sheets show diversion 1 to be constructed in phase 1-A.  A note on the plans state that mainline STA 694+00 to 708+00 to be constructed in Phase II.  It appears as though mainline STA 694+00 to 708+00 has to be constructed in order to construct diversion 1, which would require construction of 694+00 to 708+00 in phase 1A, not phase II.   The additional earthwork required for construction of diversion 1 is the only quantities shown on the end areas on the cross sections.  The majority of the earthwork for this diversion is included in the mainline quantities.  Please clarify.
The proposed grade of the project will be approximately 5’ below the Existing US 68 at approximate mainline station 702+25.  The Diversion is to be constructed to allow traffic to continue to use the existing US 68, crossing existing US 68 at grade at approximate station 302+00.  In phase I-A, traffic is transferred onto the newly constructed US 68 and diversion No. 1 and the connection between old US 68 and KY 36 will be closed to allow the construction of the new KY 36 intersection (see sheet R 86) and completion of the proposed US 68 which could not be constructed before this phase while maintaining traffic on existing US 68.  The earthwork required for constructing Diversion  No. 1 may be included in the final earthwork for the project.  To reflect this, cross sections X310-X320 illustrate the construction required for the diversion versus the overall project where the final surface is shown together with the Diversion surface.
12/4/2017 4:20 PM
17-1256107Nicholas
The “Utilities and Rail Certification Note” in the proposal identifies several utilities that require relocation by the utility owner.  Considering this will be a completion date contract, please provide expected dates when these utilities will be relocated.  How will the completion date be extended if these relocation dates are not met?  Will the Department consider making this a working day project?
KU Distribution – The company has relocated all but two poles.  All work will be complete by February 1, 2018;  Spectrum – Start date has not been provided.  The company has been given a clearance date of August 1, 2018;  Nicholas County Water District– The District just began working.   The company has been given a clearance date of August 1, 2018;  Columbia Gas – The company has completed their relocation work.  All that remains is some seeding and erosion control work;  AT&T KY - The company is scheduled to start work by December 8, 2017.  The company has been given a clearance date of August 1, 2018;  Bluegrass Energy - Start date has not been provided.  The company has been given a clearance date of August 1, 2018.  The completion date will remain fixed.
12/4/2017 4:23 PM
17-2304310Hardin
Is tack required over the scrub seal for the ultrathin pavement alternate?
Yes.
12/5/2017 9:04 AM
17-1050106Clay
The piers for Drawing 27581 are on drilled shafts but the “Special Notes for Drilled Shafts” are not in the Proposal. Also, Sheet S6 of drawing 27581 says the contractor is responsible for providing sub-surface exploration to establish tip elevations for the drilled shafts. The pay items for this Geotechnical work are not included in the Bid Items. Please advise.
An addendum will be posted to add the notes and bid items.
12/5/2017 9:06 AM
17-1050106Clay
Can the Department provide the existing bridge drawings for this project?
No, the existing bridge drawings are unavailable.
12/5/2017 9:07 AM
17-1050106Clay
The quantity for the end bent wings for Structure 27581 appears to be included in Class A in lieu of Class AA. Please clarify.
Class “A” concrete is for Barrier Wall on sheet S26.  The Class “AA” concrete for the wingwall is included in the Superstructure quantity.
12/5/2017 9:27 AM
17-1050106Clay
The quantity for the Class A modified for the Drilled Shafts for Structure 27581 is not included as a bid item. Is this item incidental to the Drilled Shafts or will a bid item be added?
The Class A modified concrete will be Incidental to Drilled Shafts.
12/5/2017 9:32 AM
17-1050106Clay
The quantity of reinforcing steel for the Drilled Shafts for Structure 27581 is included in Bid Item 08150 Steel Reinforcement.  Should this item been incidental to the Drilled Shafts? 
Yes.  An addendum will be posted to revise the Steel Reinforcement bid item. The Steel Reinforcement for drilled shafts will be incidental to the Drilled Shaft bid item.
12/5/2017 9:35 AM
17-1050106Clay
The quantities for barrier wall shown sheet S26 for Structure 27581 do not appear to be reflected anywhere in the bid quantities. Please advise.
The quantities for the Barrier Wall are included in the superstructure quantities.
12/5/2017 9:36 AM
17-1050106Clay
In the traffic drawings on sheets T11 and T12, there is no indication as to where power supply should be obtained.  Where will power supply be for lighting?
The contractor will not be responsible for the power source.
12/5/2017 9:46 AM
17-1260201Christian, Hopkins
After Crossovers #1 and #4 are removed, will the Department pay for the Edge Drain, DGA, Asphalt Base, Asphalt Surface, Asphalt Seal Coat, and Asphalt Seal Aggregate in order to get the inside shoulder back to like conditions?
Removal of the crossovers, as well as restoration of the median and shoulders to its existing condition prior to installation of the crossover, will be considered incidental to the bid item CROSSOVERS.
12/5/2017 10:25 AM
17-1256107Nicholas
There is excavation associated with the construction of Diversion #1.  Will this excavation be measured and paid for under the bid item for Roadway Excavation?
Roadway excavation shall be measured to the mainline template.  Only the earthwork required to construct Diversion No.1  relative to the final template shall be incidental to DIVERSIONS (BY-PASS DETOURS) lump sum item .  Areas shown on the Temporary Diversion reflect this and are for information only.
12/5/2017 10:34 AM
17-1256107Nicholas
Maintenance of Traffic note number 5 is not practical for Diversion #1 (it is impossible to rebuild a presplit slope).  Does this note apply to Diversion #1?
Note 5 will not apply to Diversion No 1 as it will be within the disturbed limits of the final template.
12/5/2017 10:35 AM
17-1261102Rockcastle
On page 87 of the proposal, it is states “Temporary Barrier wall installation will NOT be allowed prior to March 1, 2018.  Engineer may allow prior installation based on District’s choosing.”  The date of March 1, 2018 appears to be due to concerns with snow removal activities on main line I75 during the winter months.  With the work on Ramp C being prohibited by notes on the Maintenance of Traffic from Memorial Day to Labor Day, will district personnel permit placement of barrier wall on the ramps and/or Mainline US25 prior to March 1st to expedite the excavation work during winter months?
Temporary Barrier Walls will be allowed to be installed on US 25 and the ramps prior to March 1, 2018, excluding ramp C.
12/5/2017 10:40 AM
17-1261102Rockcastle
Plan sheet  R228 depicts some conflicting information.  There is a boring that shows a refusal depth of 26’ for a bore hole in the middle of the cut, but the face of the cut depicts limestone face.  There is a separate bore hole in that location that shows a more shallow refusal depth.  This appears to be a mud seam that in the middle of the cut that inaccurately depicts the correct rock elevation.  Based on the observation the information depicted on R228 of the geotechnical plans maybe conflicting and this is a unclassified excavation project, could the RDZ lines on the cross section plans for Ramp C may be higher or different than has been depicted and the volumes of common and rock may be inaccurate?
The geotechnical information at station 316+00 is correct for Ramp C.  The information does not however represent the depth to rock or the base of the RDZ throughout the cut slope. The limestone in this area is highly karst and depths to rock can vary due to fractures/solutioning.  Determining the depth of the RDZ through karst rock formations can be extremely difficult and unpredictable.  Bedrock on the existing ramp is exposed from the ditch up to 10-15’ from the top of the cut slope.  From the rock exposed on the existing slope, the RDZ is more likely be less than 10’-15’ below the surface with the exception of unforeseen locations where the limestone has been solutioned and created deeper pockets of soil, such as the location of the borings drilled at station 316+00.
12/5/2017 10:54 AM
17-1050106Clay
Does a contractor have the option to utilize a PRECAST THREE SIDED STRUCTURE in Accordance with SECTION 615 as an alternate to the bid plans as designed for both BRIDGE CULVERT-HART BRANCE-DRAWING #27582 and BRIDGE CULVERT-COAL HOLLOW – DRAWING #27583 assuming the supplier/manufacturer provides signed and sealed CALCULATIONS, SHOP DRAWINGS, FOUNDATION DESIGN and CONTRACT DRAWINGS by a P.E. registered in KY that meet the GEOTECHNICAL, DESIGN DATA and HYDRAULIC OPEN requirements as shown in the bid plans?
The contractor shall bid according to the plans and proposal.  Section 111 (Value Engineering Change Proposal) of the Standard Specifications for Road and Bridge may be utilized for submission of different culvert options.
12/5/2017 11:12 AM
17-1255104Morgan
Roadway Lighting Sheet T4 does not indicate where to take conduit for the power supply.  Will the new lighting be tied into existing lighting?  Is there an existing junction box to tie into?
The contractor will only install bases, conduit, and junction boxes.  It will be up to the city to install the remaining items by permit after the project is complete.
12/5/2017 11:25 AM
17-1052103Jefferson
Will a ramp closure for SB I-65 to EB I-265 be allowed in order to complete the proposed work for the ramp bridge over I-65?
No.
12/5/2017 12:05 PM
17-1050106Clay
There are several issues with incorrect bid items.  For example, in Section 0007 the quantities shown are for Drawing No. 27606 (Instead of Drawing No. 27605). The quantity for Bid Item 1830 Type IV Geotextile Fabric should be 460 sy (not 1.3 sy). Also, the quantities in Section 0008 are for Drawing No. 27605 (Instead of Drawing No. 27606). The bid item for 359 cy of Class B concrete was omitted. Please advise.
An addendum will be posted to correct the bid items.
12/5/2017 12:20 PM
17-1260201Christian, Hopkins
As it relates to the median crossovers, will the contractor be required to install temporary traffic barrier and crash cushions as shown in the Standard drawings TTC-146-02? If so, how will this work be paid for and does the department have any barrier wall available to use?
Yes. The contractor has to follow TTC-145 and TTC-146 (current edition).  An addendum will be posted to add the necessary bid items.
12/5/2017 12:31 PM
17-1260201Christian, Hopkins
The special not for pavement types on the last page of addendum #1 states that the Department will not accept any value engineering change proposals for the substitution or elimination of JPC pavement on the mainline Pennyrile Parkway or mainline Pennyrile Parkway inside shoulder, by use of an alternate paving material.  The MP noted at the top of the page is MP 16.566 to MP 19.900 NB & SB.  The scope of work in the proposal states the MP for the project are MP 16.556 to MP 29.900.  Does this mean the department will consider a value engineering proposal for the portions of the project that are outside the MP listed in the special note?
No. An addendum will be issued to reflect the correct Mile Posts for the “Special Note for Payment Type”.
12/5/2017 12:36 PM
17-1261102Rockcastle
Regarding the proposal bid items for CIPP liners, can the Department confirm that each pipe to be lined will be lined beginning to end at an existing access point?
If partial lining of a pipe is needed, it will be lined from either a box or inlet/outlet and extend to another box or inlet/outlet.
12/5/2017 12:50 PM
17-1259109Webster
Note (2) on Page 20 of the proposal states 250 tons of CL3 Base 1.00D has been added to the project for pavement base repairs.  Will this base be placed after the lanes have been milled or before the milling operation?  And after it is placed, will it be required to sit for 7 days like base failure repairs on other projects?
After the surface has been milled, the Engineer will determine if additional milling and base repair is necessary.   Surfacing over this operation can commence the same day.
12/5/2017 12:52 PM
17-1048304Hopkins
What kind of 8” PVC is to be used for the 8” PVC waterline?
SDR 18 PVC pipe is acceptable for the 8” waterline.
12/5/2017 1:16 PM
17-1049100Perry
A bid item for “MSE Retaining Wall” is missing. The plans for the Morton Blvd. Bridge No. 27596, includes the info for this wall. Please advise.
An addendum will be posted to add the bid item.
12/5/2017 1:34 PM
17-1049100Perry
The Pre-Bid Meeting minutes state the pipe material for bore and jack should meet all requirements for culvert and storm sewer applications. The material types for culvert and storm sewer specs are not suitable for jacking. Please clarify?
Special Note 11E will be added to the proposal. Refer to this special note for pipe material required for boring and jacking and for wall thickness requirements of pipes up to 42 inches. Item 21661ES706 - 66 inch bore & jack pipe will require a wall thickness of 0.938 inches. Item 23127EN – 72 inch bore & jack pipe will require a wall thickness of 1.00 inches.
12/5/2017 1:36 PM
17-2301307Barren
Will the Department add the bid items for milling and texturing and mobilization for milling and texturing for the bridge ends? Will any other milling and texturing be required for this job?
An addendum will be posted to add the bid items and associated notes.
12/5/2017 1:55 PM
17-1260201Christian, Hopkins
Note 13 on page 177 of the proposal states that existing paved median U-turns will be overlaid throughout the project.  Will these be overlaid with asphalt or JPC pavement?
Median U-turns will be JPC Pavement.  Quantities for this work are included.  See RPS-034 for joint types and spacing.
12/5/2017 2:01 PM
17-1049100Perry
Please clarify what is intended with the electrical upgrades on the pump stations.
Upgrades include new control panels, generator hookups and double throw disconnects.  Meter bases and poles with service entrance and platforms should be in place and reusable.
12/5/2017 3:41 PM
17-1048304Hopkins
Page 20 of 93 from the notes added in Addendum #1 states that the poles are to be furnished by the utility owner.  Is this correct?
No.  The poles shall be furnished by the contractor for this project.
12/5/2017 3:58 PM
17-1260201Christian, Hopkins
Will the Department allow contractor to utilize on-site borrow areas within KYTC ROW for fill dirt required? 
No.  Borrow material must be obtained off Right of Way.
12/6/2017 10:51 AM
17-1260201Christian, Hopkins
Sheets 16 and 17 of the proposal do not show the acceleration lane widening at Exit 23.  For the acceleration widening at Exit 23, will “Remove Pavement” be paid for removing the existing outside shoulder?  Or is that work incidental to Roadway Excavation?
No.  Pavement removal for the acceleration lane widening is within the template and will be considered incidental to “Embankment in Place”.
12/6/2017 11:06 AM
17-1260201Christian, Hopkins
At areas of existing mainline pavement removal, will removal of existing asphalt shoulders be paid as “Remove Pavement” or is “Remove Pavement” only for removal of concrete pavement?
All pavement deemed to be removed (shoulders and mainline) (EXCEPT pavements that are included in a roadway excavation measurement, particularly the ramp widening pavement removal) is to be measured by the square yard for payment.  Removal of concrete in the ramp acceleration extensions is within the template and will be incidental to the item “Embankment in Place”.
12/6/2017 12:30 PM
17-1260201Christian, Hopkins
Will the Department allow rubblized concrete removed from roadways to be utilized on site as slope protection or buried near toe of large slopes within the Right of Way?
Rubblized concrete may be used in embankments only, assuming no steel is protruding and no pieces larger than a foot in diameter are present.
12/6/2017 12:31 PM
17-1260201Christian, Hopkins
Does the Special Note for Longitudinal Texturing of Concrete Pavement in Addendum #1 apply only to the mainline concrete pavement or does it also apply to the shoulder concrete pavement?
Shoulder pavement may be longitudinally or transversely tined.
12/6/2017 12:31 PM
171260201Christian, Hopkins
What preparation work will be required on the existing mainline concrete pavement prior to placement of the asphalt bond breaker?  Will all existing asphalt pothole patches need to be removed and replaced?  Will the contractor be paid for this work?     
Removal of existing asphalt patching or potholes will not be required.  The Engineer will determine what corrective work will be needed and it will be paid accordingly.  Minimal to no preparation is expected.
12/6/2017 12:38 PM
17-1260201Christian, Hopkins
What preparation or repair work will be required on the existing asphalt shoulders prior to placement of the asphalt bond breaker?     
The Engineer will determine what corrective work will be needed and it will be paid accordingly.  Very minimal to no preparation work is expected on the shoulders.
12/6/2017 12:38 PM
17-1260201Christian, Hopkins
During an onsite investigation of existing roadway conditions, it appears that there is significant settlement of pavements throughout the project.  In some locations, it appears that asphalt bond breaker thickness may need to be 5” to 6” in order to correct the existing condition to meet a properly designed new profile.  If this is the case, does the Department desire to have a substantial thickness of bond breaker or will the Department consider adding a new bid item to pay for additional cubic yards of concrete required to re-profile the project in lieu of additional thickness of bond breaker material?
In areas needing significant correction, place the bond breaker in multiple lifts no greater than 2.0 inches.  Corrections should be made with the bond breaker material at the discretion of the Engineer.
12/6/2017 12:37 PM
17-1260201Christian, Hopkins
During an onsite investigation of existing roadway conditions, it appears that there is significant settlement of pavements throughout the project.  This is concerning since an IRI of 80 is required for the JPC Pavement for 100% payment.  Will the proposed profile design that the Department will provide to the contactor follow the existing roadway conditions and profile or will it follow proper design criteria to allow for this stringent ride specification to be met?  If it follows the existing profile, the contractor will be required to place additional thickness of concrete in order to meet the smoothness requirements.  In this case will the Department consider adding a new bid item to pay for additional cubic yards of concrete required to construct new pavement to meet smoothness requirements?
A new proposed best fit profile and surface will be developed and provided to the contractor.  No new bid item will be added.  Corrections to the existing profile should be made with the bond breaker at the discretion of the Engineer.
12/6/2017 12:37 PM
17-1049100Perry
There is a note on Drawing No. 27767 stating shoring will be required to maintain the limits of the Commercial Drive/Parking Lot during construction of the retaining wall.  It appears there is very little room to install any type of shoring between the edge of the foundation and the back of the guardrail, not to mention an existing underground utility in the area as well.  It is unlikely that traditional shoring methods will work in this area.  Did the design engineer consider the cost impacts of this when typing the note?
The intent of the note is to require the Contractor to make every reasonable effort to maintain as much of the existing commercial parking and access along Willie’s Way as possible during all phases of construction.   Under no circumstances shall the Contractor impact the businesses above the wall to the degree that it prohibits their normal operations.   If the utility presents an issue, the Contractor can coordinate with the Utility Company concerning possible relocation.
12/6/2017 12:43 PM
17-1052103Jefferson
In locations where the shoulder pavement is removed and replaced, the adjacent area beyond the shoulder edge will be disturbed due to construction. How will the shoulder restoration work such as DGA Shoulder, Chip & Seal, etc., be paid?
The Contractor is to minimize impacts to the DGA shoulder adjacent to pavement removal areas on the outside shoulder.  Any DGA required to reshape the shoulders in these areas will be paid at the contract unit price for “DGA Base”.  In areas where the shoulder is being replaced, Asphalt Seal Coat and Asphalt Seal Aggregate shall be required from the outside edge of pavement to a point 2 feet down the ditch or fill slope. Two applications of the Asphalt Seal Coat at 2.4 lb/sy and Asphalt Seal Aggregate at 20 lb/sy will be required. Asphalt Seal Coat, Asphalt Seal Aggregate, and any other items of work required to reshape and seal the DGA shoulder shall be incidental to the shoulder pavement replacement.
12/6/2017 12:46 PM
17-2300314Warren
Due to the lack of availability of washed No. 9 aggregate for the scrub seal item of work, would it be acceptable to use a washed No. 8 material?  There would be no affect on performance due to the fact the scrub seal is being covered with asphalt or microsurfacing.
No.  Washed No. 9M’s are to be used for the scrub seal items on this project.
12/6/2017 12:47 PM
17-2304310Hardin
Due to the lack of availability of washed No. 9 aggregate for the scrub seal item of work, would it be acceptable to use a washed No. 8 material?  There would be no affect on performance due to the fact the scrub seal is being covered with asphalt or microsurfacing.
No.  Washed No. 9M’s are to be used for the scrub seal items on this project.
12/6/2017 12:47 PM
17-2290405Carlisle, Graves
Due to the lack of availability of washed No. 9 aggregate for the scrub seal item of work, would it be acceptable to use a washed No. 8 material?  There would be no affect on performance due to the fact the scrub seal is being covered with asphalt or microsurfacing.
No.  Washed No. 9M’s are to be used for the scrub seal items on this project.
12/6/2017 12:48 PM
17-2302402Edmonson
Due to the lack of availability of washed No. 9 aggregate for the scrub seal item of work, would it be acceptable to use a washed No. 8 material?  There would be no affect on performance due to the fact the scrub seal is being covered with asphalt or microsurfacing.
No.  Washed No. 9M’s are to be used for the scrub seal items on this project.
12/6/2017 12:48 PM
17-1260201Christian, Hopkins
Will the Department consider extending the completion date to mid-November 2019?
No.
12/6/2017 2:44 PM
17-1048304Hopkins
Is the contractor required to obtain any local or state certifications or licenses other than KYTC prequalication to complete the Sanitary Sewer and Water Main relocaitons?
No other certifications are required other than what is required by KYTC.
12/6/2017 4:07 PM
17-1048304Hopkins
Item 1250 S Directional Bore (80 LF): Per section 02725 1.1 of the utility specification, “…sewer mains installed in a bore under streets, highways and railroads must be cased…” Please verify that this item is to include a steel casing per 2.1.B of the utility spec.
Since the two crossings are at a minor City side street, the contractor is to directional bore the existing roadway portion to not disturb the existing pavement. Steel casing will be not be required for these two areas.
12/6/2017 4:07 PM
17-1048304Hopkins
Is the abandonment of the sanitary sewer pipe to be completed by cut and cap or by placing flowable fill in the entire pipe?  How is the abandonment of the existing sanitary sewer pipe to be paid?
To abandon the existing sewer, plug the existing line at the manhole that is to be abandoned/removed.  This cost is incidental to the cost of S Manhole Abandon/Remove.
12/6/2017 4:07 PM
17-1048304Hopkins
How is the water line abandonment to be completed and paid?
The waterline is abandoned by cutting and capping and is paid for by W Cap Existing Main.
12/6/2017 4:08 PM
17-1049100Perry
For Perry County's Sanitation District # 1 there are bid items that appear to be missing.  What are the 6 submersible sewer pumps for?
The bid items will be added by addendum. The six (6) submersible sewer pumps are replacement pumps for the Combs pump station (2), Cherokee Hills pump station (2) and Frogtown pump station (2).  These are in conjunction with the pump station rehab required for these pump stations due to the rerouting of the sewer lines for this project.
12/6/2017 4:38 PM
17-1050106Clay
Will a low water crossing be allowed near/in Goose Creek?
A low water crossing is permitted in Goose Creek.
12/7/2017 8:56 AM
17-2304310Hardin
Will the side road approaches be covered with microsurfacing or ultrathin for either alternate?
Side road approaches will not be covered.
12/7/2017 9:04 AM
17-1256107Nicholas
Can excess material earth material be placed in the ultimate fill areas for the future 4 lane section?
Excess material may be placed in the ultimate fill area for the future 4 lane section, but must be placed as an engineered fill  as per the Standard Specifications for Road and Bridge Construction.  Material shall be placed, graded and compacted to ensure positive drainage.  Any area utilized must be seeded and protected.
12/7/2017 9:17 AM
17-2303311Hardin
Is the quantity for temporary paint correct?
The Department will make payment for placed and accepted quantities of striping material.  Please bid accordingly.
12/7/2017 9:54 AM
17-1041306Madison
Is the existing traffic signal at the intersection of Ellipse and US 25 to be removed?
Revised: Yes, after construction of the new signal.
 
12/5/2017 9:49 AM
17-1041306Madison
Is it the intent of the cabinet to have 2 operational signals at the intersection of Ellipse Street and US 25 and the completion of the project? 
No. The intent is to keep the existing signal operational until the new signal is constructed and then remove the existing signal, utilizing the new signal.
12/7/2017 10:08 AM
17-1041306Madison
On the east corner of the intersection of Ellipse Street and US-25 there is a 2” rigid steel conduit coming down the steel strain pole and looks to be fed overhead to transformer and powers the Collison and church sign behind it.  There is a meter beside the signs.  Is this powered by conduit coming down strain pole and if so is it to be re installed and shall it be maintained throughout construction ?
There is a new lighted Berea Collision Center sign which is on Existing R/W which will be the owner’s responsibility to replace.  The meter beside the signs is owned by Berea Municipal Utilities.  The meter must be maintained during construction. The disturb limits do not show disturbing the meter but if it is disconnected it must be reconnected.
12/7/2017 12:08 PM
17-1041306Madison
There is street lighting on Fairground Drive that looks to be powered by overhead coming off of the intersection at Ellipse Street and US-25.  Is this to be reinstalled or maintained throughout construction?
The existing lighting will be maintained during construction.
12/7/2017 12:09 PM
17-1041306Madison
For bid item code 14024 - W MAIN POINT RELOCATE  — will it be required that the small lengths of waterline installed for the point relocate be pressure tested and chlorinated (disinfected)?  Will the existing water main where the point relocations occur be valved off and isolated from water flow?
All new water pipe and fittings shall be pressured tested and disinfected. Testing shall be coordinated with Berea Municipal Utilities.  The section of existing water main may be isolated utilizing existing valving subject to availability and approval from The Berea Municipal Utilities.
12/7/2017 12:10 PM
17-1041306Madison
Would the Department consider adding a bid/pay item for existing parking lot and/or roof drain connections to the new storm drainage system?
See General Notes sheet R2h Special Notes: All parking lot drains whether shown on plans or not will tie into the proposed ditches or storm sewers. All the necessary material and labor to perform this work are incidental to the contract.
12/7/2017 12:11 PM
17-1041306Madison
Since it’s likely the roadway excavation materials could be unsuitable for dressing and seeding/sodding, will the Department consider adding a bid/pay item for TOPSOIL FURNISHED AND PLACED (KYTC ITEM CODE # 05997)?  
No, suitable material needed for the dressing and seeding/sod will be incidental to the roadway excavation bid item
12/7/2017 1:25 PM
17-1256107Nicholas
Although note 5 on page R2M states the excavation quantity includes the transverse benching quantity, the quantity is not included in the “Project Earthwork Total” table at the bottom of the same sheet nor is it included in the “Earthwork Summary Spreadsheet” that is part of the supplemental folder.  Should the 104,715 cubic yards be added to the total bid quantity?
No additional roadway excavation should be added to the total bid quantity.  The transverse benching quantity is included in the Project Earthwork Totals as adjusted by Note B.
12/7/2017 2:31 PM
17-1047105Green
It appears a bid item for the Temporary Signal 2 Phase (Item 4933) has been left out of the proposal.  Will there be a bid item added for the 2 Temporary 2 Phase Signals required in the Maintenance of Traffic Phasing?  This item is listed in the general summary but not included in the bid items.
A Temporary Signal 2 Phase will be handled by a Supplemental Agreement in accordance with the Standard Specifications.
12/7/2017 2:48 PM
17-1041306Madison
In the proposal line item 1760 24955ED States to remove signal equipment Ellipse Street for a quantity of 1.  There is also signal equipment that will need to be removed at Glades Rd and US25.  Please clarify.
Removal of the signal at Glades Road and US 25 will be handled by supplemental agreement in accordance with the Standard Specifications.
12/7/2017 2:50 PM
17-1260201Christian, Hopkins
Paving summary quantity sheet for Christian County shows 10,680 Tons of Crushed Aggregate Size No. 2 and Hopkins County shows 10,253 Tons.  The general summary for Christian County shows an additional 35,292 Tons for Ditch Slope detail, slide repairs, perf pipe headwalls and pavement undercuts and Hopkins County shows 14,161 for the same items.  That totals to 70,386 which is the Bid Item total.  It appears that the combined paving summary total of 10680+10253 = 20,933 for pavement undercuts was counted twice.  Should the Crushed Aggregate Size No. 2 bid item be 35292+14161 = 49,453 Tons?  Which is the 70,386 minus 20,933?
The pavement undercuts were not duplicated in the general summary estimates. The estimated quantity of 70,386 tons is correct.
12/7/2017 2:52 PM
17-1260201Christian, Hopkins
Is a field office for the owner required as an incidental cost to the contract?
A field office is not required on the project.
12/7/2017 2:58 PM
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
200 Mero StreetFrankfortKY40622KY8:00 a.m.-4:30 p.m. EST, M-F(502) 564-3500rachel.mills@ky.gov?subject=Construction%20Procurement%20Website:%20Comments%20and%20Suggestionshttp://maps.google.com/maps?hl=en&q=200+mero+street+frankfort+ky&ie=UTF8&hq=&hnear=200+Mero+St,+Frankfort,+Franklin,+Kentucky+40601&gl=us&sqi=2&z=16&iwloc=A