| Menu
Value
Engineering
|
Latest
Updates
- The
Cabinet has decided not to proceed with the selection of the
2008-06 Bulletin advertisement for Statewide Geotechnical Engineering
and Laboratory Services. Response to the Announcements will
be returned to those firms which submitted.
- The
Cabinet has decided not to proceed with the selection of the
2008-06 Bulletin advertisement for Statewide Geotechnical Drilling
Services. Response to the Announcements will be returned to
those firms which submitted.
- Rail
System Planning is no longer a part of the Division of Planning's
prequalification criteria.
-
On page 5 (Available Team Workload Capacity) of the Response
to Kentucky Transportation Cabinet's Announcement for Engineering
and Related Services, please be sure to include any design build
project responsibilities in the status of current workload,
and projected workload for at least the next 18 months, of the
key project team members from page 4.
- Please
mark all original proposals
|