Click
on a category name to view a list of prequalified firms
for the engineering and related services:
(DBE prequalified firms are defined
with an asterisk.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rail
System Planning is no longer a part of the Division of Planning's
prequalification criteria. |
| Please
note the addition of the RENEWAL DATE to
these reports. A firm's prequalification expires on the renewal
date. Annual prequalification renewals shall be submitted
one month prior to the renewal date in order that the firm's
prequalification does not lapse. A firm must be prequalified
prior to posting of the Bulletin. |