Consulting Party Projects
Request to Become a Consulting Party

Section 106 of the National Historic Preservation Act states that "Certain individuals and organizations with demonstrated interest in the undertaking may participate as consulting parties due to the nature of their legal or economic relation to the undertaking or affected properties, or their concern with the undertaking’s effects on historic properties." Section 106 consulting parties participate in the process of identifying historic properties that may be affected by the project, providing input regarding the effects that the project may have on these properties and assisting in the development of appropriate mitigative measures to resolve any adverse effects.

The list below contains KYTC highway projects currently in project development for which individuals or organizations may apply to participate as Consulting Parties.  They are listed by District item number, with District 1 being located in far western Kentucky and District 12 being located in far eastern Kentucky.  The projects can also be filtered by county.  A brief project description is provided.  Further project information may be available by contacting the Project Development Branch Manager in the appropriate District office.

If you wish to request Consulting Party status on multiple projects, the requests must be made separately for each project.  Should you prefer to apply by mail, please send a written request, identifying the project in which you have an interest, and including complete contact information and a statement explaining your legitimate interest in the project to: KYTC Division of Environmental Analysis, 200 Mero Street, Frankfort, Kentucky 40622

Click on the Item Number link to the left of the project description to apply to become a consulting party for that project.​

Click on the Project Name link to apply to become a consulting party.

Filter By County  

Project NumberRouteProject DescriptionCounty
01-0002 I 24I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH (B100); JOINT PROJECT WITH ILLINOIS TO MITIGATE SCOUR (073B00100N)MCCRACKEN
01-0121 KY 1327MURRAY FIVE-POINTS INTERSECTION ROUNDABOUT. (12CCR)CALLOWAY
01-1142 US 60REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70 (SR 32.7) 070B00017N.LIVINGSTON
01-1145 KY 866REPLACE BRIDGE ON KY 866 OVER FORK OF GUM CREEK 0.02 MILE N OF KY 1664(SR 28.1)070B00050NLIVINGSTON
01-1148 CR 1011REPLACE BRIDGE ON HOLLAND LN (CR 1011) OVER BRANCH OF HARRIS FORK CREEK 0.26 MILE E OF KENTUCKY AVE (KY 307)(SR 31.9)038C00001N(12CCR)FULTON
01-1149 CR 1411REPLACE BRIDGE ON CARLTON RD (CR 1411) OVER W FORK ROCKHOUSE CREEK 0.1 MILE W OF COLLINS RD (CR 1505)(SR 37.3)018C00110NCALLOWAY
01-8502 MultipleCITY OF MURRAY BUSINESS LOOP FROM GLENDALE TO INDUSTRIAL ROAD. (SEE 1-120 FOR D, R, & U FUNDING)(08CCN)(10CCR)CALLOWAY
02-0100.07 EB 9004CHRISTIAN COUNTY, E.T. BREATHITT (PENNYRILE) PARKWAY EXTENSION. (07KYD)(2006BOPC)CHRISTIAN
02-0137.04 US 41AU.S. 41A PHASE II DESIGN AND RIGHT-OF-WAY. (2005HPP-KY135)(SEE 2-137.01 FOR "STP" COMPONENT).HOPKINS
02-0160 US 431IMPROVE RAILROAD CROSSING AT MP 15.674 BETWEEN CENTRAL CITY AND DRAKESBORO. (04CCR)MUHLENBERG
02-0161 KY 1034STUDY POSSIBILITIES FOR IMPROVING RAILROAD CROSSING ON KY-1034 AT US-41A, MP 11.336.HOPKINS
02-0203 KY 107INTERSECTION IMPROVEMENT AT KY-107 AND KOFFMAN DRIVE JUST SOUTH OF COUNTRY CLUB LANE IN HOPKINSVILLE. (2006BOPC)CHRISTIAN
02-0711 US 41US 41/KY 812 INTERSECTION UPGRADE: ADD RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASING. KYTC PROJECT WITH KYTC PROVIDING 20% MATCH.(TOLL CREDITS)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)HENDERSON
02-0712 CS 1142N GREEN RIVER RD UPGRADE-(OSAGE DR TO WOODSPOINT DR).PROJECT WILL INCLUDE UPGRADING EXISTING PAVEMENT TO 28 FT WIDE PAVEMENT W/ CURB & GUTTER & SIDEWALK. LPA PROJECT. CITY TO PROVIDE MATCH.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)HENDERSON
02-0713 CS 1453WATHEN BRIDGE REPLACEMENT: REPLACE EXISTING BRIDGE WITH 6FT PRECAST CONCRETE BOX CULVERT, PAVEMENT AND GUARDRAIL. LPA PROJECT. CITY TO PROVIDE MATCH.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)HENDERSON
02-0714 KY 2183KY 2183 / KY 1539 INTERSECTION AND UPGRADE: PROJECT WILL RECONSTRUCT THE INTERSECTION AND MAKE IMPROVEMENTS TO THE SOUTHBOUND APPROACH. (2012BOP)HENDERSON
02-0715 US 41US 41/ WOLF HILLS ROAD INTERSECTION UPGRADE: PROJECT WILL ADD DEDICATED RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASING TO BE MODIFIED OR ADDED TO EACH LEG OF THE INTERSECTION. (2012BOP)HENDERSON
02-0902 MultipleSAFETY CORRIDORSHENDERSON
02-1072 KY 260REPLACE BRIDGE ON KY-260 (MP 2.14) OVER OTTER CREEK; .20 MI EAST OF PENNYRILE PARKWAY; (FUNCTIONALLY OBSOLETE, SR=49.9) 054B00022NHOPKINS
02-1077 CR 1194REPLACE BRIDGE ON CR-1194 (MP 0.079) OVER THREELICK CREEK; .15 MI W JCT CR 5172; (STRUCTURALLY DEFICIENT, SR=2) 092C00128NOHIO
02-1078 US 431REPLACE OVERFLOW STRUCTURE ON US-431 AT THE MUHLENBERG-MCLEAN CO LINE (SR 39) B00056N.MCLEAN
02-1080 US 60REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078 (SR 39)051B00015N.(12CCR)HENDERSON
02-1083 US 62REPLACE BRIDGE ON US 62 OVER BRANCH OF THREE LICK FORK 0.23 MILE E OF GREEN MEADOWS DR (CS 6068)(SR 49.2)092B00032OHIO
02-1086 CR 1009REPLACE BRIDGE ON COUNTRYSIDE DR (CR 1009) OVER BRANCH OF KNOBLICK CREEK 0.07 MILE S OF COTTINGHAM PRATT RD (CR 1010)(SR 34) 117C00004NWEBSTER
02-8501 US 62US-62; THREE LANES FROM BOARD OF EDUCATION TO CITY PARK IN DAWSON SPRINGS. (08CCN)(10CCR)(12CCR)HOPKINS
02-8504 US 60RELOCATE US-60 BYPASS EAST OF OWENSBORO (EAST COUNTY CORRIDOR) PRIORITY SECTION: FROM REID ROAD EAST TO EXISTING US 60 EAST OF OWENSBORO. (98KYD) (2005HPP-KY158) (SEE 2-287.5 AND 2-287.51 FOR "FS" COMPONENTS)(08CCN)DAVIESS
03-0202 WN 9007RECONSTRUCT THE EXISTING NATCHER PARKWAY/US 231 INTERCHANGE ON WEST SIDE OF BOWLING GREEN. (12CCR)WARREN
03-1076 KY 403REPLACE BRIDGE ON KY 403 OVER UNNAMED STREAM SE OF COOL SPRINGS ROAD (CR 1142)(SR 4.1) 016B00067NBUTLER
03-8706 US 68SCOPING STUDY AND DESIGN ON US-68 FROM THE CUMBERLAND PARKWAY TO THE GREEN/METCALFE COUNTY LINE.(12CCN)METCALFE
03-8707 WN 9007CONSTRUCT A NEW INTERCHANGE ON THE NATCHER PARKWAY AT ELROD ROAD IN BOWLING GREEN (MP 3.4 TO MP 4.0).(12CCN)WARREN
04-0199 US 31WREPLACE BRIDGE OVER P&L AND CSX RAILROADS (MP 36.4 TO 36.8 IN WEST POINT) (047B00007N).HARDIN
04-1077 US 62REPLACE BRIDGE ON US 62 OVER UNNAMED STREAM 0.65 MILE SW OF KY 1375 (S LONG GROVE RD)(SR 48.5) 047B00052NHARDIN
04-1078 US 62REPLACE BRIDGE ON US 62 OVER HINKLE CREEK 0.012 MILE E OF KY 55(SR 34.6) 090B00096N (12CCR)NELSON
04-8502 US 62WIDEN PORTIONS OF US-62 FROM LEITCHFIELD TO CLARKSON. (08CCN)(10CCR)GRAYSON
05-0063 I 64I-64 BRIDGE (SHERMAN MINTON) OVER OHIO RIVER @ LOUISVILLE (B279); JOINT PROJECT WITH INDIANA TO PERFORM IN-DEPTH INSPECTION. (056B00279N)JEFFERSON
05-0064 I 64I-64 BRIDGE (SHERMAN MINTON) OVER THE OHIO RIVER @ LOUISVILLE (B279); JOINT PROJECT WITH INDIANA TO PAINT THIS BRIDGE.JEFFERSON
05-0159 I 64WIDEN I-64 WESTBOUND RAMP TO I-264 WESTBOUND FROM ONE TO TWO LANES FOR ENTIRE LENGTH AND OTHER NEEDED IMPROVEMENTS TO ADDRESS WEAVE ISSUES AT MERGE ON I-264. (2006BOPP)(12CCR)JEFFERSON
05-0205 I 65RECONSTRUCT SECOND CURVE ONLY ON I-65 SOUTHBOUND RAMP AT KY-1065 (OUTER LOOP).(SEE 5-205.01 FOR BREAKOUT IMPROVEMENTS)JEFFERSON
05-0417 US 60FRANKFORT AVENUE; REALIGN INTERSECTION WITH STILZ AND HILLCREST. (TO BE LET BY LOU METRO). (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).JEFFERSON
05-0440.1 KY 1793CONSTRUCT SIDEWALKS ON KY 1793 FROM RIDGEVIEW DRIVE TO SETTLERS POINT TRAIL, AND A SIDEWALK CONNECTION FROM TIMOTHY WAY TO PEGGY BAKER PARK.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)OLDHAM
05-0458 CS 1002HBLUEGRASS INDUSTRIAL PARK TRAIL- DESIGN, RIGHT-OF-WAY, UTILITY, & CONSTRUCTION PHASES FOR A BIKE/PED TRAIL ALONG BLUEGRASS PKWY, TUCKER STATION RD, AND PLANTSIDE DR WITHIN THE BLUEGRASS INDUSTRIAL PARK IN JEFFERSONTOWN. (2006BOPC)JEFFERSON
05-0470 MultipleCONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAY TRAFFIC (MAIN,JEFFERSON,LIBERTY,MUHAMMAD ALI,CHESTNUT,3RD,8TH,7TH,SHELBY,CAMPBELL STREETS.)JEFFERSON
05-0473 US 60SHELBYVILLE ROAD OLD US 60 BRIDGE STUDY. (ALL WORK BY LOUISVILLE METRO AND LOUISVILLE METRO WILL PROVIDE REQUIRED 20% MATCHING FUNDS. ) (FY 2011 TCSP) (11KY006)(BOPP)JEFFERSON
05-0475 I 64IMPROVE LEVEL OF SERVICE AND SAFETY ON I-64 FROM KY 53 IN SHELBYVILLE TO KY 1790 UNDERPASS.(12CCR)SHELBY
05-0479 CR 1005BWIDEN HUBBARDS LANE FROM US 60 (SHELBYVILLE ROAD) TO KY 1447 (WESTPORT ROAD) AND ADD BIKE LANES FROM KRESGE WAY TO KY 1447 (WESTPORT ROAD) IN LOUISVILLE. (BOPC2010)JEFFERSON
05-0481 KY 864KY 864 - WIDEN BEULAH CHURCH ROAD FROM 2 TO 3 LANES FROM I-265 TO CEDAR CREEK ROAD.(2010BOP)JEFFERSON
05-0512 CS 1001BEXTENSION OF RIVER ROAD, LOUISVILLE. (2006KYD)JEFFERSON
05-0804 I 264RECONSTRUCT I-264 (WATTERSON EXPRESSWAY)/US-42 INTERCHANGE AS A SPUIJEFFERSON
05-0594 I 264RECONSTRUCT/WIDEN WATTERSON EXPRESSWAY FROM WESTPORT ROAD (KY 1447) TO I-71.(12CCR)JEFFERSON
05-0905 US 421ADDRESS SAFETY ISSUES AND ACCESS AT THE INTERSECTION OF US-421/KY-1226 AT MP 11.5. (12CCR)TRIMBLE
05-0908 MultipleREPLACE GUARDRAIL END TREATMENTS IN JEFFERSON COUNTY: KY 1703 (MP 2.38), KY 1934 (MP 5.002),US 31W (MP 1.750, 0.346, 0.265, 2.927, 2.274, 1.901, 1.315).(2011BOP)JEFFERSON
05-1012.12 MultipleLOUISVILLE INCIDENT MANAGEMENT PROGRAM (TRIMARC) CONSTRUCTION. (KYTC SHARE)JEFFERSON
05-1056 KY 61REPLACE BRIDGE ON KY-61 (MP 7.609) OVER BARLEY CREEK; .10 MI NORTH OF JCT KY 251; (STRUCTURALLY DEFICIENT, SR=49) 015B00013NBULLITT
05-1062 MultipleOLMSTED PARKS HISTORIC BRIDGES: REHABILITATE 11 BRIDGES THROUGH OLMSTED PARK: (056C00032N, 056C00031N, 056C00026N, 056C00027N, 056C00028N, 056C00030N, 056C00029N, 056C00034N, 056C00033N, 056C00139N, 056C00138N)JEFFERSON
05-1064 US 60AREPLACE BRIDGE ON EASTERN PARKWAY (US 60A) OVER SOUTH FORK BEARGRASS CREEK 0.2 MILE NE OF POPLAR LEVEL RD (KY 864)(SR 43.6) 056B00139NJEFFERSON
05-1065 US 460REPLACE BRIDGE ON US 460 OVER SOUTH ELKHORN CREEK AT INTERSECTION OF US 460 AND N SCRUGGS LN(CR 1010)(SR 41.3) 037B00006N (PART-WIDTH CONSTRUCTION ON EXISTING LOCATION)FRANKLIN
05-1066 KY 55REPLACE BRIDGE ON KY 55 OVER DAUGHERTY CREEK 0.17 MILE N OF JONES RD (CR 1331)(SR 46.8) 052B00003NHENRY
05-1067 US 150REPLACE BRIDGE ON E BROADWAY (US 150) OVER SOUTH FORK BEARGRASS CREEK AT INTERSECTION WITH BRENT STREET (CS 1312G)(SR 38) 056B00348NJEFFERSON
05-1068 CR 1004NREPLACE BRIDGE ON FAIRMOUNT RD (CR 1004N) OVER CEDAR CREEK 0.2 MILE W OF FARMERS WAY (PR 1021N)(SR 16.8) 056C00054NJEFFERSON
05-1070 CS 1017GREPLACE BRIDGE ON E KENTUCKY ST (CS 1017G) OVER SOUTH FORK BEARGRASS CREEK 0.01 MILE E OF SCHILLER AVE (CS 1138G)(SR 48.8) 056C00083NJEFFERSON
05-2000.76 I 264SHAWNEE EXPRESSWAY LANDSCAPING; I-264 AT DIXIE HIGHWAY. (2004BOPC)JEFFERSON
05-2000.77 I 264SHAWNEE EXPRESSWAY LANDSCAPING; I-264 FENCING PROJECT. (2002BOPC)(10CCR)JEFFERSON
05-8412 MultipleCONSTRUCT A RAILROAD SAFETY CROSSING, IMPROVE LIGHTING, ERECT SIGNALS, AND ROADWAY CROSSINGS BETWEEN CARDINAL AND HILL STREETS. (08CCN)(12CCR)JEFFERSON
06-0183 I 471STUDY AND REHABILITATE THE I-471 CORRIDOR, CAMPBELL COUNTY, KENTUCKY. (SEE ALSO 6-8104.00)(2005HPP-KY120)CAMPBELL
06-0400.03 MultipleNORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)BOONE
06-0412 US 42INTERSECTION IMPROVEMENT PROJECT AT US 42 AND RICE PIKE/HICKS PIKE. US 42 MP 8.4 TO 8.6. TOLL CREDITS. (2012BOP)BOONE
06-0907 KY 19INPROVEMENT TO THE INTERSECTION OF KY-19 AND KY-539 AT MILFORDBRACKEN
06-0910 KY 22INSTALL SIGNS, GUARDRAIL, FRICTION TREATMENT, SHOULDERS AND REMOVE TREES AND BRUSH ON KY-22 AT CLARKS CREEK BRIDGE AND BATON ROUGE ROAD INTERSECTION.(2010BOP)GRANT
06-1070 CS 2097WEST 15TH STREET; REPLACE BRIDGE AND APPROACHES OVER CSX RR IN COVINGTON (C29). (SR=3.9): (059C00029N)(12CCR)KENTON
06-1073 KY 159REPLACE BRIDGE ON KY-159 (MP 3.639) OVER KINCAID CREEK; .2 MI. SOUTH OF JCT.KY 609; (STRUCTURALLY DEFICIENT, SR=24.4) 096B00004NPENDLETON
06-1075 KY 1120EVALUATE BRIDGE ON KY-1120 (MP 0.621) OVER CSX RAILROAD; 11TH ST E OF RUSSELL ST; (STRUCTURALLY DEFICIENT, SR=3) 059B00083NKENTON
06-1077 KY 10REPLACE BRIDGE ON KY 10 OVER TWELVE MILE CREEK SE OF KY 1997 (SR 15.1) 019B00006NCAMPBELL
06-1081 KY 330REPLACE BRIDGE ON KY 330 OVER SHORT CREEK 0.35 MILE N OF J H GODMAN RD (CR 1238)(SR 47.3) 096B00012NPENDLETON
06-8507.1 US 62IMPROVE SAFETY AND CORRECT GEOMETRIC DEFICIENCIES ON US 62 FROM ORCHARD AVENUE TO KY 616.ROBERTSON
06-8714 CR 1138REPLACE BRIDGE ON SOUTH END OF BLANCHET ROAD 0.3 MILES NORTHEAST OF US 25.(SR 35.9)(041C00012)(12CCN)GRANT
06-8715 CR 1138REPLACE BRIDGE ON NORTH END OF BLANCHET ROAD 0.2 MILES SOUTHEAST OF THE JUNCTION WITH US 25.(SR 29.1)(041C00014)(12CCN)GRANT
06-8716 CR 1142REPLACE BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILE NORTH OF THE JUNCTION WITH US 25.(SR 24.6)(041C00016)(12CCN)GRANT
07-0113 KY 4NEW CIRCLE ROAD REHAB AND WIDENING FROM VERSAILLES ROAD TO NEAR GEORGETOWN ROAD. (12CCR)FAYETTE
07-0242 US 68REPLACE US 68 AND US 150 BRIDGE OVER CHAPLIN RIVER, PERRYVILLE. (2005HPP-KY134) (EARMARK DOES NOT COVER TOTAL CONSTRUCTION COST OF $600,000): (011B00042N)BOYLE
07-0362.01 KY 4NEW CIRCLE ROAD THRU CONGESTED AREA OF NE LEXINGTON BETWEEN RICHMOND RD & GEORGETOWN RDFAYETTE
07-0397 KY 29TURN LANES AT W. JESSAMINE HIGH SCHOOL AND E. JESSAMINE MIDDLE SCHOOL. (2008BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)JESSAMINE
07-0399 US 27XNICHOLASVILLE DOWNTOWN RENOVATION. (2008BOPC)JESSAMINE
07-0404 CS 4791SOUTHLAND DRIVE BIKE/PEDESTRIAN IMPROVEMENTS: CONSTRUCT ONE MILE OF BIKE LANES ALONG SOUTHLAND DRIVE FROM ROSEMONT GARDEN TO NICHOLASVILLE ROAD. CONSTRUCT SIDEWALKS UNDER RAILROAD BRIDGE THAT CROSSES SOUTHLAND DRIVE. (2010BOPC)FAYETTE
07-0412 US 27REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGE AND TYPICAL SECTION ON US 27 (NORTH BROADWAY)(12CCR)FAYETTE
07-0413 KY 922CONSTRUCT AN ADDITIONAL LANE ON KY 922 (NEWTOWN PIKE) FROM PINTAIL DR (MAIN ENTRANCE TO THE MARRIOTT GRIFFIN GATE) TO THE BEGINNING OF THE SOUTHBOUND I-75 ENTRANCE RAMP.(12CCR)FAYETTE
07-0414 KY 1980IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAY HAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RD) TO US 27 (NICHOLASVILLE RD)(12CCR)JESSAMINE
07-0915 US 68RECONSTRUCT INTERSECTION OF KY 29 NORTH OF WILMORE.JESSAMINE
07-0916 US 27ADDRESS SAFETY AND CONGESTION AT THE INTERSECTION OF US 27 AND KY 1939 IN PARISBOURBON
07-0917 US 27DEVELOP, IMPLEMENT, CONTROL AND STUDY USE OF "ADAPTIVE SIGNAL CONTROL" ON US27 IN LEXINGTON FROMM COOPER DRIVE TO SOUTH UPPER STREET.(2011BOP)FAYETTE
07-0918 US 127REPLACE GUARDRAIL END TREATMENTS ON VARIOUS ROUTES IN ANDERSON, BOURBON, BOYLE, CLARK, FAYETTE, JESSAMINE, MADISON, MERCER, MONTGOMERY, SCOTT, AND WOODFORD COUNTIES. (2010BOP)ANDERSON
07-0919 KY 1927CULVERT EXTENSIONS, PLACE EMBANKMENT AND INSTALL ALUMINUM BOX CULVERT REPLACEMENT AT JONES CREEK ON TODDS ROAD EAST OF CLEVELAND ROAD (KY 1973).(2010BOP)FAYETTE
07-0922 MultipleREPLACE TURNDOWN GUARDRAIL END TREATMENTS ON VARIOUS ROUTES IN DISTRICT 7. (2012BOP)VARIOUS
07-1120 KY 1972REPLACE BRIDGE ON KY-1972 (MP 0.663) OVER BR OF TURKEY CREEK; .50 MI EAST OF JCT KY 39; (STRUCTURALLY DEFICIENT, SR=19.4) 040B00023NGARRARD
07-1121 KY 974REPLACE BRIDGE ON KY-974 (MP 10.924) OVER DRY FORK; .05 MI E-CR 1124 @ALLNSVL; (STRUCTURALLY DEFICIENT, SR=23.1) 025B00090NCLARK
07-1122 KY 563REPLACE BRIDGE ON KY-563 (MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39; (STRUCTURALLY DEFICIENT, SR=21.7) 040B00034NGARRARD
07-1124 CR 1308REPLACE BRIDGE ON CR-1308 (MP 3.588) OVER TOWNSEND CREEK; .9 MI E OF JCT KY 353; (STRUCTURALLY DEFICIENT, SR=33.2) 009C00043NBOURBON
07-1125 CR 1008REPLACE BRIDGE ON CR-1008 (MP 4.284) OVER STEPSTONE CREEK; .2MI S-STEPSTONE @BATH CL; (STRUCTURALLY DEFICIENT, SR=32.9) 087C00006NMONTGOMERY
07-1127 KY 1689REPLACE BRIDGE ON KY 1689 OVER LECOMPTES RUN 0.46 MILE W OF KY 227(SR 37.5) 105B00038NSCOTT
07-1129 US 421REPLACE BRIDGE ON US 421 OVER FORK OF TOWN BRANCH AT INTERSECTION OF US 421 AND BRACKTOWN RD (CS 4008)(SR 27.8) 034B00018NFAYETTE
07-1130 US 421REPLACE BRIDGE ON BATTLEFIELD MEMORIAL HWY (US 421) OVER COWBELL CREEK AT JCT WITH HIGHWAY 21 E (KY 21)(SR 45.5) 076B00021MADISON
07-1131 CR 1158REPLACE BRIDGE ON OLD HAYS FORK LN (CR 1158) OVER BRANCH OF HAYS FORK 0.2 MILE SE OF BATTLEFIELD MEMORIAL HWY (US 421)(SR 16.9) 076C00023NMADISON
07-1132 CS 3605REPLACE BRIDGE ON MALABU DRIVE (CS 3605) OVER BRANCH HICKMAN CREEK AT JCT WITH TATES CREEK ROAD (KY 1974)(SR 40) 034C00038NFAYETTE
07-8503 KY 21IMPROVE PROSPECT STREET PEDESTRIAN ACCESS BEREA. (2005HPP-KY128) (MOA WITH BEREA) (SUPPLEMENTAL FUNDING FOR 07-239) (08CCN)MADISON
07-8506.01 I 64I-64/MOUNTAIN PARKWAY INTERCHANGE.(12CCR)CLARK
08-0164 US 127RECONSTRUCT CURVE ON US-127 AT DUNNVILLE. (02CCR)(04CCR) (10CCR)(12CCR)CASEY
08-0167 US 27CONTINUE ONGOING IMPROVEMENTS TO US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE LEVEL OF SERVICE AND SAFETY ON US-27 FROM KY-1247 TO EDUCATION WAY.LINCOLN
08-1050 CR 1136REPLACE BRIDGE ON CR-1136 (MP 0.225) OVER LITTLE SOUTH FORK RIVER; 0.25 MI SE OF JCT CR-5137; (STRUCTURALLY DEFICIENT, SR=16.6) 116C00007NWAYNE
08-1055 KY 1247REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH CREEK 0.044 S OF KY 78(SR 45.4) 069B00055NLINCOLN
08-8600 KY 90RELOCATE US 127 FROM KY 90 TO EXISTING US-127 NORTH OF KY-90 APPROX. 0.18 MILES EAST OF THE INTERSECTION OF AARON RIDGE ROAD. (10CCN)(12CCR)CLINTON
09-1078 CS 1023"DEMOLISH" BRIDGE ON CS-1023 (MP 0.121) OVER TOWN BRANCH; 100' S. JCT KY 2541; (STRUCTURALLY DEFICIENT, SR=16.5) 045C00051NGREENUP
09-1084 KY 32REPLACE BRIDGE ON KY 32 OVER MUD LICK CREEK 0.2 MILES W OF CRAINTOWN RD (CR 1302)(SR 48.9) 035B00038NFLEMING
10-0168 KY 9009WIDEN THE MOUNTAIN PARKWAY TO 4 LANES FROM KY 191 OVERPASS BRIDGE (MP 46.2) TO KY 205 INTERCHANGE (MP 57.2). (SEE 2012 HIGHWAY PLAN ITEM NO 10-126.03 FOR PE & ENVIR FUNDING)(2012BOP)WOLFE
11-0185 US 25EMAJOR WIDENING - ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENT ON US 25E FROM KNOX/LAUREL COUNTY LINE TO KY 770 (12CCR)LAUREL
11-0186 US 25WMAJOR WIDENING, ADDRESSES CONGESTION, FREIGHT MOVEMENT, AND ACCESS ALONG 25W FROM KY 727 TO KY 3041. (12CCR)WHITLEY
11-0188 US 25EMAJOR WIDENING - ADDRESS SAFETY AND CAPACITY ON US 25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE. IMPROVE SAFETY ALONG CORRIDOR BY PROVIDING IMPROVED ACCESS MANAGEMENT.(12CCR)KNOX
11-1064 CR 1125REPLACE BRIDGE AND APPROACHES ON CR-1125 OVER CLOVER FORK OF CUMBERLAND RIVER (C30). (SR=2.0)(PROJECT FUNDING CONTINGENT UPON BRIDGE POSTING COMPLIANCE): (048C00030N)HARLAN
11-1067 CR 1214REPLACE BRIDGE AND APPROACHES ON CR-1214 OVER BEECH FORK (C24). (SR=6.0)(PROJECT FUNDING CONTINGENT UPON BRIDGE POSTING COMPLIANCE): (066C00024N)LESLIE
11-1068 CR 1241REPLACE BRIDGE AND APPROACHES ON CR-1241 OVER BEECH FORK (C25). (SR=3.0)(PROJECT FUNDING CONTINGENT UPON BRIDGE POSTING COMPLIANCE): (066C00025N)LESLIE
11-1078 US 421REPLACE BRIDGE AND APPROACHES ON US-421 OVER STINNET CREEK (B08) 0.028 MILE SOUTH OF KY-406 NEAR STINNETT.(SR=26.0) (10CCR)LESLIE
11-1079 KY 2011REPLACE BRIDGE ON KY-2011 (MP 8.498) OVER RED BIRD CREEK; .55 MI SOUTH OF JCT KY 66; (SR=3.5) 007B00074NBELL
11-1080 KY 578REPLACE BRIDGE ON KY-578 (MP 5.154) OVER RACCOON CREEK; .10 MI W OF W-JCT KY 638; (STRUCTURALLY DEFICIENT, SR=24.9) 063B00069NLAUREL
11-1081 KY 92REPLACE BRIDGE OVER JELLICO CREEK; .80 MILE EAST OF KY 1898 (118B00022N).WHITLEY
11-1084 CR 1067REPLACE BRIDGE ON CR-1067 (MP 0.237) OVER COLLINS FORK; .2 MI SE-KY 11 @GREEN RD.; (STRUCTURALLY DEFICIENT, SR=18.1) 061C00023NKNOX
11-1086 I 75REPLACE NORTHBOUND BRIDGE ON I-75 OVER LAUREL RIVER 1.8 MILES N OF US 25E EXIT (SR 43.2) 063B00043RLAUREL
11-1087 KY 72REPLACE BRIDGE ON KY 72 OVER CATRON CREEK AT INTERSECTION OF KY 72 AND SMITH LANE (CR 1226L)(SR 30) 048B00030NHARLAN
11-1088 US 421REPLACE BRIDGE ON US 421 OVER ISLAND CREEK AT INTERSECTION OF US 421 & BOWLING BRANCH RD (CR 1346)(SR 27.8) 026B00001NCLAY
11-1089 KY 80REPLACE BRIDGE ON KY 80 OVER CUTSHIN CREEK AT INTERSECTION WITH BUSY HOLLOW DR (CR 1063)(SR 30) 066B00002NLESLIE
11-1090 US 421REPLACE BRIDGE ON US 421 OVER PIGEON ROOST CREEK AT INTERSECTION WITH WATER STREET E(CS 1006)(SR 43.9) 055B00157NJACKSON
11-1091 CR 1004REPLACE BRIDGE ON BEECH CREEK RD (CR 1004) OVER GOOSE CREEK AT INTERSECTION WITH CHANDLER BRANCH RD (CR 1003)(SR 30.8) C00001NCLAY
11-1092 CR 1154REPLACE BRIDGE ON MILL CREEK ROAD (CR 1154) OVER GOOSE CREEK AT JCT WITH KY 1524 (SR 47) 026C00025NCLAY
11-1093 CR 1184REPLACE BRIDGE ON DAVIS OXENDINE RD (CR 1184) OVER HANCES CREEK AT JCT WITH KY 1344(SR 12.9) 007C00061NBELL
11-1094 CR 1862REPLACE BRIDGE ON DOG BRANCH MAIL RD (CR 1862) OVER SINKING CREEK 0.56 MILE NW OF SINKING CREEK RD (FD 781)(SR 13.8) 063C00025NLAUREL
11-2802 I 75MEDIAN BARRIER CABLE INSTALLATION ON I-75 IN WHITLEY COUNTY FROM MP0.0 TO MP 6.0WHITLEY
11-8515 US 25DESIGN A NEW ROUTE FROM KY-1006 TO KY-25 TO PROVIDE A CONNECTOR BETWEEN CORBIN AND LONDON. (08CCN)LAUREL
11-8702 US 119WIDEN US 119 FROM MP 13.0 TO MP 15.88 ALONG EXISTING CORRIDOR. (12CCN)BELL
11-8703 US 119RECONSTRUCT US 119 FROM MP 10.7 TO MP 13.9 ALONG NEW CORRIDOR.(12CCN)HARLAN
11-8705 KY 223REPLACE STINKING CREEK ROAD BROWNS BRANCH BRIDGE.(12CCN)KNOX
11-8714 CR 1168LINSTALL RAILROAD CROSSING GATES AT THE SCHOOL STREET CROSSING IN ARTEMUS.(12CCN)KNOX
12-0191 US 23MITIGATE SAFETY HAZARDS DUE TO SPEED, POOR ACCESS CONTROL BETWEEN KY 80 AND INTERSECTION WITH KY 3384.(12CCR)FLOYD
12-1111 KY 1100REPLACE BRIDGE ON KY 1100 OVER LITTLE PAINT CREEK NEAR FLOYD/JOHNSON COUNTY LINE (SR 47.1) 036B00002NFLOYD
12-1112 KY 40REPLACE BRIDGE ON KY 40 OVER BUCK CREEK AT THE KY 2031 INTERSECTION (SR 49.8) 080B00002N.MARTIN
12-1113 KY 2034CREPLACE BRIDGE ON KY 2034C OVER N FORK KY RIVER 0.02 E OF US 119(SR 42.7) 067B00121NLETCHER
12-1114 KY 40REPLACE BRIDGE ON KY 40 OVER BRANCH OF LITTLE PAINT CREEK 0.38 MILE NE OF JOHNSON/MAGOFFIN COUNTY LINE (SR 12.5) 058B00012NJOHNSON
12-1116 CR 1008REPLACE BRIDGE ON ROCKLICK BRANCH (CR 1008) OVER RIGHT FORK BEAVER CREEK AT JCT WITH SOUTH HIGHWAY 7 (KY 7)(SR 43.9) 060C00006NKNOTT
12-1118 CR 1202REPLACE BRIDGE ON MATTIE RD (CR 1202) OVER RIGHT FORK OF LITTLE BLAIN 0.38 MILE W OF ASH BRANCH RD (CR 1161)(SR 47) 064C00011NLAWRENCE
05-8703 US 31ERESURFACE, STREETSCAPE, PEDESTRIAN BUMP-OUTS AND OTHER TRAFFIC IMPROVEMENTS ON EAST MARKET STREET FROM BAXTER TO BROOK STREET, BETWEEN NUCLEUS UL URBAN RESEARCH PARK AND HOME OF THE INNOCENTS.(12CCN)(LET BY CITY) JEFFERSON
06-0411 KY 36ROADWAY IMPROVEMENTS TO KY-36 FROM I-75 AT WILLIAMSTOWN TO APPROXIMATELY 1 MILE WEST OF HEEKIN CLARKS ROAD.(12CCR)GRANT
01-0025 I 69RECONSTRUCT AND IMPROVE I-69 AT THE KENTUCKY/TENNESSEE STATE LINE TO US-51 INTERCHANGE AT FULTON. (2012BOP)FULTON
01-0026 I 69RECONSTRUCT AND IMPROVE I-69 AT THE KENTUCKY/TENNESSEE STATE LINE TO US-51 INTERCHANGE AT FULTON. (2012BOP)FULTON, GRAVES, & HICKMAN
07-0918 US 127REPLACE GUARDRAIL END TREATMENTS ON VARIOUS ROUTES IN ANDERSON, BOURBON, BOYLE, CLARK, FAYETTE, JESSAMINE, MADISON, MERCER, MONTGOMERY, SCOTT, AND WOODFORD COUNTIES. (2010BOP)ANDERSON
12-0003 KY 3215CONSTRUCT A NEW ROADWAY TO CONNECT BETWEEN KY 3215 TO KY 1185 AT YATESVILLE LAKELAWRENCE
07-0236 KY 595COMPREHENSIVE TRAFFIC STUDY FOR INTERSECTION OF MAIN STREET AND BEREA COLLEGE CAMPUS, BEREA. (2005HPP-KY112)(MOA WITH BEREA). MADISON
08-9001 KY 80INTERSECTION IMPROVEMENTS AND IMPROVE TURNING RADIUS AT THE INTERSECTION OF KY 80 AND CR 1133 (FIRE TOWER RD). (2012BOP)PULASKI
10-0279.60 KY 30RECONSTRUCT KY 30 FROM KY 847 IN OWSLEY COUNTY TO US 421 IN JACKSON COUNTY.JACKSON, & OWSLEY
07-8705 US 460RECONSTRUCT US 460 FROM RUSSELL CAVE ROAD TO US 27 BYPASS IN PARIS; MP 1.394 TO MP 7.696.(BOURBON
03-8821 KY 1297MAJOR WIDENING FROM DONNELLY DRIVE TO US-31E (ROGER WELLS) IN GLASGOW AND WIDEN DONNELLY DRIVE. BARREN
07-8642 CR-1254REPLACE THE WEISENBURG MILL ROAD BRIDGE AT THE WOODFORD/SCOTT COUNTY LINE.SCOTT, & WOODFORD
5-478.70 US 31WTransforming Dixie Highway BRT ProjectJEFFERSON