On page 5 (Available Team Workload Capacity) of the Response to Kentucky Transportation Cabinet's Announcement for Engineering and Related Services, please be sure to include any design build project responsibilities in the status of current workload, and projected workload for at least the next 18 months, of the key project team members from page 4. 2007-11 - Oldham County - KY-53 - Item No. 5-388.00 QUESTION: I believe someone must have forgotten to list the environmental prequalifications for the Oldham County job. The consultant is supposed to provide an environmental overview, so the prequals should be listed for those areas. ANSWER:
Prequalification in environmental areas is required for an environmental
overview. The advertisement has been corrected. 2007-11 Jefferson County 5-344.01 KY 1747 QUESTION: The Bulletin states that the scope of the project is to provide engineering services for Phase II roadway design. Have Phase I plans been developed, If so can the Phase I plans be made available for review ? ANSWER:
Phase
I access control alternates have been developed but a preferred alternate
has not been selected. No Phase I Plans or studies are available to
share at this time. All Phase I work will be available to the selected
consultant before they begin Phase II roadway design. 2007-11 - Oldham County - KY 53 - Item 5-388.00 QUESTION: Because of the environmental services required for the referenced project, and because of the complexity of the project, can one additional page be allowed for the Project Approach? ANSWER:
Responses to Announcement for this Oldham County KY 53 project will
be allowed up to a total of 4 pages (A-D) for the Project Approach.
|
|
The above Q & A