2007-10 - Caldwell/Christian Counties Bridge Replacement Projects QUESTION: As this RFP is for two projects, will additional project approach pages be allowed beyond the normal three pages? ANSWER: On other projects KYTC has allowed extra
pages in the Project approach when there was and extra bridge.
In this case there are a total of 3 bridges. An extra 3 pages will be
allowed for the project approach in the response to announcement for
a total of 6 pages (A-F). 2007-10 - QUESTION: The fourth task listed
under "Scope" on Page 2 is identified as "Survey/Drawing/Inventory".
However, the description following this task refers to Speeds
Studies. We would like to confirm
whether: 1. This task should read "Speed Studies"
instead of "Survey/Drawing/Inventory"; and 2. If so, whether "Survey/Drawing/Inventory"
will also be a component in this project. ANSWER: The advertisement as originally released
contined a typographical error and was missing
some information. It should have read: Survey/Drawing/Inventory
– The task order will indicate the degree of sophistication desired.
In most cases, a good sketch with rough distances will be adequate.
Inventories will generally consist of equipment and support infrastructure. Speed Studies – Speed studies
need to be manual and in conformance with standard practice from the
Traffic Control Devices Handbook or some other reference. We would also want these to be manual, not
tubes or other methods. These
may need to be paid by the number of locations requested and maybe by
direction (we typically need speeds at multiple spots as part of the
same study). We may also want to require format of reporting.
We have a standard reporting sheet and excel format. 2007-10 Hardin Co. – 4-8103.00 QUESTION: Item 4-8103.00 in the April 10 bulletin (Hardin County, Elizabethtown to Radcliff Connector) is 6.25 miles long and will be divided into three construction bid packages. Because of the length and the number of bid packages, will the Department consider selecting three consultants or only one? ANSWER: It is the Cabinet’s intention to select one consultant for the entire 6.25 miles. It is permissible for a consultant firm to team with others with one firm being the prime consultant, responsible for the overall project. 2007-10 Caldwell/Christian Cos. – 2-1063.00 & 2-1068.00 BRIDGE SUFFICENCY RATINGS: 2-1063.00 Replace 3 bridges and approaches on KY 139 over Donaldson Creek (B04), (B05), (B06). B04 Sufficiency rating 25.5 B05 Sufficiency rating 25.5 B06 Sufficiency rating 24.1 2-1068.00 Replace bridge and approaches on CS 1007 over South Fork of Little River (C80). C80
Sufficiency rating 23.5 2007-10 Professional Services Procurement Bulletin QUESTION: The April bulletin (2007-10) listed "TBD" for the Governor's and Secretary's reps on the selection committees. Is this information available yet? If so, can it be posted to the web site? ANSWER: At the time of the April Bulletin (2007-10), KYTC made a decision to advertise without names of the new Secretary and Governor's pool committee assignments. The pools have been changed. Then new Governor pool consists of: 1) George E. Blandford, 2) Howard W. Cruse, III and 3) Edwin W. Dyer The new Secretary's pool consists of: 1) Shari Greenwell, 2) Ed McCracken, 3) Stuart Goodpaster, 4) Patty Dunaway, 5) Ted Merryman and 6) Matt Bullock The names of the members assigned to the project committees will be updated in the project advertisements posted on the web as soon as committee assignments are made. A special note will appear on the Program Performance home page when this update occurs. This information will also be posted with the selection results on our website. QUESTION: The approximate fee is shown as being $850,000. Prequalification requirements show Rural Roadway Design <$250,000. ANSWER:
The
prequalification requirement should be Rural Roadway Design >$250,000.
( Greater than $250,000)
|
|
The above Q & A
section is dealing with the 2007-10 Project Listing |