QUESTION: The project length in the bulletin is listed as approximately 3 miles. The project appears to be 5 miles. ANSWER:
The information in the bulletin was in error.
The correct project length is 5.7 miles. QUESTION: The scope for the subject project includes “preparation for approval of the appropriate environmental document”, but environmental is shown as being by the Department and no environmental prequalifications are listed. ANSWER:
The information in the scope of work listed in the advertisement was
in error. The department will be responsible for the preparation for
approval of the appropriate environmental document. QUESTION: How do you want us to certify according to the new instructions regarding Federal Funds? On page 2 add: “I certify that hat to the best of its knowledge and belief, Firm Name Consultant Company and/or its Principals is (are) not presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any State or Federal agency." 2008-03 Calloway 1-314.20 QUESTION: Can you tell me if the Calloway County (US 641) project ends at the Middle Fork Clarks River Bridge or the Clarks River Bridge? The first page of the RFP says the Clarks River Bridge, the map provided shows the project ending at the Middle Fork Clarks River Bridge and the KYTC DMI Route Log lists that those two bridges (which we verified on site visit) are right in that vicinity. The DMI Route Log says that the Middle Fork Clarks River bridge is north of the Clarks River bridge. Could you verify the following: 1. Are both the Clarks River Bridge and the Middle Fork Clarks River Bridge included in the project area? 2. Which bridge does the project end at? ANSWER:
The
project ends at the northernmost bridge, which is the Middle Fork Bridge
at MP 5.66.
|
|
The above Q & A