Back to Home

 

2007-10 - Caldwell/Christian Counties Bridge Replacement Projects

QUESTION: As this RFP is for two projects, will additional project approach pages be allowed beyond the normal three pages?

ANSWER: On other projects KYTC has allowed extra pages in the Project approach when there was and extra bridge.  In this case there are a total of 3 bridges. An extra 3 pages will be allowed for the project approach in the response to announcement for a total of 6 pages (A-F).

 

2007-10 - Jefferson County 5-183.00

 

QUESTION: The fourth task listed under "Scope" on Page 2 is identified as "Survey/Drawing/Inventory".  However, the description following this task refers to Speeds Studies. 

We would like to confirm whether:

1.  This task should read "Speed Studies" instead of "Survey/Drawing/Inventory"; and

2.  If so, whether "Survey/Drawing/Inventory" will also be a component in this project.

 

ANSWER: The advertisement as originally released contined a typographical error and was missing some information. It should have read:

Survey/Drawing/Inventory – The task order will indicate the degree of sophistication desired.  In most cases, a good sketch with rough distances will be adequate.  Inventories will generally consist of equipment and support infrastructure.

 

Speed Studies – Speed studies need to be manual and in conformance with standard practice from the Traffic Control Devices Handbook or some other reference.  We would also want these to be manual, not tubes or other methods.  These may need to be paid by the number of locations requested and maybe by direction (we typically need speeds at multiple spots as part of the same study).  We may also want to require format of reporting.  We have a standard reporting sheet and excel format.

2007-10 Hardin Co. – 4-8103.00

QUESTION: Item 4-8103.00 in the April 10 bulletin (Hardin County, Elizabethtown to Radcliff Connector) is 6.25 miles long and will be divided into three construction bid packages. Because of the length and the number of bid packages, will the Department consider selecting three consultants or only one?

ANSWER: It is the Cabinet’s intention to select one consultant for the entire 6.25 miles. It is permissible for a consultant firm to team with others with one firm being the prime consultant, responsible for the overall project.

2007-10 Caldwell/Christian Cos. – 2-1063.00 & 2-1068.00

BRIDGE SUFFICENCY RATINGS:

2-1063.00 Replace 3 bridges and approaches on KY 139 over Donaldson Creek (B04), (B05), (B06).

B04 Sufficiency rating 25.5

B05 Sufficiency rating 25.5

B06 Sufficiency rating 24.1

2-1068.00 Replace bridge and approaches on CS 1007 over South Fork of Little River (C80).

C80 Sufficiency rating 23.5 

2007-10 Professional Services Procurement Bulletin

QUESTION: The April bulletin (2007-10) listed "TBD" for the Governor's and Secretary's reps on the selection committees.

Is this information available yet?

If so, can it be posted to the web site?

ANSWER: At the time of the April Bulletin (2007-10), KYTC made a decision to advertise without names of the new Secretary and Governor's pool committee assignments.

The pools have been changed.

Then new Governor pool consists of: 1) George E. Blandford, 2) Howard W. Cruse, III and 3) Edwin W. Dyer

The new Secretary's pool consists of: 1) Shari Greenwell, 2) Ed McCracken, 3) Stuart Goodpaster, 4) Patty Dunaway, 5) Ted Merryman and 6) Matt Bullock

The names of the members assigned to the project committees will be updated in the project advertisements posted on the web as soon as committee assignments are made. A special note will appear on the Program Performance home page when this update occurs. This information will also be posted with the selection results on our website.


2007-10 - Estill County – KY 89 - Item 10-8305

QUESTION: The approximate fee is shown as being $850,000. Prequalification requirements show Rural Roadway Design <$250,000.

ANSWER: The prequalification requirement should be Rural Roadway Design >$250,000. ( Greater than $250,000)

 

 

 

 

 

 

 

 

 

 

 

The above Q & A section is dealing with the 2007-10 Project Listing
(Former name Bulletins)