Professional Services
This page contains vital information relating to the procurement of professional engineering and engineering-related services. Revisions are made frequently.
 
Please check back periodically for updates.
Body
6/13/2013 11:52 AM

NOTICE: New Pre-Design Conference Minutes & Consultant Monthly Report forms

The KYTC Division of Highway Design​ has updated forms for the Pre-Design Conference Minutes and Consultant Monthly Report. Please refer to the hyperlinks below and use these revised forms in the future.

Pre-Design Conference Minutes

Consultant Monthly Report

6/3/2013 9:37 AM

NOTICE: KYTC District Contact List

The Kentucky Transportation Cabinet has made available a list of contact information in each of the twelve Districts. Please refer to this list of names, addresses and phone numbers sorted by District and position.

District Contact Information

6/3/2013 9:55 AM
5/17/2013 4:00 PM

UPDATED 5-14-13: Project Advertisements for FY13 updated 5-14-13.xlsxProject Advertisements for FY13 updated 5-22-13.xlsx

NOTICE: KYTC is providing a list of projects that it anticipates to advertise for engineering and related service over the next year. Studies, preliminary plans or other documents associated with any of these projects will be made available at the time the project is advertised. DBE requirements for each project will be determined as each advertisement is developed. 

The Kentucky Transportation Cabinet reserves the right to add or delete projects, in whole or in part, from this list without advance notice. Anyone interested in these projects should check this page periodically for updates. After the issuance of this notice, firms or their representatives, and KYTC personnel should exercise professional judgment when discussing any projects from this list so that a "level playing field" is maintained for all potential responding firms.

5/22/2013 8:44 AM

NOTICE: Scope Verification Meetings

In accordance with the FHWA and KYTC Stewardship Plan, dated December 2012, a Scope Verification Meeting (SVM) will be conducted for all federal-aid projects requiring a Categorical Exclusion Level 3 (CE3), EA/FONSI or EIS to document appropriate consideration of environmental impacts. The purpose of the SVM is to gather key members of the Project Team, including FHWA, to assure that all members are in agreement with the work to be undertaken. Normally, the SVM will be conducted during the time between the advertisement for Professional Services and the Pre-Design Meeting. Timing of the meeting is important, to assure that all parties are in agreement with the scope of the work to be tasked to the consultant prior to the Pre-Design Meeting. This project requirement is effective immediately.

Scope Verification Meeting.pdf

4/1/2013 8:50 AM

NOTICE:  KYTC Consultant Construction Inspection Training Survey

The Division of Construction has received numerous inquiries concerning the various certification classes required for consultant inspection. The form below provides the Cabinet with information on the number of individuals that still need to be trained in the various certification courses.  We typically do not train during the summer months, but we realize there are inspectors still needing various certifications.  Please complete the form on the Division of Construction’s webpage to help us gauge the number of inspectors needing the appropriate certifications.

3/27/2013 2:22 PM
1/23/2013 4:25 PM

An updated TC 61-408 Pay Estimate form has been created and added to the forms page. 
There are several additional items added to the pay estimate form.  Information to populate these new items can be obtain from your KYTC project manager or from the Division of Professional Services.
An instructions document has also been created and added to the forms page.  The instructions contain detailed step by step instructions for submitting and approving a pay estimate.
TC 61-408 Pay Estimate Instructions 1-18-13
TC 61-408 Pay Estimate 1-18-13

2/4/2013 2:03 PM
5/8/2013 3:44 PM
2/27/2012 9:12 AM

NOTICE - Memo from Division of Highway Design- Creation of two (2) new prequalification categories and criteria for 1) Basic Traffic engineering Design and 2) Advanced Traffic Engineering Design and Modeling. - 1-26-12
Highway Design - New Prequalification Categories Memo 1-26-12.pdfHighway Design - New Prequalification Categories Memo 1-26-12.pdf
The TC 40-1 Prequalification Application
and the Prequalification Criteria and Instructions have been updated to reflect these changes.

1/27/2012 4:43 PM

NOTICE - Memo from Division of Traffic Operations - Modifications to prequalification criteria for the Electrical Engineering Traffic signal Services and electrical engineering Roadway Lighting Services prequalification categories. - 11-18-11
Memorandum Traffic 11-18-11.pdfMemorandum Traffic 11-18-11.pdf

11/22/2011 1:48 PM

​​UPDATED - General Provisions - These general provisions have been updated to include Finance and Administration Cabinet requirements for access to records clause and will apply to all new professional service contacts fully executed on or after 9-15-11.

Access to Records Clause 092011.pdfAccess to Records Clause 092011.pdf

SO 11-004 Vendor Document Disclosure.pdfSO 11-004 Vendor Document Disclosure.pdf

11/7/2011 10:18 AM
7/12/2011 11:43 AM
7/11/2011 3:01 PM
7/11/2011 3:01 PM

​NOTICE: Effective April 5, 2010, Governor Steve Beshear approved House Bill 387 which amends KRS 45A.695 to require that “no payment shall be made on any personal service contract unless the individual, firm, partnership, or corporation awarded the personal service contract submits its invoice for payment on a form established by the committee.”
At the August 10, 2010 Legislative Research Commission's Government Contract Review Committee (GCRC) meeting, the committee established a personal service contract invoice form. Information on House Bill 387 may be found at: http://www.lrc.ky.gov/record/10rs/HB387.htm and information on the GCRC form may be found at http://www.lrc.ky.gov/Statcomm/Contracts/homepage.htm
Please consider this web posting as your official notice to use this form for all future invoices referencing any personal service contract with KYTC. This form is in addition to the current TC 61-408 invoice form and any other documentation currently required or requested. This form must be signed by the consultant, scaned and included in the email chain with the partial payment request.
This form can be found at: http://transportation.ky.gov/​Professional-Services/Documents/PSC Invoice Form.dotx or http://transportation.ky.gov/Professional-Services/Documents//PSC INVOICE FORM.pdf
Any questions regarding the new invoice requirements shall be directed to the Division of Professional Services.

7/8/2011 4:14 PM
7/8/2011 4:17 PM

NOTICE - Memo from Division of Transportation Planning revising Consultant Prequalification Criteria for Bikeway Planning services. - 7-19-10 
Planning-Bike-Ped-Prequal-Policy-7-8-10.PDFPlanning-Bike-Ped-Prequal-Policy-7-8-10.PDF

7/11/2011 2:09 PM

​NOTICE - Memorandum to all Prequalified Consultants regarding mailing instructions.
REMINDER - Our mailing address is:
Division of Professional Services
200 Mero Street 3rd Floor
Frankfort KY 40622
(Please do not use Mail Codes)
Memorandum to All Prequalified Consultants regarding Mailing Instructions.pdfMemorandum to All Prequalified Consultants regarding Mailing Instructions.pdf

7/11/2011 2:12 PM
7/8/2011 4:30 PM
7/8/2011 4:32 PM
7/11/2011 2:07 PM
7/11/2011 2:09 PM

NOTICE - Memo from Division of Traffic Operations revising Consultant Prequalification Criteria for Electrical Engineering Signal Services & Electrical Engineering Roadway Lighting Services.  - 10-8-09
Traffic_REV_Consultant_Preq_EE_10-8-09.pdfTraffic_REV_Consultant_Preq_EE_10-8-09.pdf

7/11/2011 2:10 PM

NOTICE - Memo from Division of Traffic Operations revising Consultant Prequalification Criteria for Traffic Engineering. - 10-2-09
Traffic_REV_Consultant_Preq_10-2-09.pdfTraffic_REV_Consultant_Preq_10-2-09.pdf

7/11/2011 2:19 PM
7/11/2011 2:56 PM

NOTICE - Memo from Division of Traffic Operations regarding modification to requirements for traffic impact studies and mandatory training required for prequalifications in Traffic Engineering. - 7-2-09
NTP-Traffic-Prequal_7-2-09.PDFNTP-Traffic-Prequal_7-2-09.PDF

7/11/2011 2:16 PM
7/8/2011 2:25 PM
1 - 30Next
Contact Information Contact Info
Kentucky Transportation Cabinet
Division of Professional Services
200 Mero Street, 3rd Floor
Frankfort, KY 40622
Phone: (502) 564-4555
Fax: (502) 564-4422
Map it

Director, Michael Hill, PE
Current Events
Jun
21
Green/KY 61 2nd Selection Meeting
9:00 am to 10:00 am
Jun
25
Metcalfe-Green/US 68 2nd Selection Meeting
9:15 am to 9:45 am
Jun
25
Jefferson/Bridge Replacements 2nd Selection Meeting
9:45 am to 10:30 am
Jun
25
Statewide Aviation Planning & Engineering 2nd Selection Meeting
10:30 am to 11:15 am
Jun
25
Statewide Surveying Services 2nd Selection Meeting
11:15 am to 11:45 am
Jul
16
Owen KY 22 6-8702 1st Selection Meeting
8:30 am to 8:50 am
Jul
16
Henderson US 60 1st Selection Meeting
8:50 am to 9:10 am
Jul
16
Pike KY 1441, Knott CR 1008 1st Selection Meeting
9:10 am to 9:30 am
Jul
16
Pendleton KY 3185, Pendleton KY 330, Campbell KY 1996, Kenton KY 2045 1st Selection Meeting
9:30 am to 9:50 am
Jul
16
Statewide Value Engineering 1st Selection Meeting
9:50 am to 10:10 am